CN206721600U - One kind contraposition lock stitch gap permeable pavement brick - Google Patents

One kind contraposition lock stitch gap permeable pavement brick Download PDF

Info

Publication number
CN206721600U
CN206721600U CN201720229373.5U CN201720229373U CN206721600U CN 206721600 U CN206721600 U CN 206721600U CN 201720229373 U CN201720229373 U CN 201720229373U CN 206721600 U CN206721600 U CN 206721600U
Authority
CN
China
Prior art keywords
brick
prism
tenon
groove
chamfered edge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720229373.5U
Other languages
Chinese (zh)
Inventor
钱晓倩
申屠倩芸
张利锋
任谦
谢韬
王敏权
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang University ZJU
Original Assignee
Zhejiang University ZJU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang University ZJU filed Critical Zhejiang University ZJU
Priority to CN201720229373.5U priority Critical patent/CN206721600U/en
Application granted granted Critical
Publication of CN206721600U publication Critical patent/CN206721600U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model discloses one kind to align lock stitch gap permeable pavement brick, mainly includes brick body top and brick body bottom, described brick body top is prism, and described brick body bottom is chamfered edge platform;The adjacent center side position of described prism two respectively sets a tenon or groove, and another two adjacent side respectively sets a groove or tenon, and described chamfered edge countertop is identical with prism bed-plate dimension, and described chamfered edge platform base area is 0.4 0.6 times of top surface area;This pavior brick bottom is divided into chamfered edge platform, and the fastness that brick connects with ground is good, is not easy to loosen;The design of tenon and groove interlocks adjacent pavior brick, and sound construction is compact, can use lifting construction, and the road surface later stage maintenance of laying is repaired conveniently, and performance is better than current most pavior bricks.

Description

One kind contraposition lock stitch gap permeable pavement brick
Technical field
The utility model belongs to concrete brick design field, is specifically to be related to a kind of contraposition lock stitch effusion water Pavior brick.
Background technology
Pervious concrete road pavement brick is that one kind can be born compared with big load, and and can makes water be arrived down by concrete surface penetration Face or even the concrete road pavement brick of underground.Water-permeable brick is using the aggregate that cement and particular stage are matched somebody with somebody as primary raw material, Mixed With Admixture By mixing, stirring, it is made through vibrating pressing technology, while with higher-strength, there is comparatively ideal interconnected pore again. Ponding caused by its good water permeability of water-permeable brick can ensure the other reasons of the rainwater in city and road surface is smoothly descending, directly Connect and penetrate under earth's surface, reduce the influence of pavement runoff.The larger porosity of pavior brick itself can also play in the noise reduction of city Effect.Under dry climate environment, moisture content can also be made to be dispersed into through the hole of brick in air by the form of evaporation, so as to Improve the thermal climate environment in city.The urban pavement laid using water-permeable brick is under summer normal lighting conditions than common coagulation Soil surface temperature wants low 8-10 degree.
Permeable pavement brick is a crucial organism of sponge urban construction, can change traditional drainage pattern, increase Add drainage speed, be whole sponge urban construction " doing one's bit ".At present, most of permeable pavement bricks are larger using porosity Dank material.Mainly there are four problems:First, the preferable pavior brick of water permeability, compression strength is low, is only applicable to non-hold Carry road surface.Second, after long-term use, the surface of water-permeable brick and hole are easily blocked by various dirts and can not removed automatically, are caused Water permeability is degenerated, ecological effect sharp-decay.Third, after long-term use, the fastness that brick connects with ground is poor, easily loosens, makes Into pavior brick it is unstable in addition tilt, have a strong impact on walking.Fourth, water-holding capacity is poor, urban heat land effect is serious.
Insufficient present in existing pavior brick to overcome, inventor is by redesigning block type and providing a kind of ensureing On the premise of intensity, after rational drainage system, infiltration and water storage function and the easily contraposition of maintenance reparation can be integrated Lock stitch gap permeable pavement brick.
Utility model content
It is to be directed to intensity existing for existing pavior brick that the technical problem that the utility model solves, which there is provided the utility model, It is low, easy the technical problem such as to block, easily loosen, there is provided a kind of intensity is high, gap infiltration, water storage between brick, sound construction is compact, can prevent Only there is difference in height phenomenon between each fragment of brick during use, safe walking or traveling can be achieved, later stage maintenance reparation is convenient, can tie up The contraposition lock stitch gap permeable pavement brick repaiied.
To achieve the above object, the technical solution adopted in the utility model is:One kind contraposition lock stitch gap permeable pavement brick, Mainly include brick body top and brick body bottom, described brick body top is prism, and described brick body bottom is chamfered edge platform;It is described The adjacent center side position of prism two respectively set a tenon or groove, another two adjacent side respectively sets a groove or tenon, supplies Pavior brick contraposition is connected, and four turnings of described prism use rounding, and described rounding radii is 5-10mm, Described chamfered edge countertop is identical with prism bed-plate dimension, and described chamfered edge platform base area is the 0.4-0.6 of top surface area Times.
Further, described prism upper surface is the polygon such as square, rectangle, prismatic, parallelogram, institute The prism size stated is:High 150-200mm, long 100-200mm, wide 100-200mm;Described chamfered edge platform size is:High 50- 100mm, the fastness that described chamfered edge platform can be such that brick is connected with ground is good, is not easy to loosen.
Further, described tenon and groove shapes are U-shaped, ear shape, trapezoidal, circular arc one kind therein, a height of 50-100mm;Described tenon protrusion length is 15-50mm, and protrusion width is 30-60mm;Described recess width and tenon are convex Going out that width is consistent, fall in 0.8-0.9 times that depth protrudes length for tenon, the gap width between adjacent bricks is 10-30mm, And gap is adjustable, allow rainy day rainwater quickly through gap penetration between brick to underground, the structure of described tenon and groove is near Like and for complementation, positioning interlocked is played when mating formation and is used, prevents that paved surface is uneven phenomenon.
Further, the diagonal positions of described prism upper surface are provided with the irrigation canals and ditches that catchment, on described prism Centre of surface position is provided with gully-hole, described catchment four corner distributions, corner corresponding to irrigation canals and ditches along described gully-hole Horizontal level be higher than gully-hole, the gradient for having 15 degree from corner to gully-hole, the described concavity canal that irrigation canals and ditches are arc that catchments, Described arc radian is 2 π/3-3 π/4.
Further, the part in addition to catchment irrigation canals and ditches and gully-hole of described prism upper surface, is provided with tread plate Line, described skid resistance strip are the grooves of the identical parallel interval set in same direction, and the cross sectional shape of described groove is V Shape, the depth of groove is 2-4mm.
Further, four sides of described prism are respectively arranged with osculum, and described osculum is distributed respectively In the top of tenon and groove, described prism is internally provided with draining cavity, described draining cavity top with it is described Gully-hole is connected, and described draining cavity is connected with four osculums respectively in horizontal level, and the horizontal level of draining cavity is high In osculum, draining cavity to osculum is provided with 15 degree of the gradient.
Further, the paving mode of described pavior brick is lifting laying after preassembling, is lifted after described preassembling Refer to some pavior bricks carrying out preassembling according to certain size after the completion of production, obtain assembling module, then will Described assembling module carries out on-site hoisting construction using lifting appliance, and this mode can enable pavior brick to interlock, structure It is compact firm, accelerate speed of application.During factory's preassembling, assembled length and width can be adjusted according to actual conditions.
Further, during the laying of described pavior brick, a width is stayed to be more than described pavior brick every 6-8 rice distances convex Tenon protrudes the gap of length, and so as to the maintenance in later stage, the porous pavement of described pavior brick laying is used in use for some time Prior art handles gap filling material and backfilled again, you can recaptures water seepage function;During described pavior brick road surfacing, week The small-sized pavior brick laying width of rim portion is 50mm.
Compared with prior art, the utility model is by redesigning block type, on the premise of proof strength, makes pavior brick Integrate water storage function between gap infiltration and brick, mitigate discharge pressure significantly, while the rainwater evaporation laid in can reduce earth's surface Temperature, tropical island effect can be alleviated, really realize ecology and environmental effect;This pavior brick bottom is divided into chamfered edge platform, and brick and ground connect The fastness connect is good, is not easy to loosen;The design of this pavior brick tenon and groove interlocks adjacent pavior brick, and sound construction is compact, Lifting construction can be used, while can prevent difference in height phenomenon occur between each fragment of brick during use;The road surface of laying has the later stage Convenient, maintainable advantage is repaired in maintenance.The porous pavement of this pavior brick laying really possesses pair of feature and ecoscape Weight effect, and be associated with environmental effect, performance is better than current most pavior bricks.
Brief description of the drawings
Fig. 1 is the brick laying structure schematic diagram of contraposition lock stitch gap permeable pavement brick of the present utility model;
Fig. 2 is the brick laying structure three-view diagram of contraposition lock stitch gap permeable pavement brick of the present utility model;
Fig. 3 is the U-shaped tenon of contraposition lock stitch gap permeable pavement brick of the present utility model and the schematic shapes of groove;
Fig. 4 is the shape signal of the ear shape tenon and groove of contraposition lock stitch gap permeable pavement brick of the present utility model Figure;
Fig. 5 is the schematic shapes of trapezoidal tenon and groove that the utility model aligns lock stitch gap permeable pavement brick;
Fig. 6 is that the utility model aligns the circular arc tenon of lock stitch gap permeable pavement brick and the schematic shapes of groove;
Fig. 7 is the assembled diagrammatic cross-section that the utility model aligns lock stitch gap permeable pavement brick;
Fig. 8 is the assembly entirety and lifting schematic diagram that the utility model aligns lock stitch gap permeable pavement brick;
Wherein, 1- prisms, 2- chamfered edge platforms, 3- tenons, 4- grooves, 5- prisms upper surface, 6-U shapes, 7- ear shapes, 8- Trapezoidal, 9- circular arcs, 10- gap widths, 11- catchments irrigation canals and ditches, 12- gully-holes, 13- osculums.
Embodiment
It is new below in conjunction with this practicality to make the purpose, technical scheme and advantage of the utility model embodiment clearer The accompanying drawing of type, the technical scheme in the embodiment of the utility model is clearly and completely described, it is clear that described implementation Example is the utility model part of the embodiment, rather than whole embodiments.Based on the embodiment in the utility model, this area The every other embodiment that those of ordinary skill is obtained under the premise of creative work is not made, belongs to the utility model The scope of protection.
For ease of the understanding to the utility model embodiment, below in conjunction with the accompanying drawings and the specific embodiments exemplified by do further Explanation, embodiment do not form the restriction to the utility model embodiment.
