- CN106760567A CN106760567A CN201710024746.XA CN201710024746A CN106760567A CN 106760567 A CN106760567 A CN 106760567A CN 201710024746 A CN201710024746 A CN 201710024746A CN 106760567 A CN106760567 A CN 106760567A
- Authority
- CN
- China
- Prior art keywords
- back cord
- template
- wall
- screw rod
- fastener
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 229910000838 Al alloy Inorganic materials 0.000 title claims abstract description 15
- 238000009415 formwork Methods 0.000 claims abstract description 14
- 238000000926 separation method Methods 0.000 claims description 6
- 238000002627 tracheal intubation Methods 0.000 claims description 6
- 241000276425 Xiphophorus maculatus Species 0.000 claims description 3
- 239000004744 fabric Substances 0.000 claims 1
- 230000008774 maternal effect Effects 0.000 claims 1
- 238000010276 construction Methods 0.000 abstract description 10
- 230000009286 beneficial effect Effects 0.000 abstract description 2
- 238000005516 engineering process Methods 0.000 description 4
- 230000007812 deficiency Effects 0.000 description 2
- 230000015572 biosynthetic process Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 238000005457 optimization Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
- E04G21/16—Tools or apparatus
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C1/00—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
- B66C1/10—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
- B66C1/12—Slings comprising chains, wires, ropes, or bands; Nets
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The present invention relates to building field, specifically a kind of shear wall aluminum alloy mould plate fixes hanging apparatus, including:Inside wall formwork, outer wall template, screw rod, back cord and and boom hoisting, inner, external wall template is parallel to each other, accommodating chamber is defined between the two, screw rod through the two ends of the space of inner, external wall template and back cord and screw rod respectively by the first fastener for being located inside wall formwork side and the second fastener for being located at outer wall template side internally, outer wall template, back cord be fixed, and screw rod the end in outer wall template side be connected with the second fastener after do not protruded relative to the lateral surface of back cord.It is beneficial in that:It is of the invention to reduce the prominent length of outer wall template by improving the fixed form of the inner, external wall template of shear wall, so as to increase the distance between two sides shear wall, reduce difficulty of construction;And back cord and boom hoisting by optimizing, centring property is improve, improve the security performance of efficiency of construction and boom hoisting.
Description
Technical field
The present invention relates to building field, specifically a kind of shear wall aluminum alloy mould plate fixes hanging apparatus.
Background technology
In building field, according to relevant regulations, after wall span exceedes certain length, applying, man-hour requirement building is heavy
Drop is stitched come to prevent building each several part from causing house to destroy due to uneven settlement of foundation.Between the wall of subsiding crack both sides
Away from typically only 200mm or so.
And the shear wall aluminum alloy mould plate of currently available technology and the mode that is connected of back cord are as shown in figure 1, be to pass through
Split bolt is fixed through the template of inner, external wall, and split bolt is passed from both sides, it is difficult to ensure that split bolt passes exterior wall
Distance after template is less than 200mm, even if being less than 200mm, also can be very when the wall of subsiding crack both sides is constructed simultaneously
It is difficult.
When being constructed using aluminum alloy mould plate, the template assembly for high-storey is often to lift by crane each template one by one
Installed to specified location, and if integral lifting to specified location can undoubtedly be carried significantly after template system is installed on ground
Efficiency of construction high, keeps system not deform upon integrally during the key problem in technology of integral hoisting during lifting, firm in structure, and
And boom hoisting can be dismantled conveniently, and the boom hoisting of the template system for after installation of the prior art cannot often be protected
Demonstrate,prove the requirement of this key technology.
The content of the invention
In order to solve above-mentioned technological deficiency, the invention provides following technical scheme:
The present invention is that a kind of shear wall aluminum alloy mould plate fixes hanging apparatus, including:Inside wall formwork, outer wall template and it is described it is interior,
The screw rod of outer wall template connection and the back cord of screw rod connection and the boom hoisting being connected with the back cord, it is described inside and outside
Wall form is parallel to each other, and accommodating chamber is defined between the two, and pouring into a mould concrete in the accommodating chamber during construction forms wall, described
Back cord be two opposing parallel settings and between leave the square through-pipe structure of Two bors d's oeuveres in space, the screw rod is through described inside and outside
The two ends of the space of wall form and the back cord and the screw rod are respectively by being located at the first fastener of inside wall formwork side
The inner, external wall template, the back cord are fixed with the second fastener for being located at outer wall template side, and the screw rod
Do not protruded relative to the lateral surface of the back cord after the end of outer wall template side is connected with second fastener, that is,
Second fastener is connected the fixation carried out to the back cord by with the screw rod, wherein, outside second fastener
Lateral surface of the side end face substantially with the back cord mutually maintains an equal level.So ensure that to be tried one's best in construction and reduce the relative of outer wall template
Thickness, is easy to construction.
A kind of its specific optimal technical scheme is that first fastener is nut, and second fastener is built-in
Formula nut, the built-in nut has nut body and the lid axially vertical with the nut body, the end of the screw rod
Stopped by the lid after nut body described in portion's precession.
When needing to carry out lifting operation to this template, it is necessary to install boom hoisting on the back cord, as the present invention
A kind of optimal technical scheme, the boom hoisting include connection sheet, the first bolt and rise chain sling, the connection sheet vertically side
It is connected with described chain sling upwardly through the first bolt, the connection sheet includes interior and outer plate, it incites somebody to action described with being oppositely arranged
Back cord is clamped between two panels, and the two ends of described inside and outside removably connect.
As a preferred technical solution of the present invention, space from the interior middle part and outer plate between to the back cord
Sunken inside forms separation sleeve, and the separation sleeve two ends pass through the second bolt connection.
In the above-mentioned technical solutions, the back cord on the outside of the outer wall template except with the screw rod and second fastener
Connection, is also attached with connector and the 3rd fastener, and its specific connected mode is that the inner, external wall formwork structure is identical,
And its both sides has the template side rib vertical with its plate face, and some mounting holes are distributed at equal intervals on the rib of the template side, each
The adjacent inside wall formwork or the outer wall template are spliced by the 3rd bolt through the mounting hole, on the rib of the template side
Connector removably is connected with, the connector is connected with the 3rd fastener and back cord.
As a preferred technical solution of the present invention, the connector have installing plate, at least two can be by
The installing plate is fixed on the 4th bolt on the rib of the template side, be fixed with the installing plate one it is vertical with plate face and to
The intubation that outside is stretched out;The back cord be two ends to connection and it is opposing parallel setting and between have space the square siphunculus of Two bors d's oeuveres
Structure;Platy structure with cylinder centered on 3rd fastener, the cylinder interior has screw thread, and it puts in the back of the body
It is connected with the intubation of the connector by the 4th bolt in stupefied space.
In the inventive solutions, generally there are multiple back cords in construction on each wall form, therefore in peace
Need that multiple boom hoistings are installed during dress, the 5th bolt connection is passed through between the boom hoisting and boom hoisting.
By the template system of said structure, the modular unit of assembled suitable size as needed in a practical situation, interior,
Outer wall template is fixed by multigroup screw rod, back cord and boom hoisting.
The present invention is compared with prior art, it is beneficial that:The present invention is by improving the inner, external wall template of shear wall
Fixed form reduces the prominent length of outer wall template, so as to increase the distance between two sides shear wall, further reduces construction
Difficulty.By the back cord and boom hoisting that optimize, centring property is improve, effectively increase efficiency of construction, reduce the peace of back cord
ETL estimated time of loading simultaneously improves the security performance of boom hoisting.
Brief description of the drawings
Fig. 1 is the schematic cross-section of inner, external wall template in the prior art;
Fig. 2 is the schematic cross-section of inner, external wall template of the invention;
Fig. 3 is the axial section of the second fastener of the invention;
Fig. 4 is the structural representation after template of the invention, back cord and boom hoisting are installed;
Fig. 5 is the lateral view of Fig. 4;
Fig. 6 is the enlarged drawing of the connection sheet part of boom hoisting in Fig. 5;
Fig. 7 is the structural representation after template of the invention, back cord and connector are installed;
Fig. 8 is the lateral enlarged drawing in A portions in Fig. 7;
Fig. 9 is the structural representation of connector of the invention;
Figure 10 is the section view of connector of the invention;
Figure 11 is the structural representation of the 3rd fastener of the invention;
The section view of Figure 12 the 3rd fasteners of the invention.
Specific embodiment
Further implementation of the invention is illustrated by accompanying drawing now.
Illustrated in fig. 1 is inside wall formwork 01, outer wall template 02 and the screw rod 03 of shear wall common in the art
Section view, can clearly observe that its left and right is essentially symmetrical structure, has thus resulted in the outside of outer wall template 02 in figure
Screw rod excessively protrude, and the distance of subsiding crack both sides wall 04 typically only have 200mm, construction when often bring inconvenience.
