- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000004519 manufacturing process Methods 0.000 title claims abstract description 81
- 238000000034 method Methods 0.000 claims abstract description 13
- 238000009434 installation Methods 0.000 abstract description 4
- 230000000694 effects Effects 0.000 description 3
- 238000010586 diagram Methods 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 239000004566 building material Substances 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000009413 insulation Methods 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Landscapes
- Supports For Pipes And Cables (AREA)
Abstract
The utility model discloses a kind of component production line, includes the component production line of some parallel side-by-sides, and for carrying out the pipelining equipment of continuous productive process, and the pipelining equipment is only one;Also include being arranged on each component production thread end, the ferry-boat equipment for the pipelining equipment to be transitted to another component production line.In application component production line provided by the utility model, pipelining equipment is in a component production line normal operation, pipelining equipment is transitted on another production line by equipment of ferrying continues operation, so, a pipelining equipment is set to realize single device in a plurality of production on-line operation using equipment of ferrying, improve utilization rate of equipment and installations, it is cost-effective, ensure that a plurality of component production line is smoothly reliably run simultaneously, automaticity is high, manpower is saved, so as to reduce production cost.
Description
Technical field
New Building Materials manufacturing equipment technical field is the utility model is related to, more particularly to a kind of component production line.
Background technology
As Chinese novel building industry modernization develops, safe efficient, high quality the mode of production turns into industry development
Direction.Prestressing force superimposed sheet production be mainly long line platform mould fix, multiple devices movement operation the mode of production, equipment
Power taking and its consumption reduction are the breakthrough of difficulties points of design.
At present, the main power supply mode cable drum of component production line and low voltage rail power supply, cable drum is simple in construction, only
Can be to the one-to-one power supply of equipment, cost is high, efficiency is low;Low voltage rail power supply needs to carry out insulation processing, work to walking track
When power consumption it is high, both power supply mode automaticities are low, and operating efficiency is low, and waste of manpower, improves production cost.
Therefore, component production line operation cost how is reduced, is those skilled in the art's technical problem urgently to be resolved hurrily.
Utility model content
The purpose of this utility model is to provide a kind of component production line, can realize that single device is made on a plurality of production line
Industry, utilization rate of equipment and installations is improved, it is cost-effective, ensure a plurality of smooth reliability service of component production line, and it is easy to maintenance, automate journey
Degree is high, and then improves operating efficiency, reduces production cost.
In order to solve the above technical problems, the utility model provides a kind of component production line, including some parallel side-by-sides
Component production line, for carrying out the pipelining equipment of continuous productive process, and the pipelining equipment is only one;Also wrap
Include and be arranged on each component production thread end, for the pipelining equipment to be transitted into another component production line
Ferry-boat equipment.
Preferably, power supply buses are provided with each component production line and the ferry-boat equipment, the power supply is female
Line is provided with the conductive chute for being used to make the pipelining equipment slide power taking.
Preferably, the power supply buses are provided with middle power supplying device, and for making the pipelining equipment by institute
The ferry-boat connecting-refused machine that component production line is directed in the ferry-boat equipment is stated, and the ferry-boat connecting-refused machine is arranged on each component
At the crossover position of production line.
Preferably, in addition to both arms current-collector, described both arms current-collector one end are connected with the pipelining equipment, and
The other end is slidably disposed in the conductive chute of the power supply buses.
Preferably, in addition to it is arranged on the both arms current-collector, is high for adjusting the pipelining equipment availability
The regulation support frame of degree, and the supporting part of the regulation support frame is connected with the pipelining equipment, the regulation support
The support bar of frame is adjustable to be arranged in the neck of the both arms current-collector.
Preferably, the ferry-boat equipment is provided with the support for being used for supporting the power supply buses.
Component production line provided by the utility model, mainly the component production line including some parallel side-by-sides and ferry-boat
Equipment.Wherein, ferry-boat equipment is arranged on a plurality of component production thread end, is mainly used in making pipelining equipment by a upper structure
Part production line transits to next component production line.In application component production line provided by the utility model, streamline is made
Industry equipment is transitted on another production line in a component production line normal operation, pipelining equipment by equipment of ferrying
Continue operation, in this way, making a pipelining equipment realize single device on a plurality of production line using equipment of ferrying
Operation, utilization rate of equipment and installations is improved, it is cost-effective, while ensure that a plurality of component production line is smoothly reliably run, automaticity
Height, manpower is saved, so as to reduce production cost.
Brief description of the drawings
, below will be to embodiment in order to illustrate more clearly of the utility model embodiment or technical scheme of the prior art
Or the required accompanying drawing used is briefly described in description of the prior art, it should be apparent that, drawings in the following description are only
It is embodiment of the present utility model, for those of ordinary skill in the art, on the premise of not paying creative work, also
Other accompanying drawings can be obtained according to the accompanying drawing of offer.
Fig. 1 is a kind of integral layout schematic diagram of embodiment provided by the utility model;
Fig. 2 is integrally-built another angular views shown in Fig. 1;
Fig. 3 is the power supply buses structural representation shown in Fig. 1.
Wherein, in Fig. 1-Fig. 2:
Ferry-boat equipment -1, power supply buses -2, middle power supplying device -3, support -4, connecting-refused machine -5 of ferrying, operation rail
Road -6, component production line one -7, pipelining equipment -8, component production line two -9, adjust support frame -101, both arms
Relay -102, external power source -103.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out
Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole
Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made
The every other embodiment obtained, belong to the scope of the utility model protection.
Fig. 1 is refer to, Fig. 1 is a kind of integral layout schematic diagram of embodiment provided by the utility model.
In a kind of embodiment provided by the utility model, mainly include the component life of some parallel side-by-sides
Producing line and ferry-boat equipment 1.
Wherein, ferry-boat equipment 1 is arranged on a plurality of component production thread end, is mainly used in making pipelining equipment 8 by upper
One component production line transits to next component production line.
For the actual effect level of resources utilization, power supply buses 2, power supply are set in ferry-boat equipment 1 and every component production line
Bus 2 is mainly that pipelining equipment 8 provides power supply, and power supply buses 2 are provided with and are used to slide pipelining equipment 8
The conductive chute of power taking, in this way, providing operation power supply by sliding way to take power for pipelining equipment 8, realize streamline
Implement 8 uses same power supply on a plurality of component production line.
In actual application, pipelining equipment 8 can be given birth to by being connected with power supply buses 2 in a component
Producing line normal operation, because pipelining equipment 8 is in component production on-line operation and its ferry-boat to ferry-boat equipment 1, use
Same power supply buses 2, resource utilization is improved, while enable a pipelining equipment 8 more using equipment 1 of ferrying
Bar component produces on-line operation, ensures that a plurality of component production line is smoothly reliably run.
Fig. 2 and Fig. 3 are refer to, wherein Fig. 2 is integrally-built another angular views shown in Fig. 1, and Fig. 3 is power supply buses
2 structural representations.
Specifically, according to the scheduling of production of component production line, the continuous productive process in the operation track 6 of component production line 1
Equipment 8, which needs to ferry to production operation on component production line 29, continuous productive process equipment 8 from component production line 1, passes through streamline
When the power taking of power supply buses 2 driving reductor walking is to close to ferry-boat equipment 1, ferry-boat equipment 1 obtains control signals row and goes to component
The station of production line 1, which is accurately positioned, waits continuous productive process equipment 8 to ferry, and continuous productive process equipment 8 is first when entering ferry-boat equipment 1
First first both arms current-collector 102 is by the power taking on the power supply buses 2 of streamline, and second both arms current-collector 102 passes through
Ferry-boat connecting-refused machine 4 is transitioned into ferry-boat equipment 1, and second both arms current-collector 102 starts from the power supply buses 2 of ferry-boat equipment 1
Power taking, until continuous productive process equipment 8 is walked the parking stall parking that has set in advance, ferry-boat equipment 1 is walked by control system and arrives structure
The station of part production line 29, continuous productive process equipment 8 start lower ferry-boat equipment 1, and its power taking process is both arms current-collector 102 first from the
First, the power taking simultaneously of the second both arms current-collector 102, given birth to when first both arms current-collector 102 is transitioned into component by connecting-refused machine 4 of ferrying
Start on the power supply buses 2 of producing line 29 from power taking on the power supply buses 2 of component production line 29, power taking step is repeated, in this way, sharp
A pipelining equipment 8 is set to produce on-line operation in a plurality of component with ferry-boat equipment 1.
In order to optimize the power taking effect of pipelining equipment 8 in above-described embodiment, power supply buses 2 are designed as chute knot
Structure, and middle power supplying device 3 is provided with power supply buses 2, the middle power supplying device 3 connects with outside working power, the sliding groove structure
Be advantageous to the sliding type power taking of pipelining equipment 8, in this way, pipelining equipment 8 can be double when by ferry-boat equipment 1
To power taking, ensure that pipelining equipment 8 will not be because of the situation of power-off parking.
Further, both arms current-collector 102, one end of the both arms current-collector 102 and flowing water are installed on the sliding groove structure
Line implement 8 connects, and carries out operation by the power taking of both arms current-collector 102.Meanwhile the other end of the both arms current-collector 102
It is slidably arranged in the sliding groove structure, and slides power taking along its length.
In order to optimize the application effect of both arms current-collector 102 in above-described embodiment, regulation stream is set up on both arms current-collector 102
The regulation support frame 101 of the operation height of water implement 8, and the supporting part of support frame 101 supports continuous productive process equipment 8
Fixed, the support bar of support frame 101 is connected in both arms current-collector 102, and the support bar by adjusting support frame 101 extends high
Degree so that continuous productive process equipment 8 disclosure satisfy that a variety of different height job requirements, improve the utility ratio of continuous productive process equipment 8.
Because ferry-boat equipment 1 is provided with power supply buses 2, and power supply buses 2 need to be connected with power supply, meanwhile, the ferry-boat
Mobile device is additionally provided with equipment 1.
Based on this, in order to meet the ferry power demands of equipment 1 and movement, external electrical preferably is set in ferry-boat equipment 1 bottom
Source 103, the external power source 103 is connected with the power supply buses 2 in ferry-boat equipment 1, and external power source 103 passes through drag chain cable or cunning
Touch line and carry out power taking.
Further, ferry-boat equipment 1 includes support 4, the power supply buses 2 that the support 4 will can ferry in equipment 1
Support, and prevent operating worker from touching power supply buses 2, improve the security of component production line.
In summary, the component production line that the present embodiment is provided mainly includes ferry-boat equipment 1 and power supply buses 2.Its
In, ferry-boat equipment 1 is arranged on a plurality of component production thread end, is mainly used in making pipelining equipment 8 be given birth to by a upper component
Producing line transits to next component production line;Power supply buses 2 are arranged on ferry-boat equipment 1 and every component production line, predominantly
Pipelining equipment 8 provides power supply.In application component production line provided by the utility model, pipelining equipment 8
, can be in a component production line normal operation, because pipelining equipment 8 is given birth in component by being connected with power supply buses 2
When producing on-line operation and its ferry-boat to ferry-boat equipment 1, using same power supply buses 2, resource utilization is improved, while utilize pendulum
Crossing equipment 1 enables a pipelining equipment 8 to produce on-line operation in a plurality of component, and single device can be realized a plurality of
On-line operation is produced, improves utilization rate of equipment and installations, while ensures that a plurality of component production line is smoothly reliably run, automaticity
Height, manpower is saved, so as to reduce production cost.
The foregoing description of the disclosed embodiments, professional and technical personnel in the field are enable to realize or new using this practicality
Type.A variety of modifications to these embodiments will be apparent for those skilled in the art, determine herein
The General Principle of justice can be realized in other embodiments in the case where not departing from spirit or scope of the present utility model.Cause
This, the utility model is not intended to be limited to the embodiments shown herein, and is to fit to and principles disclosed herein
The most wide scope consistent with features of novelty.
Claims (7)
1. a kind of component production line, include the component production line of some parallel side-by-sides, for carrying out the streamline of continuous productive process
Implement (8), and the pipelining equipment (8) is only one, it is characterised in that also include being arranged on each component
Produce thread end, the ferry-boat equipment (1) for the pipelining equipment (8) to be transitted to another component production line.
2. component production line according to claim 1, it is characterised in that set in each component production line and the ferry-boat
Power supply buses (2) are provided with standby (1), the power supply buses (2), which are provided with, to be used to make the pipelining equipment (8) sliding
The conductive chute of dynamic power taking.
3. component production line according to claim 2, it is characterised in that the power supply buses (2) are provided with middle power supplying
Device (3), and for making the pipelining equipment (8) be directed to the ferry-boat equipment (1) by the component production line
Ferry-boat connecting-refused machine (5), and it is described ferry-boat connecting-refused machine (5) be arranged at the crossover position of each component production line.
4. component production line according to claim 3, it is characterised in that also including both arms current-collector (102), the both arms
Current-collector (102) one end is connected with the pipelining equipment (8), and the other end is slidably disposed on the power supply buses
(2) in conductive chute.
5. component production line according to claim 4, it is characterised in that also include being arranged on the both arms current-collector
(102) the regulation support frame (101) on, for adjusting pipelining equipment (8) operation height, and the regulation support
The supporting part of frame (101) is connected with the pipelining equipment (8), and the support bar of the regulation support frame (101) can adjust
It is arranged in the neck of the both arms current-collector (102).
6. component production line according to claim 5, it is characterised in that described ferry-boat equipment (1) bottom is provided with external electrical
Source (103), and the external power source (103) is connected with the power supply buses (2) of the ferry-boat equipment (1).
7. component production line according to claim 6, it is characterised in that the ferry-boat equipment (1), which is provided with, to be used to support
The support (4) of the power supply buses (2).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720567771.8U CN206720216U (en) | 2017-05-19 | 2017-05-19 | A kind of component production line |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720567771.8U CN206720216U (en) | 2017-05-19 | 2017-05-19 | A kind of component production line |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206720216U true CN206720216U (en) | 2017-12-08 |
Family
ID=60512573
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720567771.8U Expired - Fee Related CN206720216U (en) | 2017-05-19 | 2017-05-19 | A kind of component production line |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206720216U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113617227A (en) * | 2021-08-24 | 2021-11-09 | 郑州中科新兴产业技术研究院 | Intelligent pollution prevention and control method used in starch sugar desalting process |
-
2017
- 2017-05-19 CN CN201720567771.8U patent/CN206720216U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113617227A (en) * | 2021-08-24 | 2021-11-09 | 郑州中科新兴产业技术研究院 | Intelligent pollution prevention and control method used in starch sugar desalting process |
CN113617227B (en) * | 2021-08-24 | 2024-02-13 | 郑州中科新兴产业技术研究院 | Intelligent pollution prevention and control method for starch sugar desalination process |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202881852U (en) | Suspension bridge cable installation system | |
CN102561744A (en) | Integrated base station capable of realizing one-click maintenance without ascending height | |
CN206720216U (en) | A kind of component production line | |
CN202441047U (en) | Hanging basket guide device on curved surface | |
CN106966131A (en) | A kind of component production line | |
CN203557539U (en) | Baseless concrete stirring station | |
CN203522040U (en) | Power cable wellhead pulley slide plate | |
CN103691841A (en) | Cord making tool | |
CN203456799U (en) | A double-bundled conductor hoisting frame equipped with rollers | |
CN204046065U (en) | A kind of wiring operations platform | |
CN203632531U (en) | Coal mine frequency converter | |
CN102689168B (en) | Fitting connection technique for large precision equipment | |
CN202872257U (en) | Opening type slide cable hook | |
CN203684100U (en) | Upper and lower reinforcement connection device in bridge pier column reinforcement cage | |
CN203412351U (en) | F-shaped narrow-base triangular steel tube tower | |
CN202877447U (en) | Horse mouth ring winding machine | |
CN205844600U (en) | A kind of fibre optic installations groove | |
CN205399213U (en) | Space cable face structure funicular system is transversely to drawing device | |
CN203967626U (en) | A kind of double bundle conductor dedicated pulley of convertible use height | |
CN202731100U (en) | Section welding type steel roof truss used for convertor station valve hall | |
CN202130924U (en) | Rope guiding mechanism of rope coiling machine | |
CN204144758U (en) | A kind of outdoor power distribution unit arrangement | |
CN208776140U (en) | A kind of trolley anti-fall device that the escalator standard sections slash that is staggered is convenient for safeguarding | |
CN203319420U (en) | Renewable electric energy group control scheduling electricity-saving system of elevator | |
CN203583377U (en) | Hang basket for corrugated steel web bridge cantilever construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address | ||
CP03 | Change of name, title or address |
Address after: 5 / F, office building 2, Zhongmin zhuyou Co., Ltd., No. 10, Zhongshi Road, shaping street, Kaifu District, Changsha City, Hunan Province, 410000 Patentee after: Zhuyou Zhizao Technology Investment Co.,Ltd. Address before: 410205 room 3005, complex building, Changsha Jin Xia bonded logistics center, 30 Xingang Road, Kaifu District, Changsha, Hunan. Patentee before: Zhongmin Zhuyou Technology Investment Co.,Ltd. |
|
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171208 |