CN206721600U - One kind contraposition lock stitch gap permeable pavement brick - Google Patents
One kind contraposition lock stitch gap permeable pavement brick Download PDFInfo
- Publication number
- CN206721600U CN206721600U CN201720229373.5U CN201720229373U CN206721600U CN 206721600 U CN206721600 U CN 206721600U CN 201720229373 U CN201720229373 U CN 201720229373U CN 206721600 U CN206721600 U CN 206721600U
- Authority
- CN
- China
- Prior art keywords
- brick
- prism
- tenon
- groove
- chamfered edge
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000011449 brick Substances 0.000 title claims abstract description 142
- 230000002262 irrigation Effects 0.000 claims description 21
- 238000003973 irrigation Methods 0.000 claims description 21
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 18
- 238000009826 distribution Methods 0.000 claims description 6
- 238000007514 turning Methods 0.000 claims description 6
- 238000010276 construction Methods 0.000 abstract description 16
- 238000012423 maintenance Methods 0.000 abstract description 9
- 239000000463 material Substances 0.000 description 6
- 230000035515 penetration Effects 0.000 description 6
- 230000015572 biosynthetic process Effects 0.000 description 5
- 230000000694 effects Effects 0.000 description 5
- 238000004519 manufacturing process Methods 0.000 description 5
- 230000013011 mating Effects 0.000 description 5
- 239000011468 face brick Substances 0.000 description 4
- 230000002093 peripheral effect Effects 0.000 description 4
- 238000010586 diagram Methods 0.000 description 3
- 230000008595 infiltration Effects 0.000 description 3
- 238000001764 infiltration Methods 0.000 description 3
- 230000035699 permeability Effects 0.000 description 3
- 238000003860 storage Methods 0.000 description 3
- 239000004567 concrete Substances 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 230000007613 environmental effect Effects 0.000 description 2
- 230000008020 evaporation Effects 0.000 description 2
- 238000001704 evaporation Methods 0.000 description 2
- 239000012634 fragment Substances 0.000 description 2
- 230000007774 longterm Effects 0.000 description 2
- 240000007594 Oryza sativa Species 0.000 description 1
- 235000007164 Oryza sativa Nutrition 0.000 description 1
- 239000004568 cement Substances 0.000 description 1
- 230000015271 coagulation Effects 0.000 description 1
- 238000005345 coagulation Methods 0.000 description 1
- 230000006835 compression Effects 0.000 description 1
- 238000007906 compression Methods 0.000 description 1
- 239000011456 concrete brick Substances 0.000 description 1
- 239000011380 pervious concrete Substances 0.000 description 1
- 239000011148 porous material Substances 0.000 description 1
- 238000003825 pressing Methods 0.000 description 1
- 239000002994 raw material Substances 0.000 description 1
- 235000009566 rice Nutrition 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 238000003756 stirring Methods 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Landscapes
- Road Paving Structures (AREA)
Abstract
The utility model discloses one kind to align lock stitch gap permeable pavement brick, mainly includes brick body top and brick body bottom, described brick body top is prism, and described brick body bottom is chamfered edge platform;The adjacent center side position of described prism two respectively sets a tenon or groove, and another two adjacent side respectively sets a groove or tenon, and described chamfered edge countertop is identical with prism bed-plate dimension, and described chamfered edge platform base area is 0.4 0.6 times of top surface area;This pavior brick bottom is divided into chamfered edge platform, and the fastness that brick connects with ground is good, is not easy to loosen;The design of tenon and groove interlocks adjacent pavior brick, and sound construction is compact, can use lifting construction, and the road surface later stage maintenance of laying is repaired conveniently, and performance is better than current most pavior bricks.
Description
Technical field
The utility model belongs to concrete brick design field, is specifically to be related to a kind of contraposition lock stitch effusion water
Pavior brick.
Background technology
Pervious concrete road pavement brick is that one kind can be born compared with big load, and and can makes water be arrived down by concrete surface penetration
Face or even the concrete road pavement brick of underground.Water-permeable brick is using the aggregate that cement and particular stage are matched somebody with somebody as primary raw material, Mixed With Admixture
By mixing, stirring, it is made through vibrating pressing technology, while with higher-strength, there is comparatively ideal interconnected pore again.
Ponding caused by its good water permeability of water-permeable brick can ensure the other reasons of the rainwater in city and road surface is smoothly descending, directly
Connect and penetrate under earth's surface, reduce the influence of pavement runoff.The larger porosity of pavior brick itself can also play in the noise reduction of city
Effect.Under dry climate environment, moisture content can also be made to be dispersed into through the hole of brick in air by the form of evaporation, so as to
Improve the thermal climate environment in city.The urban pavement laid using water-permeable brick is under summer normal lighting conditions than common coagulation
Soil surface temperature wants low 8-10 degree.
Permeable pavement brick is a crucial organism of sponge urban construction, can change traditional drainage pattern, increase
Add drainage speed, be whole sponge urban construction " doing one's bit ".At present, most of permeable pavement bricks are larger using porosity
Dank material.Mainly there are four problems:First, the preferable pavior brick of water permeability, compression strength is low, is only applicable to non-hold
Carry road surface.Second, after long-term use, the surface of water-permeable brick and hole are easily blocked by various dirts and can not removed automatically, are caused
Water permeability is degenerated, ecological effect sharp-decay.Third, after long-term use, the fastness that brick connects with ground is poor, easily loosens, makes
Into pavior brick it is unstable in addition tilt, have a strong impact on walking.Fourth, water-holding capacity is poor, urban heat land effect is serious.
Insufficient present in existing pavior brick to overcome, inventor is by redesigning block type and providing a kind of ensureing
On the premise of intensity, after rational drainage system, infiltration and water storage function and the easily contraposition of maintenance reparation can be integrated
Lock stitch gap permeable pavement brick.
Utility model content
It is to be directed to intensity existing for existing pavior brick that the technical problem that the utility model solves, which there is provided the utility model,
It is low, easy the technical problem such as to block, easily loosen, there is provided a kind of intensity is high, gap infiltration, water storage between brick, sound construction is compact, can prevent
Only there is difference in height phenomenon between each fragment of brick during use, safe walking or traveling can be achieved, later stage maintenance reparation is convenient, can tie up
The contraposition lock stitch gap permeable pavement brick repaiied.
To achieve the above object, the technical solution adopted in the utility model is:One kind contraposition lock stitch gap permeable pavement brick,
Mainly include brick body top and brick body bottom, described brick body top is prism, and described brick body bottom is chamfered edge platform;It is described
The adjacent center side position of prism two respectively set a tenon or groove, another two adjacent side respectively sets a groove or tenon, supplies
Pavior brick contraposition is connected, and four turnings of described prism use rounding, and described rounding radii is 5-10mm,
Described chamfered edge countertop is identical with prism bed-plate dimension, and described chamfered edge platform base area is the 0.4-0.6 of top surface area
Times.
Further, described prism upper surface is the polygon such as square, rectangle, prismatic, parallelogram, institute
The prism size stated is:High 150-200mm, long 100-200mm, wide 100-200mm;Described chamfered edge platform size is:High 50-
100mm, the fastness that described chamfered edge platform can be such that brick is connected with ground is good, is not easy to loosen.
Further, described tenon and groove shapes are U-shaped, ear shape, trapezoidal, circular arc one kind therein, a height of
50-100mm;Described tenon protrusion length is 15-50mm, and protrusion width is 30-60mm;Described recess width and tenon are convex
Going out that width is consistent, fall in 0.8-0.9 times that depth protrudes length for tenon, the gap width between adjacent bricks is 10-30mm,
And gap is adjustable, allow rainy day rainwater quickly through gap penetration between brick to underground, the structure of described tenon and groove is near
Like and for complementation, positioning interlocked is played when mating formation and is used, prevents that paved surface is uneven phenomenon.
Further, the diagonal positions of described prism upper surface are provided with the irrigation canals and ditches that catchment, on described prism
Centre of surface position is provided with gully-hole, described catchment four corner distributions, corner corresponding to irrigation canals and ditches along described gully-hole
Horizontal level be higher than gully-hole, the gradient for having 15 degree from corner to gully-hole, the described concavity canal that irrigation canals and ditches are arc that catchments,
Described arc radian is 2 π/3-3 π/4.
Further, the part in addition to catchment irrigation canals and ditches and gully-hole of described prism upper surface, is provided with tread plate
Line, described skid resistance strip are the grooves of the identical parallel interval set in same direction, and the cross sectional shape of described groove is V
Shape, the depth of groove is 2-4mm.
Further, four sides of described prism are respectively arranged with osculum, and described osculum is distributed respectively
In the top of tenon and groove, described prism is internally provided with draining cavity, described draining cavity top with it is described
Gully-hole is connected, and described draining cavity is connected with four osculums respectively in horizontal level, and the horizontal level of draining cavity is high
In osculum, draining cavity to osculum is provided with 15 degree of the gradient.
Further, the paving mode of described pavior brick is lifting laying after preassembling, is lifted after described preassembling
Refer to some pavior bricks carrying out preassembling according to certain size after the completion of production, obtain assembling module, then will
Described assembling module carries out on-site hoisting construction using lifting appliance, and this mode can enable pavior brick to interlock, structure
It is compact firm, accelerate speed of application.During factory's preassembling, assembled length and width can be adjusted according to actual conditions.
Further, during the laying of described pavior brick, a width is stayed to be more than described pavior brick every 6-8 rice distances convex
Tenon protrudes the gap of length, and so as to the maintenance in later stage, the porous pavement of described pavior brick laying is used in use for some time
Prior art handles gap filling material and backfilled again, you can recaptures water seepage function;During described pavior brick road surfacing, week
The small-sized pavior brick laying width of rim portion is 50mm.
Compared with prior art, the utility model is by redesigning block type, on the premise of proof strength, makes pavior brick
Integrate water storage function between gap infiltration and brick, mitigate discharge pressure significantly, while the rainwater evaporation laid in can reduce earth's surface
Temperature, tropical island effect can be alleviated, really realize ecology and environmental effect;This pavior brick bottom is divided into chamfered edge platform, and brick and ground connect
The fastness connect is good, is not easy to loosen;The design of this pavior brick tenon and groove interlocks adjacent pavior brick, and sound construction is compact,
Lifting construction can be used, while can prevent difference in height phenomenon occur between each fragment of brick during use;The road surface of laying has the later stage
Convenient, maintainable advantage is repaired in maintenance.The porous pavement of this pavior brick laying really possesses pair of feature and ecoscape
Weight effect, and be associated with environmental effect, performance is better than current most pavior bricks.
Brief description of the drawings
Fig. 1 is the brick laying structure schematic diagram of contraposition lock stitch gap permeable pavement brick of the present utility model;
Fig. 2 is the brick laying structure three-view diagram of contraposition lock stitch gap permeable pavement brick of the present utility model;
Fig. 3 is the U-shaped tenon of contraposition lock stitch gap permeable pavement brick of the present utility model and the schematic shapes of groove;
Fig. 4 is the shape signal of the ear shape tenon and groove of contraposition lock stitch gap permeable pavement brick of the present utility model
Figure;
Fig. 5 is the schematic shapes of trapezoidal tenon and groove that the utility model aligns lock stitch gap permeable pavement brick;
Fig. 6 is that the utility model aligns the circular arc tenon of lock stitch gap permeable pavement brick and the schematic shapes of groove;
Fig. 7 is the assembled diagrammatic cross-section that the utility model aligns lock stitch gap permeable pavement brick;
Fig. 8 is the assembly entirety and lifting schematic diagram that the utility model aligns lock stitch gap permeable pavement brick;
Wherein, 1- prisms, 2- chamfered edge platforms, 3- tenons, 4- grooves, 5- prisms upper surface, 6-U shapes, 7- ear shapes, 8-
Trapezoidal, 9- circular arcs, 10- gap widths, 11- catchments irrigation canals and ditches, 12- gully-holes, 13- osculums.
Embodiment
It is new below in conjunction with this practicality to make the purpose, technical scheme and advantage of the utility model embodiment clearer
The accompanying drawing of type, the technical scheme in the embodiment of the utility model is clearly and completely described, it is clear that described implementation
Example is the utility model part of the embodiment, rather than whole embodiments.Based on the embodiment in the utility model, this area
The every other embodiment that those of ordinary skill is obtained under the premise of creative work is not made, belongs to the utility model
The scope of protection.
For ease of the understanding to the utility model embodiment, below in conjunction with the accompanying drawings and the specific embodiments exemplified by do further
Explanation, embodiment do not form the restriction to the utility model embodiment.
Embodiment 1:As shown in figure 1, a kind of contraposition lock stitch gap permeable pavement brick, mainly includes under brick body top and brick body
Portion, brick body top are prism 1, and brick body bottom is chamfered edge platform 2;
As shown in Fig. 2 the adjacent center side position of 1 liang of prism respectively sets a tenon 3 and groove 4, another two adjacent side
A groove 4 and tenon 3 are respectively set, is connected for pavior brick contraposition, four turnings of prism 1 use rounding, rounding half
Footpath is 5mm, and the top surface of chamfered edge platform 2 is identical with the bed-plate dimension of prism 1, and the base area of chamfered edge platform 2 is 0.4 times of top surface area.
As shown in figure 1, prism upper surface 5 is square, the size of prism 1 is:High 150mm, long 100mm, it is wide
100mm;The size of chamfered edge platform 2 is:High 50mm, the fastness that chamfered edge platform 2 can be such that brick is connected with ground is good, is not easy to loosen, prism
The diagonal positions of body upper surface 5 are provided with the irrigation canals and ditches 11 that catchment, and the described center of prism upper surface 5 is provided with gully-hole
12, four corners distributions of catchmenting corresponding to irrigation canals and ditches 11 along gully-hole 12, the horizontal level in corner is higher than gully-hole 12, from corner to
Gully-hole 12 has 15 degree of the gradient, and the irrigation canals and ditches 11 that catchment are the concavity canal of arc, and arc radian is 2 π/3.Prism upper surface 5
Part in addition to catchment irrigation canals and ditches 11 and gully-hole 12, is provided with skid resistance strip, skid resistance strip be set in same direction it is identical
The groove of parallel interval, the cross sectional shape of groove is V-arrangement, and the depth of groove is 2mm.Four sides of prism 1 are set respectively
There is osculum 12, osculum 12 is respectively distributed to the top of tenon 3 and groove 4, and prism 1 is internally provided with draining cavity, row
Water cavity top is connected with gully-hole 12, and draining cavity is connected with four osculums 12 respectively in horizontal level, draining cavity
Horizontal level is higher than osculum 13, and draining cavity is provided with 15 degree of the gradient to osculum 12.
As shown in figure 3, tenon 3 and groove 4 are shaped as U-shaped 6, a height of 50mm;It is 15mm that tenon 3, which protrudes length, and protrusion is wide
Spend for 30mm;The width of groove 4 is consistent with the protrusion width of tenon 3, falls in 0.8 times that depth protrudes length for tenon 3.
As shown in fig. 7, the gap width 10 between adjacent bricks is 10mm, and gap is adjustable, allows rainy day rainwater quick
By gap penetration between brick to underground, the structure proximate of tenon 3 and groove 4 and for complementation, positioning interlocked is played when mating formation
With preventing that paved surface is uneven phenomenon.
As shown in figure 8, the paving mode of pavior brick is lifting laying after preassembling, if lifting refers to main line after preassembling
Face brick carries out preassembling after the completion of production according to certain size, obtains assembling module, then uses assembling module
Lifting appliance carries out on-site hoisting construction, and this mode can enable pavior brick to interlock, compact-sized firm, accelerates construction speed
Degree.During factory's preassembling, assembled length and width can be adjusted according to actual conditions.
When pavior brick is laid, a width is stayed to be more than the gap that pavior brick tenon 3 protrudes length every 6 meters of distances, so as to
The maintenance in later stage, the porous pavement of pavior brick laying handle gap filling material simultaneously in use for some time, with prior art
Again backfill, you can recapture water seepage function;During pavior brick road surfacing, the small-sized pavior brick laying width of peripheral part is
50mm。
Embodiment 2:As shown in figure 1, a kind of contraposition lock stitch gap permeable pavement brick, mainly includes under brick body top and brick body
Portion, brick body top are prism 1, and brick body bottom is chamfered edge platform 2;
As shown in Fig. 2 the adjacent center side position of 1 liang of prism respectively sets a tenon 3 and groove 4, another two adjacent side
A groove 4 and tenon 3 are respectively set, is connected for pavior brick contraposition, four turnings of prism 1 use rounding, rounding half
Footpath is 7.5mm, and the top surface of chamfered edge platform 2 is identical with the bed-plate dimension of prism 1, and the base area of chamfered edge platform 2 is 0.5 times of top surface area.
As shown in figure 1, prism upper surface 5 is rectangle, the size of prism 1 is:High 175mm, long 150mm, it is wide
150mm;The size of chamfered edge platform 2 is:High 75mm, the fastness that chamfered edge platform 2 can be such that brick is connected with ground is good, is not easy to loosen, prism
The diagonal positions of body upper surface 5 are provided with the irrigation canals and ditches 11 that catchment, and the described center of prism upper surface 5 is provided with gully-hole
12, four corners distributions of catchmenting corresponding to irrigation canals and ditches 11 along gully-hole 12, the horizontal level in corner is higher than gully-hole 12, from corner to
Gully-hole 12 has 15 degree of the gradient, and the irrigation canals and ditches 11 that catchment are the concavity canal of arc, and arc radian is 2 π/3.Prism upper surface 5
Part in addition to catchment irrigation canals and ditches 11 and gully-hole 12, is provided with skid resistance strip, skid resistance strip be set in same direction it is identical
The groove of parallel interval, the cross sectional shape of groove is V-arrangement, and the depth of groove is 3mm.Four sides of prism 1 are set respectively
There is osculum 12, osculum 12 is respectively distributed to the top of tenon 3 and groove 4, and prism 1 is internally provided with draining cavity, row
Water cavity top is connected with gully-hole 12, and draining cavity is connected with four osculums 12 respectively in horizontal level, draining cavity
Horizontal level is higher than osculum 13, and draining cavity is provided with 15 degree of the gradient to osculum 12.
As shown in figure 4, tenon 3 and groove 4 are shaped as ear shape 7, a height of 75mm;It is 35mm that tenon 3, which protrudes length, protrusion
Width is 45mm;The width of groove 4 is consistent with the protrusion width of tenon 3, falls in 0.85 times that depth protrudes length for tenon 3.
As shown in fig. 7, the gap width 10 between adjacent bricks is 20mm, and gap is adjustable, allows rainy day rainwater quick
By gap penetration between brick to underground, the structure proximate of tenon 3 and groove 4 and for complementation, positioning interlocked is played when mating formation
With preventing that paved surface is uneven phenomenon.
As shown in figure 8, the paving mode of pavior brick is lifting laying after preassembling, if lifting refers to main line after preassembling
Face brick carries out preassembling after the completion of production according to certain size, obtains assembling module, then uses assembling module
Lifting appliance carries out on-site hoisting construction, and this mode can enable pavior brick to interlock, compact-sized firm, accelerates construction
Speed.During factory's preassembling, assembled length and width can be adjusted according to actual conditions.
When pavior brick is laid, a width is stayed to be more than the gap that pavior brick tenon 3 protrudes length every 7 meters of distances, so as to
The maintenance in later stage, the porous pavement of pavior brick laying handle gap filling material simultaneously in use for some time, with prior art
Again backfill, you can recapture water seepage function;During pavior brick road surfacing, the small-sized pavior brick laying width of peripheral part is
50mm。
Embodiment 3:As shown in figure 1, a kind of contraposition lock stitch gap permeable pavement brick, mainly includes under brick body top and brick body
Portion, brick body top are prism 1, and brick body bottom is chamfered edge platform 2;
As shown in Fig. 2 the adjacent center side position of 1 liang of prism respectively sets a tenon 3 and groove 4, another two adjacent side
A groove 4 and tenon 3 are respectively set, is connected for pavior brick contraposition, four turnings of prism 1 use rounding, rounding half
Footpath is 10mm, and the top surface of chamfered edge platform 2 is identical with the bed-plate dimension of prism 1, and the base area of chamfered edge platform 2 is 0.6 times of top surface area.
As shown in figure 1, prism upper surface 5 is prismatic, the size of prism 1 is:High 200mm, long 200mm, wide 200mm;
The size of chamfered edge platform 2 is:High 100mm, the fastness that chamfered edge platform 2 can be such that brick is connected with ground is good, is not easy to loosen, prism upper table
The diagonal positions in face 5 are provided with the irrigation canals and ditches 11 that catchment, and the described center of prism upper surface 5 is provided with gully-hole 12, collection
The distribution of four corners, the horizontal level in corner are higher than gully-hole 12 corresponding to Box Drain 11 along gully-hole 12, from corner to catchmenting
There is 15 degree of the gradient in hole 12, and the irrigation canals and ditches 11 that catchment are the concavity canal of arc, and arc radian is 3 π/4.Remove collection in prism upper surface 5
Part outside Box Drain 11 and gully-hole 12, is provided with skid resistance strip, and skid resistance strip is in the identical parallel of same direction setting
The groove at interval, the cross sectional shape of groove is V-arrangement, and the depth of groove is 4mm.Four sides of prism 1 are respectively arranged with row
Water hole 12, osculum 12 are respectively distributed to the top of tenon 3 and groove 4, and prism 1 is internally provided with draining cavity, and draining is empty
Top of chamber is connected with gully-hole 12, and draining cavity is connected with four osculums 12 respectively in horizontal level, the level of draining cavity
Position is higher than osculum 13, and draining cavity is provided with 15 degree of the gradient to osculum 12.
As shown in figure 5, tenon 3 and groove 4 are shaped as trapezoidal 8, a height of 100mm;It is 50mm that tenon 3, which protrudes length, protrusion
Width is 60mm;The width of groove 4 is consistent with the protrusion width of tenon 3, falls in 0.9 times that depth protrudes length for tenon 3.
As shown in fig. 7, the gap width 10 between adjacent bricks is 30mm, and gap is adjustable, allows rainy day rainwater quick
By gap penetration between brick to underground, the structure proximate of tenon 3 and groove 4 and for complementation, positioning interlocked is played when mating formation
With preventing that paved surface is uneven phenomenon.
As shown in figure 8, the paving mode of pavior brick is lifting laying after preassembling, if lifting refers to main line after preassembling
Face brick carries out preassembling after the completion of production according to certain size, obtains assembling module, then uses assembling module
Lifting appliance carries out on-site hoisting construction, and this mode can enable pavior brick to interlock, compact-sized firm, accelerates construction speed
Degree.During factory's preassembling, assembled length and width can be adjusted according to actual conditions.
When pavior brick is laid, a width is stayed to be more than the gap that pavior brick tenon 3 protrudes length every 8 meters of distances, so as to
The maintenance in later stage, the porous pavement of pavior brick laying handle gap filling material simultaneously in use for some time, with prior art
Again backfill, you can recapture water seepage function;During pavior brick road surfacing, the small-sized pavior brick laying width of peripheral part is
50mm。
Embodiment 4:As shown in figure 1, a kind of contraposition lock stitch gap permeable pavement brick, mainly includes under brick body top and brick body
Portion, brick body top are prism 1, and brick body bottom is chamfered edge platform 2;
As shown in Fig. 2 the adjacent center side position of 1 liang of prism respectively sets a tenon 3 and groove 4, another two adjacent side
A groove 4 and tenon 3 are respectively set, is connected for pavior brick contraposition, four turnings of prism 1 use rounding, rounding half
Footpath is 10mm, and the top surface of chamfered edge platform 2 is identical with the bed-plate dimension of prism 1, and the base area of chamfered edge platform 2 is 0.6 times of top surface area.
As shown in figure 1, prism upper surface 5 is prismatic, the size of prism 1 is:High 200mm, long 200mm, wide 200mm;
The size of chamfered edge platform 2 is:High 100mm, the fastness that chamfered edge platform 2 can be such that brick is connected with ground is good, is not easy to loosen, prism upper table
The diagonal positions in face 5 are provided with the irrigation canals and ditches 11 that catchment, and the described center of prism upper surface 5 is provided with gully-hole 12, collection
The distribution of four corners, the horizontal level in corner are higher than gully-hole 12 corresponding to Box Drain 11 along gully-hole 12, from corner to catchmenting
There is 15 degree of the gradient in hole 12, and the irrigation canals and ditches 11 that catchment are the concavity canal of arc, and arc radian is 3 π/4.Remove collection in prism upper surface 5
Part outside Box Drain 11 and gully-hole 12, is provided with skid resistance strip, and skid resistance strip is in the identical parallel of same direction setting
The groove at interval, the cross sectional shape of groove is V-arrangement, and the depth of groove is 4mm.Four sides of prism 1 are respectively arranged with row
Water hole 12, osculum 12 are respectively distributed to the top of tenon 3 and groove 4, and prism 1 is internally provided with draining cavity, and draining is empty
Top of chamber is connected with gully-hole 12, and draining cavity is connected with four osculums 12 respectively in horizontal level, the level of draining cavity
Position is higher than osculum 13, and draining cavity is provided with 15 degree of the gradient to osculum 12.
As shown in fig. 6, tenon 3 and groove 4 are shaped as circular arc 9, a height of 100mm;It is 50mm that tenon 3, which protrudes length, convex
It is 60mm to go out width;The width of groove 4 is consistent with the protrusion width of tenon 3, falls in 0.9 times that depth protrudes length for tenon 3.
As shown in fig. 7, the gap width 10 between adjacent bricks is 30mm, and gap is adjustable, allows rainy day rainwater quick
By gap penetration between brick to underground, the structure proximate of tenon 3 and groove 4 and for complementation, positioning interlocked is played when mating formation
With preventing that paved surface is uneven phenomenon.
As shown in figure 8, the paving mode of pavior brick is lifting laying after preassembling, if lifting refers to main line after preassembling
Face brick carries out preassembling after the completion of production according to certain size, obtains assembling module, then uses assembling module
Lifting appliance carries out on-site hoisting construction, and this mode can enable pavior brick to interlock, compact-sized firm, accelerates construction speed
Degree.During factory's preassembling, assembled length and width can be adjusted according to actual conditions.
When pavior brick is laid, a width is stayed to be more than the gap that pavior brick tenon 3 protrudes length every 8 meters of distances, so as to
The maintenance in later stage, the porous pavement of pavior brick laying handle gap filling material simultaneously in use for some time, with prior art
Again backfill, you can recapture water seepage function;During pavior brick road surfacing, the small-sized pavior brick laying width of peripheral part is
50mm。
It should be noted last that above example is only unrestricted to illustrate the technical solution of the utility model, to the greatest extent
The utility model is described in detail with reference to preferred embodiment for pipe, it will be understood by those within the art that, can be with
The technical solution of the utility model is modified or equivalent substitution, without departing from technical solutions of the utility model spirit and
Scope.
Claims (6)
1. one kind contraposition lock stitch gap permeable pavement brick, it is characterised in that mainly include brick body top and brick body bottom, it is described
Brick body top is prism (1), and described brick body bottom is chamfered edge platform (2);Described (1) two adjacent center side of prism
Position respectively sets a tenon (3) or groove (4), and another two adjacent side respectively sets a groove (4) or tenon (3), described prism (1)
Four turnings use rounding, described rounding radii is 5-10mm, described chamfered edge platform (2) top surface and prism (1)
Bed-plate dimension is identical, and described chamfered edge platform (2) base area is 0.4-0.6 times of top surface area.
A kind of 2. contraposition lock stitch gap permeable pavement brick as claimed in claim 1, it is characterised in that described prism upper table
Face (5) is that polygon, described prism (1) sizes such as square, rectangle, prismatic, parallelogram are:High 150-
200mm, long 100-200mm, wide 100-200mm;Described chamfered edge platform (2) size is:High 50-100mm.
As claimed in claim 1 a kind of 3. contraposition lock stitch gap permeable pavement brick, it is characterised in that described tenon (3) and
Groove (4) is shaped as U-shaped (6), ear shape (7), trapezoidal (8), circular arc (9) one kind therein, a height of 50-100mm;Described
Tenon (3) protrusion length is 15-50mm, and protrusion width is 30-60mm;Described groove (4) width and tenon (3) protrusion width
Unanimously, fall in depth and protrude 0.8-0.9 times of length for tenon (3), the gap width (10) between adjacent bricks is 10-
30mm, and gap is adjustable.
A kind of 4. contraposition lock stitch gap permeable pavement brick as claimed in claim 1, it is characterised in that described prism upper table
The diagonal positions in face (5) are provided with the irrigation canals and ditches that catchment (11), and described prism upper surface (5) center is provided with gully-hole
(12), four corner distributions corresponding to the described irrigation canals and ditches that catchment (11) along described gully-hole (12), the horizontal level in corner are high
In gully-hole (12), (12) have 15 degree of the gradient from corner to gully-hole, and the described irrigation canals and ditches that catchment (11) are the concavity canal of arc,
Described arc radian is 2 π/3-3 π/4.
A kind of 5. contraposition lock stitch gap permeable pavement brick as claimed in claim 1, it is characterised in that described prism upper table
The part in addition to the irrigation canals and ditches that catchment (11) and gully-hole (12) in face (5), is provided with skid resistance strip, described skid resistance strip is same
The groove for the identical parallel interval that one direction is set, the cross sectional shape of described groove is V-arrangement, and the depth of groove is 2-4mm.
A kind of 6. contraposition lock stitch gap permeable pavement brick as claimed in claim 4, it is characterised in that described prism (1)
Four sides be respectively arranged with osculum (13), described osculum (13) is respectively distributed to the upper of tenon (3) and groove (4)
Side, described prism (1) are internally provided with draining cavity, and described draining cavity top connects with described gully-hole (12)
Connect, described draining cavity is connected with four osculums (13) respectively in horizontal level, and the horizontal level of draining cavity is higher than row
Water hole (13), draining cavity to osculum (13) are provided with 15 degree of the gradient.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720229373.5U CN206721600U (en) | 2017-03-10 | 2017-03-10 | One kind contraposition lock stitch gap permeable pavement brick |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720229373.5U CN206721600U (en) | 2017-03-10 | 2017-03-10 | One kind contraposition lock stitch gap permeable pavement brick |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206721600U true CN206721600U (en) | 2017-12-08 |
Family
ID=60501522
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720229373.5U Expired - Fee Related CN206721600U (en) | 2017-03-10 | 2017-03-10 | One kind contraposition lock stitch gap permeable pavement brick |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206721600U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109853879A (en) * | 2019-03-15 | 2019-06-07 | 中国一冶集团有限公司 | A kind of prefabricated stair |
-
2017
- 2017-03-10 CN CN201720229373.5U patent/CN206721600U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109853879A (en) * | 2019-03-15 | 2019-06-07 | 中国一冶集团有限公司 | A kind of prefabricated stair |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106049217B (en) | Fabricated permeable paving method and block and paving structure | |
CN104313967B (en) | Row's water-seepage type is mated formation combining structure | |
CN106758638A (en) | A kind of city sponge brick and its construction technology | |
CN206553868U (en) | A kind of permeable road kerb | |
CN208279960U (en) | A kind of assembled building block | |
CN208533316U (en) | A kind of slot type porous pavement Deck pavement | |
CN204125814U (en) | A kind of garden path structure | |
CN202247596U (en) | Permeable road with semi-flexible structure | |
CN204417949U (en) | Regeneration concrete water-permeable brick | |
CN209602912U (en) | A kind of asphalt pavement road surface | |
CN105484132B (en) | A kind of construction method that novel water permeable pavement is mated formation | |
CN206721600U (en) | One kind contraposition lock stitch gap permeable pavement brick | |
CN202830673U (en) | Existing embankment heightening structure for limited using land area | |
CN206971026U (en) | A kind of sponge type water suction water storage pavement bricks | |
CN104594155A (en) | Permeable pavement laying method | |
CN206706495U (en) | A kind of ortho position lock stitch gap permeable pavement brick | |
CN206721596U (en) | A kind of pavement structure of permeable road | |
CN207047637U (en) | A kind of sponge city Ceramic water-permeable brick | |
CN211227948U (en) | Prefabricated water-permeable base layer block for laying green path drift diameter | |
CN207891680U (en) | A kind of regeneration concrete water-permeable brick | |
CN209669626U (en) | A kind of pervious concrete brick | |
CN209722641U (en) | A kind of environment friendly pervious brick of multi-layer and multi-directional | |
CN203411895U (en) | Drainage facility for highway bridge floor | |
CN220908052U (en) | Prefabricated drainage type water permeable brick | |
CN215829172U (en) | Brick structure of mating formation permeates water |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171208 |
|
CF01 | Termination of patent right due to non-payment of annual fee |