CN206767423U - A kind of shear wall aluminum alloy mould plate fixes hanging apparatus - Google Patents
A kind of shear wall aluminum alloy mould plate fixes hanging apparatus Download PDFInfo
- Publication number
- CN206767423U CN206767423U CN201720039486.9U CN201720039486U CN206767423U CN 206767423 U CN206767423 U CN 206767423U CN 201720039486 U CN201720039486 U CN 201720039486U CN 206767423 U CN206767423 U CN 206767423U
- Authority
- CN
- China
- Prior art keywords
- back cord
- template
- wall
- screw rod
- fastener
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
Building field is the utility model is related to, specifically a kind of shear wall aluminum alloy mould plate fixes hanging apparatus, including:Inside wall formwork, outer wall template, screw rod, back cord and and boom hoisting, inner, external wall template is parallel to each other, accommodating chamber is defined between the two, screw rod through the space of inner, external wall template and back cord and the both ends of screw rod respectively by the first fastener for being located inside wall formwork side and the second fastener for being located at outer wall template side internally, outer wall template, back cord be fixed, and do not protruded relative to the lateral surface of back cord after being connected in the end of outer wall template side with the second fastener of screw rod.It is beneficial in that:The utility model reduces the prominent length of outer wall template by improving the fixed form of the inner, external wall template of shear wall, so as to increase the distance between two sides shear wall, reduces difficulty of construction;And by the back cord and boom hoisting of optimization, centring property is improved, improves efficiency of construction and the security performance of boom hoisting.
Description
Technical field
The present invention relates to building field, specifically a kind of shear wall aluminum alloy mould plate fixes hanging apparatus.
Background technology
In building field, according to relevant regulations, after wall span exceedes certain length, applying, man-hour requirement building is heavy
Drop seam is come to prevent building each several part because uneven settlement of foundation causes house to destroy.Between the wall of subsiding crack both sides
Away from typically only 200mm or so.
And the shear wall aluminum alloy mould plate of currently available technology and the mode that is connected of back cord are as shown in figure 1, be to pass through
The template of split bolt through inner, external wall is fixed, and split bolt passes from both sides, it is difficult to ensure that split bolt passes exterior wall
Distance after template is less than 200mm, also can be very when the wall of subsiding crack both sides is constructed simultaneously even if being less than 200mm
It is difficult.
When being constructed using aluminum alloy mould plate, often each template is lifted by crane one by one for the template assembly of high-storey
Installed to specified location, and if integral lifting can undoubtedly carry significantly to specified location after on ground, template system is installed
High efficiency of construction, system is kept not deform upon integrally during lifting during the key problem in technology of integral hoisting, it is firm in structure, and
And boom hoisting can be dismantled conveniently, and the boom hoisting of the template system of the prior art for after installation can not often be protected
Demonstrate,prove the requirement of this key technology.
The content of the invention
In order to solve above-mentioned technological deficiency, the invention provides following technical scheme:
The present invention is that a kind of shear wall aluminum alloy mould plate fixes hanging apparatus, including:Inside wall formwork, outer wall template and institute
Screw rod, the back cord being connected with the screw rod and the boom hoisting being connected with the back cord of inner, external wall template connection are stated, it is described
Inner, external wall template is parallel to each other, defines accommodating chamber between the two, and pouring into a mould concrete in the accommodating chamber during construction forms wall
Body, the back cord be two it is relative be arranged in parallel and between leave the square through-pipe structure of Two bors d's oeuveres in space, the screw rod passes through institute
The both ends of the space of inner, external wall template and the back cord and the screw rod are stated respectively by being located at the first of inside wall formwork side
The inner, external wall template, the back cord are fixed with the second fastener for being located at outer wall template side for fastener, and described
Do not protruded relative to the lateral surface of the back cord after being connected in the end of outer wall template side with second fastener of screw rod,
Namely described second fastener by being connected the fixation carried out to the back cord with the screw rod, wherein, it is described second fastening
The end face outside of part mutually maintains an equal level with the lateral surface of the back cord substantially.It can so ensure to reduce outer wall template as far as possible in construction
Relative thickness, be easy to construct.
A kind of its specific optimal technical scheme is that first fastener is nut, and second fastener is built-in
Formula nut, the built-in nut have nut body and the lid axially vertical with the nut body, the end of the screw rod
Stopped after nut body described in portion's precession by the lid.
When needing to carry out lifting operation to this template, it is necessary to boom hoisting be installed on the back cord, as the present invention
A kind of optimal technical scheme, the boom hoisting includes connection sheet, the first bolt and plays chain sling, and the connection sheet is in vertical side
Upwardly through the first bolt and the lifting chain link, the connection sheet includes inner sheet and outer plate, its be oppositely arranged will described in
Back cord is clamped between two panels, and the both ends of described inside and outside removably connect.
