CN206752879U - Building parapet - Google Patents
Building parapet Download PDFInfo
- Publication number
- CN206752879U CN206752879U CN201720311500.6U CN201720311500U CN206752879U CN 206752879 U CN206752879 U CN 206752879U CN 201720311500 U CN201720311500 U CN 201720311500U CN 206752879 U CN206752879 U CN 206752879U
- Authority
- CN
- China
- Prior art keywords
- wall
- rail bar
- waterproof layer
- utility
- building parapet
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Finishing Walls (AREA)
Abstract
The utility model discloses a kind of building parapet, including wall and roofing, arc-shaped transition side is provided between the wall and the roofing, the inner side of the wall is provided with several installation sets, the both sides of the installation set are provided with fixed ear, the fixed ear is fixedly connected by screw with the wall, vertical rail bar is equipped with each installation set, the top of the wall, which is provided with, bears down on one, it is described bear down on one on open up several grooves, the rail bar passes through the groove, front rail is provided between the rail bar, the height of the front rail is higher than the height beared down on one, fixed plate is provided with the notch of the groove, the fixed plate passes through screw and the secure fit of bearing down on one.The utility model on wall by setting installation set and fixed ear, directly rail bar and parapet can be coordinated, rail bar is further reinforced by fixed plate, improves stability, the utility model on roofing without punching, so as to reduce the influence to fabric structure.
Description
Technical field
Construction engineering technical field is the utility model is related to, more particularly to a kind of building parapet.
Background technology
Parapet is the parapet of roof plan periphery, and if building is more than 10 floors, parapet highly cannot be less than 1.2
Rice, highest must not exceed 1.5 meters, and main function is the safety of protection staff, and elevation of building is played role in decoration, in addition, daughter
When the effect of wall is roof plan construction, plays fixed water proof asphalt felt, prevent from avoiding roof from seeping water.
At present, in order to increase the security around parapet, all the equipment such as guardrail can be further added by the sidepiece of parapet, but
The installation of guardrail is typically necessary punches on roof, and this is easy for the structure for destroying whole building thing.
Utility model content
The purpose of this utility model is to propose a kind of to influence less building parapet to fabric structure.
A kind of building parapet, including wall and roofing, arc-shaped transition side is provided between the wall and the roofing,
The inner side of the wall is provided with several installation sets, and the both sides of the installation set are provided with fixed ear, and the fixed ear passes through screw
It is fixedly connected with the wall, vertical rail bar is equipped with each installation set, the top of the wall, which is provided with, bears down on one,
It is described bear down on one on open up several grooves, the rail bar passes through the groove, front rail, institute is provided between the rail bar
The height that the height of front rail is beared down on one higher than described in is stated, is provided with fixed plate at the notch of the groove, the fixed plate passes through
Screw and the secure fit of bearing down on one.
Compared with prior art, the utility model proposes the beneficial effect of building parapet be:By on wall
Installation set and fixed ear are set, directly rail bar and parapet can be coordinated, and rail bar is further reinforced by fixed plate,
Stability is improved, the utility model on roofing without punching, so as to reduce the influence to fabric structure.
In addition, according to building parapet provided by the utility model, there can also be technical characteristic additional as follows:
Further, the roofing includes stacking gradually from top to bottom upper waterproof layer, nonwoven layer, lower waterproof layer and look for
Flat bed.
Further, the fixed plate is provided with compact heap, the compact heap and the rail bar snug fit.
Further, the outside of the wall is provided with guiding gutter.
Further, the upper waterproof layer and the lower waterproof layer are using cement mortar thick 6~12mm, the nonwoven
Layer of cloth is the thick terylene non-woven fabrics of 1~4mm.
Further, the upper waterproof layer is identical with the thickness of the lower waterproof layer.
Further, the front rail is provided with several decorative bases away from described one end beared down on one.
Further, the decorative base is spherical decorative seat or deltoid decorative base.
Additional aspect and advantage of the present utility model will be set forth in part in the description, partly by from following description
In become obvious, or by it is of the present utility model practice recognize.
Brief description of the drawings
Of the present utility model above-mentioned and/or additional aspect and advantage will in the description from combination accompanying drawings below to embodiment
Become obvious and be readily appreciated that, wherein:
Fig. 1 is the structural representation of the building parapet of the utility model first embodiment;
Fig. 2 is Fig. 1 surface structural representation;
Fig. 3 is Fig. 1 centre circles II enlarged diagram;
Fig. 4 is the surface structural representation of the building parapet of the utility model second embodiment.
Embodiment
To enable the purpose of this utility model, feature and advantage more obvious understandable, below in conjunction with the accompanying drawings to this practicality
New embodiment is described in detail.Some embodiments of the present utility model are given in accompanying drawing.But this practicality
It is new to realize in many different forms, however it is not limited to embodiment described herein.On the contrary, provide these implementations
The purpose of example is made to disclosure of the present utility model more thorough and comprehensive.
It should be noted that when element is referred to as " being fixedly arranged on " another element, it can be directly on another element
Or there may also be element placed in the middle.When an element is considered as " connection " another element, it can be directly connected to
To another element or it may be simultaneously present centering elements.Term as used herein " vertical ", " horizontal ", " left side ",
" right side ", " on ", " under " and similar statement is for illustrative purposes only, rather than instruction or the device or member that imply meaning
Part must have specific orientation, with specific azimuth configuration and operation, therefore it is not intended that to limitation of the present utility model.
In the utility model, unless otherwise clearly defined and limited, term " installation ", " connected ", " connection ", " Gu
It is fixed " etc. term should be interpreted broadly, for example, it may be being fixedly connected or being detachably connected, or be integrally connected;Can
To be mechanical connection or electrical connection;Can be joined directly together, can also be indirectly connected by intermediary, Ke Yishi
The connection of two element internals.For the ordinary skill in the art, above-mentioned term can be understood as the case may be
Concrete meaning in the utility model.Term as used herein " and/or " include one or more related Listed Items
Arbitrary and all combination.
Referring to Fig. 1, the building parapet that first embodiment of the present utility model provides, including wall 10 and roofing
20。
Wherein, the roofing 20 includes upper waterproof layer 201, nonwoven layer 202, the lower waterproof layer stacked gradually from top to bottom
203 and screed-coat 204, double layer water-proof structure can effectively improve waterproof effect.The upper waterproof layer 201 and the lower waterproof layer
203 using cement mortar thick 6~12mm, and the nonwoven layer 202 is the thick terylene non-woven fabrics of 1~4mm.Specifically in this reality
Apply in example, the upper waterproof layer 201 is identical with the thickness of the lower waterproof layer 203.
Fig. 1 and Fig. 2 is referred to, arc-shaped transition side 30, the wall 10 are provided between the wall 10 and the roofing 20
Inner side be provided with several installation sets 40, the both sides of the installation set 40 are provided with fixed ear 50, and the fixed ear 50 passes through screw
It is fixedly connected with the wall 10, vertical rail bar 60, the top of the wall 10 is equipped with each installation set 40
Provided with bearing down on one 70, described bear down on one opens up several grooves 80 on 70, and the rail bar 60 passes through the groove 80, the rail bar
Be provided with front rail 90 between 60, the height of the front rail 90 higher than it is described bear down on one 70 height, the groove of the groove 80
Fixed plate 100 is provided with mouthful, the fixed plate 100 passes through screw and 70 secure fits of bearing down on one.
Referring to Fig. 3, in the present embodiment, in order to further improve stability, the fixed plate 100 is provided with compact heap
110, the compact heap 110 and the snug fit of rail bar 60.Compact heap 110 can be effectively increased stability, make rail bar
60 do not have displacement substantially, improve security.The outside of the wall 10 is provided with guiding gutter 120, and the guiding gutter 120 is described to lead
Tank 120 is identical by pipeline with deck, even if being easy to export rainwater.
Compared with prior art, the utility model proposes the beneficial effect of building parapet be:By on wall
Installation set and fixed ear are set, directly rail bar and parapet can be coordinated, and rail bar is further reinforced by fixed plate,
Stability is improved, the utility model on roofing without punching, so as to reduce the influence to fabric structure.
Referring to Fig. 4, the building parapet that the utility model second embodiment proposes, itself and the basic phase of first embodiment
Together, difference is, in the present embodiment, the front rail 90 is provided with several decorative bases away from described 70 one end of bearing down on one
130, in the present embodiment, the decorative base 130 is spherical decorative seat, it is possible to understand that, in other embodiments of the present utility model
In, the decorative base 130 can also use deltoid decorative base.
Embodiment described above only expresses several embodiments of the present utility model, and its description is more specific and detailed,
But therefore it can not be interpreted as the limitation to the utility model patent scope.It should be pointed out that for the common of this area
For technical staff, without departing from the concept of the premise utility, various modifications and improvements can be made, these all belong to
In the scope of protection of the utility model.Therefore, the protection domain of the utility model patent should be determined by the appended claims.
In the description of this specification, reference term " one embodiment ", " some embodiments ", " example ", " specifically show
The description of example " or " some examples " etc. means specific features, structure, material or the spy for combining the embodiment or example description
Point is contained at least one embodiment or example of the present utility model.In this manual, to the schematic table of above-mentioned term
State and be not necessarily referring to identical embodiment or example.Moreover, specific features, structure, material or the feature of description can be
Combined in an appropriate manner in any one or more embodiments or example.
Embodiment described above only expresses several embodiments of the present utility model, and its description is more specific and detailed,
But therefore it can not be interpreted as the limitation to the utility model patent scope.It should be pointed out that for the common of this area
For technical staff, without departing from the concept of the premise utility, various modifications and improvements can be made, these all belong to
In the scope of protection of the utility model.Therefore, the protection domain of the utility model patent should be determined by the appended claims.
Claims (8)
1. a kind of building parapet, including wall and roofing, it is characterised in that arc is provided between the wall and the roofing
Shape transition side, the inner side of the wall are provided with several installation sets, and the both sides of the installation set are provided with fixed ear, the fixed ear
It is fixedly connected by screw with the wall, vertical rail bar, the top of the wall is equipped with each installation set
Provided with bearing down on one, it is described bear down on one on open up several grooves, the rail bar passes through the groove, horizontal stroke is provided between the rail bar
To railing, the height of the front rail is higher than the height beared down on one, and fixed plate is provided with the notch of the groove, described solid
Fixed board passes through screw and the secure fit of bearing down on one.
2. building parapet according to claim 1, it is characterised in that the roofing includes stacking gradually from top to bottom
Upper waterproof layer, nonwoven layer, lower waterproof layer and screed-coat.
3. building parapet according to claim 1, it is characterised in that the fixed plate is provided with compact heap, described
Compact heap and the rail bar snug fit.
4. building parapet according to claim 1, it is characterised in that the outside of the wall is provided with guiding gutter.
5. building parapet according to claim 2, it is characterised in that the upper waterproof layer and the lower waterproof layer are equal
Using the thick cement mortar of 6~12mm, the nonwoven layer is the thick terylene non-woven fabrics of 1~4mm.
6. building parapet according to claim 5, it is characterised in that the upper waterproof layer and the lower waterproof layer
Thickness is identical.
7. the building parapet according to claim 1 to 6 any one, it is characterised in that the front rail is remote
Described one end beared down on one is provided with several decorative bases.
8. building parapet according to claim 7, it is characterised in that the decorative base is spherical decorative seat or rifle point
Shape decorative base.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720311500.6U CN206752879U (en) | 2017-03-28 | 2017-03-28 | Building parapet |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720311500.6U CN206752879U (en) | 2017-03-28 | 2017-03-28 | Building parapet |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206752879U true CN206752879U (en) | 2017-12-15 |
Family
ID=60611724
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720311500.6U Expired - Fee Related CN206752879U (en) | 2017-03-28 | 2017-03-28 | Building parapet |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206752879U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109252624A (en) * | 2018-10-23 | 2019-01-22 | 肖霞 | A kind of parapet seepage-proof structure and its construction method |
-
2017
- 2017-03-28 CN CN201720311500.6U patent/CN206752879U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109252624A (en) * | 2018-10-23 | 2019-01-22 | 肖霞 | A kind of parapet seepage-proof structure and its construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201184014Y (en) | Wall board and armored movable machinery room using the same | |
CN206220343U (en) | A kind of multi-functional composite color steel plate | |
CN206752879U (en) | Building parapet | |
CN211949246U (en) | Roof with waterproof integrated solar buttress | |
CN202530773U (en) | Reinforcing apparatus having brick-concrete structure | |
CN202577371U (en) | Building moisture-proof structure | |
CN207934510U (en) | A kind of multi-deck container formula army barracks | |
CN205894600U (en) | Concrete floor structure | |
CN211816461U (en) | Waterproof layer structure of passive room heating underground outdoor heat insulation material | |
CN208777630U (en) | A kind of raised flooring structure using stone material as surface layer | |
CN206917144U (en) | A kind of mushroom rock decorative integrated plate | |
CN203247747U (en) | Ridge waterproof and heat-insulation structure | |
CN206189690U (en) | Roof boarding and room lid | |
CN206941930U (en) | A kind of assembled slope roof surface board | |
CN203022239U (en) | Composite boss drain board | |
CN202559541U (en) | Novel deformation joint apparatus | |
CN206205117U (en) | Water-bound under a kind of Quick drainage | |
CN206385731U (en) | A kind of roof boarding and roof system | |
CN203213096U (en) | Novel boss of drainage board | |
CN204370719U (en) | A kind of flat roof waterproof heat insulation structural | |
CN204001329U (en) | A kind of floor slab structure that can built-in heat insulation embeds chamber | |
CN203939263U (en) | Fort, a kind of portable extraordinary composite plate base station | |
CN205242830U (en) | House property building material | |
CN203475714U (en) | Roof waterproof structure | |
CN210563032U (en) | Heat insulation type copper tile log cabin roof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171215 Termination date: 20180328 |
|
CF01 | Termination of patent right due to non-payment of annual fee |