CN206736923U - A kind of suspension type concrete shakes flat workbench - Google Patents

A kind of suspension type concrete shakes flat workbench Download PDF

Info

Publication number
CN206736923U
CN206736923U CN201720304996.4U CN201720304996U CN206736923U CN 206736923 U CN206736923 U CN 206736923U CN 201720304996 U CN201720304996 U CN 201720304996U CN 206736923 U CN206736923 U CN 206736923U
Authority
CN
China
Prior art keywords
suspension type
type concrete
horizontal operation
shakes
operation support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720304996.4U
Other languages
Chinese (zh)
Inventor
徐振家
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Haimen Luqiao Construction Co Ltd
Original Assignee
Haimen Luqiao Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Haimen Luqiao Construction Co Ltd filed Critical Haimen Luqiao Construction Co Ltd
Priority to CN201720304996.4U priority Critical patent/CN206736923U/en
Application granted granted Critical
Publication of CN206736923U publication Critical patent/CN206736923U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

Building implement field is the utility model is related to, specially a kind of suspension type concrete shakes flat workbench.The utility model provides a kind of suspension type concrete and shaken flat workbench, including workbench support and shaking table, workbench support includes horizontal operation support and vertical Working rack, and one end of vertical Working rack is vertically set on the centre position of the horizontal operation support;The other end of vertical Working rack is fixedly connected with shaking table;The two bottom sides of horizontal operation support are provided with pulley.It is connected to by vertical Working rack between horizontal operation support and shaking table, shaking table is vacantly set, moved by pulley, improve operating efficiency, concrete in the prior art is overcome to shake the defects of flat workbench operating efficiency is low, and vertical precision is forbidden.

Description

一种悬挂式混凝土振平工作平台A suspended concrete vibrating work platform

技术领域technical field

本实用新型涉及建筑工具领域,具体为一种悬挂式混凝土振平工作平台。The utility model relates to the field of construction tools, in particular to a suspended concrete leveling work platform.

背景技术Background technique

传统的深基坑箱涵类混凝土垫层、底板浇筑时的纵向水平精度控制采用的是:1、在箱涵基槽底部设水平高度的钢筋样桩或水泥墩作为混凝土底板的水平高度的基准点。2、用人工将直尺贴紧样桩平面来刮平混凝土。The traditional control of longitudinal horizontal accuracy of the box culvert concrete cushion and bottom slab in deep foundation pits is as follows: 1. Set a horizontal steel sample pile or cement pier at the bottom of the box culvert foundation groove as the benchmark of the horizontal height of the concrete bottom slab point. 2. Manually stick the ruler close to the plane of the sample pile to level the concrete.

这种工艺的最大缺点是:1、横向纵向水平高度的误差控制严重超标,经常造成下道工艺二次返工。2、工作效率低下,仅为悬挂式振动平台的二十分之一。The biggest disadvantage of this process is: 1. The error control of horizontal, vertical and horizontal heights seriously exceeds the standard, often causing secondary rework of the next process. 2. The work efficiency is low, only one-twentieth of that of the suspended vibration platform.

实用新型内容Utility model content

本实用新型要解决的技术问题是:克服现有技术中混凝土振平工作平台工作效率低,竖直精度不准的缺陷。The technical problem to be solved by the utility model is to overcome the defects of low working efficiency and inaccurate vertical precision of the concrete vibrating work platform in the prior art.

为实现上述目的,本实用新型提供如下技术方案:一种悬挂式混凝土振平工作平台,包括工作平台支架和振动工作台,In order to achieve the above purpose, the utility model provides the following technical solutions: a suspended concrete vibrating work platform, including a work platform support and a vibrating workbench,

工作平台支架包括水平工作支架和竖直工作支架,竖直工作支架的一端垂直设置在所述水平工作支架上;The working platform support includes a horizontal working support and a vertical working support, and one end of the vertical working support is vertically arranged on the horizontal working support;

竖直工作支架的另一端和振动工作台固定连接;The other end of the vertical working support is fixedly connected to the vibration table;

水平工作支架的底部两侧设置有滑轮。Pulleys are arranged on both sides of the bottom of the horizontal working support.

作为优选,所述水平工作支架的中间位置设有导向孔,竖直工作支架四边的销轴插装在导向孔中;水平工作支架的中间位置连接有提升装置;水平工作支架的中间位置垂直设有高度调节螺杆,高度调节螺杆的一端与提升装置连接,另一端与竖直工作支架连接。As a preference, the middle position of the horizontal work support is provided with a guide hole, and the pin shafts on the four sides of the vertical work support are inserted in the guide hole; the middle position of the horizontal work support is connected with a lifting device; the middle position of the horizontal work support is vertically set There is a height adjustment screw rod, one end of the height adjustment screw rod is connected with the lifting device, and the other end is connected with the vertical working support.

作为优选,所述提升装置包括,Preferably, the lifting device includes,

电机,其与水平工作支架固定连接;The motor is fixedly connected with the horizontal working support;

第一斜齿轮,其与电机的输出端连接;the first helical gear, which is connected to the output end of the motor;

第二斜齿轮,其与水平工作支架通过固定座连接,第二斜齿轮与固定座之间连接有第一轴承;The second helical gear is connected with the horizontal working support through a fixed seat, and the first bearing is connected between the second helical gear and the fixed seat;

水平工作支架和第二斜齿轮沿第二斜齿轮的轴心设有通孔,高度调节螺杆插装在通孔中,第二斜齿轮内的通孔与高度调节螺杆设有相互配合的螺纹。The horizontal working support and the second helical gear are provided with a through hole along the axis of the second helical gear, and the height adjustment screw is inserted in the through hole, and the through hole in the second helical gear and the height adjustment screw are provided with mutually cooperating threads.

作为优选,所述竖直工作支架上设有第二轴承,第二轴承的外圈与竖直工作支架固定连接,第二轴承的内圈与高度调节螺杆固定连接。Preferably, the vertical working support is provided with a second bearing, the outer ring of the second bearing is fixedly connected with the vertical working support, and the inner ring of the second bearing is fixedly connected with the height adjusting screw.

作为优选,所述水平工作支架的底部两侧的其中一侧的滑轮的圆弧面设有滑槽,滑轮放置在轨道上。Preferably, the arc surface of the pulley on one of the two sides of the bottom of the horizontal working support is provided with a chute, and the pulley is placed on the track.

作为优选,所述轨道包括轨道梁,Advantageously, said track comprises track beams,

固定板,其中间与轨道梁连接;fixed plate, the middle of which is connected with the track beam;

防偏板,其连接于轨道梁的一端;An anti-deflection plate, which is connected to one end of the track beam;

防偏销,其插装在防偏板上。The anti-deflection pin is inserted on the anti-deflection plate.

作为优选,所述轨道梁的内部为空腔,空腔的一端设有对接块。Preferably, the inside of the track beam is a cavity, and a docking block is provided at one end of the cavity.

作为优选,所述对接块的内部为空腔,对接块的一端与相邻轨道梁未设置对接块的一端连接,并向其中心弯折。Preferably, the inside of the docking block is a cavity, and one end of the docking block is connected to the end of the adjacent track beam without the docking block, and is bent toward the center thereof.

作为优选,所述轨道梁设有防偏板的一端连接有连接板,连接板与固定板设置在轨道梁下端面,所述固定板上设置有螺纹孔,所述高度调节螺栓穿过所述螺纹孔设置。As a preference, the track beam is provided with a connecting plate connected to one end of the deflection plate, the connecting plate and the fixing plate are arranged on the lower end surface of the track beam, the fixing plate is provided with a threaded hole, and the height adjusting bolt passes through the Threaded hole settings.

作为优选,多组所述悬挂式混凝土振平工作平台上水平工作支架横向排列。As a preference, multiple groups of horizontal working supports on the suspended concrete vibrating working platform are arranged horizontally.

本实用新型方案,具有如下优点:The utility model scheme has the following advantages:

本实用新型提供的一种悬挂式混凝土振平工作平台,通过竖直工作支架连接于水平工作支架和振动工作台之间,通过电机控制调节螺杆移动,调节工作平台的高度,使得混凝土底板的厚度精确控制;通过滑轮移动,控制施工混凝土底板的速度,提高了工作效率;通过高度调节螺栓调节轨道梁的高度,使得轨道在一个水平高度,提高了施工混凝土底板的平面度。The utility model provides a suspended concrete vibrating working platform, which is connected between the horizontal working support and the vibrating worktable through the vertical working support, and the motor controls the movement of the adjusting screw to adjust the height of the working platform so that the thickness of the concrete bottom plate Precise control; through the movement of the pulley, the speed of the construction concrete floor is controlled, which improves the work efficiency; the height of the track beam is adjusted through the height adjustment bolt, so that the track is at a horizontal height, which improves the flatness of the construction concrete floor.

附图说明Description of drawings

图1是本实用新型中实施例1的整体结构示意图。Fig. 1 is the overall structure schematic diagram of embodiment 1 in the utility model.

图2是本实用新型中提升装置的放大图。Fig. 2 is an enlarged view of the lifting device in the utility model.

图3是本实用新型中轨道的结构示意图。Fig. 3 is a structural schematic diagram of the track in the utility model.

图4是本实用新型中轨道A-A向的剖视图。Fig. 4 is a cross-sectional view of the track A-A in the utility model.

图5是本实用新型中实施例2的整体结构示意图。Fig. 5 is a schematic diagram of the overall structure of Embodiment 2 of the present utility model.

其中,工作平台支架-1、水平工作支架-101、竖直工作支架-102;Among them, working platform support-1, horizontal working support-101, vertical working support-102;

高度调节螺杆-2;Height adjustment screw-2;

振动工作台-3;Vibration table-3;

轨道-4、轨道梁-401、固定板-402、防偏板-403、防偏销-404、对接块-405、连接板-406、高度调节螺栓-407;Track-4, track beam-401, fixed plate-402, anti-deflection plate-403, anti-deflection pin-404, docking block-405, connecting plate-406, height adjustment bolt-407;

滑轮-5;Pulley - 5;

提升装置-6、电机-601、第一斜齿轮-602、第二斜齿轮-603、固定座-604、第一轴承-605Lifting device-6, motor-601, first helical gear-602, second helical gear-603, fixed seat-604, first bearing-605

第二轴承-7;Second bearing - 7;

导向孔-8。Pilot hole-8.

具体实施方式detailed description

实施例1Example 1

如图1所示,一种悬挂式混凝土振平工作平台,包括工作平台支架1和振动工作台3,工作平台支架1包括水平工作支架101和竖直工作支架102,竖直工作支架102的一端垂直设置在所述水平工作支架101的中间位置,竖直工作支架102的另一端和振动工作台3通过螺栓固定连接;水平工作支架101的中间位置设有导向孔8,竖直工作支架102四边的销轴插装在导向孔8中,竖直工作支架102能够在导向孔8中上下移动;水平工作支架101的中间位置连接有提升装置6;水平工作支架101的中间位置垂直设有高度调节螺杆2,高度调节螺杆2的一端与提升装置6连接,另一端与竖直工作支架102连接,竖直工作支架102上设有第二轴承,第二轴承的外圈与竖直工作支架102固定连接,第二轴承的内圈与高度调节螺杆2固定连接,使高度调节螺杆2能够在竖直工作支架102上转动;水平工作支架101的底部两侧设置有滑轮5,水平工作支架101的底部两侧的其中一侧的滑轮5的圆弧面设有滑槽501。As shown in Figure 1, a kind of suspended concrete vibrating working platform comprises working platform support 1 and vibrating worktable 3, and working platform support 1 comprises horizontal working support 101 and vertical working support 102, and one end of vertical working support 102 Vertically arranged in the middle position of the horizontal work support 101, the other end of the vertical work support 102 is fixedly connected with the vibration table 3 by bolts; the middle position of the horizontal work support 101 is provided with a guide hole 8, and the four sides of the vertical work support 102 The pin shaft is inserted in the guide hole 8, and the vertical working support 102 can move up and down in the guiding hole 8; the middle position of the horizontal working support 101 is connected with a lifting device 6; the middle position of the horizontal working support 101 is vertically provided with a height adjustment Screw rod 2, one end of height adjustment screw rod 2 is connected with hoisting device 6, and the other end is connected with vertical work support 102, is provided with second bearing on the vertical work support 102, and the outer ring of the second bearing is fixed with vertical work support 102 connection, the inner ring of the second bearing is fixedly connected with the height adjustment screw rod 2, so that the height adjustment screw rod 2 can rotate on the vertical work support 102; The arc surface of the pulley 5 on one of the two sides is provided with a slide groove 501 .

如图2所示,提升装置6包括,电机601,其与水平工作支架101固定连接;第一斜齿轮602,其与电机601的输出端连接;第二斜齿轮603,其与水平工作支架101通过固定座604连接,第二斜齿轮603与固定座604之间连接有第一轴承605;水平工作支架101和第二斜齿轮603沿第二斜齿轮603的轴心设有通孔,高度调节螺杆2插装在通孔中,第二斜齿轮603内的通孔与高度调节螺杆2设有相互配合的螺纹,电机601带动第一斜齿轮602转动,第一斜齿轮602带动第二斜齿轮603转动,通过第二斜齿轮603内的通孔与高度调节螺杆2上相互配合的螺纹,带动高度调节螺杆2上下移动。As shown in Figure 2, lifting device 6 comprises, motor 601, and it is fixedly connected with horizontal working support 101; The first helical gear 602, it is connected with the output end of motor 601; Connected by the fixed seat 604, the first bearing 605 is connected between the second helical gear 603 and the fixed seat 604; the horizontal working support 101 and the second helical gear 603 are provided with a through hole along the axis of the second helical gear 603, and the height adjustment The screw rod 2 is inserted in the through hole, and the through hole in the second helical gear 603 and the height adjustment screw 2 are provided with threads that cooperate with each other. The motor 601 drives the first helical gear 602 to rotate, and the first helical gear 602 drives the second helical gear 603 rotates, through the through hole in the second helical gear 603 and the screw thread that cooperates on the height adjustment screw rod 2, drives the height adjustment screw rod 2 to move up and down.

如图3和图4所示,滑轮5放置在轨道4上,轨道4包括轨道梁401;固定板402,其中间与轨道梁401连接;防偏板403,其连接于轨道梁401的一端;防偏销404,其插装在防偏板403上;轨道梁401的内部为空腔,空腔的一端设有对接块405;对接块405的内部为空腔,对接块405的一端与相邻轨道梁401未设置对接块405的一端连接,并向其中心弯折;轨道梁401设有防偏板403的一端连接有连接板406,连接板406与固定板402设置在轨道梁401的下端面,当两条轨道梁401对接后,将连接板406的两端分别与轨道梁401连接,使相邻的轨道梁401之间实现平滑过渡,也起到连接两条轨道梁401的作用,所述固定板402上设置有螺纹孔,高度调节螺栓407穿过所述螺纹孔设置,所述高度调节螺栓407能调节轨道梁的高度,使得轨道在一个水平高度,提高了施工混凝土底板的平面度。As shown in Figures 3 and 4, the pulley 5 is placed on the track 4, and the track 4 includes a track beam 401; a fixed plate 402, which is connected to the track beam 401 in the middle; a deflection plate 403, which is connected to an end of the track beam 401; Anti-deflection pin 404, which is inserted on the anti-deflection plate 403; the inside of track beam 401 is a cavity, and one end of the cavity is provided with a docking block 405; the inside of the docking block 405 is a cavity, and one end of the docking block 405 is connected to One end of the adjacent track beam 401 that is not provided with the docking block 405 is connected and bent towards its center; the end of the track beam 401 provided with the anti-deflection plate 403 is connected with a connecting plate 406, and the connecting plate 406 and the fixing plate 402 are arranged on the track beam 401. On the lower end surface, when the two track beams 401 are docked, the two ends of the connecting plate 406 are respectively connected to the track beams 401, so that a smooth transition can be achieved between the adjacent track beams 401, which also plays the role of connecting the two track beams 401 , the fixed plate 402 is provided with a threaded hole, and the height adjusting bolt 407 is set through the threaded hole. The height adjusting bolt 407 can adjust the height of the track beam, so that the track is at a horizontal height, which improves the construction of the concrete floor. Flatness.

实施例2Example 2

如图5所示,在实施例1的基础上,多组所述悬挂式混凝土振平工作平台上水平工作支架101横向排列,加宽了悬挂式混凝土振平工作平台的工作跨度,使悬挂式混凝土振平工作平台适用于不同的工作环境。As shown in Figure 5, on the basis of Embodiment 1, multiple groups of horizontal working supports 101 on the suspended concrete leveling work platform are arranged horizontally, which widens the working span of the suspended concrete leveling work platform, so that the suspended concrete leveling work platform Concrete leveling work platforms are suitable for different working environments.

工作流程:work process:

首先将轨道铺设在工作场地,通过对接块405插入轨道梁401中实现轨道的快速对接,将滑轮5放置在轨道梁401上,通过高度调节螺栓407调整两条轨道的高度相同,启动电机601,电机601带动第一斜齿轮602转动,第一斜齿轮602带动第二斜齿轮603转动,通过第二斜齿轮603内的通孔与高度调节螺杆2上相互配合的螺纹,带动高度调节螺杆2上下移动,从而实现振动工作台3的上下位置调节。悬挂式混凝土振平工作平台每分钟整平速度约0.8-1.2m(混凝土厚度在30cm以内),4人操作,整平工作效率是传统工艺的20倍以上;高度调节螺杆2高度调节在0-100mm以内任意调节,达到快速精准。First lay the track on the work site, insert the docking block 405 into the track beam 401 to realize the fast docking of the track, place the pulley 5 on the track beam 401, adjust the height of the two tracks through the height adjustment bolt 407 to be the same, start the motor 601, The motor 601 drives the first helical gear 602 to rotate, and the first helical gear 602 drives the second helical gear 603 to rotate. Through the through hole in the second helical gear 603 and the thread that cooperates with the height adjustment screw 2, the height adjustment screw 2 is driven up and down. Move, thereby realizing the up and down position adjustment of the vibration table 3. The leveling speed of the suspended concrete vibrating work platform is about 0.8-1.2m per minute (the thickness of the concrete is within 30cm), 4 people operate, and the leveling work efficiency is more than 20 times that of the traditional process; the height adjustment screw 2 can adjust the height between 0- Can be adjusted within 100mm to achieve fast and accurate.

以上结合附图对本实用新型的技术方案进行清楚、完整地描述,显然,所描述的实施例是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solution of the utility model is clearly and completely described above in conjunction with the accompanying drawings. Apparently, the described embodiments are part of the embodiments of the utility model, but not all of them. Based on the embodiments of the present utility model, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the scope of protection of the present utility model.

Claims (10)

  1. The flat workbench 1. a kind of suspension type concrete shakes, including workbench support (1) and shaking table (3), its feature It is,
    Workbench support (1) includes horizontal operation support (101) and vertical Working rack (102), vertical Working rack (102) One end be vertically set on the horizontal operation support (101);
    The other end of vertical Working rack (102) is fixedly connected with shaking table (3);
    The two bottom sides of horizontal operation support (101) are provided with pulley (5).
  2. The flat workbench 2. a kind of suspension type concrete according to claim 1 shakes, it is characterised in that
    The centre position of the horizontal operation support (101) is provided with pilot hole (8), the vertical side top of Working rack (102) four Guide rod is inserted into pilot hole (8);The centre position of horizontal operation support (101) is connected with lifting device (6);Horizontal operation The centre position of support (101) is vertically provided with height adjusting screw rod (2), one end and the lifting device (6) of height adjusting screw rod (2) Connection, the other end are connected with vertical Working rack (102).
  3. The flat workbench 3. a kind of suspension type concrete according to claim 2 shakes, it is characterised in that
    The lifting device (6) includes,
    Motor (601), it is fixedly connected with horizontal operation support (101);
    First helical gear (602), it is connected with the output end of motor (601);
    Second helical gear (603), it is connected with horizontal operation support (101) by fixed seat (604), the second helical gear (603) Engaged with the first helical gear (602), clutch shaft bearing (605) is connected between the second helical gear (603) and fixed seat (604);
    The axle center of horizontal operation support (101) and the second helical gear (603) along the second helical gear (603) is provided with through hole, and height is adjusted Save screw rod (2) inserting in through-holes, the through hole in the second helical gear (603) is provided with what is cooperated with height adjusting screw rod (2) Screw thread.
  4. The flat workbench 4. a kind of suspension type concrete according to claim 3 shakes, it is characterised in that
    The vertical Working rack (102) is provided with second bearing (7), outer ring and the vertical Working rack of second bearing (7) (102) it is fixedly connected, the inner ring of second bearing (7) is fixedly connected with height adjusting screw rod (2).
  5. The flat workbench 5. a kind of suspension type concrete according to claim 1 shakes, it is characterised in that
    The pulley (5) of the wherein side of the two bottom sides of the horizontal operation support (101), the arc surface of the pulley (5) of the side Provided with chute (501), pulley (5) is placed on track (4).
  6. The flat workbench 6. a kind of suspension type concrete according to claim 5 shakes, it is characterised in that
    The track (4) includes track girder (401),
    Fixed plate (402), it is connected among it with track girder (401);
    Anti-bias plate (403), it is connected to one end of track girder (401);
    Anti- cotter pin (404), it is inserted on anti-bias plate (403).
  7. The flat workbench 7. a kind of suspension type concrete according to claim 6 shakes, it is characterised in that
    The inside of the track girder (401) is cavity, and one end of cavity is provided with docking block (405).
  8. The flat workbench 8. a kind of suspension type concrete according to claim 7 shakes, it is characterised in that
    The inside of the docking block (405) is cavity, and one end of docking block (405) is not provided with docking with adjacent orbit beam (401) One end connection of block (405), and the heart is bent thereto.
  9. The flat workbench 9. a kind of suspension type concrete according to any one of claim 6-8 shakes, it is characterised in that
    One end that the track girder (401) is provided with anti-bias plate (403) is connected with connecting plate (406), connecting plate (406) and fixed plate (402) lower surface of track girder (401) is arranged on, screwed hole, height adjustment bolt are provided with the fixed plate (402) (407) set through the screwed hole.
  10. The flat workbench 10. a kind of suspension type concrete according to claim 9 shakes, it is characterised in that
    Multigroup suspension type concrete horizontal operation support (101) on flat workbench that shakes is transversely arranged.
CN201720304996.4U 2017-03-27 2017-03-27 A kind of suspension type concrete shakes flat workbench Expired - Fee Related CN206736923U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720304996.4U CN206736923U (en) 2017-03-27 2017-03-27 A kind of suspension type concrete shakes flat workbench

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720304996.4U CN206736923U (en) 2017-03-27 2017-03-27 A kind of suspension type concrete shakes flat workbench

Publications (1)

Publication Number Publication Date
CN206736923U true CN206736923U (en) 2017-12-12

Family

ID=60558361

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720304996.4U Expired - Fee Related CN206736923U (en) 2017-03-27 2017-03-27 A kind of suspension type concrete shakes flat workbench

Country Status (1)

Country Link
CN (1) CN206736923U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111567370A (en) * 2020-05-15 2020-08-25 扬州大学 Environment-friendly water-saving intelligent irrigation device and method based on Internet of things agriculture
CN112127635A (en) * 2020-09-02 2020-12-25 中国一冶集团有限公司 Ditch table surface leveling device and ditch table surface leveling method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111567370A (en) * 2020-05-15 2020-08-25 扬州大学 Environment-friendly water-saving intelligent irrigation device and method based on Internet of things agriculture
CN111567370B (en) * 2020-05-15 2021-12-17 扬州大学 Environment-friendly water-saving intelligent irrigation device and method based on Internet of things agriculture
CN112127635A (en) * 2020-09-02 2020-12-25 中国一冶集团有限公司 Ditch table surface leveling device and ditch table surface leveling method

Similar Documents

Publication Publication Date Title
CN206736923U (en) A kind of suspension type concrete shakes flat workbench
CN213418569U (en) Supporting structure of novel coincide floor of steel construction building
CN217949805U (en) Auxiliary device is used in wallboard installation
CN119062008B (en) A prefabricated housing structure and method thereof
CN220395223U (en) Leveling device for cast-in-situ box girder concrete construction
CN218912325U (en) Wall masonry equipment
CN221219835U (en) Steel construction industry factory building installation supporting platform
CN218375041U (en) Electric operation frame for building site
CN115127517B (en) Adjustable laser measuring device for building engineering
CN206010165U (en) The double lowering or hoisting gear adjusted for laser height and laser machine
CN216190595U (en) Tower crane support reinforcing apparatus for building be convenient for adjust
CN217232881U (en) Support bed-jig base
CN213445986U (en) A material lifting device for construction engineering
CN115522741A (en) Building vertical device convenient to build
CN223963188U (en) Cement lifting machine auxiliary device for building engineering
CN210412691U (en) Semi-automatic ceiling drilling equipment of seeking a position
CN108532464A (en) Three-dimensional adjusting method for bridge high pier climbing formwork
CN117532050B (en) A cantilever milling machine and a method for machining the anchorage plane of a suspension bridge using the same.
CN223254845U (en) Elevator construction is with lifting machine safety protection subassembly
CN214402620U (en) Multipurpose wall surface trowelling machine
CN224077921U (en) Concrete pavement elevation control device
CN111751069A (en) Mounting device and mounting method for embedded panel of vertical actuator of vibrating table
CN224106843U (en) A quick leveling mechanism for hanging basket templates
CN222782410U (en) A skin counting rod for adjusting mortar joints in masonry
CN224213781U (en) A formwork support structure for the construction of inclined beams in super high-rise buildings

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171212