CN206707743U - It is a kind of to strengthen shield launching and the portal sealing device of reception - Google Patents

It is a kind of to strengthen shield launching and the portal sealing device of reception Download PDF

Info

Publication number
CN206707743U
CN206707743U CN201720547105.8U CN201720547105U CN206707743U CN 206707743 U CN206707743 U CN 206707743U CN 201720547105 U CN201720547105 U CN 201720547105U CN 206707743 U CN206707743 U CN 206707743U
Authority
CN
China
Prior art keywords
shield
portal
rubber slab
cord rubber
turnover panel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720547105.8U
Other languages
Chinese (zh)
Inventor
何帅
李春生
陈平
卜渭航
罗彬�
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Haoji Railway Co ltd
Original Assignee
Fourth Engineering Co Ltd of CTCE Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fourth Engineering Co Ltd of CTCE Group filed Critical Fourth Engineering Co Ltd of CTCE Group
Priority to CN201720547105.8U priority Critical patent/CN206707743U/en
Application granted granted Critical
Publication of CN206707743U publication Critical patent/CN206707743U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

It the utility model is related to and a kind of strengthen shield launching and the portal sealing device of reception,Including the cord rubber slab being arranged at openings position,One end of cord rubber slab is fastenedly connected with portal steel loop,The other end of cord rubber slab overhang and with the outer wall of section of jurisdiction against,Device also includes being arranged on the shield tail brush at portal steel loop inwall,Circumferential direction arrangement of the shield tail brush along portal steel loop inwall,The front that shield tail brush is located at shield machine tunneling direction is set,Shield tail, which paints, is coated with grease,Shield machine is during tunneling construction,After cord rubber slab is opened on the shield body top of shield machine,So that the projecting end of cord rubber slab and the outer wall of section of jurisdiction against,Realize the preliminary sealing to hole,Utilize shield tail brush,And paint smearing grease in shield tail,So as to form the barrier to portal,Due to shield tail brush bristle can sufficiently with section of jurisdiction outer wall against,And then it can ensure that the sealing effectiveness to portal.