As a preferred technical solution of the present invention, middle part between the inner sheet and outer plate is to the space of the back cord
Sunken inside forms separation sleeve, and the separation sleeve both ends pass through the second bolt connection.
In the above-mentioned technical solutions, the back cord on the outside of the outer wall template except with the screw rod and second fastener
Connection, is also attached with connector and the 3rd fastener, and its specific connected mode is that the inner, external wall formwork structure is identical,
And its both sides has the template side rib vertical with its plate face, is distributed some mounting holes at equal intervals on the rib of the template side, each
The adjacent inside wall formwork or the outer wall template are spliced by the 3rd bolt through the mounting hole, on the rib of the template side
Connector removably is connected with, the connector is connected with the 3rd fastener and back cord.
As a preferred technical solution of the present invention, there are the connector installing plate, at least two can incite somebody to action
The installing plate is fixed on the 4th bolt on the rib of the template side, be fixed with the installing plate one it is vertical with plate face and to
The intubation that outside is stretched out;The back cord be both ends to connection and it is relative be arranged in parallel and between there is the square siphunculus of Two bors d's oeuveres in space
Structure;There is the platy structure of cylinder, the cylinder interior has screw thread, and it puts in the back of the body centered on 3rd fastener
It is connected in stupefied space by the 4th bolt with the intubation of the connector.
In the inventive solutions, generally there are multiple back cords on each wall form in construction, therefore is pacifying
Need that multiple boom hoistings are installed during dress, pass through the 5th bolt connection between the boom hoisting and boom hoisting.
By the modular unit of the template system of said structure, in a practical situation assembled suitable size as needed, interior,
Outer wall template is fixed by the multigroup screw rod, back cord and boom hoisting.
The present invention is compared with prior art, it is beneficial that:The present invention is by improving the inner, external wall template of shear wall
Fixed form reduces the prominent length of outer wall template, so as to increasing the distance between two sides shear wall, further reduces construction
Difficulty.By the back cord and boom hoisting of optimization, centring property is improved, effectively increases efficiency of construction, reduce the peace of back cord
ETL estimated time of loading and the security performance for improving boom hoisting.
Brief description of the drawings
Fig. 1 is the schematic cross-section of inner, external wall template in the prior art;
Fig. 2 is the schematic cross-section of the inner, external wall template of the present invention;
Fig. 3 is the axial section of the second fastener of the present invention;
Fig. 4 is the structural representation after template, back cord and the boom hoisting installation of the present invention;
Fig. 5 is Fig. 4 lateral view;
Fig. 6 is the enlarged drawing of the connection sheet part of boom hoisting in Fig. 5;
Fig. 7 is the structural representation after template, back cord and the connector installation of the present invention;
Fig. 8 is the lateral enlarged drawing in A portions in Fig. 7;
Fig. 9 is the structural representation of the connector of the present invention;
Figure 10 is the section view of the connector of the present invention;
Figure 11 is the structural representation of the 3rd fastener of the present invention;
The section view of the 3rd fastener of Figure 12 present invention.
Embodiment
Now further the implementation of the present invention is illustrated by accompanying drawing.
Illustrated in fig. 1 is the inside wall formwork 01, outer wall template 02 and screw rod 03 of shear wall common in the art
Section view, can clearly observe that its left and right is essentially symmetrical structure in figure, therefore cause the outside of outer wall template 02
Screw rod it is excessively prominent, and the distance of subsiding crack both sides wall 04 typically only has 200mm, is often brought inconvenience in construction.
In order to improve above-mentioned prior art deficiency and obtain further effect of optimization, Fig. 2 is illustrated that changing for the present invention
The section view of the inside wall formwork of shear wall after entering, outer wall template and screw rod, including:Inside wall formwork 1, outer wall template
2nd, the screw rod 3 that is connected with the inner, external wall template 1,2, the back cord 4 being connected with the screw rod 3 and it is connected with the back cord 4
Boom hoisting 5, the inner, external wall template 1,2 is parallel to each other, defines accommodating chamber between the two, is wall 10 in accommodating chamber, institute
State back cord 4 for two it is relative be arranged in parallel and between leave the square through-pipe structure of Two bors d's oeuveres in space, the screw rod 3 is through described
The space of inner, external wall template 1, the 2 and the back cord 4 and both ends of the screw rod 3 are respectively by being located at the side of inside wall formwork 1
First fastener 6 is carried out with the second fastener 7 for being located at the side of outer wall template 2 to the inner, external wall template 1,2, the back cord 4
It is fixed, and relative to the back cord 4 after being connected in the end of the side of outer wall template 2 with second fastener 7 of the screw rod 3
Lateral surface do not protrude.
In order to further illustrate the connected mode of the screw rod 3 and the inner, external wall template 1,2, as shown in figure 3, described
First fastener 6 is nut, and second fastener 7 is built-in nut, and the built-in nut has the He of nut body 71
The axially vertical lid 72 with the nut body 71, by described after nut body 71 described in the end precession of the screw rod 3
Lid 72 stops.
Further, as shown in Figs. 4-6, the boom hoisting 5 includes connection sheet, the first bolt 53 and plays chain sling 54, institute
State connection sheet in the vertical direction to be connected with described chain sling 54 by the first bolt 53, the connection sheet is including inner sheet 51 and outside
Piece 52, between the back cord 4 is clamped in two panels with being oppositely arranged by it, the both ends of described inside and outside 51,52 removably connect
Connect.Middle part between the inner sheet 51 and outer plate 52 forms separation sleeve 55, the separation sleeve to the space sunken inside of the back cord 4
55 both ends are connected by the second bolt 56.
Shown by Fig. 7 and 8 is that two adjacent outer wall templates 2 are installed the structural representation of back cord 4 and cut after assembly
Face view, the inner, external wall template 1,2 structures are identical, and its both sides has the template side rib 21 vertical with its plate face, the mould
Some mounting holes 22 are distributed on edges of boards rib 21 at equal intervals, each adjacent inside wall formwork 1 or the outer wall template 2 pass through
3rd bolt 23 splices through the mounting hole 22, and connector 8, the connection are removably connected with template side rib 21
Part 8 is connected with the 3rd fastener 9 and back cord 4.What Fig. 9 and Figure 10 was showed is the connector 8, and it has an installing plate
81st, two the 4th bolts 82 that the installing plate can be fixed on the rib of the template side, it is fixed with the installing plate 81
One intubation 83 that is vertical with plate face and stretching out laterally;As is illustrated by figs. 11 and 12, the 3rd fastener 9 protrudes for middle part
The projection 91 being engaged with the gap of the back cord is formed, the center of projection 91 has the platy structure of circular hole 92, the circle
The inside of hole 91 has screw thread, and it is put in the space of the back cord 4 by the intubation of the 5th bolt 92 and the connector 8
83 connections.
The inner, external wall template 1,2 is fixed by the multigroup screw rod 3, back cord 4 and boom hoisting 5, and described
Connected between boom hoisting 5 and boom hoisting 5 by the 6th bolt 57.
Above-mentioned embodiment is only the specific case of the present invention, and scope of patent protection of the invention includes but is not limited to
The product form and style of above-mentioned embodiment, any claims of the present invention and any art of meeting
The appropriate change or modification that those of ordinary skill is done to it, it should all fall into the scope of patent protection of the present invention.
Claims (8)
1. a kind of shear wall aluminum alloy mould plate fixes hanging apparatus, including:Inside wall formwork, outer wall template and the inner, external wall mould
Screw rod, the back cord being connected with the screw rod and the boom hoisting being connected with the back cord of plate connection, the inner, external wall template
It is parallel to each other, define accommodating chamber between the two, it is characterised in that the back cord be two it is relative be arranged in parallel and between leave
The square through-pipe structure of Two bors d's oeuveres in space, the screw rod pass through space and the spiral shell of the inner, external wall template and the back cord
The both ends of bar pass through the first fastener for being located inside wall formwork side and the second fastener pair for being located at outer wall template side respectively
The inner, external wall template, the back cord are fixed, and the screw rod is tight in the end of outer wall template side and described second
Do not protruded relative to the lateral surface of the back cord after firmware connection.
2. a kind of shear wall aluminum alloy mould plate according to claim 1 fixes hanging apparatus, it is characterised in that described first
Fastener is nut, and second fastener is built-in nut, the built-in nut have nut body and with the spiral shell
The axially vertical lid of maternal body, stopped by the lid after nut body described in the end precession of the screw rod.
3. a kind of shear wall aluminum alloy mould plate according to claim 1 fixes hanging apparatus, it is characterised in that the lifting
Device includes connection sheet, the first bolt and plays chain sling, and the connection sheet in the vertical direction passes through the first bolt and the lifting
Chain link, the connection sheet include inner sheet and outer plate, between the back cord is clamped in two panels with being oppositely arranged by it, it is described in,
The both ends of outer plate removably connect.
4. a kind of shear wall aluminum alloy mould plate according to claim 3 fixes hanging apparatus, it is characterised in that the inner sheet
Middle part between outer plate forms separation sleeve to the space sunken inside of the back cord, and the separation sleeve both ends are connected by the second bolt
Connect.
5. a kind of shear wall aluminum alloy mould plate according to claim 1 fixes hanging apparatus, it is characterised in that in described,
Outer wall template structure is identical, and its both sides has the template side rib vertical with its plate face, divides at equal intervals on the rib of the template side
Some mounting holes of cloth, each adjacent inside wall formwork or the outer wall template are spelled by the 3rd bolt through the mounting hole
Connect, connector is removably connected with the rib of the template side, the connector is connected with the 3rd fastener and back cord.
6. a kind of shear wall aluminum alloy mould plate according to claim 5 fixes hanging apparatus, it is characterised in that the connection
The installing plate can be fixed on the 4th bolt on the rib of the template side with an installing plate, at least two by part, described
An intubation that is vertical with plate face and stretching out laterally is fixed with installing plate;With cylinder centered on 3rd fastener
Platy structure, the cylinder interior have screw thread, and it is put in the space of the back cord by the 4th bolt and the connector
The intubation connection.
7. a kind of shear wall aluminum alloy mould plate according to claim 5 or 6 fixes hanging apparatus, it is characterised in that described
Pass through the 5th bolt connection between boom hoisting and boom hoisting.
8. a kind of shear wall aluminum alloy mould plate according to claim 7 fixes hanging apparatus, it is characterised in that in described,
Outer wall template is fixed by the multigroup screw rod, back cord and boom hoisting.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720039486.9U CN206767423U (en) | 2017-01-13 | 2017-01-13 | A kind of shear wall aluminum alloy mould plate fixes hanging apparatus |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720039486.9U CN206767423U (en) | 2017-01-13 | 2017-01-13 | A kind of shear wall aluminum alloy mould plate fixes hanging apparatus |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206767423U true CN206767423U (en) | 2017-12-19 |
Family
ID=60647079
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720039486.9U Active CN206767423U (en) | 2017-01-13 | 2017-01-13 | A kind of shear wall aluminum alloy mould plate fixes hanging apparatus |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206767423U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106760567A (en) * | 2017-01-13 | 2017-05-31 | 山东中煤能源机械有限责任公司 | A kind of shear wall aluminum alloy mould plate fixes hanging apparatus |
-
2017
- 2017-01-13 CN CN201720039486.9U patent/CN206767423U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106760567A (en) * | 2017-01-13 | 2017-05-31 | 山东中煤能源机械有限责任公司 | A kind of shear wall aluminum alloy mould plate fixes hanging apparatus |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104196222B (en) | The suspension scaffold of tools type section steel builder's jack | |
CN206174138U (en) | Joint construction suitable for steel house room externally -hanging wallboard and major structure | |
CN106760567A (en) | A kind of shear wall aluminum alloy mould plate fixes hanging apparatus | |
CN212689564U (en) | Temporary supporting device and temporary supporting structure for floor bearing plate | |
CN109095343A (en) | Assembled hanger | |
CN108049628A (en) | Assembled architecture outer wall quickly pacifies form removal system and construction method without outrigger | |
CN206767423U (en) | A kind of shear wall aluminum alloy mould plate fixes hanging apparatus | |
CN111456425A (en) | Temporary supporting device, temporary supporting structure and temporary supporting method for floor bearing plate | |
CN208039885U (en) | A kind of safety belt wall suspension arrangement | |
CN208502291U (en) | Elevator horizontal protective device | |
KR101707037B1 (en) | A structure for assembled system scaffold and erecting method thereof | |
CN209815480U (en) | Prefabricated post hoisting structure | |
CN207934466U (en) | A kind of trench corner position waterproof roll liner is laid with tool | |
CN207634046U (en) | A kind of suspension type blowout preventer protective umbrella and its drilling fluid outlet pipe | |
CN208948679U (en) | Assembled hanger | |
CN210619988U (en) | Hoisting device of building module unit | |
CN209817386U (en) | Outer enclosure structure of overhanging balcony position of prefabricated building | |
CN208981753U (en) | Key slot type scaffold is fixedly connected device | |
CN208182417U (en) | A kind of flexible lift car bottom cover | |
CN207406005U (en) | A kind of Screw arbor with nut at both-ends casing and template component | |
CN214363436U (en) | Tubular pile | |
CN217871357U (en) | Novel building energy-saving prefabricated part structure | |
CN108104486A (en) | A kind of trench corner position waterproof roll liner is laid with instrument | |
CN217925865U (en) | Steel plate clamp for temporary connection of vertical shaft construction hanging scaffold | |
CN218116135U (en) | Bridge anticollision wall template subassembly |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |