CN206734347U - Heat treatment department workpiece transport carriage - Google Patents
Heat treatment department workpiece transport carriage Download PDFInfo
- Publication number
- CN206734347U CN206734347U CN201720522792.8U CN201720522792U CN206734347U CN 206734347 U CN206734347 U CN 206734347U CN 201720522792 U CN201720522792 U CN 201720522792U CN 206734347 U CN206734347 U CN 206734347U
- Authority
- CN
- China
- Prior art keywords
- rotating shaft
- baffle
- base
- fulcrum bearing
- bearing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010438 heat treatment Methods 0.000 title claims abstract description 15
- 230000005484 gravity Effects 0.000 claims description 3
- 238000009434 installation Methods 0.000 abstract description 6
- 230000000903 blocking effect Effects 0.000 abstract description 5
- 238000004519 manufacturing process Methods 0.000 abstract description 4
- 238000010276 construction Methods 0.000 abstract description 2
- 241000208340 Araliaceae Species 0.000 description 1
- 235000005035 Panax pseudoginseng ssp. pseudoginseng Nutrition 0.000 description 1
- 235000003140 Panax quinquefolius Nutrition 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 235000008434 ginseng Nutrition 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000012216 screening Methods 0.000 description 1
Landscapes
- Heat Treatment Of Articles (AREA)
Abstract
The utility model discloses a kind of heat treatment department workpiece transport carriage, including base, universal wheel is installed in the lower end of base, fulcrum bearing is installed in the upper end of base, at least three roller bearings side by side is installed in fulcrum bearing, it is provided with two adjacent sides of fulcrum bearing and blocks component, blocking component includes horizontal first rotating shaft and the second rotating shaft, first baffle and second baffle are respectively fixed with the middle part of first rotating shaft and the second rotating shaft, linkage structure is designed between first rotating shaft and the second rotating shaft, when first rotating shaft turn to first baffle it is vertical when, it is vertical that second rotating shaft also rotates to second baffle, the other both sides of fulcrum bearing also this be provided with and block component.So pass through the installation bearing seat on base, component is blocked in installation in fulcrum bearing, so as to provide a kind of laborsaving, efficient heat treatment department workpiece transport carriage, make the transhipment of workpiece more efficient, have the characteristics that to be skillfully constructed, simple in construction, production is easy and production cost is low.
Description
Technical field
The utility model is related to a kind of heat treatment department workpiece transport carriage, be mainly used in each station in heat treatment department it
Between transporting work pieces.
Background technology
At present, when workpiece is heat-treated in heat treatment department, it usually needs be loaded in batch in frock, so into
The piece count of batch is more, weight is big.In each step is heat-treated, it usually needs workpiece is transported through, by manually into
Transporting work pieces are very laborious in bulk and efficiency is low, by fork truck or driving there is also efficiency it is low the problem of.Therefore, Shen
Ask someone to expect developing a kind of dolly of laborsaving, the efficient transporting work pieces of energy.
Utility model content
Technical problem to be solved in the utility model is to provide a kind of laborsaving, efficient heat treatment department workpiece transhipment
Dolly.
The technical solution of the utility model is as follows:A kind of heat treatment department workpiece transport carriage, including horizontal base,
The lower end of the base is provided with least four universal wheels, horizontal fulcrum bearing is provided with the upper end of the base, described
At least three roller bearings side by side is installed in fulcrum bearing, is provided with two adjacent sides of the fulcrum bearing and blocks component, institute
State and block component and include horizontal first rotating shaft and the second rotating shaft, the first rotating shaft is shorter than the second rotating shaft, at described first turn
First baffle and second baffle, the one end of the first rotating shaft away from the second rotating shaft are respectively fixed with the middle part of axle and the second rotating shaft
The corresponding sides edge of Extension support seat is simultaneously bent to form the connecting rod parallel with first baffle, and the outer end of the connecting rod is bent to form
The handle parallel with first rotating shaft, fixture block is fixed with close to the position of connecting rod in the fulcrum bearing, the fixture block is close to connection
One end of bar is provided with the bar v notch v of up/down perforation, and the width of the bar v notch v and the width of connecting rod are adapted, and the
One rotating shaft is located in this v notch v, and the chute vertical with first rotating shaft is also provided with the fixture block, in the chute and bar
The spacing being adapted with connecting rod thickness is left between the inner of v notch v, block is inserted with the chute;At described second turn
Axle is fixed with the action plate vertical with second baffle, and the corresponding end and work of the first rotating shaft close to one end of first rotating shaft
Vertically offseted with plate;When block is entirely located in chute, under the Action of Gravity Field of first baffle and second baffle, described first
Baffle plate and second baffle ride over the upper surface of fulcrum bearing;Work as rotational handle, connecting rod is turned into vertical state, and the company of promotion
Extension bar is caught in bar v notch v the inner, then during by blocking connecting rod in the corresponding end of block push-in bar v notch v, the first gear
Plate turns to vertical state, while the first rotating shaft impetus plate and the second axis of rotation, also rotates to second baffle
Vertical state;Structure identical, which is also disposed with, on the two other side of the fulcrum bearing blocks component.