Description

It is a kind of to strengthen shield launching and the portal sealing device of reception
Technical field
It the utility model is related to technical field of tunnel construction, and in particular to a kind of to strengthen shield launching and the portal of reception Sealing device.
Background technology
Shield machine is typically provided with during set of tunneling construction in originating for tunneling shield construction at openings position Cord rubber slab is to play a part of sealing, and cord rubber slab is flexible board, and one end of cord rubber slab is arranged on the ring of portal On shape framework, the other end of cord rubber slab overhangs and with the section of jurisdiction in tunnel against so as to play the hole that originates to tunnel Sealing, shield machine in tunnel is moved spacing to play, be additionally provided with turnover panel at outdoor openings position, one end hinge of turnover panel Connect on the portal steel loop for being arranged on hole, the other end of turnover panel, which overhangs, points to section of jurisdiction, and turnover panel is close in the outside for originating hole, curtain Cloth rubber slab is close to originating the inner side at hole, after shield machine driving, the turnover panel of side and inner side over the shield body of shield machine is pushed up successively Cord rubber slab, continue to tunnel with shield machine, the shield body of shield machine and above-mentioned turnover panel and cord rubber slab are remote, curtain Cloth rubber slab and turnover panel reset in the presence of its own resilient, so that the plate end and section of jurisdiction of cord rubber slab and turnover panel is outer Wall against, and then play a part of sealing, it is limited yet with the deformation restoring force of cord rubber slab itself, cause cord rubber The deformation of plate reset it is relatively slow or reset it is not thorough so as to be bonded tight ness rating with section of jurisdiction not high at the plate end of cord rubber slab, In turn result in tunnel to originate hole sealing not high.
It is on the other hand, entitled filed in 26 days Mays in 2016 of applicant《Tunnel shielding portal cord rubber slab and the sealing knot of section of jurisdiction Structure》In disclose a kind of sealing structure for tunnel shielding portal, one end of cord rubber slab is arranged on the ring-shaped frame of portal, The other end of cord rubber slab overhangs and with the section of jurisdiction in tunnel against so as to play the sealing for originating hole to tunnel, to rise What shield machine moved in tunnel is spacing, and turnover panel is additionally provided with outdoor openings position, and one end of turnover panel is be hinged to be arranged on On the portal steel loop at hole, the other end of turnover panel, which overhangs, points to section of jurisdiction, and turnover panel is close in the outside for originating hole, cord rubber slab Close to originating the inner side at hole, after shield machine driving, the turnover panel of side and the cord rubber of inner side over the shield body of shield machine is pushed up successively Offset plate, continue to tunnel with shield machine, the shield body of shield machine and above-mentioned turnover panel and cord rubber slab are remote, cord rubber slab And turnover panel resets in the presence of its own resilient so that the outer wall at the plate end and section of jurisdiction of cord rubber slab and turnover panel against, And then play a part of sealing, yet with the deformation restoring force of cord rubber slab itself it is limited or deformation, cause cord rubber The deformation of plate reset it is relatively slow or reset it is not thorough so as to be bonded tight ness rating with section of jurisdiction not high at the plate end of cord rubber slab, In turn result in tunnel to originate hole sealing not high.
Utility model content
The purpose of this utility model be just to provide it is a kind of strengthen shield launching and the portal sealing device of reception, can be true During protecting shield machine driving or receiving, it is ensured that the sealing effectiveness of portal.
To achieve the above object, the technical solution adopted in the utility model is:
It is a kind of to strengthen shield launching and the portal sealing device of reception, including it is arranged on the cord rubber at openings position Plate, one end and the portal steel loop of the cord rubber slab are fastenedly connected, and the other end of cord rubber slab overhangs and outer with section of jurisdiction Wall is against device also includes being arranged on the shield tail brush at portal steel loop inwall, week of the shield tail brush along portal steel loop inwall Arranged to direction, the front that the shield tail brush is located at shield machine tunneling direction is set, and the shield tail, which paints, is coated with grease.
Following characteristics also be present in the utility model:
Circumferential direction of the shield tail brush along portal steel loop inwall forms cyclic structure, and the shield tail brush is along shield machine Two groups are arranged at intervals with front of tunneling direction.
The shield tail brush is metal material steel wire, and the brush body of shield tail brush is welded on portal steel loop inwall.
The projecting end of the cord rubber slab is arranged to convex structure, and through hole is provided with cord rubber slab for fastening spiral shell Bolt is passed through, and one end of fastening bolt is connected with portal steel loop.
The lateral surface of cord rubber slab is provided with clamping rings, is provided with clamping rings and leads to for what fastening bolt passed through Hole.
The lateral surface of clamping rings is provided with turnover panel, and one end and the clamping rings of turnover panel are hinged, the other end and curtain of turnover panel The overhanging direction of cloth rubber slab is consistent, is provided with the articulated position of turnover panel and clamping rings for limiting turnover panel to hole outside The limiting section of rotation, turnover panel and the neighbouring setting of cord rubber slab.
Compared with prior art, the technique effect that the utility model possesses is:Shield machine is during tunneling construction, shield After cord rubber slab is opened on the shield body top of structure machine so that the projecting end of cord rubber slab and the outer wall of section of jurisdiction are against realizing to hole Preliminary sealing, smearing grease is painted using shield tail brush, and in shield tail, so as to form the barrier to portal, due to shield tail The bristle of brush can be sufficiently with section of jurisdiction outer wall against and then can ensure that the sealing effectiveness to portal.
Brief description of the drawings
Fig. 1 is portal reception device view before shield receives;
Fig. 2 is that shield receives portal reception device view when passing through hole circle;
Fig. 3 is that shield finishes receiving rear portal reception device view;
Fig. 4 is portal reception device view before shield launching;
Fig. 5 is portal reception device view when shield launching passes through hole circle;
Fig. 6 is portal reception device view after the completion of shield launching;
Fig. 7 is the view of portal device when constructing portal ring beam.
Embodiment
With reference to Fig. 1 to Fig. 7, the utility model is further described:
It is a kind of to strengthen shield launching and the portal sealing device of reception, including it is arranged on the cord rubber at openings position Plate 20, one end and the portal steel loop 10 of the cord rubber slab 20 are fastenedly connected, the other end of cord rubber slab 20 overhang and with The outer wall of section of jurisdiction 30 also includes being arranged on the shield tail brush 40 at portal steel loop inwall against, device, and the shield tail brush 40 is along hole The circumferential direction arrangement of door steel loop inwall, the front that the shield tail brush 40 is located at shield machine tunneling direction are set, the shield tail brush Grease is coated with 40;
With reference to shown in Fig. 1 to Fig. 6, because the deformation restoring force of cord rubber slab 20 itself is limited or deformation, cause cord The deformation reset of rubber slab 20 is relatively slow or reset is not thorough, so that the plate end of cord rubber slab 20 is bonded tightly with section of jurisdiction 30 Density is not high, in turn result in tunnel to originate hole sealing not high;
In the circle elasticity of portal steel loop outer fix welding two preferably shield tail brush 40, full shield tail oil is smeared in shield tail brush 40 Fat.After shield machine is being tunneled to shield tail brush 40, shield machine and the shield tail brush 40 for filling shield tail grease are closely connected, form good hole Door seal device, the device have lubrication while can guarantee that certain pressure, to prevent soil in stratum, muddy water, underground Water and lining cutting periphery injecting paste material flow out from portal;
When constructing portal ring beam, the sealing device of cord rubber slab 20 needs to remove, if wall thickness grouting and reinforcing is not thorough Or destruction grouting behind shaft or drift lining effect during section of jurisdiction 30 is removed, seepage aquaporin be present, percolating water risk be present.
Because running tunnel and subway station main body have differences sedimentation, the infiltration imagination, shield tail easily occur at tunnel portal 40 sealing structures are brushed because being flexible, can effectively prevent that infiltration situation occurs.
As preferred scheme of the present utility model, circumferential direction of the shield tail brush 40 along portal steel loop inwall forms ring Shape structure, the shield tail brush 40 are arranged at intervals with two groups along in front of shield machine tunneling direction;
The width of above-mentioned shield tail brush 40 can be reasonably set according to the condition of construction of reality, to ensure to the close of construction hole Envelope.
Specifically, the shield tail brush 40 is metal material, and the brush body of shield tail brush 40 is welded on portal steel loop inwall.
The projecting end of the cord rubber slab 20 is arranged to convex structure, and through hole is provided with cord rubber slab 20 for tight Fixing bolt 11 is passed through, and one end of fastening bolt 11 is connected with portal steel loop 10.
The lateral surface of cord rubber slab 20 is provided with clamping rings 50, is provided with clamping rings 50 and is worn for fastening bolt 11 The through hole crossed.
The lateral surface of clamping rings 50 is provided with turnover panel 60, and one end of turnover panel 60 and clamping rings 50 are be hinged, turnover panel 60 The other end is consistent with the overhanging direction of cord rubber slab 20, and turnover panel 60 is used to limit with being provided with the articulated position of clamping rings 50 Turnover panel 60 processed is to the limiting section of rotation on the outside of hole, and turnover panel 60 is with cord rubber slab 20 adjacent to setting;
With reference to shown in Fig. 7, after above-mentioned shield machine construction, by above-mentioned turnover panel 60, clamping rings 50 and cord Rubber slab 20 is removed, and above-mentioned shield tail brush 40 can be permanently stored in tunnel portal, without removing, and is applied at hole Work portal ring beam 70.
It is obvious to a person skilled in the art that the utility model is not limited to the details of above-mentioned one exemplary embodiment, and And without departing from the spirit or essential characteristics of the present invention, the utility model can be realized in other specific forms. Therefore, no matter from the point of view of which point, embodiment all should be regarded as exemplary, and is nonrestrictive, the utility model Scope limited by appended claims rather than described above, it is intended that implication in the equivalency of claim will be fallen Included with all changes in scope in the present invention.Any reference in claim should not be considered as involved by limitation Claim.
Moreover, it will be appreciated that although the present specification is described in terms of embodiments, not each embodiment is only wrapped Containing an independent technical scheme, this narrating mode of specification is only that those skilled in the art should for clarity Using specification as an entirety, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art It is appreciated that other embodiment.

Claims (6)

1. a kind of strengthen shield launching and the portal sealing device of reception, including is arranged on the cord rubber slab at openings position (20), one end of the cord rubber slab (20) is fastenedly connected with portal steel loop (10), and the other end of cord rubber slab (20) hangs Stretch and with the outer wall of section of jurisdiction (30) against, it is characterised in that:Device also includes being arranged on the shield tail brush at portal steel loop inwall (40), circumferential direction arrangement of the shield tail brush (40) along portal steel loop inwall, the shield tail brush (40) are located at shield machine pick The front for entering direction is set, and grease is coated with the shield tail brush (40).
2. according to claim 1 strengthen shield launching and the portal sealing device of reception, it is characterised in that:The shield Circumferential direction of the ventral brush (40) along portal steel loop inwall forms cyclic structure, and the shield tail brush (40) is along shield machine driving side To front be arranged at intervals with two groups.
3. according to claim 2 strengthen shield launching and the portal sealing device of reception, it is characterised in that:The shield The bristle of ventral brush (40) is steel wire, and the brush body of shield tail brush (40) is welded on portal steel loop inwall.
4. strengthen shield launching and the portal sealing device of reception according to claim 1 or 2 or 3, it is characterised in that: The projecting end of the cord rubber slab (20) is arranged to convex structure, and through hole is provided with cord rubber slab (20) for fastening spiral shell Bolt (11) is passed through, and one end of fastening bolt (11) is connected with portal steel loop (10).
5. according to claim 4 strengthen shield launching and the portal sealing device of reception, it is characterised in that:Cord rubber The lateral surface of offset plate (20) is provided with clamping rings (50), is provided with clamping rings (50) and leads to for what fastening bolt (11) passed through Hole.
6. according to claim 5 strengthen shield launching and the portal sealing device of reception, it is characterised in that:Fixed circle The lateral surface of ring (50) is provided with turnover panel (60), and one end of turnover panel (60) and clamping rings (50) are be hinged, turnover panel (60) it is another End is consistent with the overhanging direction of cord rubber slab (20), and turnover panel (60) is used for being provided with the articulated position of clamping rings (50) Limitation turnover panel (60) is to the limiting section of rotation on the outside of hole, and turnover panel (60) is with cord rubber slab (20) adjacent to setting.
CN201720547105.8U 2017-05-16 2017-05-16 It is a kind of to strengthen shield launching and the portal sealing device of reception Active CN206707743U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720547105.8U CN206707743U (en) 2017-05-16 2017-05-16 It is a kind of to strengthen shield launching and the portal sealing device of reception

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720547105.8U CN206707743U (en) 2017-05-16 2017-05-16 It is a kind of to strengthen shield launching and the portal sealing device of reception

Publications (1)

Publication Number Publication Date
CN206707743U true CN206707743U (en) 2017-12-05

Family

ID=60464515

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720547105.8U Active CN206707743U (en) 2017-05-16 2017-05-16 It is a kind of to strengthen shield launching and the portal sealing device of reception

Country Status (1)

Country Link
CN (1) CN206707743U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108150201A (en) * 2017-12-29 2018-06-12 上海市机械施工集团有限公司 Tunnel antipriming and construction method
CN109681229A (en) * 2018-12-30 2019-04-26 中国铁建股份有限公司 Tunnel sealing component
CN110273698A (en) * 2019-07-25 2019-09-24 中建隧道建设有限公司 A kind of pre-buried steel loop water-stopping system of gasbag-type
CN113047851A (en) * 2021-04-08 2021-06-29 宁波美优郎润滑科技有限公司 Long-acting shield constructs high sealed shield tail sealing waterproof device
CN113482632A (en) * 2021-08-12 2021-10-08 中铁十二局集团有限公司 Shield tunneling machine starting construction method with external water-rich silt stratum grouting pipe
CN115095647A (en) * 2022-07-05 2022-09-23 中铁四局集团有限公司 Novel shield or TBM main drive seal protection device and construction method thereof

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108150201A (en) * 2017-12-29 2018-06-12 上海市机械施工集团有限公司 Tunnel antipriming and construction method
CN109681229A (en) * 2018-12-30 2019-04-26 中国铁建股份有限公司 Tunnel sealing component
CN109681229B (en) * 2018-12-30 2021-11-09 中国铁建股份有限公司 Tunnel water stop assembly
CN110273698A (en) * 2019-07-25 2019-09-24 中建隧道建设有限公司 A kind of pre-buried steel loop water-stopping system of gasbag-type
CN113047851A (en) * 2021-04-08 2021-06-29 宁波美优郎润滑科技有限公司 Long-acting shield constructs high sealed shield tail sealing waterproof device
CN113047851B (en) * 2021-04-08 2024-03-01 陕西涌鑫矿业有限责任公司 High sealed shield tail sealing waterproof device of long-acting shield
CN113482632A (en) * 2021-08-12 2021-10-08 中铁十二局集团有限公司 Shield tunneling machine starting construction method with external water-rich silt stratum grouting pipe
CN115095647A (en) * 2022-07-05 2022-09-23 中铁四局集团有限公司 Novel shield or TBM main drive seal protection device and construction method thereof
CN115095647B (en) * 2022-07-05 2023-09-22 中铁四局集团有限公司 Novel shield or TBM main drive sealing protection device and construction method thereof

Similar Documents

Publication Publication Date Title
CN206707743U (en) It is a kind of to strengthen shield launching and the portal sealing device of reception
CN203835402U (en) Starting portal sealing structure of slurry shield tunnel
CN104358575B (en) A kind of water-rich sand layer slurry shield originates sealing device and originates sealing control method
CN108590695A (en) Service channel shield construction method and service channel
CN206487496U (en) A kind of shield tunnel knocker anti-seep water structure
CN207297011U (en) A kind of water-rich sand layer slurry shield originates portal sealing device
CN101230783A (en) Method for using new-style shield tail sealing device of shield machine
CN105114625A (en) Middle shield and tail shield connecting structure
CN105275474B (en) A kind of shield tail brush and fast disassembly type tail sealing device of shield
CN206942765U (en) Shield tunnel door seal device
CN104912573B (en) A kind of shield tunnel portal temporary leaking water device
CN208203306U (en) Tunnel antipriming
CN107989648A (en) A kind of coal mine gas drainage samples pipe connection
CN108150201A (en) Tunnel antipriming and construction method
CN206016818U (en) A kind of suitable for steel bushing balance originating with reach portal seal construction
CN105065010A (en) Shield with-water receiving tunnel hole temporary sealing device and shield with-water receiving tunnel hole temporary sealing method
CN202690073U (en) Water stopping structure of steel wire brush of shield tunnel portal
CN203403891U (en) Temporary water sealing structure for shield tunnel portal
CN213684120U (en) Water-rich sand layer shield starting tunnel portal extension ring device
DE2250635C3 (en) Method of making a tunnel
CN111911171B (en) Tunnel portal sealing device and method for shield launching
CN211174115U (en) Slurry shield tunnel door pressure-bearing sealing device
CN105065008A (en) Method for preventing sand gushing in shield tunneling construction
CN204738822U (en) Interim antipriming of shield method tunnel portal
CN206111185U (en) Shield constructs quick -witted sealing device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20220607

Address after: No. 4 company of China Railway fourth Bureau, No. 106, xinbengbu Road, Hefei, Anhui 230041

Patentee after: THE FOURTH ENGINEERING CO., LTD. OF CTCE Group

Patentee after: Haoji Railway Co.,Ltd.

Address before: No. 4 company of China Railway fourth Bureau, No. 106, xinbengbu Road, Hefei, Anhui 230041

Patentee before: THE FOURTH ENGINEERING CO., LTD. OF CTCE Group

CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: He Shuai

Inventor after: Bu Weihang

Inventor after: Luo Bin

Inventor after: Li Chunsheng

Inventor after: Chen Ye

Inventor after: Chen Ping

Inventor after: Chen Li

Inventor after: Chang Zongjie

Inventor after: Pi Sheng

Inventor after: Zhang Yanmei

Inventor after: Li Dingke

Inventor before: He Shuai

Inventor before: Li Chunsheng

Inventor before: Chen Ping

Inventor before: Bu Weihang

Inventor before: Luo Bin