Embodiment 1:As shown in figure 1, a kind of contraposition lock stitch gap permeable pavement brick, mainly includes under brick body top and brick body Portion, brick body top are prism 1, and brick body bottom is chamfered edge platform 2;
As shown in Fig. 2 the adjacent center side position of 1 liang of prism respectively sets a tenon 3 and groove 4, another two adjacent side A groove 4 and tenon 3 are respectively set, is connected for pavior brick contraposition, four turnings of prism 1 use rounding, rounding half Footpath is 5mm, and the top surface of chamfered edge platform 2 is identical with the bed-plate dimension of prism 1, and the base area of chamfered edge platform 2 is 0.4 times of top surface area.
As shown in figure 1, prism upper surface 5 is square, the size of prism 1 is:High 150mm, long 100mm, it is wide 100mm;The size of chamfered edge platform 2 is:High 50mm, the fastness that chamfered edge platform 2 can be such that brick is connected with ground is good, is not easy to loosen, prism The diagonal positions of body upper surface 5 are provided with the irrigation canals and ditches 11 that catchment, and the described center of prism upper surface 5 is provided with gully-hole 12, four corners distributions of catchmenting corresponding to irrigation canals and ditches 11 along gully-hole 12, the horizontal level in corner is higher than gully-hole 12, from corner to Gully-hole 12 has 15 degree of the gradient, and the irrigation canals and ditches 11 that catchment are the concavity canal of arc, and arc radian is 2 π/3.Prism upper surface 5 Part in addition to catchment irrigation canals and ditches 11 and gully-hole 12, is provided with skid resistance strip, skid resistance strip be set in same direction it is identical The groove of parallel interval, the cross sectional shape of groove is V-arrangement, and the depth of groove is 2mm.Four sides of prism 1 are set respectively There is osculum 12, osculum 12 is respectively distributed to the top of tenon 3 and groove 4, and prism 1 is internally provided with draining cavity, row Water cavity top is connected with gully-hole 12, and draining cavity is connected with four osculums 12 respectively in horizontal level, draining cavity Horizontal level is higher than osculum 13, and draining cavity is provided with 15 degree of the gradient to osculum 12.
As shown in figure 3, tenon 3 and groove 4 are shaped as U-shaped 6, a height of 50mm;It is 15mm that tenon 3, which protrudes length, and protrusion is wide Spend for 30mm;The width of groove 4 is consistent with the protrusion width of tenon 3, falls in 0.8 times that depth protrudes length for tenon 3.
As shown in fig. 7, the gap width 10 between adjacent bricks is 10mm, and gap is adjustable, allows rainy day rainwater quick By gap penetration between brick to underground, the structure proximate of tenon 3 and groove 4 and for complementation, positioning interlocked is played when mating formation With preventing that paved surface is uneven phenomenon.
As shown in figure 8, the paving mode of pavior brick is lifting laying after preassembling, if lifting refers to main line after preassembling Face brick carries out preassembling after the completion of production according to certain size, obtains assembling module, then uses assembling module Lifting appliance carries out on-site hoisting construction, and this mode can enable pavior brick to interlock, compact-sized firm, accelerates construction speed Degree.During factory's preassembling, assembled length and width can be adjusted according to actual conditions.
When pavior brick is laid, a width is stayed to be more than the gap that pavior brick tenon 3 protrudes length every 6 meters of distances, so as to The maintenance in later stage, the porous pavement of pavior brick laying handle gap filling material simultaneously in use for some time, with prior art Again backfill, you can recapture water seepage function;During pavior brick road surfacing, the small-sized pavior brick laying width of peripheral part is 50mm。
Embodiment 2:As shown in figure 1, a kind of contraposition lock stitch gap permeable pavement brick, mainly includes under brick body top and brick body Portion, brick body top are prism 1, and brick body bottom is chamfered edge platform 2;
As shown in Fig. 2 the adjacent center side position of 1 liang of prism respectively sets a tenon 3 and groove 4, another two adjacent side A groove 4 and tenon 3 are respectively set, is connected for pavior brick contraposition, four turnings of prism 1 use rounding, rounding half Footpath is 7.5mm, and the top surface of chamfered edge platform 2 is identical with the bed-plate dimension of prism 1, and the base area of chamfered edge platform 2 is 0.5 times of top surface area.
As shown in figure 1, prism upper surface 5 is rectangle, the size of prism 1 is:High 175mm, long 150mm, it is wide 150mm;The size of chamfered edge platform 2 is:High 75mm, the fastness that chamfered edge platform 2 can be such that brick is connected with ground is good, is not easy to loosen, prism The diagonal positions of body upper surface 5 are provided with the irrigation canals and ditches 11 that catchment, and the described center of prism upper surface 5 is provided with gully-hole 12, four corners distributions of catchmenting corresponding to irrigation canals and ditches 11 along gully-hole 12, the horizontal level in corner is higher than gully-hole 12, from corner to Gully-hole 12 has 15 degree of the gradient, and the irrigation canals and ditches 11 that catchment are the concavity canal of arc, and arc radian is 2 π/3.Prism upper surface 5 Part in addition to catchment irrigation canals and ditches 11 and gully-hole 12, is provided with skid resistance strip, skid resistance strip be set in same direction it is identical The groove of parallel interval, the cross sectional shape of groove is V-arrangement, and the depth of groove is 3mm.Four sides of prism 1 are set respectively There is osculum 12, osculum 12 is respectively distributed to the top of tenon 3 and groove 4, and prism 1 is internally provided with draining cavity, row Water cavity top is connected with gully-hole 12, and draining cavity is connected with four osculums 12 respectively in horizontal level, draining cavity Horizontal level is higher than osculum 13, and draining cavity is provided with 15 degree of the gradient to osculum 12.
As shown in figure 4, tenon 3 and groove 4 are shaped as ear shape 7, a height of 75mm;It is 35mm that tenon 3, which protrudes length, protrusion Width is 45mm;The width of groove 4 is consistent with the protrusion width of tenon 3, falls in 0.85 times that depth protrudes length for tenon 3.
As shown in fig. 7, the gap width 10 between adjacent bricks is 20mm, and gap is adjustable, allows rainy day rainwater quick By gap penetration between brick to underground, the structure proximate of tenon 3 and groove 4 and for complementation, positioning interlocked is played when mating formation With preventing that paved surface is uneven phenomenon.
As shown in figure 8, the paving mode of pavior brick is lifting laying after preassembling, if lifting refers to main line after preassembling Face brick carries out preassembling after the completion of production according to certain size, obtains assembling module, then uses assembling module Lifting appliance carries out on-site hoisting construction, and this mode can enable pavior brick to interlock, compact-sized firm, accelerates construction Speed.During factory's preassembling, assembled length and width can be adjusted according to actual conditions.
When pavior brick is laid, a width is stayed to be more than the gap that pavior brick tenon 3 protrudes length every 7 meters of distances, so as to The maintenance in later stage, the porous pavement of pavior brick laying handle gap filling material simultaneously in use for some time, with prior art Again backfill, you can recapture water seepage function;During pavior brick road surfacing, the small-sized pavior brick laying width of peripheral part is 50mm。
Embodiment 3:As shown in figure 1, a kind of contraposition lock stitch gap permeable pavement brick, mainly includes under brick body top and brick body Portion, brick body top are prism 1, and brick body bottom is chamfered edge platform 2;
As shown in Fig. 2 the adjacent center side position of 1 liang of prism respectively sets a tenon 3 and groove 4, another two adjacent side A groove 4 and tenon 3 are respectively set, is connected for pavior brick contraposition, four turnings of prism 1 use rounding, rounding half Footpath is 10mm, and the top surface of chamfered edge platform 2 is identical with the bed-plate dimension of prism 1, and the base area of chamfered edge platform 2 is 0.6 times of top surface area.
As shown in figure 1, prism upper surface 5 is prismatic, the size of prism 1 is:High 200mm, long 200mm, wide 200mm; The size of chamfered edge platform 2 is:High 100mm, the fastness that chamfered edge platform 2 can be such that brick is connected with ground is good, is not easy to loosen, prism upper table The diagonal positions in face 5 are provided with the irrigation canals and ditches 11 that catchment, and the described center of prism upper surface 5 is provided with gully-hole 12, collection The distribution of four corners, the horizontal level in corner are higher than gully-hole 12 corresponding to Box Drain 11 along gully-hole 12, from corner to catchmenting There is 15 degree of the gradient in hole 12, and the irrigation canals and ditches 11 that catchment are the concavity canal of arc, and arc radian is 3 π/4.Remove collection in prism upper surface 5 Part outside Box Drain 11 and gully-hole 12, is provided with skid resistance strip, and skid resistance strip is in the identical parallel of same direction setting The groove at interval, the cross sectional shape of groove is V-arrangement, and the depth of groove is 4mm.Four sides of prism 1 are respectively arranged with row Water hole 12, osculum 12 are respectively distributed to the top of tenon 3 and groove 4, and prism 1 is internally provided with draining cavity, and draining is empty Top of chamber is connected with gully-hole 12, and draining cavity is connected with four osculums 12 respectively in horizontal level, the level of draining cavity Position is higher than osculum 13, and draining cavity is provided with 15 degree of the gradient to osculum 12.
As shown in figure 5, tenon 3 and groove 4 are shaped as trapezoidal 8, a height of 100mm;It is 50mm that tenon 3, which protrudes length, protrusion Width is 60mm;The width of groove 4 is consistent with the protrusion width of tenon 3, falls in 0.9 times that depth protrudes length for tenon 3.
As shown in fig. 7, the gap width 10 between adjacent bricks is 30mm, and gap is adjustable, allows rainy day rainwater quick By gap penetration between brick to underground, the structure proximate of tenon 3 and groove 4 and for complementation, positioning interlocked is played when mating formation With preventing that paved surface is uneven phenomenon.
As shown in figure 8, the paving mode of pavior brick is lifting laying after preassembling, if lifting refers to main line after preassembling Face brick carries out preassembling after the completion of production according to certain size, obtains assembling module, then uses assembling module Lifting appliance carries out on-site hoisting construction, and this mode can enable pavior brick to interlock, compact-sized firm, accelerates construction speed Degree.During factory's preassembling, assembled length and width can be adjusted according to actual conditions.
When pavior brick is laid, a width is stayed to be more than the gap that pavior brick tenon 3 protrudes length every 8 meters of distances, so as to The maintenance in later stage, the porous pavement of pavior brick laying handle gap filling material simultaneously in use for some time, with prior art Again backfill, you can recapture water seepage function;During pavior brick road surfacing, the small-sized pavior brick laying width of peripheral part is 50mm。
Embodiment 4:As shown in figure 1, a kind of contraposition lock stitch gap permeable pavement brick, mainly includes under brick body top and brick body Portion, brick body top are prism 1, and brick body bottom is chamfered edge platform 2;
As shown in Fig. 2 the adjacent center side position of 1 liang of prism respectively sets a tenon 3 and groove 4, another two adjacent side A groove 4 and tenon 3 are respectively set, is connected for pavior brick contraposition, four turnings of prism 1 use rounding, rounding half Footpath is 10mm, and the top surface of chamfered edge platform 2 is identical with the bed-plate dimension of prism 1, and the base area of chamfered edge platform 2 is 0.6 times of top surface area.
As shown in figure 1, prism upper surface 5 is prismatic, the size of prism 1 is:High 200mm, long 200mm, wide 200mm; The size of chamfered edge platform 2 is:High 100mm, the fastness that chamfered edge platform 2 can be such that brick is connected with ground is good, is not easy to loosen, prism upper table The diagonal positions in face 5 are provided with the irrigation canals and ditches 11 that catchment, and the described center of prism upper surface 5 is provided with gully-hole 12, collection The distribution of four corners, the horizontal level in corner are higher than gully-hole 12 corresponding to Box Drain 11 along gully-hole 12, from corner to catchmenting There is 15 degree of the gradient in hole 12, and the irrigation canals and ditches 11 that catchment are the concavity canal of arc, and arc radian is 3 π/4.Remove collection in prism upper surface 5 Part outside Box Drain 11 and gully-hole 12, is provided with skid resistance strip, and skid resistance strip is in the identical parallel of same direction setting The groove at interval, the cross sectional shape of groove is V-arrangement, and the depth of groove is 4mm.Four sides of prism 1 are respectively arranged with row Water hole 12, osculum 12 are respectively distributed to the top of tenon 3 and groove 4, and prism 1 is internally provided with draining cavity, and draining is empty Top of chamber is connected with gully-hole 12, and draining cavity is connected with four osculums 12 respectively in horizontal level, the level of draining cavity Position is higher than osculum 13, and draining cavity is provided with 15 degree of the gradient to osculum 12.
As shown in fig. 6, tenon 3 and groove 4 are shaped as circular arc 9, a height of 100mm;It is 50mm that tenon 3, which protrudes length, convex It is 60mm to go out width;The width of groove 4 is consistent with the protrusion width of tenon 3, falls in 0.9 times that depth protrudes length for tenon 3.
As shown in fig. 7, the gap width 10 between adjacent bricks is 30mm, and gap is adjustable, allows rainy day rainwater quick By gap penetration between brick to underground, the structure proximate of tenon 3 and groove 4 and for complementation, positioning interlocked is played when mating formation With preventing that paved surface is uneven phenomenon.
As shown in figure 8, the paving mode of pavior brick is lifting laying after preassembling, if lifting refers to main line after preassembling Face brick carries out preassembling after the completion of production according to certain size, obtains assembling module, then uses assembling module Lifting appliance carries out on-site hoisting construction, and this mode can enable pavior brick to interlock, compact-sized firm, accelerates construction speed Degree.During factory's preassembling, assembled length and width can be adjusted according to actual conditions.
When pavior brick is laid, a width is stayed to be more than the gap that pavior brick tenon 3 protrudes length every 8 meters of distances, so as to The maintenance in later stage, the porous pavement of pavior brick laying handle gap filling material simultaneously in use for some time, with prior art Again backfill, you can recapture water seepage function;During pavior brick road surfacing, the small-sized pavior brick laying width of peripheral part is 50mm。
It should be noted last that above example is only unrestricted to illustrate the technical solution of the utility model, to the greatest extent The utility model is described in detail with reference to preferred embodiment for pipe, it will be understood by those within the art that, can be with The technical solution of the utility model is modified or equivalent substitution, without departing from technical solutions of the utility model spirit and Scope.

Claims (6)

1. one kind contraposition lock stitch gap permeable pavement brick, it is characterised in that mainly include brick body top and brick body bottom, it is described Brick body top is prism (1), and described brick body bottom is chamfered edge platform (2);Described (1) two adjacent center side of prism Position respectively sets a tenon (3) or groove (4), and another two adjacent side respectively sets a groove (4) or tenon (3), described prism (1) Four turnings use rounding, described rounding radii is 5-10mm, described chamfered edge platform (2) top surface and prism (1) Bed-plate dimension is identical, and described chamfered edge platform (2) base area is 0.4-0.6 times of top surface area.
A kind of 2. contraposition lock stitch gap permeable pavement brick as claimed in claim 1, it is characterised in that described prism upper table Face (5) is that polygon, described prism (1) sizes such as square, rectangle, prismatic, parallelogram are:High 150- 200mm, long 100-200mm, wide 100-200mm;Described chamfered edge platform (2) size is:High 50-100mm.
As claimed in claim 1 a kind of 3. contraposition lock stitch gap permeable pavement brick, it is characterised in that described tenon (3) and Groove (4) is shaped as U-shaped (6), ear shape (7), trapezoidal (8), circular arc (9) one kind therein, a height of 50-100mm;Described Tenon (3) protrusion length is 15-50mm, and protrusion width is 30-60mm;Described groove (4) width and tenon (3) protrusion width Unanimously, fall in depth and protrude 0.8-0.9 times of length for tenon (3), the gap width (10) between adjacent bricks is 10- 30mm, and gap is adjustable.
A kind of 4. contraposition lock stitch gap permeable pavement brick as claimed in claim 1, it is characterised in that described prism upper table The diagonal positions in face (5) are provided with the irrigation canals and ditches that catchment (11), and described prism upper surface (5) center is provided with gully-hole (12), four corner distributions corresponding to the described irrigation canals and ditches that catchment (11) along described gully-hole (12), the horizontal level in corner are high In gully-hole (12), (12) have 15 degree of the gradient from corner to gully-hole, and the described irrigation canals and ditches that catchment (11) are the concavity canal of arc, Described arc radian is 2 π/3-3 π/4.
A kind of 5. contraposition lock stitch gap permeable pavement brick as claimed in claim 1, it is characterised in that described prism upper table The part in addition to the irrigation canals and ditches that catchment (11) and gully-hole (12) in face (5), is provided with skid resistance strip, described skid resistance strip is same The groove for the identical parallel interval that one direction is set, the cross sectional shape of described groove is V-arrangement, and the depth of groove is 2-4mm.
A kind of 6. contraposition lock stitch gap permeable pavement brick as claimed in claim 4, it is characterised in that described prism (1) Four sides be respectively arranged with osculum (13), described osculum (13) is respectively distributed to the upper of tenon (3) and groove (4) Side, described prism (1) are internally provided with draining cavity, and described draining cavity top connects with described gully-hole (12) Connect, described draining cavity is connected with four osculums (13) respectively in horizontal level, and the horizontal level of draining cavity is higher than row Water hole (13), draining cavity to osculum (13) are provided with 15 degree of the gradient.
CN201720229373.5U 2017-03-10 2017-03-10 One kind contraposition lock stitch gap permeable pavement brick Expired - Fee Related CN206721600U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720229373.5U CN206721600U (en) 2017-03-10 2017-03-10 One kind contraposition lock stitch gap permeable pavement brick

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720229373.5U CN206721600U (en) 2017-03-10 2017-03-10 One kind contraposition lock stitch gap permeable pavement brick

Publications (1)

Publication Number Publication Date
CN206721600U true CN206721600U (en) 2017-12-08

Family

ID=60501522

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720229373.5U Expired - Fee Related CN206721600U (en) 2017-03-10 2017-03-10 One kind contraposition lock stitch gap permeable pavement brick

Country Status (1)

Country Link
CN (1) CN206721600U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109853879A (en) * 2019-03-15 2019-06-07 中国一冶集团有限公司 A kind of prefabricated stair

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109853879A (en) * 2019-03-15 2019-06-07 中国一冶集团有限公司 A kind of prefabricated stair

Similar Documents

Publication Publication Date Title
CN104313967B (en) Row's water-seepage type is mated formation combining structure
CN106758638A (en) A kind of city sponge brick and its construction technology
CN208279960U (en) A kind of assembled building block
CN204039856U (en) Row's water-seepage type is mated formation combining structure
CN202247596U (en) Permeable road with semi-flexible structure
CN204417949U (en) Regeneration concrete water-permeable brick
CN105484132B (en) A kind of construction method that novel water permeable pavement is mated formation
CN208533316U (en) A kind of slot type porous pavement Deck pavement
CN206721600U (en) One kind contraposition lock stitch gap permeable pavement brick
CN206971026U (en) A kind of sponge type water suction water storage pavement bricks
CN104594155A (en) Permeable pavement laying method
CN206706495U (en) A kind of ortho position lock stitch gap permeable pavement brick
CN209602912U (en) A kind of asphalt pavement road surface
CN206721596U (en) A kind of pavement structure of permeable road
CN207047637U (en) A kind of sponge city Ceramic water-permeable brick
CN211227948U (en) Prefabricated water-permeable base layer block for laying green path drift diameter
CN207891680U (en) A kind of regeneration concrete water-permeable brick
CN209669626U (en) A kind of pervious concrete brick
CN209722641U (en) A kind of environment friendly pervious brick of multi-layer and multi-directional
CN203411895U (en) Drainage facility for highway bridge floor
CN220908052U (en) Prefabricated drainage type water permeable brick
CN211395234U (en) Industrial solid waste environment-friendly water permeable brick
CN215829172U (en) Brick structure of mating formation permeates water
CN205776118U (en) A kind of final stage open drain of controllable farmland underground water level
CN206828899U (en) A kind of wear-resisting antiskid lock stitch gap permeable pavement brick

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171208

CF01 Termination of patent right due to non-payment of annual fee