CN206722839U - A kind of system of mucking haulage for constructing tunnel - Google Patents

A kind of system of mucking haulage for constructing tunnel Download PDF

Info

Publication number
CN206722839U
CN206722839U CN201720435844.8U CN201720435844U CN206722839U CN 206722839 U CN206722839 U CN 206722839U CN 201720435844 U CN201720435844 U CN 201720435844U CN 206722839 U CN206722839 U CN 206722839U
Authority
CN
China
Prior art keywords
slag
afterbody
ribbon conveyer
mucking haulage
belt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720435844.8U
Other languages
Chinese (zh)
Inventor
白文凯
孙方相
巩明
李志见
孙红海
于强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yankuang Donghua Heavy Industry Co Ltd
Yankuang Group Corp Ltd
Original Assignee
Yankuang Donghua Heavy Industry Co Ltd
Yankuang Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yankuang Donghua Heavy Industry Co Ltd, Yankuang Group Corp Ltd filed Critical Yankuang Donghua Heavy Industry Co Ltd
Priority to CN201720435844.8U priority Critical patent/CN206722839U/en
Application granted granted Critical
Publication of CN206722839U publication Critical patent/CN206722839U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The utility model provides a kind of system of mucking haulage for constructing tunnel, this muck haulage system the characteristics of be, including ribbon conveyer, described ribbon conveyer one end has head slag unloading device (1), the other end has afterbody by slag device (10), close to the head slag unloading device (1), to the afterbody belt drive (4) is disposed with by slag device (10) direction, vulcanize platform (6), storage band device (7) and take-up device (8), slag device (10) is provided with fuselage extension apparatus (9) close to the afterbody.Native slag can be transported tunnel in time by the system of mucking haulage provided by the utility model in the case where development machine is continuously constructed, and improve the efficiency of constructing tunnel.

Description

A kind of system of mucking haulage for constructing tunnel
Technical field
Technical field of tunnel construction is the utility model is related to, more particularly to a kind of system of mucking haulage for constructing tunnel.
Background technology
With economic construction of China and the propulsion of development of the West Regions, the project scale of tunnel construction expands all the more, and tunnel is applied Work method also develops into tunnel boring machine method of today by traditional drilling and blasting method, and development machine has the advantages of highly effective and safe, still, at present There is the drawbacks of batch operation in the automobile or the locomotive mode of mucking haulage of use, i.e. vehicle can not feed in way of mucking haulage, and cause to dig Entering machine must be shut down, and tunnel can not be transported in time by ultimately resulting in a large amount of native slags caused by driving, efficiency of construction is had a greatly reduced quality.
Therefore, how the mode of mucking haulage is improved, to improve the efficiency of constructing tunnel, becomes those skilled in the art and urgently solve Technical problem certainly.
Utility model content
In view of this, the utility model provides a kind of system of mucking haulage for constructing tunnel, and the system of mucking haulage can have Effect improves the efficiency of constructing tunnel.
In order to achieve the above object, the utility model provides following technical scheme:
A kind of system of mucking haulage for constructing tunnel, including ribbon conveyer, described ribbon conveyer one end have head Slag unloading device, the other end have afterbody by slag device, close to the head slag unloading device, to the afterbody by slag device direction according to Secondary to be provided with belt drive, vulcanization platform, storage band device and take-up device, the close afterbody is set organic by slag device Body extension apparatus.
Preferably, in above-mentioned system of mucking haulage, the belt drive is provided with the vulcanization platform and puts band machine.
Preferably, in above-mentioned system of mucking haulage, the belt drive includes the driving drum of two parallel arrangements, from The head slag unloading device is to the afterbody by slag device direction, and the belt of the ribbon conveyer is along two driving drums Internal tangent set obliquely.
Preferably, in above-mentioned system of mucking haulage, the fuselage extension apparatus includes two along the ribbon conveyer length The deviation correcting device of direction arrangement, bend pulley and installation window, the bend pulley are provided between two deviation correcting devices Quantity be two, the bend pulley be used for widen the distance between upper belt and lower belt of the ribbon conveyer.
Preferably, in above-mentioned system of mucking haulage, storage band capacity of the storage with device is 500m~600m.
It can be seen from above-mentioned technical proposal, in the system of mucking haulage provided by the utility model for constructing tunnel, it is provided with Ribbon conveyer, and storage band device is provided near the head slag unloading device of ribbon conveyer, in afterbody by near slag device Be provided with fuselage extension apparatus, therefore, ribbon conveyer in the system of mucking haulage can with before development machine and then extending, and Head slag unloading device can be then always positioned at outside tunnel, so, the system of mucking haulage can be in the case where development machine be continuously constructed Native slag is transported into tunnel in time, improves the efficiency of constructing tunnel.
Brief description of the drawings
, below will be to embodiment in order to illustrate more clearly of the utility model embodiment or technical scheme of the prior art Or the required accompanying drawing used is briefly described in description of the prior art, it should be apparent that, drawings in the following description are only It is embodiment of the present utility model, for those of ordinary skill in the art, on the premise of not paying creative work, also Other accompanying drawings can be obtained according to the accompanying drawing of offer.
Fig. 1 is a kind of arrangement schematic diagram for system of mucking haulage for constructing tunnel that the utility model embodiment provides;
Fig. 2 is the schematic diagram of belt drive 4 in Fig. 1;
Fig. 3 is a kind of view of the storage with device 7 in Fig. 1;
Fig. 4 is another view of the storage with device 7 in Fig. 1;
Fig. 5 is the schematic diagram of Fig. 1 middle fuselages extension apparatus 9.
In figure mark for:
1st, head slag unloading device;2nd, roller group;3rd, belt roller;4th, belt drive;5th, frame;51st, normal fuselage; 52nd, fuselage is pre-installed;6th, platform is vulcanized;7th, storage band device;71st, car is tensed;72nd, Vehicle with lifted water hose;73rd, storage band bogie;74th, carry secretly Device;8th, take-up device;9th, fuselage extension apparatus;91st, deviation correcting device;92nd, bend pulley;The 93rd, window is installed;10th, afterbody by Slag device.
Embodiment
In order to make it easy to understand, the utility model will be further described below in conjunction with the accompanying drawings.
Referring to Fig. 1~Fig. 5, Fig. 1 is a kind of system of mucking haulage for constructing tunnel that the utility model embodiment provides Arrange schematic diagram;Fig. 2 is the schematic diagram of belt drive 4 in Fig. 1;Fig. 3 is a kind of state signal of the storage with device 7 in Fig. 1 Figure;Fig. 4 is another view of the storage with device 7 in Fig. 1;Fig. 5 is the schematic diagram of Fig. 1 middle fuselages extension apparatus 9.
A kind of system of mucking haulage for constructing tunnel that the utility model embodiment provides includes ribbon conveyer, and belt is defeated The machine one end of sending has a head slag unloading device 1, and the other end has afterbody by slag device 10, close to head slag unloading device 1, rearwardly by The direction of slag device 10 be disposed with belt drive 4, vulcanization platform 6, storage band device 7 and take-up device 8, close to afterbody by Slag device 10 is provided with fuselage extension apparatus 9.
As shown in figure 1, belt roller 3 is provided with the frame 5 of ribbon conveyer, close to the position of head slag unloading device 1 Install and be equipped with roller group 2, during application, fuselage extension apparatus 9 is fixedly mounted on the rear supporting chassis of development machine, head slag dumping dress Put 1 to be arranged in outside tunnel, native slag caused by driving pours into afterbody by slag device 10, then by belt-conveying to head slag dumping Device 1, because head slag unloading device 1 is nearby provided with storage band device 7, and prolonged in afterbody by fuselage is provided near slag device 10 Device 9 is stretched, therefore, ribbon conveyer can be with before development machine and then extending, and head slag unloading device 1 can be then always positioned at Outside tunnel, so, the system of mucking haulage provided by the utility model can be timely by native slag in the case where development machine is continuously constructed Tunnel is transported, improves the efficiency of constructing tunnel.
Referring to Fig. 2, to adapt to the limitation in tunnel to space hold, in the present embodiment, belt drive 4 includes two The driving drum (unmarked in figure) of parallel arrangement, from head slag unloading device 1 to afterbody by the direction of slag device 10, ribbon conveyer Internal tangent of the belt along two driving drums set obliquely.Moreover, belt drive 4 can use hollow shaft to slow down Device, so that compact-sized.Reduce space hold, convenient construction.
Referring to Fig. 3 and Fig. 4, storage band device 7 includes tensing car 71, Vehicle with lifted water hose 72 and storage band bogie 73, storage band bogie Storage band is arranged as 12 layers by 73, is stored up the band edge that enters with device 7 and is provided with entrainment device (close to one end of belt drive 4) 74, when the fuselage extension of ribbon conveyer, tense car 71 and moved to the dextrad of diagram, is moved to when tensing car 71 shown in Fig. 4 Extreme position when, adhesive tape and vulcanized joint can be supplemented on vulcanization platform 6, the adhesive tape supplemented is then stored in storage band again In device 7, it is ready for driving next time.
In specific practical application, it can be 500m~600m to store up the storage band capacity with device 7.For the ease of supplementing adhesive tape, In the present embodiment, belt drive 4 is provided with vulcanization platform 6 and puts band machine (unmarked in figure).
Referring to Fig. 5, in the present embodiment, fuselage extension apparatus 9 uses semi-enclosed structure, including two along ribbon conveyer The deviation correcting device 91 of length direction arrangement, bend pulley 92 and installation window 93, changed course are provided between two deviation correcting devices 91 The quantity of roller 92 is two, and bend pulley 92 is used to widen the distance between upper belt and lower belt of ribbon conveyer.Machine Body extension apparatus 9 is normal fuselage 51 close to the side of head slag unloading device 1, and is pacified close to afterbody by the side of slag device 10 to be pre- Installation body 52, installation window 93 provide semi-enclosed working space for worker, ensure safety, and worker passes through in pre-installation fuselage 52 Installation idler machining causes the fuselage of ribbon conveyer to extend.
The foregoing description of the disclosed embodiments, professional and technical personnel in the field are enable to realize or new using this practicality Type.A variety of modifications to embodiment will be apparent for those skilled in the art, as defined herein General Principle can be realized in other embodiments in the case where not departing from spirit or scope of the present utility model.Therefore, originally Utility model is not intended to be limited to embodiment illustrated herein, and is to fit to and principles disclosed herein and features of novelty Consistent most wide scope.

Claims (5)

  1. A kind of 1. system of mucking haulage for constructing tunnel, it is characterised in that including ribbon conveyer, described ribbon conveyer one end With head slag unloading device (1), the other end has afterbody by slag device (10), close to the head slag unloading device (1), to described Afterbody is disposed with belt drive (4), vulcanization platform (6), storage band device (7) by slag device (10) direction and tenses dress (8) are put, slag device (10) is provided with fuselage extension apparatus (9) close to the afterbody.
  2. 2. system according to claim 1 of mucking haulage, it is characterised in that the belt drive (4) and the vulcanization are flat Platform (6), which is provided with, puts band machine.
  3. 3. system according to claim 1 of mucking haulage, it is characterised in that the belt drive (4) is parallel including two The driving drum of arrangement, from the head slag unloading device (1) to the afterbody by slag device (10) direction, the ribbon conveyer Internal tangent of the belt along two driving drums set obliquely.
  4. 4. system according to claim 1 of mucking haulage, it is characterised in that the fuselage extension apparatus (9) includes two along institute The deviation correcting device (91) of ribbon conveyer length direction arrangement is stated, bend pulley is provided between two deviation correcting devices (91) (92) and window (93) is installed, the quantity of the bend pulley (92) is two, and the bend pulley (92) is described for widening The distance between the upper belt of ribbon conveyer and lower belt.
  5. 5. system according to claim 1 of mucking haulage, it is characterised in that storage band capacity of the storage with device (7) is 500m ~600m.
CN201720435844.8U 2017-04-24 2017-04-24 A kind of system of mucking haulage for constructing tunnel Active CN206722839U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720435844.8U CN206722839U (en) 2017-04-24 2017-04-24 A kind of system of mucking haulage for constructing tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720435844.8U CN206722839U (en) 2017-04-24 2017-04-24 A kind of system of mucking haulage for constructing tunnel

Publications (1)

Publication Number Publication Date
CN206722839U true CN206722839U (en) 2017-12-08

Family

ID=60506340

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720435844.8U Active CN206722839U (en) 2017-04-24 2017-04-24 A kind of system of mucking haulage for constructing tunnel

Country Status (1)

Country Link
CN (1) CN206722839U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110593886A (en) * 2019-08-07 2019-12-20 成都中机盈科科技有限公司 A dregs clearance system in push pipe for municipal building construction
CN114013942A (en) * 2021-10-21 2022-02-08 太重集团向明智能装备股份有限公司 High-efficient tunnelling belt conveyor with high capacity level stores up belting
CN114408449A (en) * 2022-02-21 2022-04-29 山东科技大学 Belt replacing device of belt conveyor under limited space condition

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110593886A (en) * 2019-08-07 2019-12-20 成都中机盈科科技有限公司 A dregs clearance system in push pipe for municipal building construction
CN110593886B (en) * 2019-08-07 2020-07-17 嘉兴市康立德构件股份有限公司 A dregs clearance system in push pipe for municipal building construction
CN114013942A (en) * 2021-10-21 2022-02-08 太重集团向明智能装备股份有限公司 High-efficient tunnelling belt conveyor with high capacity level stores up belting
CN114408449A (en) * 2022-02-21 2022-04-29 山东科技大学 Belt replacing device of belt conveyor under limited space condition
CN114408449B (en) * 2022-02-21 2024-05-24 山东科技大学 Belt replacing device for belt conveyor under limited space condition

Similar Documents

Publication Publication Date Title
CN206722839U (en) A kind of system of mucking haulage for constructing tunnel
CN204225880U (en) A kind of cantilevered longitudinal axis anchor driving machine
CN106477244A (en) Automatic telescopic belt conveyer
CN108590660A (en) A kind of outdoor highwall coal mining transport device and its fast transfer working face method
CN104909112A (en) Fast replacement process for long-distance steel cord belt
CN110159278A (en) A kind of tunnel trolley walking tooling and construction method
CN104863601A (en) Shield tunneling machine split starting lengthened pipeline suspension system
CN205221830U (en) Reprint band conveyer
CN110159287B (en) Novel cutter conveying system and conveying method thereof
CN206358762U (en) Automatic telescopic belt conveyer
CN205150947U (en) Energy -efficient scratch board conveyor
CN201080825Y (en) Tunneling machine belt transfer machine coal dropping point automatic rectification device
CN207467494U (en) A kind of shock-absorbing type Mine haul machine
CN202220607U (en) Travelling type automatic centering coal blocking board
CN208135755U (en) A kind of hobboing cutter auxiliary handling apparatus
CN209369821U (en) A kind of shield-tunneling construction trolley transportation system for driving two-way in narrow active well
CN105417060A (en) Detachable roller for belt winding device
CN207917939U (en) Two operatings carry jigger
CN215047402U (en) Tubular belt compactor
CN209442118U (en) Coal mine rubber belt conveyer tail advancing device
CN208516854U (en) A kind of coal mine lifting equipment of fast and easy discharging
CN206926520U (en) The wheel drive structure of hydraulic support truck six
CN206782675U (en) A kind of hydraulic-driven forward type elevating conveyor
CN210504258U (en) Tail device for telescopic belt conveyor
CN206969527U (en) A kind of drag conveyor

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant