CN206752459U - Bamboo joint pile reinforcing bar basket assembly - Google Patents

Bamboo joint pile reinforcing bar basket assembly Download PDF

Info

Publication number
CN206752459U
CN206752459U CN201720504160.9U CN201720504160U CN206752459U CN 206752459 U CN206752459 U CN 206752459U CN 201720504160 U CN201720504160 U CN 201720504160U CN 206752459 U CN206752459 U CN 206752459U
Authority
CN
China
Prior art keywords
hole
bamboo joint
joint pile
reinforcing bar
steel reinforcement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720504160.9U
Other languages
Chinese (zh)
Inventor
褚福勇
武大伟
李伟
吴伟鹏
何西泉
姜官青
李雪
单振东
李晓睿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
YANKUANG DONGHUA CONSTRUCTION CO Ltd
Original Assignee
YANKUANG DONGHUA CONSTRUCTION CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by YANKUANG DONGHUA CONSTRUCTION CO Ltd filed Critical YANKUANG DONGHUA CONSTRUCTION CO Ltd
Priority to CN201720504160.9U priority Critical patent/CN206752459U/en
Application granted granted Critical
Publication of CN206752459U publication Critical patent/CN206752459U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

It the utility model is related to a kind of bamboo joint pile reinforcing bar basket assembly.It is existing fill out core steel reinforcement cage in-convenience in use.For this, this bamboo joint pile is included filling out core steel reinforcement cage with reinforcing bar basket assembly, also include capping, N number of through hole is provided with capping, above-mentioned through hole is uniformly arranged in a ring, each corresponding longitudinal hole of through hole, a pin is provided with each through hole, fill out core steel reinforcement cage bottom and be provided with a round pallet, fill out in the middle part of core steel reinforcement cage and be provided with an annular clamp, the annular clamp may be stuck on adapted bamboo joint pile centre bore along upper, M tapped through hole is correspondingly provided with annular clamp, it is furnished with an anchorage screw in each tapped through hole, a Double-ended nut is additionally provided with the top of each anchorage screw, it is fixed on Double-ended nut by core steel reinforcement cage is filled out on the corresponding reinforcing bar of adapted foundation platform or adapted bolster, fixation can be readily achieved.The utility model bamboo joint pile reinforcing bar basket assembly has the advantages of simple in construction, easy to use, easy for construction, is adapted to prestressing force bamboo joint pile building site to use.

Description

Bamboo joint pile reinforcing bar basket assembly
Technical field
It the utility model is related to a kind of bamboo joint pile reinforcing bar basket assembly.
Background technology
With the development of building trade, building height is continuously increased, to building foundation bearing capacity requirement also more and more higher.
The bearing capacity of traditional concrete tubular pile is only influenceed by side skin friction and with stake end frictional resistance, to increase Bearing capacity can only be realized by increasing caliber or length, increase construction cost and difficulty.The prestressing force bamboo occurred in recent years Stake is saved, dress body surface is provided with projection, by soil compaction effect after burying, is engaged in one with sub-surface to raised close and firm Rise, substantially increase the frictional force of pile body and the soil body, greatly improve pile body total bearing capacity, in the requirement of equal bearing capacity Under, prestressing force bamboo joint pile can be thinner shorter more more economical than common pile for prestressed pipe, and therefore, the application of prestressing force bamboo joint pile will It is more and more wider.Manufacture bamboo joint pile mould it is how convenient, fast, it is efficient manufacture prestressing force bamboo joint pile also by increasing Research.
Connected between prestressing force bamboo joint pile and adapted foundation platform or bolster by filling out core armored concrete, pouring adapted Often fall the debris such as many soil, rubble, concrete when foundation platform or bolster, in the centre bore of prestressing force bamboo joint pile, it is necessary to Arduously draw out, it is very inconvenient, and also existing prestressing force bamboo joint pile is all welded to foundation platform or bolster with core steel reinforcement cage is filled out It is fixed inconvenient on reinforcing bar.
Utility model content
The technical problems to be solved in the utility model is how to overcome the drawbacks described above of prior art, there is provided a kind of bamboo joint pile With reinforcing bar basket assembly.
In order to solve the above technical problems, this bamboo joint pile reinforcing bar basket assembly, including core steel reinforcement cage is filled out, this fills out core steel reinforcement cage bag Include multiple ring muscle and a plurality of vertical bars, the ring muscle is arranged successively from top to bottom, the vertical bars in a ring uniform welding in each ring The outside or inner side of muscle, it is characterised in that:It also includes capping, and the capping is more than adapted bamboo joint pile center-hole diameter, adapted bamboo M equally distributed longitudinal holes are provided with section stake both ends end face, are provided with N number of through hole in capping, above-mentioned through hole is uniform in a ring Arrangement, the corresponding longitudinal hole of each through hole, each through hole is interior to be provided with a pin, and the pin lower portion can correspond to and insert longitudinal direction In through hole, the core steel reinforcement cage bottom of filling out is provided with a round pallet, and described fill out in the middle part of core steel reinforcement cage is provided with an annular clamp, The annular clamp overall diameter is more than adapted bamboo joint pile center-hole diameter, and may be stuck on adapted bamboo joint pile centre bore along upper, described Round pallet diameter is smaller than adapted bamboo joint pile center-hole diameter 2~6 millimeters, all ring muscle for filling out core steel reinforcement cage and all perpendicular Muscle is both fallen within the projected area of round pallet in the horizontal plane in the projection of horizontal plane, and M are correspondingly provided with the annular clamp Tapped through hole, above-mentioned tapped through hole correspond with the longitudinal hole on the end face of adapted bamboo joint pile both ends, and axis overlaps, each The root diameter of tapped through hole is respectively less than or equal to adapted bamboo joint pile center-hole diameter, each tapped through hole is interior to be furnished with an anchor Gu screw rod, each anchorage screw top is additionally provided with a Double-ended nut, and upper screwed hole is provided with the centre bore of Double-ended nut with Screwed hole, upper screwed hole and lower screwed hole axle center are relative, and the hand of spiral is on the contrary, the correspondence of adapted foundation platform or adapted bolster Reinforcing bar is provided with external screw thread, and the upper screwed hole of each Double-ended nut is tightened on the external screw thread of corresponding reinforcing bar;Its lower screwed hole rotation Tightly on corresponding anchorage screw, wherein M, N are positive integer, and N is equal to M half or three point one or a quarter.So Design, during pressing pile construction, it is covered in prestressing force ring stake top with capping, and is fixed with pin, such prestressing force bamboo joint pile is not Debris can be fallen into.Before pouring adapted foundation platform or bolster, remove capping and pin, core steel reinforcement cage will be filled out and be put into prestressing force ring In pile center hole, the corresponding reinforcing bar of adapted foundation platform or adapted bolster is then laid, sets anchorage screw annular clamp is built-in, Then, it is fixed on Double-ended nut by core steel reinforcement cage is filled out on the corresponding reinforcing bar of adapted foundation platform or adapted bolster, you can convenient Complete to fix in ground.
As optimization, the through hole in the capping is screwed hole, and the pin is screw.It is so designed that, is connected firmly.
The utility model bamboo joint pile reinforcing bar basket assembly has the advantages of simple in construction, easy to use, easy for construction, is adapted to Prestressing force bamboo joint pile building site uses.
Brief description of the drawings
The utility model bamboo joint pile is described further with reinforcing bar basket assembly below in conjunction with the accompanying drawings:
Fig. 1 is the capping schematic top plan view of this bamboo joint pile reinforcing bar basket assembly;
Fig. 2 is structural representation of this bamboo joint pile with reinforcing bar basket assembly.
In figure:1 for fill out core steel reinforcement cage, 11 be ring muscle, 12 be vertical bars, 2 be capping, 3 be adapted bamboo joint pile, 4 be through hole, 5 It is tapped through hole for round pallet, 6,7 be anchorage screw, 8 be Double-ended nut, 9 be adapted foundation platform, 10 is reinforcing bar.
Embodiment
Embodiment one:As shown in Fig. 2 this bamboo joint pile is included filling out core steel reinforcement cage 1 with reinforcing bar basket assembly, this fills out core steel reinforcement cage 1 includes multiple ring muscle 11 and a plurality of vertical bars 12, and the ring muscle 11 is arranged successively from top to bottom, the vertical bars 12 uniformly weldering in a ring It is connected on the outside or inner side of each ring muscle 11.It is characterized in that:It also includes capping 2, and the capping 2 is more than in adapted bamboo joint pile 3 Heart bore dia, M equally distributed longitudinal holes are provided with the both ends end face of adapted bamboo joint pile 3.
As shown in figure 1, N number of through hole 4 is provided with capping 2, and the uniformly arrangement in a ring of above-mentioned through hole 4, each through hole 4 corresponding one Individual longitudinal hole, each through hole 4 is interior to be provided with a pin (not shown), and the pin lower portion can correspond to insertion longitudinal hole It is interior.
As shown in Fig. 2 the bottom of core steel reinforcement cage 1 of filling out is provided with a round pallet 5, the middle part of core steel reinforcement cage 1 of filling out is set There is an annular clamp 5, the annular overall diameter of clamp 5 is more than the diameter of centre bore 4 of adapted bamboo joint pile 3, and may be stuck in adapted bamboo Saving on the centre bore 4 of stake 3 along upper, the diameter of round pallet 5 is smaller than the diameter of the centre bore 4 of adapted bamboo joint pile 3 2~6 millimeters, All ring muscle 11 for filling out core steel reinforcement cage 1 and all vertical bars 12 both fall within round pallet 5 in horizontal plane in the projection of horizontal plane On projected area in, be correspondingly provided with M tapped through hole 6 on the annular clamp 5,3 liang of above-mentioned tapped through hole 6 and adapted bamboo joint pile Hold the longitudinal hole on end face to correspond, and axis overlaps, the root diameter of each tapped through hole 6 be respectively less than or equal to With the diameter of the centre bore 4 of bamboo joint pile 3, each tapped through hole 6 is interior to be furnished with an anchorage screw 7, and each top of anchorage screw 7 is also Provided with a Double-ended nut 8, upper screwed hole and lower screwed hole, upper screwed hole and lower screw thread are provided with the centre bore of Double-ended nut 8 The hole axle heart is relative, and the hand of spiral is on the contrary, the corresponding reinforcing bar 10 of adapted foundation platform 9 (or adapted bolster) is provided with external screw thread, The upper screwed hole of each Double-ended nut 8 is tightened on the external screw thread of corresponding reinforcing bar 10;Its lower screwed hole is tightened on corresponding anchoring On screw rod 7, wherein M, N are positive integer, and N is equal to M half or three point one or a quarter.
Through hole 4 in the capping 2 is screwed hole, and the pin is screw.

Claims (2)

1. a kind of bamboo joint pile reinforcing bar basket assembly, including core steel reinforcement cage is filled out, this, which fills out core steel reinforcement cage, includes multiple ring muscle and a plurality of perpendicular Muscle, the ring muscle are arranged successively from top to bottom, and for uniform welding in the outside or inner side of each ring muscle, it is special in a ring for the vertical bars Sign is:It also includes capping, and the capping is more than adapted bamboo joint pile center-hole diameter, and adapted bamboo joint pile both ends are provided with M on end face Individual equally distributed longitudinal hole, N number of through hole is provided with capping, above-mentioned through hole is uniformly arranged in a ring, each through hole corresponding one Individual longitudinal hole, each through hole is interior to be provided with a pin, and the pin lower portion can be corresponded in insertion longitudinal hole, described to fill out core reinforcing bar Cage bottom portion is provided with a round pallet, and described fill out in the middle part of core steel reinforcement cage is provided with an annular clamp, and the annular clamp overall diameter is big In adapted bamboo joint pile center-hole diameter, and it may be stuck on adapted bamboo joint pile centre bore along upper, the round pallet diameter compares adapted Bamboo joint pile center-hole diameter is small 2~6 millimeters, all ring muscle for filling out core steel reinforcement cage and all vertical bars horizontal plane projection all Fall into round pallet in the horizontal plane in projected area, M tapped through hole, above-mentioned screw thread are correspondingly provided with the annular clamp Through hole corresponds with the longitudinal hole on the end face of adapted bamboo joint pile both ends, and axis overlaps, the root circle of each tapped through hole Diameter is respectively less than or equal to adapted bamboo joint pile center-hole diameter, each tapped through hole is interior to be furnished with an anchorage screw, each anchoring Screw tip is additionally provided with a Double-ended nut, and upper screwed hole and lower screwed hole, upper screwed hole are provided with the centre bore of Double-ended nut It is relative with lower screwed hole axle center, and the hand of spiral is on the contrary, the corresponding reinforcing bar of adapted foundation platform or adapted bolster is provided with outer spiral shell Line, the upper screwed hole of each Double-ended nut are tightened on the external screw thread of corresponding reinforcing bar;Its lower screwed hole is tightened on corresponding anchoring On screw rod, wherein M, N are positive integer, and N is equal to M half or three point one or a quarter.
2. bamboo joint pile according to claim 1 reinforcing bar basket assembly, it is characterised in that:Through hole in the capping is screw thread Hole, the pin are screw.
CN201720504160.9U 2017-05-08 2017-05-08 Bamboo joint pile reinforcing bar basket assembly Expired - Fee Related CN206752459U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720504160.9U CN206752459U (en) 2017-05-08 2017-05-08 Bamboo joint pile reinforcing bar basket assembly

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720504160.9U CN206752459U (en) 2017-05-08 2017-05-08 Bamboo joint pile reinforcing bar basket assembly

Publications (1)

Publication Number Publication Date
CN206752459U true CN206752459U (en) 2017-12-15

Family

ID=60617349

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720504160.9U Expired - Fee Related CN206752459U (en) 2017-05-08 2017-05-08 Bamboo joint pile reinforcing bar basket assembly

Country Status (1)

Country Link
CN (1) CN206752459U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110528526A (en) * 2019-09-26 2019-12-03 成都建工第四建筑工程有限公司 A kind of method and device of manually digging hole pile cages positioning and degree control
CN116446435A (en) * 2023-06-19 2023-07-18 中国土木工程集团有限公司 Novel revetment pile foundation structure under complicated geological conditions

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110528526A (en) * 2019-09-26 2019-12-03 成都建工第四建筑工程有限公司 A kind of method and device of manually digging hole pile cages positioning and degree control
CN110528526B (en) * 2019-09-26 2024-03-26 成都建工第四建筑工程有限公司 Method and device for positioning and controlling verticality of reinforcement cage of manual hole digging pile
CN116446435A (en) * 2023-06-19 2023-07-18 中国土木工程集团有限公司 Novel revetment pile foundation structure under complicated geological conditions
CN116446435B (en) * 2023-06-19 2023-09-29 中国土木工程集团有限公司 Novel revetment pile foundation structure under complicated geological conditions

Similar Documents

Publication Publication Date Title
CN105569183B (en) Concrete-filled Double Skin Steel Tube Columns pin node
CN206736901U (en) A kind of anchor pole or pile foundation variable diameters steel reinforcement cage
CN206752459U (en) Bamboo joint pile reinforcing bar basket assembly
CN203924099U (en) Bonding modified Rock Bolt Foundation
CN210766743U (en) High resistance to compression concrete tubular pile
CN109235413B (en) Device for reinforcing soft soil foundation by transverse reinforced rigid-flexible composite piles and construction method
CN204849799U (en) Antidetonation connection structure between stress tube stake and cushion cap in advance
CN103195055A (en) Prefabricated helical pile head for assisting prestressed high-strength concrete (PHC) pipe pile in pile sinking and construction method
CN206174594U (en) Roofing concatenation formula pole setting connection structure
CN202755362U (en) Prestressed concrete pile
CN205604283U (en) Building bar planting concrete column
CN202500146U (en) Steel-structure assembly type bearing platform tubular pile foundation
CN203639905U (en) Spinning pile, spinning pile waist and spinning pile head
CN102134856B (en) Tower crane foundation
CN214401745U (en) Environment-friendly precast pile for soft foundation treatment
CN206337561U (en) A kind of anchor pole for being used to improve retaining wall bearing capacity
CN211689865U (en) Reinforced pier
CN205205847U (en) Frame construction of stake cushion cap
CN210105124U (en) Auxiliary reinforcing member for two-way inclined support column base
CN209144780U (en) Transversal reinforcement combination of rigidity and flexibility stake reinforcing soft ground device
CN209838439U (en) Coal mine tunnel roof fall prosthetic devices
CN105297759A (en) Framework structure of pile and pillar bearing platform
CN205917725U (en) Communication tower
CN205918208U (en) Tubular communication tower
CN205976692U (en) Base of communication tower

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171215

Termination date: 20180508