CN206742774U - A kind of Novel cable bridge - Google Patents
A kind of Novel cable bridge Download PDFInfo
- Publication number
- CN206742774U CN206742774U CN201720400357.8U CN201720400357U CN206742774U CN 206742774 U CN206742774 U CN 206742774U CN 201720400357 U CN201720400357 U CN 201720400357U CN 206742774 U CN206742774 U CN 206742774U
- Authority
- CN
- China
- Prior art keywords
- crane span
- span structure
- screw
- support bar
- draw back
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Load-Engaging Elements For Cranes (AREA)
Abstract
The utility model discloses a kind of Novel cable bridge, including crane span structure, suspension rod and hanging beam, plane four-way is provided with the crane span structure switching, plane four-way is connected by screw with crane span structure, suspension rod and hanging beam pass through screw connection, hanging beam is located at crane span structure bottom, screw thread is provided with the outside of suspension rod, crane span structure terminal is detachably connected provided with terminal end socket, draw back plate is provided with inside the crane span structure, side plate and covering plate, draw back plate is connected by hinge with side plate, draw back plate bottom is provided with draw ring, draw back plate top is provided with connecting rod and fixed seat, connecting rod is fixedly connected with biside plate, fixed seat top is provided with support bar, support bar top is provided with cable, cable contacts connection with support bar, side plate is provided with positioning hole, screw rod and groove, groove is located at side plate bottom, covering plate is located at crane span structure top.This kind of Novel cable bridge, by being provided with support bar inside crane span structure, and support bar can be dismantled, convenient that cable inside crane span structure is overhauled.
Description
Technical field
Cable laying be the utility model is related to for technical field, specially a kind of Novel cable bridge.
Background technology
Exterior cable is provided with one layer of important insulating protective layer, must if protective layer has the situation scratched or worn
Special insulating tape must be wound according to associated construction specification, wasted time and energy;It is existing in construction if the cut of cable is long, too deep
Field, which can only be done, scraps processing, causes serious waste, delays the duration, and the damage of cable insulation protective layer occurs mainly in cable and applied
During if, such as in cabling on groove or crane span structure, as run on groove or crane span structure it is jagged, raised or sharp
During obstacle, during cable is pulled by hauling machine and is passed through, not only speed is slow, and efficiency is low, and cable and above-mentioned obstacle
Friction easily causes the major injury of cable insulation protective layer, and traditional cable testing bridge is that cable is placed in inside crane span structure,
Bottom is detachably connected by screw and side plate, extremely inconvenient for maintenance circuit, and the connecting rod of support cable is not
Removably, use is extremely inconvenient.For this, we devise a kind of a new Novel cable bridge, solve traditional one
The problem of kind Novel cable bridge is inconvenient for use.
Utility model content
The purpose of this utility model is to provide a kind of Novel cable bridge, to solve existing technological deficiency and can not reach
The technical requirements arrived.
To achieve the above object, the utility model provides following technical scheme:A kind of Novel cable bridge, including crane span structure,
Suspension rod and hanging beam, plane four-way are provided with the crane span structure switching, plane four-way is connected by screw with crane span structure, and suspension rod and hanging beam lead to
Screw connection is crossed, hanging beam is located at crane span structure bottom, screw thread is provided with the outside of suspension rod, and crane span structure terminal is detachably connected provided with terminal end socket,
Draw back plate, side plate and covering plate are provided with inside the crane span structure, draw back plate is connected by hinge with side plate, and draw back plate bottom, which is provided with, draws
Ring, draw back plate top are provided with connecting rod and fixed seat, and connecting rod is fixedly connected with biside plate, and fixed seat top is provided with support bar,
Support bar top is provided with cable, and cable contacts connection with support bar, and side plate is provided with positioning hole, screw rod and groove, and groove is located at
Side plate bottom, covering plate are located at crane span structure top, and connection is contacted with crane span structure.
Preferably, card is provided with the outside of the draw back plate, draw back plate one end is connected by hinge with side plate, and one end passes through card
Piece is fixedly connected with groove.
Preferably, the support bar and fixed seat are connected by contacting.
Preferably, the bolt is located inside wall top, and stud base is provided with screw, and suspension rod is detachable with screw by nut
Link together.
Preferably, connector is provided between the crane span structure and crane span structure, and is coordinated by screw and positioning hole so that crane span structure connects
It is connected together.
Compared with prior art, the beneficial effects of the utility model are as follows:
1. compared with traditional cable testing bridge, the Novel cable bridge after improvement in side plate bottom by being fixed with fixation
Seat, is provided with support bar, support bar can be dismantled, can be by support bar after circuit goes wrong in fixed seat
Remove, facilitate electrician to overhaul circuit, find out where problem goes out as soon as possible.
2. compared with traditional cable testing bridge, the Novel cable bridge after improvement will be drawn manually after circuit goes wrong
Ring pulls down, and the situation inside enhanced convenience observation cable, after long-time use, is stood covered in dust inside crane span structure, can
So that draw back plate to be opened, inside is cleared up, prevents joint from causing short circuit due to the long time integration of dust.
Brief description of the drawings
Fig. 1 is a kind of Novel cable bridge structural representation of the utility model;
Fig. 2 is a kind of Novel cable bridge internal structure schematic diagram of the utility model;
Fig. 3 is a kind of Novel cable bridge side structure schematic view of the utility model;
In figure:1- crane span structures, 2- suspension rods, 3- hanging beams, 4- plane four-ways, 5- connectors, 6- terminal end sockets, 7- positioning holes, 8-
Cable, 9- connecting rods, 10- support bars, 11- hinges, 12- draw back plates, 13- fixed seats, 14- screw rods, 15- side plates, 16- grooves,
17- covering plates, 18- draw rings.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out
Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole
Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made
The every other embodiment obtained, belong to the scope of the utility model protection.
Fig. 1-3 are referred to, the utility model provides a kind of technical scheme:A kind of Novel cable bridge, including crane span structure 1, hang
Bar 2 and hanging beam 3, plane four-way 4 are provided with the switching of crane span structure 1, plane four-way 4 is connected by screw with crane span structure 1, the He of suspension rod 2
For hanging beam 3 by screw connection, hanging beam 3 is located at the bottom of crane span structure 1, and the outside of suspension rod 2 is provided with screw thread, and the terminal of crane span structure 1, which is detachably connected, to be set
There is terminal end socket 6, the inside of crane span structure 1 is provided with draw back plate 12, side plate 15 and covering plate 17, and draw back plate 12 passes through hinge 11 and side
Plate 15 connects, and the bottom of draw back plate 12 is provided with draw ring 18, and the top of draw back plate 12 is provided with connecting rod 9 and fixed seat 13, connecting rod 9 and two
Side plate is fixedly connected, and the top of fixed seat 13 is provided with support bar 10, and the top of support bar 10 is provided with cable 8, and cable 8 connects with support bar 10
Connection is touched, side plate 15 is provided with positioning hole 7, screw rod 14 and groove 16, and groove 16 is located at the bottom of side plate 15, and covering plate 17 is located at bridge
The top of frame 1, connection is contacted with crane span structure 1.
The outside of draw back plate 12 is provided with card, and the one end of draw back plate 12 is connected by hinge 11 with side plate 15, and one end passes through card
It is fixedly connected with groove 16, after circuit goes wrong, by opening draw back plate 12, in order to observe the situation inside cable 8,
Make corresponding processing method.
Support bar 10 and fixed seat 13 are connected by contacting, and support bar 10 is located in fixed seat 13 in U-shaped groove,
The supporting role to cable 8 is played, when fault occurs for cable 8, support bar 10 is pulled down circuit is carried out to cable 8
Failture evacuation.
Bolt is located inside wall top, and stud base is provided with screw, and suspension rod 2 is detachably connected on one by nut and screw
Rise, 2 are fixedly connected in wall top, and hanging beam 3 is connected by screw with suspension rod 2, and crane span structure 1 is played a supporting role, and prevents from dropping.
Connector 5 is provided between crane span structure 1 and crane span structure 1, and is coordinated by screw and positioning hole 7 so that crane span structure 1 is connected to one
Rise, because the length of crane span structure 1 is long, not only installation is inconvenient, and hardness and intensity can also reduce, and use the crane span structure being of convenient length
1, crane span structure 1 is connected with crane span structure 1 by connector 5.
Suspension rod 2 is first fixed in wall top and hanging beam 3 is connected into suspension rod 2 again by a kind of Novel cable bridge of the utility model
Bottom, crane span structure 1 is arranged on hanging beam 3, then crane span structure 1 is fixed on hanging beam 3 by screw, by cable 8 according to construction of cable run
Figure tiling is located on the support bar 10 inside crane span structure 1, and covering plate 17 is finally placed in the top of crane span structure 1 by contacting connection.
While there has been shown and described that embodiment of the present utility model, for the ordinary skill in the art,
It is appreciated that these embodiments can be carried out with a variety of changes in the case where not departing from principle of the present utility model and spirit, repaiied
Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.
Claims (5)
1. a kind of Novel cable bridge, including crane span structure (1), suspension rod (2) and hanging beam (3), it is characterised in that:The crane span structure (1) turns
Meet place and be provided with plane four-way (4), plane four-way (4) is connected by screw with crane span structure (1), and suspension rod (2) and hanging beam (3) pass through screw
Connection, hanging beam (3) are located at crane span structure (1) bottom, are provided with screw thread on the outside of suspension rod (2), crane span structure (1) terminal is detachably connected provided with terminal
End socket (6), the crane span structure (1) is internal to be provided with draw back plate (12), side plate (15) and covering plate (17), and draw back plate (12) passes through hinge
(11) it is connected with side plate (15), draw back plate (12) bottom is provided with draw ring (18), and draw back plate (12) top is provided with connecting rod (9) and admittedly
Reservation (13), connecting rod (9) are fixedly connected with biside plate, and fixed seat (13) top is provided with support bar (10), on support bar (10)
Portion is provided with cable (8), and cable (8) contacts connection with support bar (10), side plate (15) be provided with positioning hole (7), screw rod (14) and
Groove (16), groove (16) are located at side plate (15) bottom, and covering plate (17) is located at crane span structure (1) top, with crane span structure (1) company of contact
Connect.
A kind of 2. Novel cable bridge according to claim 1, it is characterised in that:Card is provided with the outside of the draw back plate (12)
Piece, draw back plate (12) one end are connected by hinge (11) with side plate (15), and one end is fixedly connected by card with groove (16).
A kind of 3. Novel cable bridge according to claim 1, it is characterised in that:The support bar (10) and fixed seat
(13) connected by contacting.
A kind of 4. Novel cable bridge according to claim 1, it is characterised in that:Bolt is located inside wall top, bolt bottom
Portion is provided with screw, and suspension rod (2) is detachably connected by nut and screw.
A kind of 5. Novel cable bridge according to claim 1, it is characterised in that:Between the crane span structure (1) and crane span structure (1)
Coordinate provided with connector (5), and by screw and positioning hole (7) so that crane span structure (1) links together.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720400357.8U CN206742774U (en) | 2017-04-17 | 2017-04-17 | A kind of Novel cable bridge |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720400357.8U CN206742774U (en) | 2017-04-17 | 2017-04-17 | A kind of Novel cable bridge |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206742774U true CN206742774U (en) | 2017-12-12 |
Family
ID=60561239
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720400357.8U Active CN206742774U (en) | 2017-04-17 | 2017-04-17 | A kind of Novel cable bridge |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206742774U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113193519A (en) * | 2021-04-28 | 2021-07-30 | 中铁建工集团有限公司 | Inner support type bridge frame for bridge, box girder and tunnel construction |
-
2017
- 2017-04-17 CN CN201720400357.8U patent/CN206742774U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113193519A (en) * | 2021-04-28 | 2021-07-30 | 中铁建工集团有限公司 | Inner support type bridge frame for bridge, box girder and tunnel construction |
CN113193519B (en) * | 2021-04-28 | 2022-09-13 | 中铁建工集团有限公司 | Inner support type bridge frame for bridge, box girder and tunnel construction |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105790150B (en) | A kind of cable aligns pulley bracket | |
CN105305317B (en) | Live wire hangs the instrument of insulated flexible ladder | |
CN206742774U (en) | A kind of Novel cable bridge | |
CN202967920U (en) | Hanging overhaul device of load switch of transformer | |
CN207183553U (en) | A kind of practical multicore cable alignment device | |
CN205543906U (en) | Cubical switchboard hoisting accessory | |
CN201682215U (en) | High-altitude line hanging device | |
CN205312977U (en) | Portable elevating gear | |
CN216530465U (en) | Bypass insulation drainage wire fixing device | |
CN104348119A (en) | Control console routing structure | |
CN210640495U (en) | Automatic management device for power distribution network | |
CN210607690U (en) | Hook-holding automatic fastening grounding wire clamp | |
CN204155751U (en) | High-power transformer sleeve pipe installation and repairing frock | |
CN106207850B (en) | The operational method of charged for replacement holes duplex board linear insulator chain | |
CN212849614U (en) | Universal suspension fixing device for cross arm angle iron of line tower | |
CN219420183U (en) | Bridge frame with good heat dissipation capacity | |
CN204391603U (en) | Charged insulating ceiling plate | |
CN104742103B (en) | A kind of multi-action computer network layout tool box | |
CN204775837U (en) | Washing of tanks ladder | |
CN216085780U (en) | Building regulator cubicle convenient to overhaul | |
CN203732768U (en) | Wire coiling frame for rubber-insulated fiber cable production equipment | |
CN221058005U (en) | Bus anti-falling device | |
CN205600606U (en) | Plug -type 2M connects replacer | |
CN202949198U (en) | Paying-off pulley for cable overhead installation | |
CN208596904U (en) | Phase cross-arm fixture in one kind |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address |
Address after: 518000 building C, 29-3, Shakeng 2nd Road, biling community, biling street, Pingshan District, Shenzhen City, Guangdong Province Patentee after: Guangdong yichengfa Technology Group Co.,Ltd. Address before: 518000 1st floor, building B, Nanhu Industrial Zone, Shahu community, Pingshan office, Pingshan New District, Shenzhen City, Guangdong Province Patentee before: SHENZHEN YICHENGFA TECHNOLOGY Co.,Ltd. |
|
CP03 | Change of name, title or address |