Using said structure, the installation bearing seat on base, installed in fulcrum bearing and block component, when workpiece is needed with work
During dress transhipment, it is only necessary to frock is transferred on the roller bearing of fulcrum bearing, is rotated further by handle, first baffle and second baffle is located
In vertical state, base or fulcrum bearing are then promoted, you can workpiece is shifted;From roller bearing is when frock is got on the bus and is got off
Labour-saving effect is arrived, and universal wheel also significantly reduces the motive force needed for transport process, there is the work for blocking component
With even if transport speed is slightly fast, workpiece and frock are not fallen off yet, so as to provide a kind of laborsaving, efficient heat treatment department
Workpiece transport carriage.Also, the structure of blocking component is simple, rapid operation, conveniently.
The handle of " u "-shaped is installed on the base, the blind end of the handle is on wherein one side upper and with base
Parallel, the upper end of handle is vertically arranged, and the lower end of the handle bends to base direction and fixed with base.Promote more square
Just.
The fulcrum bearing is arranged on base by central shaft, bearing and splicing sleeve, and the central shaft is vertically fixed on bottom
Seat middle part, the bearing are solidly set on outside central shaft, and the splicing sleeve is solidly set on outside bearing, and the fulcrum bearing is fixed on splicing sleeve
Upper end, wherein one jiao in the fulcrum bearing is fitted with vertical latch, and the upper end of the latch is bent to form horizontal segment, in institute
The corner for stating base is provided with the jack coordinated with latch.Such installation bearing seat, allows fulcrum bearing easily to turn on base
It is dynamic, quickly it can also be defined by latch after turning to the direction of needs, use is more convenient.
Preferably, the roller bearing is arranged side by side with 11, the roller bearing is wherein parallel on one side with fulcrum bearing.
Beneficial effect:The utility model by the installation bearing seat on base, in fulcrum bearing installation block component, so as to
A kind of laborsaving, efficient heat treatment department workpiece transport carriage is provided, makes the transhipment of workpiece more efficient, has design skilful
The features such as wonderful, simple in construction, production is easily and production cost is low.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model.
Fig. 2 is Fig. 1 top view.
Fig. 3 is Fig. 1 A-A sectional views.
Fig. 4 is first baffle and the structural representation of second baffle vertical state.
Marked in figure as follows:Base 1, roller 2, central shaft 3, bearing 4, splicing sleeve 5, latch 6, horizontal segment 6a, first turn
Axle 7, connecting rod 7a, handle 7b, fixture block 8, handle 9, block 10, first baffle 11, second baffle 12, the second rotating shaft 13, supporting
Seat 14, action plate 15, roller bearing 16.
Embodiment
Embodiment of the present utility model is described below in detail, described embodiment example is shown in the drawings, wherein from beginning
Same or similar element is represented to same or similar label eventually or there is the element of same or like function.Below by ginseng
It is exemplary to examine accompanying drawing and describe embodiment, it is intended to the utility model is explained, and it is not intended that to limitation of the present utility model.
Below in conjunction with the accompanying drawings, by being further described to specific embodiment of the present utility model, make this practicality new
The technical scheme and its advantage of type are clearer, clear and definite.
As shown in Figure 1, Figure 2 and Figure 3, the utility model includes horizontal rectangular base 1, pacifies in the lower end of the base 1
Equipped with least four universal wheels, the preferably described universal wheel of the present embodiment has four.It is provided with the upper end of the base 1 horizontal
Rectangle fulcrum bearing 14, the fulcrum bearing 14 are arranged on base 1 by central shaft 3, bearing 4 and splicing sleeve 5.The central shaft 3
Vertical to be fixed on the middle part of base 1, the bearing 4 is solidly set on outside central shaft 3, and the splicing sleeve 5 is solidly set on outside bearing 4, the branch
Bearing 14 is fixed on the upper end of splicing sleeve 5.Wherein one jiao in the fulcrum bearing 14 is fitted with vertical latch 6, the latch 6
Upper end be bent to form horizontal segment 6a, be provided with the corner of the base 1 with latch 6 coordinate jack.In the fulcrum bearing 14
On at least three roller bearings 16 side by side is installed, the preferably described roller bearing 16 of the present embodiment is arranged side by side with 11, the roller bearing
16 is wherein parallel on one side with fulcrum bearing 14.The handle 9 of " u "-shaped, the blind end of the handle 9 are installed on the base 1
Parallel on upper and with base 1 wherein one side, the upper end of handle 9 is vertically arranged, and the lower end of the handle 9 is curved to the direction of base 1
Roll over and fixed with base 1.
As shown in Figure 1, Figure 2 and Figure 3, it is provided with two adjacent sides of the fulcrum bearing 14 and blocks component, the screening
Gear component includes the rotating shaft 13 of first rotating shaft 7 and second, and the rotating shaft of first rotating shaft 7 to the second 13 is short, in the He of first rotating shaft 7
The middle part of second rotating shaft 13 is respectively fixed with first baffle 11 and second baffle 12, and the first baffle 11 and first rotating shaft 7 are flat
OK, the second baffle 12 is parallel with the second rotating shaft 13.One end Extension support seat of the first rotating shaft 7 away from the second rotating shaft 13
14 corresponding sides along and be bent to form the connecting rod 7a, the connecting rod 7a parallel with first baffle 11 outer end be bent to form with
The parallel handle 7b of first rotating shaft 7.Fixture block 8 is fixed with close to connecting rod 7a position in the fulcrum bearing 14, the fixture block 8 leans on
Nearly connecting rod 7a one end is provided with the bar v notch v of up/down perforation, and the width of the bar v notch v is mutually fitted with connecting rod 7a width
Should, and first rotating shaft 7 is located in this v notch v.The chute vertical with first rotating shaft 7 is also provided with the fixture block 8,
The spacing being adapted with connecting rod 7a thicknesses is left between the inner of chute and the bar v notch v, block is inserted with the chute
10.The action plate 15 vertical with second baffle 12, and institute are fixed with close to one end of first rotating shaft 7 in second rotating shaft 13
The corresponding end for stating first rotating shaft 7 vertical with action plate 15 offsets.
As shown in Figure 1, Figure 2 and Figure 3, when block 10 is entirely located in chute, in first baffle 11 and second baffle 12
Action of Gravity Field under, the first baffle 11 and second baffle 12 ride over the upper surface of fulcrum bearing 14.
As shown in figure 4, working as rotational handle 7b, connecting rod 7a is turned into vertical state, and promote connecting rod 7a to be caught in bar
V notch v is inner, then during by blocking connecting rod 7a in the corresponding end push-in bar v notch v of block 10,11 turns of the first baffle
Vertical state is moved, while the impetus plate 15 of the first rotating shaft 7 and the second rotating shaft 13 rotate, and second baffle 12 is also rotated
To vertical state;Structure identical, which is also disposed with, on the two other side of the fulcrum bearing 14 blocks component.
Claims (4)
- A kind of 1. heat treatment department workpiece transport carriage, it is characterised in that:Include the base of level, pacify in the lower end of the base Equipped with least four universal wheels, horizontal fulcrum bearing is installed in the upper end of the base, be provided with the fulcrum bearing to Few three roller bearings side by side, are provided with two adjacent sides of the fulcrum bearing and block component, and the component that blocks includes the One rotating shaft and the second rotating shaft, the first rotating shaft are shorter than the second rotating shaft, distinguish at the middle part of the first rotating shaft and the second rotating shaft First baffle and second baffle are fixed with, the corresponding sides of one end Extension support seat of the first rotating shaft away from the second rotating shaft are along simultaneously The connecting rod parallel with first baffle is bent to form, the outer end of the connecting rod is bent to form the handle parallel with first rotating shaft, Fixture block is fixed with close to the position of connecting rod in the fulcrum bearing, the fixture block is provided with up/down perforation close to one end of connecting rod Bar v notch v, the width of the bar v notch v and the width of connecting rod are adapted, and first rotating shaft is located in this v notch v, The chute vertical with first rotating shaft is also provided with the fixture block, is left between the inner of the chute and bar v notch v with connecting The adaptable spacing of extension bar thickness, block is inserted with the chute;Fixed in second rotating shaft close to one end of first rotating shaft There is the action plate vertical with second baffle, and the corresponding end of the first rotating shaft is vertical with action plate offsets;When block is entirely located in chute, under the Action of Gravity Field of first baffle and second baffle, the first baffle and Two baffle plates ride over the upper surface of fulcrum bearing;Work as rotational handle, connecting rod is turned into vertical state, and promote connecting rod to be caught in bar v notch v the inner, then by block When connecting rod is blocked in corresponding end push-in bar v notch v, the first baffle turns to vertical state, while described first turn Axle impetus plate and the second axis of rotation, make second baffle also rotate to vertical state;Structure identical, which is also disposed with, on the two other side of the fulcrum bearing blocks component.
- 2. workpiece transport carriage in heat treatment department according to claim 1, it is characterised in that:It is provided with the base The handle of " u "-shaped, the blind end of the handle is parallel on upper and with base wherein one side, and the upper end of handle is vertically arranged, institute The lower end for stating handle bends to base direction and fixed with base.
- 3. workpiece transport carriage in heat treatment department according to claim 1 or 2, it is characterised in that:The fulcrum bearing passes through Central shaft, bearing and splicing sleeve are arranged on base, and the central shaft is vertically fixed on the middle of the base, during the bearing is solidly set on Outside mandrel, the splicing sleeve is solidly set on outside bearing, and the fulcrum bearing is fixed on the upper end of splicing sleeve, in the fulcrum bearing wherein One jiao is fitted with vertical latch, and the upper end of the latch is bent to form horizontal segment, is provided with the corner of the base and latch The jack of cooperation.
- 4. workpiece transport carriage in heat treatment department according to claim 3, it is characterised in that:The roller bearing is arranged side by side with 11, the roller bearing is wherein parallel on one side with fulcrum bearing.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720522792.8U CN206734347U (en) | 2017-05-11 | 2017-05-11 | Heat treatment department workpiece transport carriage |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720522792.8U CN206734347U (en) | 2017-05-11 | 2017-05-11 | Heat treatment department workpiece transport carriage |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206734347U true CN206734347U (en) | 2017-12-12 |
Family
ID=60564440
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720522792.8U Expired - Fee Related CN206734347U (en) | 2017-05-11 | 2017-05-11 | Heat treatment department workpiece transport carriage |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206734347U (en) |
-
2017
- 2017-05-11 CN CN201720522792.8U patent/CN206734347U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207957005U (en) | Assembling line changement | |
CN106335786A (en) | The glass sheet transporter | |
CN106298222B (en) | Turn-over device for transformer iron core and its operational method | |
CN206734347U (en) | Heat treatment department workpiece transport carriage | |
CN204452501U (en) | A kind of textile tool car | |
CN206126033U (en) | Device is got to staving clamp | |
CN206810996U (en) | Mould changing device | |
CN106143550A (en) | A kind of textile cart | |
CN103964248B (en) | Automatic overturning device for production line of container corner column | |
CN105523370B (en) | Chopsticks sequence orienting device | |
CN214492982U (en) | Coating raw material transfer car (buggy) | |
CN104494662A (en) | Spinning tool cart | |
CN213948465U (en) | Hand push trolley equipment for transporting bricks in construction site | |
CN215401966U (en) | Conveying chain of melt-blowing machine | |
CN205801151U (en) | A kind of utility cart transporting regulator cubicle | |
CN108858111A (en) | A kind of transfer tooling of Wooden door plank | |
CN206049737U (en) | A kind of textile cloth conveying arrangement | |
CN206735236U (en) | Continuous acieration furnace transport carriage | |
CN204938213U (en) | Transfer car(buggy) | |
CN104400376B (en) | Device for transporting and changing workpiece | |
CN210555844U (en) | Plastic film rolls up and emptys device | |
CN204775355U (en) | Steel sheet transfer device | |
CN207328541U (en) | Door glass transfer car(buggy) | |
CN107839743A (en) | The warp beam transshipment acitivity weaved between each workshop | |
CN213083235U (en) | Non-woven fabrics transports shallow |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171212 |