CN206757374U - A kind of tunnel extra-high-tension cable central control system - Google Patents

A kind of tunnel extra-high-tension cable central control system Download PDF

Info

Publication number
CN206757374U
CN206757374U CN201720540521.5U CN201720540521U CN206757374U CN 206757374 U CN206757374 U CN 206757374U CN 201720540521 U CN201720540521 U CN 201720540521U CN 206757374 U CN206757374 U CN 206757374U
Authority
CN
China
Prior art keywords
tunnel
equipment
monitoring
detector
control system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720540521.5U
Other languages
Chinese (zh)
Inventor
杨文威
张旭雷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Jiaqi Intelligent Technology Co., Ltd
Original Assignee
Shanghai Jiaqi Network Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Jiaqi Network Technology Co Ltd filed Critical Shanghai Jiaqi Network Technology Co Ltd
Priority to CN201720540521.5U priority Critical patent/CN206757374U/en
Application granted granted Critical
Publication of CN206757374U publication Critical patent/CN206757374U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

It the utility model is related to a kind of tunnel extra-high-tension cable central control system, the system includes monitor workstation, database server, tunnel monitoring device, the communication server, Ethernet switch and router, wherein described monitor workstation is communicated by the router with the communication server, the tunnel monitoring device includes apparatus of electrical monitoring equipment, video monitoring equipment, emergent broadcast equipment, telephone communication set, synthesis display screen management equipment, the apparatus of electrical monitoring equipment, video monitoring equipment, emergent broadcast equipment, telephone communication set, synthesis display screen management equipment is connected by optical fiber ring network with the communication server respectively, the described communication server is connected to the database server by Ethernet switch.Compared with prior art, the utility model has the advantages that distributed management, communication are reliable, monitoring is comprehensive, safe.

Description

A kind of tunnel extra-high-tension cable central control system
Technical field
Tunnel cable monitoring technology field is the utility model is related to, is controlled more particularly, to a kind of tunnel extra-high-tension cable center System processed.
Background technology
For current cable monitoring system, intellectuality is also not implemented, networking, is primarily present following problem:Each subsystem Intensive management is not implemented in system;Each subsystem clock is asynchronous;Communication ring network is not formed, and communication reliability cannot ensure;If Standby redundancy is serious, overlapping investment, such as power supply, server;Each tunneling data is delivered in cable by the existing Intranet of Utilities Electric Co. The heart, due to bandwidth deficiency, can not transmission video signal, cause great inconvenience to cable center operational management work.
Extra-high-tension cable central control system in tunnel of the present utility model is tunnel extra-high-tension cable comprehensive monitoring system Core component, to realize that engineering all fronts intelligent management provides hardware and software platform.By the system, comprehensive monitoring system is held Row monitoring strategies, complete environment information acquisition, cable information collection, fire alarm linkage, electromechanical equipment monitoring and and power network The functions such as the cooperation and communication of the departments such as Surveillance center, fire-fighting, decision support is provided for emergency event disposal.
Utility model content
The purpose of this utility model is exactly to provide a kind of centralized formula the defects of overcoming above-mentioned prior art to exist Management, the tunnel extra-high-tension cable central control system that monitoring is comprehensive, communication is reliable, safe.
The purpose of this utility model can be achieved through the following technical solutions:
A kind of tunnel extra-high-tension cable central control system, the system include monitor workstation, database server, communication Server, Ethernet switch and router, wherein the monitor workstation is by the router and optical fiber ring network and leads to Telecommunications services device is communicated, and the monitor workstation includes apparatus of electrical monitoring equipment, video monitoring equipment, emergent broadcast equipment, electricity Talk about communication equipment, synthesis display screen management equipment, the apparatus of electrical monitoring equipment, video monitoring equipment, emergent broadcast equipment, phone Communication equipment, synthesis display screen management equipment are connected by fiber buss with the communication server respectively, the described communication server It is connected by Ethernet switch with optical fiber ring network, the monitor workstation is also connected to the database server.
Further, the apparatus of electrical monitoring equipment includes cable sheath induced-current detector, partial discharge detector, moved State increase-volume detection unit and cable distribution optical fiber temperature-measurement device.
Further, in addition to tunnel and auxiliary equipment monitoring device, the tunnel and auxiliary equipment monitoring device include Video surveillance instrument, ambient tunnel temperature meter, fireproof partition/fire-fighting thermo detector, toxic and harmful gas detector, tunnel subsidence detection Instrument and fume monitor.
Further, described monitor workstation also includes warning device, and described warning device also includes well lid pick-proof Device, tunnel portal infrared detector and audible-visual annunciator.
The detector and detection unit that the utility model uses are existing detection technique.
Compared with prior art, extra-high-tension cable central control system in tunnel of the present utility model realizes each subsystem Geo-database integration, information resources share, the running of each subsystem is managed collectively, to airfield equipment, Surveillance center's equipment and biography The running status of defeated network carries out Centralizing inspection, alarm, and systemic presupposition various control prediction scheme, operator can pass through keyboard/mouse Prediction scheme is selected, also can voluntarily send order.The parameters such as time, place and the property that the order and event that operator keys in occur Corresponding computer and the webserver are stored into, can inquire about and print at any time.Prediction scheme can modify as needed.
Brief description of the drawings
Fig. 1 is the structural representation of extra-high-tension cable central control system in tunnel of the present utility model.
Embodiment
The utility model is described in detail with specific embodiment below in conjunction with the accompanying drawings.
Embodiment:
As shown in figure 1, it illustrates the concrete structure of the utility model tunnel extra-high-tension cable central control system, in this Control system is entreated to include monitor workstation 1, the communication server 2, database server 5, tunnel monitoring device, Ethernet switch 4 and router, wherein the monitor workstation 1 is communicated by the router with the communication server 2, the tunnel prison Measurement equipment includes apparatus of electrical monitoring equipment 6, video monitoring equipment 7, emergent broadcast equipment 8, telephone communication set 9, synthesis display screen Management equipment 10, the apparatus of electrical monitoring equipment 6, video monitoring equipment 7, emergent broadcast equipment 8, telephone communication set 9, synthesis are aobvious Display screen management equipment 10 is connected by optical fiber ring network 3 with the communication server 2 respectively, and the described communication server 2 passes through Ethernet Interchanger 4 is connected to the database server 5.
Also, the apparatus of electrical monitoring equipment 6 includes cable sheath induced-current detector 211, partial discharge detector 212nd, dynamic compatibilization detection unit 213 and cable distribution optical fiber temperature-measurement device 214.The tunnel monitoring equipment is supervised including video Survey instrument, ambient tunnel temperature meter, fireproof partition/fire-fighting thermo detector, toxic and harmful gas detector, tunnel subsidence detector and cigarette Mist detector.Described monitor workstation also includes warning device, and described warning device also includes well lid anti-pick device, tunnel enters Lipstick external detector and audible-visual annunciator.
The present embodiment press by apparatus of electrical monitoring equipment 6, video monitoring equipment 7, emergent broadcast equipment 8, telephone communication set 9, Synthesis display screen management equipment 10 builds special optic fibre looped network 3, and the communication server 2 in access set, the communication server 2 will receive Various monitoring informations imported into by router in monitor workstation 1, finally realize the monitoring of all tunnels in monitor workstation 1 Data acquisition, operation monitoring, operational control, information comprehensive analysis and the intelligent alarm function of point.
The function of monitor workstation is as follows:
1st, data acquisition:Each equipment management data and monitoring data synchronously utilize " private clound " technology to classify gathered data Storage and backup;
2nd, operation monitoring:Monitor each monitoring object data mode and data query in each substation management and control tunnel;
3rd, operational control:Control command is remotely forwarded by substation computer system, and obtains control result;
4th, information analysis:Business diagnosis and the routine work for comparing each substation and O&M are carried out to the synchronous data in each substation Counted, and go out form.
5th, intelligent alarm:Using supplementary means such as infrared, acousto-optic, video analysis, security protection is intelligently realized, circumference is deployed to ensure effective monitoring and control of illegal activities.
Central control system in the utility model is the core component of comprehensive monitoring system, to realize engineering completely Intelligent management provides hardware and software platform.By the system, comprehensive monitoring system performs monitoring strategies, completes environmental information and adopts Collection, cable information collection, fire alarm linkage, electromechanical equipment monitoring and the coordination with the department such as power system monitor center, fire-fighting The functions such as communication, decision support is provided for emergency event disposal.
Extra-high-tension cable central control system in tunnel of the present utility model is not limited to the structure of above-described embodiment, can carry out A variety of modifications.In a word, both fallen within all improvement not departed from the utility model scope in the scope of the utility model.

Claims (4)

1. a kind of tunnel extra-high-tension cable central control system, it is characterised in that the system includes monitor workstation, database takes Business device, tunnel monitoring device, the communication server, Ethernet switch and router, wherein the monitor workstation passes through institute State router to be communicated with the communication server, the tunnel monitoring device includes apparatus of electrical monitoring equipment, video monitoring equipment, answered Anxious broadcasting equipment, telephone communication set, synthesis display screen management equipment, the apparatus of electrical monitoring equipment, video monitoring equipment, meet an urgent need Broadcasting equipment, telephone communication set, synthesis display screen management equipment are connected by optical fiber ring network with the communication server respectively, described The communication server database server is connected to by Ethernet switch.
2. extra-high-tension cable central control system in tunnel according to claim 1, it is characterised in that the power monitoring is set It is standby to include cable sheath induced-current detector, partial discharge detector, dynamic compatibilization detection unit and cable distribution light Fine thermal detector.
3. extra-high-tension cable central control system in tunnel according to claim 1, it is characterised in that the tunnel monitoring is set Standby video surveillance instrument, ambient tunnel temperature meter, fireproof partition/fire-fighting thermo detector, toxic and harmful gas detector, the tunnel of including sinks Detector and fume monitor drop.
4. extra-high-tension cable central control system in tunnel according to claim 1, it is characterised in that described monitoring work Standing also includes warning device, and described warning device also includes well lid anti-pick device, tunnel portal infrared detector and sound and light alarm Device.
CN201720540521.5U 2017-05-16 2017-05-16 A kind of tunnel extra-high-tension cable central control system Active CN206757374U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720540521.5U CN206757374U (en) 2017-05-16 2017-05-16 A kind of tunnel extra-high-tension cable central control system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720540521.5U CN206757374U (en) 2017-05-16 2017-05-16 A kind of tunnel extra-high-tension cable central control system

Publications (1)

Publication Number Publication Date
CN206757374U true CN206757374U (en) 2017-12-15

Family

ID=60617178

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720540521.5U Active CN206757374U (en) 2017-05-16 2017-05-16 A kind of tunnel extra-high-tension cable central control system

Country Status (1)

Country Link
CN (1) CN206757374U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108038812A (en) * 2017-12-29 2018-05-15 中铁局集团电务工程有限公司 A kind of municipal tunnel intelligent comprehensive commander's managing and control system based on deep layer intergration model

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108038812A (en) * 2017-12-29 2018-05-15 中铁局集团电务工程有限公司 A kind of municipal tunnel intelligent comprehensive commander's managing and control system based on deep layer intergration model

Similar Documents

Publication Publication Date Title
CN102931724B (en) Intelligent video monitoring system for electric power transmission and transformation
CN104052151B (en) Intelligent substation aided synthesis is monitored and D5000 cooler interlock platforms
CN104329120B (en) Tunnel construction safety monitoring and management system and tunnel construction safety monitoring and management method
CN202513670U (en) Auxiliary control system of intelligent transformer substation
CN202102550U (en) Intelligent safety prevention system for transformer station
CN204465736U (en) A kind of power transmission line intelligent long distance control system based on Internet of Things
CN104978821B (en) A kind of intelligent radio rack fire monitoring system
CN104581087A (en) Intelligent remote monitoring system of power transmission line on basis of internet of things
CN109698555B (en) One-key remote inspection system and inspection method for unattended transformer substation
CN102566519A (en) Setting method for power tunnel monitoring system
CN111147823B (en) Method for realizing remote monitoring and supporting for transformer substation emergency repair by adopting monitoring platform
CN109473970A (en) Protect power supply trouble monitoring removal system and method
CN206863889U (en) The anti-external force of power cable destroys intelligent monitor system
CN107193244A (en) A kind of communication comprehensive monitoring system
CN108923542A (en) A kind of VR system for power scheduling
CN207854027U (en) Intelligent campus total management system
CN114705959A (en) Power cable and channel on-line monitoring system
CN206132116U (en) Tunnel extra -high -tension cable life state supervisory systems
CN112994230A (en) Environment monitoring system for intelligent substation auxiliary system and use method thereof
CN206757374U (en) A kind of tunnel extra-high-tension cable central control system
CN103905781A (en) Wind power plant on-site safety prevention system
CN203206397U (en) Remote visual integrated monitoring system for power distribution network
CN205015422U (en) Distributed type cable state monitoring system
CN207939554U (en) A kind of security monitoring integrated machine based on cloud
CN206805252U (en) Power distribution room Intelligent remote control device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: Room 420h, building 9, 509 Caobao Road, Xuhui District, Shanghai, 200333

Patentee after: Shanghai Jiaqi Intelligent Technology Co., Ltd

Address before: 200233 420H room 9, building 509, Caobao Road, Shanghai, Xuhui District, China

Patentee before: SHANGHAI JIAQI NETWORK TECHNOLOGY Co.,Ltd.