In order to improve above-mentioned prior art deficiency and obtain further effect of optimization, Fig. 2 is illustrated that of the invention changing
The section view of the inside wall formwork, outer wall template and screw rod of the shear wall after entering, including:Inside wall formwork 1, outer wall template
2 and the screw rod 3 of the connection of the inner, external wall template 1,2 and the back cord 4 of the connection of the screw rod 3 and it is connected with the back cord 4
Boom hoisting 5, the inner, external wall template 1,2 is parallel to each other, and it is wall 10, institute to define between the two in accommodating chamber, accommodating chamber
State back cord 4 for two opposing parallel settings and between leave the square through-pipe structure of Two bors d's oeuveres in space, the screw rod 3 is through described
The space of inner, external wall template 1, the 2 and the back cord 4 and two ends of the screw rod 3 are respectively by being located at the side of inside wall formwork 1
First fastener 6 and be located at the side of outer wall template 2 the inner, external wall template 1 of the second fastener 7 pairs, 2, the back cord 4 carries out
It is fixed, and the screw rod 3 the end in the side of outer wall template 2 be connected with second fastener 7 after relative to the back cord 4
Lateral surface do not protrude.
In order to further illustrate the connected mode of the screw rod 3 and the inner, external wall template 1,2, as shown in figure 3, described
First fastener 6 is nut, and second fastener 7 is built-in nut, and the built-in nut has the He of nut body 71
The lid 72 axially vertical with the nut body 71, is subject to described after nut body 71 described in the end precession of the screw rod 3
Lid 72 stops.
Further, as shown in Figs. 4-6, the boom hoisting 5 includes connection sheet, the first bolt 53 and plays chain sling 54, institute
State connection sheet in the vertical direction to be connected with described chain sling 54 by the first bolt 53, the connection sheet is including interior 51 and outer
Piece 52, be clamped in the back cord 4 between two panels with being oppositely arranged by it, and the two ends of described inside and outside 51,52 removably connect
Connect.Described interior 51 and the middle part between outer plate 52 form separation sleeve 55, the separation sleeve to the space sunken inside of the back cord 4
55 two ends are connected by the second bolt 56.
Shown by Fig. 7 and 8 is that two adjacent outer wall templates 2 are installed the structural representation of back cord 4 and cut after assembly
Face view, the inner, external wall template 1,2 structures are identical, and its both sides has the template side rib 21 vertical with its plate face, the mould
Some mounting holes 22 are distributed on edges of boards rib 21 at equal intervals, each adjacent inside wall formwork 1 or the outer wall template 2 pass through
3rd bolt 23 splices through the mounting hole 22, and removably connector 8, the connection are connected with template side rib 21
Part 8 is connected with the 3rd fastener 9 and back cord 4.What Fig. 9 and Figure 10 were represented is the connector 8, and it has an installing plate
81st, two the 4th bolts 82 that can be fixed on the installing plate on the rib of the template side, are fixed with the installing plate 81
One intubation 83 that is vertical with plate face and stretching out laterally;As is illustrated by figs. 11 and 12, the 3rd fastener 9 is middle part protrusion
The projection 91 that formation is engaged with the gap of the back cord, the center of the projection 91 has the platy structure of circular hole 92, the circle
The inside of hole 91 has screw thread, and the intubation of the 5th bolt 92 and the connector 8 is passed through in its space for putting in the back cord 4
83 connections.
The inner, external wall template 1,2 is fixed by multigroup screw rod 3, back cord 4 and boom hoisting 5, and described
Connected by the 6th bolt 57 between boom hoisting 5 and boom hoisting 5.
Above-mentioned specific embodiment is only specific case of the invention, and scope of patent protection of the invention is included but is not limited to
The product form and style of above-mentioned specific embodiment, any claims of the present invention and any art of meeting
Appropriate change or modification that those of ordinary skill is done to it, should all fall into scope of patent protection of the invention.
Claims (8)
1. a kind of shear wall aluminum alloy mould plate fixes hanging apparatus, including:Inside wall formwork, outer wall template and the inner, external wall mould
The screw rod of plate connection and the back cord of screw rod connection and the boom hoisting being connected with the back cord, the inner, external wall template
It is parallel to each other, accommodating chamber is defined between the two, it is characterised in that the back cord be two it is opposing parallel setting and between leave
The square through-pipe structure of Two bors d's oeuveres in space, the screw rod passes through space and the spiral shell of the inner, external wall template and the back cord
The two ends of bar are respectively by being located at the first fastener of inside wall formwork side and being located at the second fastener pair of outer wall template side
The inner, external wall template, the back cord are fixed, and the end in outer wall template side of the screw rod is tight with described second
Do not protruded relative to the lateral surface of the back cord after firmware connection.
2. a kind of shear wall aluminum alloy mould plate according to claim 1 fixes hanging apparatus, it is characterised in that described first
Fastener is nut, second fastener be built-in nut, the built-in nut have nut body and with the spiral shell
The axially vertical lid of maternal body, is stopped after nut body described in the end precession of the screw rod by the lid.
3. a kind of shear wall aluminum alloy mould plate according to claim 1 fixes hanging apparatus, it is characterised in that the lifting
Device includes connection sheet, the first bolt and plays chain sling, and the connection sheet in the vertical direction passes through the first bolt and the lifting
Chain connect, the connection sheet include interior and outer plate, be clamped in the back cord between two panels with being oppositely arranged by it, it is described in,
The two ends of outer plate removably connect.
4. a kind of shear wall aluminum alloy mould plate according to claim 3 fixes hanging apparatus, it is characterised in that described interior
Middle part and outer plate between forms separation sleeve to the space sunken inside of the back cord, and the separation sleeve two ends are connected by the second bolt
Connect.
5. a kind of shear wall aluminum alloy mould plate according to claim 1 fixes hanging apparatus, it is characterised in that in described,
Outer wall template structure is identical, and its both sides has the template side rib vertical with its plate face, divides at equal intervals on the rib of the template side
The some mounting holes of cloth, each adjacent inside wall formwork or the outer wall template are spelled by the 3rd bolt through the mounting hole
Connect, removably connector is connected with the rib of the template side, the connector is connected with the 3rd fastener and back cord.
6. a kind of shear wall aluminum alloy mould plate according to claim 5 fixes hanging apparatus, it is characterised in that the connection
Part has an installing plate, at least two the 4th bolts that can be fixed on the installing plate on the rib of the template side, described
An intubation that is vertical with plate face and stretching out laterally is fixed with installing plate;There is cylinder centered on 3rd fastener
Platy structure, the cylinder interior has screw thread, and the 4th bolt and the connector are passed through in its space for putting in the back cord
The intubation connection.
7. a kind of shear wall aluminum alloy mould plate according to claim 5 or 6 fixes hanging apparatus, it is characterised in that described
Pass through the 5th bolt connection between boom hoisting and boom hoisting.
8. a kind of shear wall aluminum alloy mould plate according to any of the above-described claim fixes hanging apparatus, and its feature exists
In the inner, external wall template is fixed by multigroup screw rod, back cord and boom hoisting.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710024746.XA CN106760567A (en) | 2017-01-13 | 2017-01-13 | A kind of shear wall aluminum alloy mould plate fixes hanging apparatus |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710024746.XA CN106760567A (en) | 2017-01-13 | 2017-01-13 | A kind of shear wall aluminum alloy mould plate fixes hanging apparatus |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106760567A true CN106760567A (en) | 2017-05-31 |
Family
ID=58945332
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710024746.XA Pending CN106760567A (en) | 2017-01-13 | 2017-01-13 | A kind of shear wall aluminum alloy mould plate fixes hanging apparatus |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106760567A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108316644A (en) * | 2018-03-22 | 2018-07-24 | 浙江谊科建筑技术发展有限公司 | A kind of big mold device of aluminum alloy mould plate assembling |
CN108590177A (en) * | 2018-07-09 | 2018-09-28 | 中建铝新材料成都有限公司 | K plates bracing means and its reinforcement means |
CN110409825A (en) * | 2019-08-23 | 2019-11-05 | 中国建筑第八工程局有限公司 | Connection jaw arrangement and its construction method for reinforcing template system |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5836132A (en) * | 1996-04-10 | 1998-11-17 | E-Z Anchor Bolt Template, Inc. | Anchor template |
CN203247506U (en) * | 2013-04-28 | 2013-10-23 | 中铁十二局集团第二工程有限公司 | Bridge high-pier construction creeping formwork internal formwork lifting frame |
CN203394028U (en) * | 2013-05-14 | 2014-01-15 | 中建保华建筑有限责任公司 | Wall template system applied in seismic joint |
CN204252530U (en) * | 2014-11-14 | 2015-04-08 | 中建三局集团有限公司 | A kind of exterior wall typified form to rise overally hanging apparatus with climbing frame |
CN105178591A (en) * | 2015-10-12 | 2015-12-23 | 江苏南通二建集团有限公司 | Small-gap double-shear-wall deformation joint formwork and construction method thereof |
CN105332508A (en) * | 2015-11-28 | 2016-02-17 | 晟通科技集团有限公司 | Formwork fastening device |
CN206767423U (en) * | 2017-01-13 | 2017-12-19 | 山东中煤能源机械有限责任公司 | A kind of shear wall aluminum alloy mould plate fixes hanging apparatus |
-
2017
- 2017-01-13 CN CN201710024746.XA patent/CN106760567A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5836132A (en) * | 1996-04-10 | 1998-11-17 | E-Z Anchor Bolt Template, Inc. | Anchor template |
CN203247506U (en) * | 2013-04-28 | 2013-10-23 | 中铁十二局集团第二工程有限公司 | Bridge high-pier construction creeping formwork internal formwork lifting frame |
CN203394028U (en) * | 2013-05-14 | 2014-01-15 | 中建保华建筑有限责任公司 | Wall template system applied in seismic joint |
CN204252530U (en) * | 2014-11-14 | 2015-04-08 | 中建三局集团有限公司 | A kind of exterior wall typified form to rise overally hanging apparatus with climbing frame |
CN105178591A (en) * | 2015-10-12 | 2015-12-23 | 江苏南通二建集团有限公司 | Small-gap double-shear-wall deformation joint formwork and construction method thereof |
CN105332508A (en) * | 2015-11-28 | 2016-02-17 | 晟通科技集团有限公司 | Formwork fastening device |
CN206767423U (en) * | 2017-01-13 | 2017-12-19 | 山东中煤能源机械有限责任公司 | A kind of shear wall aluminum alloy mould plate fixes hanging apparatus |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108316644A (en) * | 2018-03-22 | 2018-07-24 | 浙江谊科建筑技术发展有限公司 | A kind of big mold device of aluminum alloy mould plate assembling |
CN108590177A (en) * | 2018-07-09 | 2018-09-28 | 中建铝新材料成都有限公司 | K plates bracing means and its reinforcement means |
CN110409825A (en) * | 2019-08-23 | 2019-11-05 | 中国建筑第八工程局有限公司 | Connection jaw arrangement and its construction method for reinforcing template system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104196222B (en) | The suspension scaffold of tools type section steel builder's jack | |
CN106760567A (en) | A kind of shear wall aluminum alloy mould plate fixes hanging apparatus | |
CN109095343A (en) | Assembled hanger | |
CN212689564U (en) | Temporary supporting device and temporary supporting structure for floor bearing plate | |
CN108049628A (en) | Assembled architecture outer wall quickly pacifies form removal system and construction method without outrigger | |
CN206767423U (en) | A kind of shear wall aluminum alloy mould plate fixes hanging apparatus | |
CN111456425A (en) | Temporary supporting device, temporary supporting structure and temporary supporting method for floor bearing plate | |
CN208502291U (en) | Elevator horizontal protective device | |
CN205323047U (en) | Perforation formula safety belt hanging device | |
CN217079667U (en) | Elevator shaft and daylighting are handled well and are hung mould structure | |
CN216766397U (en) | Building curtain wall mounting structure | |
CN109987500A (en) | A kind of building material cage | |
CN207634046U (en) | A kind of suspension type blowout preventer protective umbrella and its drilling fluid outlet pipe | |
CN211691536U (en) | Simple lifting mechanism for bare concrete exterior wall cladding | |
CN212802504U (en) | Deformation joint double-shear wall template system | |
CN211056521U (en) | Prefabricated component installation hoist | |
CN210480607U (en) | Hoisting device for disassembling and assembling shield machine | |
KR101707037B1 (en) | A structure for assembled system scaffold and erecting method thereof | |
CN210286469U (en) | Prefabricated part hoist | |
KR20130129151A (en) | Clamp of system support for construction | |
CN208948679U (en) | Assembled hanger | |
CN205637587U (en) | Thick liquid processing apparatus is leaked to template bottom | |
CN205555870U (en) | Hoisting equipment for engineering | |
CN108104486A (en) | A kind of trench corner position waterproof roll liner is laid with instrument | |
CN217925865U (en) | Steel plate clamp for temporary connection of vertical shaft construction hanging scaffold |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170531 |