CN206721900U - Dowel pilework - Google Patents
Dowel pilework Download PDFInfo
- Publication number
- CN206721900U CN206721900U CN201720587938.7U CN201720587938U CN206721900U CN 206721900 U CN206721900 U CN 206721900U CN 201720587938 U CN201720587938 U CN 201720587938U CN 206721900 U CN206721900 U CN 206721900U
- Authority
- CN
- China
- Prior art keywords
- boundling
- reinforcing bar
- reinforcing
- bar
- dowel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A10/00—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
- Y02A10/23—Dune restoration or creation; Cliff stabilisation
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
Dowel pilework, it is related to side slope and preventing land slide technical field.A kind of dowel pilework includes guide-localization reinforcing bar and boundling reinforcing bar.Boundling reinforcing bar includes being set by coaxially connected at least two lengths of rebar of reinforced bar sleeve, more boundling parallel reinforced steel bars.The side wall of reinforced bar sleeve offsets with the side wall of the lengths of rebar of boundling reinforcing bar adjacent thereto.Guide-localization bar connecting is between adjacent two boundling reinforcing bars.Another dowel pilework includes guide-localization reinforcing bar and boundling reinforcing bar.Boundling reinforcing bar includes being set by coaxially connected at least two lengths of rebar of reinforced bar sleeve, more boundling parallel reinforced steel bars, and the side wall of two reinforced bar sleeves of adjacent two boundling reinforcing bars offsets.Guide-localization bar connecting is between adjacent two boundling reinforcing bars.The two can solve the problem that problems of the prior art, suitable for deep layer high thrust landslide control.
Description
Technical field
Side slope and preventing land slide technical field are the utility model is related to, in particular to dowel pilework.
Background technology
Anchor pile category mini pile, in recent years the anchor pile technology based on mini pile be progressively applied to side slope and preventing land slide
In, and achieve certain achievement.At present there is following defect in anchor pile technology:First, existing pile body bundle structure is insufficiently resistant to
High thrust comes down;Second, when pile body length exceedes single standard reinforcing bar length, and when single boundling reinforcing bar is more than 28mm diameters,
At longitudinally connected place, it can not realize and be close to bunchy, the tight type and intensity of dowel pilework are greatly reduced;Third, anchor pile boundling
Dead load is larger, and lifting is difficult, inconvenient for use.
Utility model content
The purpose of this utility model is to provide a kind of dowel pilework, and it can solve the problem that above-mentioned exists in the prior art
The problem of, suitable for deep layer high thrust landslide control.
Another object of the present utility model is to provide another dowel pilework, and it can solve the problem that above-mentioned prior art
Present in problem, suitable for deep layer high thrust landslide control.
What embodiment of the present utility model was realized in:
A kind of dowel pilework, it includes guide-localization reinforcing bar and Duo Gen boundling reinforcing bars.Boundling reinforcing bar is included by reinforcing bar set
Coaxially connected at least two lengths of rebar of cylinder, more boundling parallel reinforced steel bars are set, and the side wall of reinforced bar sleeve is the same as collection adjacent thereto
The side wall of the lengths of rebar of beam reinforcing bar offsets, and has gap between adjacent two boundling reinforcing bars.Guide-localization reinforcing bar is along boundling reinforcing bar
It is axially arranged, guide-localization reinforcing bar is located at gap, and guide-localization bar connecting is between adjacent two boundling reinforcing bars.
Further, in preferred embodiment of the present utility model, more boundling reinforcing bars surround ring steel reinforced bar beam.
Further, in preferred embodiment of the present utility model, the quantity of boundling reinforcing bar is 3~4.
Further, in preferred embodiment of the present utility model, the end wall of more boundling reinforcing bars is generally aligned in the same plane.
Further, in preferred embodiment of the present utility model, each gap is equipped with more guide-localization steel
Muscle, axially spaced-apart of the more guide-localization reinforcing bars along boundling reinforcing bar in each gap are set.
Further, in preferred embodiment of the present utility model, more guide-localization reinforcing bar edges in each gap
The axial uniform intervals of boundling reinforcing bar are set.
Further, in preferred embodiment of the present utility model, dowel pilework also includes suspension ring reinforcing bar, suspension ring steel
Muscle is along the axially arranged of boundling reinforcing bar and is connected to boundling reinforcing bar.
Further, in preferred embodiment of the present utility model, dowel pilework also includes slip casting steel pipe, slip casting steel
Pipe is along the axially arranged of boundling reinforcing bar and is connected between two adjacent boundling reinforcing bars.
Further, in preferred embodiment of the present utility model, dowel pilework also includes reinforcing collar, rigidized cover
Ring is located on more boundling reinforcing bars and slip casting steel pipe, reinforcing collar simultaneously with boundling reinforcing bar and slip casting fastener for connection.Reinforcing collar
Reinforced column is convexly equipped with, reinforced column is protruded by reinforcing collar towards the side away from boundling reinforcing bar.
A kind of dowel pilework, it includes guide-localization reinforcing bar and Duo Gen boundling reinforcing bars.Boundling reinforcing bar is included by reinforcing bar set
Coaxially connected at least two lengths of rebar of cylinder, more boundling parallel reinforced steel bars are set, two reinforcing bars of adjacent two boundling reinforcing bars
The side wall of sleeve offsets, and has gap between adjacent two boundling reinforcing bars.Guide-localization reinforcing bar is axially arranged along boundling reinforcing bar
And gap is located at, guide-localization bar connecting is between adjacent two boundling reinforcing bars.
The beneficial effect of the utility model embodiment is:
The length of the boundling reinforcing bar for the dowel pilework that embodiment of the present utility model provides can be selected flexibly, by using
Reinforced bar sleeve is coaxially connected by the lengths of rebar of corresponding length, and the flexible assembling to the length of boundling reinforcing bar can be achieved, make boundling steel
The length selection variation of muscle.In addition, combined between the boundling reinforcing bar for the dowel pilework that embodiment of the present utility model provides
Closely, the anchor pile structural strength of formation is high, small volume, and the ability on anti-high thrust landslide is strong, is come down suitable for deep layer high thrust
Improvement.On the other hand, the anchor pile dead load is smaller, carries and construction is very convenient, and saves material, and is advantageous to drop
Low cost.
Brief description of the drawings
, below will be to required use in embodiment in order to illustrate more clearly of the technical scheme of the utility model embodiment
Accompanying drawing be briefly described, it will be appreciated that the following drawings illustrate only some embodiments of the present utility model, therefore should not be by
Regard the restriction to scope as, for those of ordinary skill in the art, on the premise of not paying creative work, may be used also
To obtain other related accompanying drawings according to these accompanying drawings.
Fig. 1 is the schematic diagram for the dowel pilework that the utility model embodiment 1 provides;
Fig. 2 is the partial enlarged drawing of the a-quadrant of the dowel pilework in Fig. 1;
Fig. 3 is the schematic diagram of a cross section of the dowel pilework in Fig. 1;
Fig. 4 is the schematic diagram for the dowel pilework that the utility model embodiment 2 provides.
Icon:100- dowel pileworks;110- boundling reinforcing bars;The lengths of rebar of 111- first;The lengths of rebar of 112- second;120- is led
To spacer bar;130- reinforced bar sleeves;140- gaps;150- suspension ring reinforcing bars;160- slip casting steel pipes;170- stake holes;200- dowels
Pilework;210- reinforcing collars;211- reinforced columns.
Embodiment
It is new below in conjunction with this practicality to make the purpose, technical scheme and advantage of the utility model embodiment clearer
Accompanying drawing in type embodiment, the technical scheme in the embodiment of the utility model is clearly and completely described, it is clear that is retouched
The embodiment stated is the utility model part of the embodiment, rather than whole embodiments.Generally here described in accompanying drawing and
The component of the utility model embodiment shown can be configured to arrange and design with a variety of.
Therefore, the detailed description of the embodiment of the present utility model to providing in the accompanying drawings is not intended to limit requirement below
The scope of the utility model of protection, but it is merely representative of selected embodiment of the present utility model.Based in the utility model
Embodiment, the every other embodiment that those of ordinary skill in the art are obtained under the premise of creative work is not made, all
Belong to the scope of the utility model protection.
It should be noted that:Similar label and letter represents similar terms in following accompanying drawing, therefore, once a certain Xiang Yi
It is defined, then it further need not be defined and explained in subsequent accompanying drawing in individual accompanying drawing.
Term " first ", " second " etc. are only used for distinguishing description, and it is not intended that instruction or hint relative importance.
In description of the present utility model, it is also necessary to which explanation, unless otherwise clearly defined and limited, term " are set
Put ", " connection " should be interpreted broadly, for example, it may be being fixedly connected or being detachably connected, or be integrally connected;Can
To be mechanical connection or electrical connection;Can be joined directly together, can also be indirectly connected by intermediary, Ke Yishi
The connection of two element internals.For the ordinary skill in the art, with concrete condition above-mentioned term can be understood at this
Concrete meaning in utility model.
Embodiment 1
Fig. 1, Fig. 2 and Fig. 3 are refer to, the present embodiment provides a kind of dowel pilework 100.Dowel pilework 100 includes leading
To spacer bar 120 and four boundling reinforcing bars 110.
Boundling reinforcing bar 110 is included by two coaxially connected lengths of rebar of reinforced bar sleeve 130, respectively the first lengths of rebar 111
With the second lengths of rebar 112.It is be arranged in parallel between four boundling reinforcing bars 110, the side wall of reinforced bar sleeve 130 is the same as boundling adjacent thereto
The side wall of the lengths of rebar of reinforcing bar 110 offsets, and has gap 140 between adjacent two boundling reinforcing bars 110.Guide-localization reinforcing bar 120
Gap 140 is located at along the axially arranged and guide-localization reinforcing bar 120 of boundling reinforcing bar 110, guide-localization reinforcing bar 120 is connected to adjacent
Between two boundling reinforcing bars 110.
Boundling reinforcing bar 110 is coaxially connected by the progress of corresponding lengths of rebar by using reinforced bar sleeve 130, can be achieved to boundling
The flexible assembling of the length of reinforcing bar 110, make the selection variation of the length of boundling reinforcing bar 110.In addition, adjacent two boundling reinforcing bars
It is to realize to connect by guide-localization reinforcing bar 120 between 110, and axial direction of the guide-localization reinforcing bar 120 along boundling reinforcing bar 110 is set
Put, not only increase the contact area between guide-localization reinforcing bar 120 and boundling reinforcing bar 110, improve connection effect, also make phase
Spacing between adjacent two boundling reinforcing bars 110 diminishes, and gap 140 is diminished, helps to make the dowel pilework 100 ultimately formed
Volume diminish.
On the other hand, it is be arranged in parallel between four boundling reinforcing bars 110, and the side wall of reinforced bar sleeve 130 is the same as adjacent thereto
The side wall of lengths of rebar of boundling reinforcing bar 110 offset, this to combine between adjacent two boundling reinforcing bars 110 even closer, makes
Gap 140 reduces, and is advantageous to reduce the diameter of guide-localization reinforcing bar 120, mitigates the weight of guide-localization reinforcing bar 120, makes final
The close structure of the dowel pilework 100 of formation and deadweight is smaller, is easy to carry and constructs, save material, advantageously reduce
Cost.Meanwhile the side wall of reinforced bar sleeve 130 offsets with the side wall of the lengths of rebar of boundling reinforcing bar 110 adjacent thereto, along boundling steel
The radial direction of muscle 110, make the junction of two lengths of rebar of boundling reinforcing bar 110 even closer, it is not easy to occur to break away or deform.And
And the side wall and the side wall of reinforced bar sleeve 130 of the lengths of rebar of adjacent boundling reinforcing bar 110 offset, above-mentioned lengths of rebar is to reinforcing bar set
Cylinder 130 have support and fixation, can further improve reinforced bar sleeve 130 stability and lengths of rebar junction it is strong
Degree, the bulk strength of dowel pilework 100 is improved, improve the ability of confrontation high thrust, dowel pilework 100 is applied to deep layer
The improvement on high thrust landslide.
It should be noted that in other embodiment of the present utility model, boundling reinforcing bar 110 can also be by reinforced bar sleeve
The lengths of rebar of 130 three, four or more coaxially connected roots is formed, if keep the side wall of reinforced bar sleeve 130 with its phase
The side wall of the lengths of rebar of adjacent boundling reinforcing bar 110 offsets.Preferably, the quantity of boundling reinforcing bar 110 is 3~4.
Further, in the present embodiment, the length of the first lengths of rebar 111 is more than the length of the second lengths of rebar 112, arbitrarily
First lengths of rebar 111 of the reinforced bar sleeve 130 of a piece boundling reinforcing bar 110 and adjacent boundling reinforcing bar 110 offsets, whole boundlings
The end wall of reinforcing bar 110 is respectively positioned on same plane.Further, preferably, the reinforced bar sleeve of adjacent two boundling reinforcing bars 110
130 are not less than the diameter of 35 times of boundling reinforcing bars 110 along the axial spacing of boundling reinforcing bar 110.
Further, in the present embodiment, four boundling reinforcing bars 110 surround the tendon of ring-type.Four boundling reinforcing bars 110
By rounded perpendicular to the cross section that the same plane of its axial line is intercepted, and the cross section of four boundling reinforcing bars 110
The center of circle is in same circumference.
Above structure to be connected to more regular, close, any one boundling of arranging between four boundling reinforcing bars 110
The reinforced bar sleeve 130 of reinforcing bar 110 offsets with the first lengths of rebar 111 of adjacent boundling reinforcing bar 110, also causes four boundling steel
Interaction force between muscle 110 tends to balance, and makes the inside uniform force of dowel pilework 100, avoids the occurrence of local pressure
Excessive situation, improve the overall intensity of dowel pilework 100 and the resistivity to thrust.
Further, in the present embodiment, guide-localization reinforcing bar 120 is in rod-short.Each gap 140 is equipped with more
Guide-localization reinforcing bar 120, axial uniform intervals of the more guide-localization reinforcing bars 120 along boundling reinforcing bar 110 in each gap 140
Set.
The structure can effectively reduce the gross weight of guide-localization reinforcing bar 120, but the connection to guide-localization reinforcing bar 120 is strong
Degree influences little with connection effect, not only ensure that between boundling reinforcing bar 110 there is good connection effect, also allows anchor pile knot
The deadweight of structure 100 substantially reduces.Make carrying, construction to dowel pilework 100 more convenient, meanwhile, guide-localization reinforcing bar
The dosage of 120 pairs of raw material also greatly reduces, and guide-localization reinforcing bar 120 can also be served as using the cutting clout of reinforcing bar,
The utilization rate to raw material is substantially increased, and reduces the consumption of raw material.
Further, in the present embodiment, dowel pilework 100 also includes suspension ring reinforcing bar 150, and suspension ring reinforcing bar 150 is along collection
The lengths of rebar that is axially arranged and being connected to boundling reinforcing bar 110 of beam reinforcing bar 110.Preferably, suspension ring reinforcing bar 150 is two-sided continuous
Weld length is not less than 25cm, and bond pad locations are calculated using arm of force balancing method and determined according to unit steel material weight.
Further, dowel pilework 100 also includes slip casting steel pipe 160, axle of the slip casting steel pipe 160 along boundling reinforcing bar 110
To setting and be connected between two adjacent boundling reinforcing bars 110.Preferably, slip casting steel pipe 160 is slip casting seamless steel pipe.Tool
Body, slip casting steel pipe 160 is connected to by guide-localization reinforcing bar 120 between the lengths of rebar of two adjacent boundling reinforcing bars 110.Need
Illustrate, during carrying out mortar depositing construction using dowel pilework 100, slip casting steel pipe 160 is preferably to be positioned over close to side
The side on slope, it can so make the stress condition of anchor pile structure 100 more preferable, slip casting steel pipe 160 also can be used as stress structure to hold
By Thrust of Landslide.
It should be noted that it is in the present embodiment, between guide-localization reinforcing bar 120 and boundling reinforcing bar 110 to pass through welding
To realize connection, bunchy is connected in pad continuous single pass welding, pad longitudinal direction clear spacing is no more than 1m.In the utility model
Other embodiment in, can also be other connected modes, it is not limited to this.It is in addition, so-called in the present embodiment flat
Row, which is set, not to be implied that parallel in absolute sense, can there is deviation somewhat.Slip casting steel pipe 160 is necessary for slip casting seamless steel
Pipe, can not there is perforate in the side wall of slip casting steel pipe 160.
Specifically, in the present embodiment, four boundling reinforcing bars 110 be diameter be equal to 28mm HRB400 reinforcing bars, first
The length of lengths of rebar 111 is 12m, and the length of the second lengths of rebar 112 is 6m.Guide-localization reinforcing bar 120 is using diameter 16mm's
1m centre-to-centre spacing uniform intervals cloth is pressed in HRB400 reinforcing bars, length 30cm, axial direction of the guide-localization reinforcing bar 120 along boundling reinforcing bar 110
If end to end the center of two groups of guide-localization reinforcing bars 120 to boundling reinforcing bar 110 end 50cm.Suspension ring reinforcing bar 150 it is a diameter of
14mm.According to unit steel material weight, the bond pad locations of suspension ring reinforcing bar 150 are calculated using arm of force balancing method, lifting is solved and asks
Topic.
Dowel pilework 100 adds the quantity of boundling reinforcing bar 110, expands a footpath, has single dowel pilework 100
Standby bigger lateral anti-weight bearing power, the bigger Thrust of Landslide of resistance.On the other hand, while pile body length is increased, pass through
Guide-localization reinforcing bar 120 connects boundling reinforcing bar 110 and suspension ring reinforcing bar 150 integral, improves lifting efficiency.In addition, slip casting
Steel pipe 160 is connected with boundling reinforcing bar 110, is forever embedded to underground, further increases the lateral anti-weight bearing power of single pile.In summary,
Dowel pilework 100 is applied to deep layer high thrust landslide control, further promotes anchor pile technology in side slope and preventing land slide
In popularization and application.
It should be noted that in other embodiment of the present utility model, the first lengths of rebar 111, the second lengths of rebar 112 with
Length, diameter and the material of guide-localization reinforcing bar 120 can be different, can be selected and be set according to actual needs
Put.Preferably, the diameter of boundling reinforcing bar 110 is more than or equal to 28mm, a diameter of 12~16mm of guide-localization reinforcing bar 120,
A diameter of 14~18mm of suspension ring reinforcing bar 150.
The embodiment of dowel pilework 100 is as follows:
The pore-forming of stake holes 170:The diameter of stake holes 170 is not less than 200mm, and meets all components and the stake of dowel pilework 100
The inwall clear distance in hole 170 is not less than 2cm, and using equipment pore-formings such as geological drilling rig, tracked hydraulic down-the-holes, the depth of stake holes 170 is extremely
It is more than pile body length 10cm less.
Lift dowel pilework 100:Using boom hoisting, by dowel pilework 100, transversely axis loads stake holes 170, and
Each component of dowel pilework 100 is not less than 2cm with the inwall clear distance of stake holes 170, and the bottom of slip casting steel pipe 160 is away from stake holes 170
Bottom is not less than 10cm.
The slip casting of stake holes 170:Neat slurry is injected in slip casting steel pipe 160, strength of cement grout is not less than M30, grouting pressure 2
~3MPa, the tube wall of slip casting steel pipe 160 do not open up aperture, it is ensured that bottom sediment foldback is gone out aperture by grouting pressure, ensures that pile body is complete
Whole property and uniformity.It should be noted that grouting must ensure one-time-reach-place, it is consistent with pouring into grind slurries quality that slurries are returned out in aperture
When, terminate grouting.Benefit slurry is carried out before initial set, it is necessary to accomplish that slurries uniformly fill up the inwall of dowel pilework 100 and stake holes 170
Between space.
The operation principle of dowel pilework 100 is:The length of the boundling reinforcing bar 110 of dowel pilework 100 can be selected flexibly,
It is by using reinforced bar sleeve 130 that the lengths of rebar of corresponding length is coaxially connected, it can be achieved to the flexible of the length of boundling reinforcing bar 110
Assembling, the length of boundling reinforcing bar 110 is set to select variation.In addition, it is tightly combined between boundling reinforcing bar 110, the anchor pile of formation
The intensity of structure 100 is high, small volume, and the ability on anti-high thrust landslide is strong, suitable for the improvement on deep layer high thrust landslide.The opposing party
Face, the dowel pilework 100 are conducted oneself with dignity smaller, carry and construction is very convenient, and save material, advantageously reduce cost.
Embodiment 2
Referring to Fig. 4, identical structure can be combined with reference to embodiment 1.The present embodiment provides a kind of dowel pilework 200.Anchor
Muscle pilework 200 compared with dowel pilework 100, unlike:Dowel pilework 200 also includes reinforcing collar 210, rigidized cover
Ring 210 is located on more boundling reinforcing bars 110 and slip casting steel pipe 160, the axial line of reinforcing collar 210 and the axle of boundling reinforcing bar 110
Heart line be arranged in parallel.Reinforcing collar 210 is connected with the side wall of two boundling reinforcing bars 110 and the side wall of slip casting steel pipe 160 simultaneously.
Further, reinforcing collar 210 is convexly equipped with reinforced column 211, and reinforced column 211 is in cylindric, reinforced column 211 substantially
Protruded by reinforcing collar 210 towards the side away from boundling reinforcing bar 110, reinforced column 211 radially extends along reinforcing collar 210.
Reinforcing collar 210 can greatly improve the bond strength of dowel pilework 200 and concrete, improve the reinforcing bar of formation
Concrete structure further improves the resistivity to high thrust to the resistant function of thrust.In addition, reinforcing collar 210 improves
The bond strength of boundling reinforcing bar 110 and slip casting steel pipe 160, it is more conducive to improve slip casting steel pipe 160 and is born as stress structure
The ability of Thrust of Landslide.
Further, reinforcing collar 210 is multiple, axial uniform intervals of multiple reinforcing collars 210 along boundling reinforcing bar 110
Set.
Embodiment 3
The present embodiment provides a kind of dowel pilework (not shown).The dowel pilework that the present embodiment provides and anchor pile knot
Structure 100 is compared, unlike:Two steel of the adjacent two piece boundling reinforcing bar 110 in the dowel pilework that the present embodiment provides
The side wall of muscle sleeve 130 offsets, and guide-localization bar connecting is between adjacent two boundling reinforcing bars 110.
Compared with dowel pilework 100, the adjacent two piece boundling reinforcing bar 110 for the dowel pilework that the present embodiment provides
The side wall of two reinforced bar sleeves 130 offsets, and the spacing between adjacent two boundling reinforcing bars 110 is larger, for by adjacent two
The radius of the radius ratio guide-localization reinforcing bar 120 for the guide-localization reinforcing bar that boundling reinforcing bar 110 connects is big.
In summary, dowel pilework 100, dowel pilework 200 and the embodiment 3 that the utility model embodiment provides carry
The dowel pilework of confession can flexibly select length, and the flexible assembling of length can be achieved.It is tightly combined, intensity is high, small volume, resists
The ability on high thrust landslide is strong, suitable for the improvement on deep layer high thrust landslide.On the other hand, conduct oneself with dignity smaller, carry and construction is equal
Easily, and save material, advantageously reduce cost.
Preferred embodiment of the present utility model is the foregoing is only, is not limited to the utility model, for this
For the technical staff in field, the utility model can have various modifications and variations.It is all in the spirit and principles of the utility model
Within, any modification, equivalent substitution and improvements made etc., it should be included within the scope of protection of the utility model.
Claims (10)
- A kind of 1. dowel pilework, it is characterised in that including:More boundling reinforcing bars, the boundling reinforcing bar is included by coaxially connected at least two lengths of rebar of reinforced bar sleeve, described in more Boundling parallel reinforced steel bar is set, the side wall of the side wall of the reinforced bar sleeve with the lengths of rebar of the boundling reinforcing bar adjacent thereto Offset, there is gap between adjacent two boundling reinforcing bars;AndGuide-localization reinforcing bar, the guide-localization reinforcing bar is axially arranged along the boundling reinforcing bar, and the guide-localization reinforcing bar is set In the gap, the guide-localization bar connecting is between the adjacent two boundling reinforcing bars.
- 2. dowel pilework according to claim 1, it is characterised in that the more boundling reinforcing bars surround ring steel reinforced bar Beam.
- 3. dowel pilework according to claim 2, it is characterised in that the quantity of the boundling reinforcing bar is 3~4.
- 4. dowel pilework according to claim 1, it is characterised in that the end wall of the more boundling reinforcing bars is positioned at same Plane.
- 5. dowel pilework according to claim 1, it is characterised in that each gap, which is equipped with described in more, leads To spacer bar, axially spaced-apart of the more guide-localization reinforcing bars along the boundling reinforcing bar in each gap is set.
- 6. dowel pilework according to claim 5, it is characterised in that more described are oriented in each gap are determined Axial uniform intervals of the position reinforcing bar along the boundling reinforcing bar are set.
- 7. dowel pilework according to claim 1, it is characterised in that the dowel pilework also includes suspension ring reinforcing bar, The suspension ring reinforcing bar is along the axially arranged of the boundling reinforcing bar and is connected to the boundling reinforcing bar.
- 8. dowel pilework according to claim 1, it is characterised in that the dowel pilework also includes slip casting steel pipe, The slip casting steel pipe is along the axially arranged of the boundling reinforcing bar and is connected between the boundling reinforcing bar of adjacent two.
- 9. dowel pilework according to claim 8, it is characterised in that the dowel pilework also includes reinforcing collar, The reinforcing collar is located on the more boundling reinforcing bars and the slip casting steel pipe, the reinforcing collar simultaneously with the boundling steel Muscle and the slip casting fastener for connection;The reinforcing collar is convexly equipped with reinforced column, and the reinforced column is by the reinforcing collar towards remote The side protrusion of the boundling reinforcing bar.
- A kind of 10. dowel pilework, it is characterised in that including:More boundling reinforcing bars, the boundling reinforcing bar is included by coaxially connected at least two lengths of rebar of reinforced bar sleeve, described in more Boundling parallel reinforced steel bar is set, and the side wall of two reinforced bar sleeves of adjacent two boundling reinforcing bars offsets, adjacent two There is gap between the boundling reinforcing bar;AndGuide-localization reinforcing bar, the guide-localization reinforcing bar is along the axially arranged of the boundling reinforcing bar and is located at the gap, described Guide-localization bar connecting is between the adjacent two boundling reinforcing bars.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720587938.7U CN206721900U (en) | 2017-05-24 | 2017-05-24 | Dowel pilework |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720587938.7U CN206721900U (en) | 2017-05-24 | 2017-05-24 | Dowel pilework |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206721900U true CN206721900U (en) | 2017-12-08 |
Family
ID=60511878
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720587938.7U Active CN206721900U (en) | 2017-05-24 | 2017-05-24 | Dowel pilework |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206721900U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113373953A (en) * | 2021-06-09 | 2021-09-10 | 中国水利水电第十四工程局有限公司 | Lengthening process for long anchor bar pile of high slope |
-
2017
- 2017-05-24 CN CN201720587938.7U patent/CN206721900U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113373953A (en) * | 2021-06-09 | 2021-09-10 | 中国水利水电第十四工程局有限公司 | Lengthening process for long anchor bar pile of high slope |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103362119B (en) | Large-size rebar cage exempt from the method that is welded to connect and syndeton | |
CN103233481B (en) | A kind of jacket support structure connected that is in the milk | |
CN112832825B (en) | Assembled hollow sandwich concrete filled steel tube arch center and construction method thereof | |
CN206396742U (en) | A kind of prefabricated pile | |
CN103590414A (en) | Structure for connecting concrete tubular pile with bearing platform | |
CN206721900U (en) | Dowel pilework | |
CN108824471A (en) | A kind of deep water drift net multi-column pier foundation and its construction method | |
CN110847165A (en) | Construction method of spiral anchor core-inserting cement mixing pile | |
CN203284773U (en) | Pipe pile connecting structure and pipe pile foundation | |
CN212534063U (en) | Connecting structure for precast piles | |
CN101881025B (en) | Design method for shallow-buried flexible anti-slide pile for deep covering layer slope retaining | |
CN103410529B (en) | A kind of support of tunnel arch springing ruggedized construction for weak surrounding rock and construction method | |
CN206752481U (en) | A kind of dowel pilework and slope reinforcement structure | |
CN208219638U (en) | A kind of deep foundation pit precast stake | |
CN208106342U (en) | A kind of multi-functional double sleeve slewing drilling machine drilling rods | |
CN206941588U (en) | A kind of simple positioning tool of steel-pipe pile spreading | |
CN207295732U (en) | It is a kind of can reaming novel slurry filling floral tube | |
CN202688990U (en) | Steel-concrete structure for reinforcing bored cast-in-place pile with insufficient concrete mark | |
CN207553084U (en) | A kind of variable diameters PHC piles | |
CN202543908U (en) | Extruding and enlarging device of slip casting enlarged cast-in-situ bored pile | |
CN212294629U (en) | Concrete precast pile connecting device | |
CN106223332A (en) | Combined concrete stake | |
CN207454006U (en) | A kind of integral type anchor pole | |
CN204023579U (en) | Reverse construction method post dowel bar tool holder | |
CN206495218U (en) | Foundation pit supporting construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |