CN206707319U - A kind of construction stair provisional protection column - Google Patents

A kind of construction stair provisional protection column Download PDF

Info

Publication number
CN206707319U
CN206707319U CN201720484529.4U CN201720484529U CN206707319U CN 206707319 U CN206707319 U CN 206707319U CN 201720484529 U CN201720484529 U CN 201720484529U CN 206707319 U CN206707319 U CN 206707319U
Authority
CN
China
Prior art keywords
bar
connecting column
adapter
locking member
fore
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720484529.4U
Other languages
Chinese (zh)
Inventor
杜华东
郭丹丹
包兴虹
吕剑波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Garden Construction Group Co Ltd
Original Assignee
Zhejiang Garden Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Garden Construction Group Co Ltd filed Critical Zhejiang Garden Construction Group Co Ltd
Priority to CN201720484529.4U priority Critical patent/CN206707319U/en
Application granted granted Critical
Publication of CN206707319U publication Critical patent/CN206707319U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Ladders (AREA)

Abstract

It the utility model is related to a kind of guard rail, in particular it is a kind of construction stair provisional protection column, regulation corner angle can be connected by spline, guard rail height is adjusted by vertical extension bar, guard rail length is adjusted by front rail, it is easy to adjust, stabilized structure, used suitable for the stair of different size;And the utility model is easy to assembly, be advantageous to improve construction efficiency, while solve the problems, such as that conventional welded type stair guard rail is not easily-disassembled;The utility model is bolted in stair tread end face outside, and without first disassembling this provisional protection column when the engineering later stage installs formal stair guard rail, therefore this provisional protection column can ensure construction safety to greatest extent.A kind of construction stair provisional protection column, including vertical supporting bar, front rail, vertical extension bar, connecting column, fore-set, clamp nut.

Description

A kind of construction stair provisional protection column
Technical field
A kind of guard rail is the utility model is related to, is in particular a kind of construction stair provisional protection column.
Background technology
Stair provisional protection column can be typically added at stair edge in building construction process, to ensure that workmen works Safety, this provisional protection column are typically formed using steel pipe or reinforcement welding, this provisional protection when installing formal stair Column needs to remove, but due to the connected mode using welding, disassembles very difficult, and different architectural stairs are diversified in specifications, this Kind stair provisional protection column is difficult to be secondary use.
Such as a kind of staircase temporary protective railing that number of patent application is CN201420836315.5, including adjustable component And cross bar, the adjustable component include vertical rod, moving sleeve, are flexibly connected sleeve, the moving sleeve can be along vertical rod Axis direction is moved, and the flexible connection sleeve is hinged with moving sleeve, and the end of the cross bar is fixed with being flexibly connected sleeve Connection.The utility model can realize the angular adjustment at stair railing height inclination angle and guardrail turning, so as to meet different size The use demand of stair, and the utility model can be dismantled, and be easy to secondary use.But utility model turning regulation inconvenience And it is not firm enough, cross bar can not adjustment length, and formal stair railing be installed first need to remove the utility model, whole can not protect Demonstrate,prove construction safety.
Utility model content
The purpose of this utility model is to provide a kind of construction stair provisional protection column, can be connected and adjusted by spline Corner angle is saved, guard rail height is adjusted by vertical extension bar, guard rail length is adjusted by front rail, it is easy to adjust, Stabilized structure, used suitable for the stair of different size;And the utility model is easy to assembly, be advantageous to improve construction effect Rate, while solve the problems, such as that conventional welded type stair guard rail is not easily-disassembled;The utility model is bolted in stair In pedal end face outside, without first disassembling this provisional protection column when the engineering later stage installs formal stair guard rail, therefore this is interim Guard rail can ensure construction safety to greatest extent.
The purpose of this utility model is achieved through the following technical solutions:
A kind of construction stair provisional protection column, including vertical supporting bar, front rail, vertical extension bar, switching Post, fore-set, clamp nut, it is characterised in that:Described vertical supporting bar is by support tube, installation pedestal, direction locking member I and lock Tight screwed hole is formed, and described support tube is round tubular structure, and the lower end of support tube is by welding the upper end with installation pedestal Face connects, and is provided with four mounting holes at the corner of the side end face of installation pedestal, and mounting hole is manhole, the upper end of support tube Setting direction locking member I, the upper end of direction locking member I set multiple fan-shaped splines I, and support tube side upper end sets locking screw Hole, locking screw pit are with connecting the round thread hole inside support tube;
Described front rail is made up of interior bar, extension sleeve, interior joint element for bar and telescopic connector, and interior bar is cylinder Structure, the left end of interior bar set in joint element for bar, interior joint element for bar is made up of two arc structures being arranged symmetrically, interior bar connection Part front/rear end center is provided with interior bar hinge hole, and interior bar hinge hole is manhole, and the right-hand member of interior bar is plugged on flexible In sleeve, extension sleeve is cylindrical tubular structure, and the right-hand member of extension sleeve is by being welded to connect telescopic connector, telescopic Connector is identical with interior bar connecting-piece structure, and extension sleeve hinge hole, extension sleeve hinge hole are provided with telescopic connector It is hinged that pore structure is identical with interior bar, left end, the right-hand member of telescopic connector of interior joint element for bar are provided with connecting column;
Described connecting column is made up of connecting column body, direction locking member II, direction locking member III, adapter, connecting column Body is cylindrical tubular structure, and the lower end of connecting column body is welded to connect direction locking member II, and direction locking member II is multiple Arc spline, the upper end of connecting column body are welded to connect direction locking member III, and direction locking member III is multiple fan-shaped splines, switching The side of post body is welded to connect adapter, and adapter and connecting column body connection end are rectangle structure, adapter it is another Hold and arc structure, the arc structure circle centre position of adapter are provided with switching hinge hole, switching hinge hole is manhole;
Described vertical extension bar is by vertically lengthening bar body, extension bar connecting column, extension bar adapter, direction locking member IV is formed, and the vertical bar body that lengthens is screw-rod structure, and the vertical bar body upper end that lengthens is welded to connect extension bar connecting column, extension bar Connecting column side sets extension bar adapter, extension bar connecting column upper end setting direction locking member IV, vertical extension bar upper end set It is connected to fore-set;
Described fore-set is made up of fore-set body, fore-set adapter, direction locking member V, and this body side surface of fore-set is welded to connect Fore-set adapter, fore-set body lower end are welded to connect direction locking member V;
Described clamp nut is regular hexagon structure, and clamp nut center is tapped through hole;
Described installation pedestal is bolted, in stair tread end face outside, described vertical extension bar Lower end sequentially passes through clamp nut, two connecting columns, vertical supporting bar from top to bottom, vertical extension bar and vertical supporting bar, turns It is that gap coordinates to connect post, by screwing in bolt into locking screw pit, vertical extension bar is fastened in vertical supporting bar inner clip Fixed, the direction locking member II of direction locking member I and lower end connecting column forms gap and coordinated, the direction locking member III of lower end connecting column Gap is formed with the direction locking member II of upper end connecting column to coordinate, vertical extension bar and clamp nut are threaded connection relation, tightly Gu the lower surface of nut is bonded with the upper surface of upper end connecting column, direction locking member V forms gap with direction locking member IV and matched somebody with somebody Close, fore-set sets second clamp nut to be fixed on the upper end of vertical extension bar by upper end, the adapter of lower end connecting column with For fore-set adapter towards identical, the adapter of upper end connecting column is identical with the direction of extension bar adapter, and lower end connecting column turns Joint is bolted front rail with fore-set adapter, and adapter and the extension bar adapter of upper end connecting column pass through Another front rail of bolt connection, the both ends of two front rails correspondingly connect same components.
As the further optimization of the technical program, a kind of construction of the utility model is described in stair provisional protection column Extension bar connecting column, connecting column body, fore-set body construction it is identical;Described extension bar adapter, adapter, fore-set switching Header structure is identical;Described direction locking member I, direction locking member IV, the structure of direction locking member III are identical;Described direction locking Part II is identical with the structure of direction locking member V.
As the further optimization of the technical program, a kind of construction of the utility model is described in stair provisional protection column Interior joint element for bar, telescopic connector can be bolted and to be formed with extension bar adapter, adapter, fore-set adapter It is be hinged.
A kind of construction stair provisional protection column of the utility model has the beneficial effect that:
A kind of construction of the utility model stair provisional protection column, regulation corner angle can be connected by spline, Guard rail height is adjusted by vertical extension bar, guard rail length is adjusted by front rail, easy to adjust, stabilized structure, fitted Stair for different size use;And the utility model is easy to assembly, is advantageous to improve construction efficiency, solves simultaneously The problem of conventional welded type stair guard rail is not easily-disassembled;The utility model is bolted in stair tread end face outside On, without first disassembling this provisional protection column when the engineering later stage installs formal stair guard rail, therefore this provisional protection column can be most Limits ensure construction safety.
Brief description of the drawings
The utility model is described in more detail with specific implementation method below in conjunction with the accompanying drawings.
Fig. 1 is overall structure diagram of the present utility model;
Fig. 2 is vertical supporting bar structural representation of the present utility model;
Fig. 3 is front rail structural representation of the present utility model;
Fig. 4 is vertical extension bar structural representation of the present utility model;
Fig. 5 is connecting column structural representation of the present utility model;
Fig. 6 is roof pillar configuration schematic diagram of the present utility model;
Fig. 7 is clamp nut structural representation of the present utility model;
Fig. 8 is the top view of connecting column of the present utility model;
Fig. 9 is the upward view of connecting column of the present utility model.
In figure:Vertical supporting bar 1;Support tube 1-1;Installation pedestal 1-2;The 1-3 of direction locking member I;Locking screw pit 1-4;
Front rail 2;Interior bar 2-1;Extension sleeve 2-2;Interior joint element for bar 2-3;Telescopic connector 2-4;
Connecting column 4;Connecting column body 4-1;The 4-2 of direction locking member II;The 4-3 of direction locking member III;Adapter 4-4;
Vertical extension bar 3;It is vertical to lengthen bar body 3-1;Extension bar connecting column 3-2;Extension bar adapter 3-3;Directional lock The tight 3-4 of part IV;
Fore-set 5;Fore-set body 5-1;Fore-set adapter 5-2;The 5-3 of direction locking member V;
Clamp nut 6.
Embodiment
The utility model is described in further detail below in conjunction with the accompanying drawings.
Embodiment one:
Illustrate present embodiment, a kind of construction stair provisional protection with reference to Fig. 1,2,3,4,5,6,7,8,9 Column, including vertical supporting bar 1, front rail 2, vertical extension bar 3, connecting column 4, fore-set 5, clamp nut 6, it is characterised in that: Described vertical supporting bar 1 is made up of support tube 1-1, installation pedestal 1-2, the 1-3 of direction locking member I and locking screw pit 1-4, institute The support tube 1-1 stated is round tubular structure, and support tube 1-1 lower end is connected by welding with installation pedestal 1-2 upper surface, It is provided with four mounting holes at the corner of installation pedestal 1-2 side end face, mounting hole is manhole, support tube 1-1 upper end The 1-3 of setting direction locking member I, the 1-3 upper ends of direction locking member I set multiple fan-shaped splines I, and support tube 1-1 sides upper end is set Locking screw pit 1-4, locking screw pit 1-4 are with connecting the round thread hole inside support tube 1-1;
Described front rail 2 is by interior bar 2-1, extension sleeve 2-2, interior joint element for bar 2-3 and telescopic connector 2-4 structures Be cylindrical structure into, interior bar 2-1, interior bar 2-1 left end set in joint element for bar 2-3, interior joint element for bar 2-3 is by two symmetrical cloth The arc structure put is formed, and interior joint element for bar 2-3 front/rear ends center is provided with interior bar hinge hole, and interior bar hinge hole is circle Shape through hole, interior bar 2-1 right-hand member are plugged in extension sleeve 2-2, and extension sleeve 2-2 is cylindrical tubular structure, extension sleeve 2-2 right-hand member is identical with interior joint element for bar 2-3 structures by being welded to connect telescopic connector 2-4, telescopic connector 2-4, Extension sleeve hinge hole is provided with telescopic connector 2-4, extension sleeve hinge hole is identical with the be hinged pore structure of interior bar, interior bar Connector 2-3 left end, telescopic connector 2-4 right-hand member is provided with connecting column 4;
Described connecting column 4 is by connecting column body 4-1, the 4-2 of direction locking member II, the 4-3 of direction locking member III, adapter 4- 4 are formed, and connecting column body 4-1 is cylindrical tubular structure, and connecting column body 4-1 lower end is welded to connect the 4- of direction locking member II 2, the 4-2 of direction locking member II are multiple arcs spline, and connecting column body 4-1 upper end is welded to connect the 4-3 of direction locking member III, side Be multiple fan-shaped splines to the 4-3 of locking member III, connecting column body 4-1 side is welded to connect adapter 4-4, adapter 4-4 with Connecting column body 4-1 connection ends are rectangle structure, and the adapter 4-4 other end is arc structure, adapter 4-4 circular arc knot Structure circle centre position is provided with switching hinge hole, and switching hinge hole is manhole;
Described vertical extension bar 3 by vertically lengthen bar body 3-1, extension bar connecting column 3-2, extension bar adapter 3-3, The 3-4 of direction locking member IV is formed, and the vertical bar body 3-1 that lengthens is screw-rod structure, and the vertical bar body 3-1 upper ends that lengthen are welded to connect Extension bar connecting column 3-2, extension bar connecting column 3-2 side set extension bar adapter 3-3, and extension bar connecting column 3-2 upper ends are set The 3-4 of direction locking member IV is put, the vertical upper end of extension bar 3 is socketed with fore-set 5;
Described fore-set 5 is made up of fore-set body 5-1, fore-set adapter 5-2, the 5-3 of direction locking member V, fore-set body 5- 1 side is welded to connect fore-set adapter 5-2, and fore-set body 5-1 lower ends are welded to connect the 5-3 of direction locking member V;
Described clamp nut 6 is regular hexagon structure, and the center of clamp nut 6 is tapped through hole;
Described installation pedestal 1-2 is bolted, and is fixed in stair tread end face outside, described vertical lengthening The lower end of bar 3 sequentially passes through clamp nut 6, two connecting columns 4, vertical supporting bars 1, vertical extension bar 3 and vertical branch from top to bottom Strut 1, connecting column 4 are that gap coordinates, and by screwing in bolt into locking screw pit 1-4, vertical extension bar 3 is vertically being propped up It is fixedly clamped in strut 1, the 4-2 of direction locking member II of the 1-3 of direction locking member I and lower end connecting column 4 forms gap and coordinated, lower end The 4-3 of direction locking member III of the connecting column 4 and 4-2 of direction locking member II of upper end connecting column 4 forms gap and coordinated, vertical extension bar 3 and clamp nut 6 are threaded connection relation, and the lower surface of clamp nut 6 is bonded with the upper surface of upper end connecting column 4, directional lock The tight 5-3 of the part V and 3-4 of direction locking member IV forms gap and coordinated, second clamp nut that fore-set 5 is set by the upper end of fore-set 5 6 are fixed on the upper end of vertical extension bar 3, and towards identical, upper end turns by the adapter 4-4 and fore-set adapter 5-2 of lower end connecting column 4 Connect that the adapter 4-4 of post 4 is identical with extension bar adapter 3-3 direction, adapter 4-4 and the fore-set of lower end connecting column 4 are transferred Head 5-2 is bolted front rail 2, and the adapter 4-4 and extension bar adapter 3-3 of upper end connecting column 4 pass through spiral shell Tether and connect front rail 2, the both ends of front rail 2 correspondingly connect same components.
Embodiment two:
With reference to Fig. 1,2,3,4,5,6,7,8,9 illustrate present embodiment, present embodiment embodiment one is made into One step illustrates that described extension bar connecting column 3-2, connecting column body 4-1, fore-set body 5-1 structures are identical;Described extension bar Adapter 3-3, adapter 4-4, fore-set adapter 5-2 structures are identical;The described 1-3 of direction locking member I, the 3- of direction locking member IV 4th, the 4-3 structures of direction locking member III are identical;The described 4-2 of direction locking member II is identical with the 5-3 structures of direction locking member V.
Embodiment three:
With reference to Fig. 1,2,3,4,5,6,7,8,9 illustrate present embodiment, present embodiment embodiment one is made into One step illustrate, described interior joint element for bar 2-3, telescopic connector 2-4 can with extension bar adapter 3-3, adapter 4-4, Fore-set adapter 5-2 be bolted to be formed it is be hinged.
A kind of construction of the present utility model stair provisional protection column, its operation principle are:Guard rail will when installing Installation pedestal 1-2 is bolted, in stair tread end face outside, the described lower end of vertical extension bar 3 on to Under sequentially pass through clamp nut 6, two connecting columns 4, vertical supporting bars 1, vertical extension bar 3 and vertical supporting bar 1, connecting column 4 It is that gap coordinates, by screwing in bolt into locking screw pit 1-4, vertical extension bar 3 is fastened in the inner clip of vertical supporting bar 1 Fixed, the 4-2 of direction locking member II of the 1-3 of direction locking member I and lower end connecting column 4 forms gap and coordinated, the direction of lower end connecting column 4 The 4-2 of direction locking member II of the 4-3 of locking member III and upper end connecting column 4 forms gap and coordinated, vertical extension bar 3 and clamp nut 6 For threaded connection relation, the lower surface of clamp nut 6 is bonded with the upper surface of upper end connecting column 4, the 5-3 of direction locking member V and side Gap is formed to the 3-4 of locking member IV to coordinate, fore-set 5 sets second clamp nut 6 to be fixed on vertical extension bar 3 by upper end Upper end, the adapter 4-4 and fore-set adapter 5-2 of lower end connecting column 4 towards identical, the adapter 4-4 of upper end connecting column 4 with plus Stock adapter 3-3 direction is identical, and the adapter 4-4 and fore-set adapter 5-2 of lower end connecting column 4 are bolted horizontal stroke To railing 2, the adapter 4-4 and extension bar adapter 3-3 of upper end connecting column 4 are bolted another front rail 2, The both ends of two front rails correspondingly connect same components;Locked by the direction of the 1-3 of direction locking member I and lower end connecting column 4 The 4-2 of part II forms gap cooperation, the 4-3 of direction locking member III of lower end connecting column 4 and the 4- of direction locking member II of upper end connecting column 4 2, which form gap cooperation, the 5-3 of direction locking member V and the 3-4 of direction locking member IV, forms gap cooperation, vertical extension bar 3 vertical The angular adjustment for realizing the utility model turning is rotated in support bar 1, is coordinated more using spline connection because angle is fixed, so Stabilized structure;The length of vertical supporting bar 1 is inserted by adjusting vertical extension bar 3, it is possible to achieve the height of stair guard rail is adjusted Section, pass through the flexible stair that the utility model can be made to adapt to different length of front rail 2;The utility model is connected by screw thread Connect and connected with spline, stabilized structure is easy to dismount again, and installation pedestal 1-2 is arranged on stair tread end face outside, and installation is just Formula stair without dismantling this provisional protection column in advance, therefore the utility model can ensure construction safety to greatest extent.
Certainly, described above is not limitation of the utility model, and the utility model is also not limited to the example above, this skill The variations, modifications, additions or substitutions that the those of ordinary skill in art field is made in essential scope of the present utility model, also belong to In the scope of protection of the utility model.

Claims (3)

1. a kind of construction stair provisional protection column, including vertical supporting bar (1), front rail (2), vertical extension bar (3), connecting column (4), fore-set (5), clamp nut (6), it is characterised in that:Described vertical supporting bar (1) is by support tube (1- 1), installation pedestal (1-2), direction locking member I (1-3) and locking screw pit (1-4) are formed, and described support tube (1-1) is circle Shape tubular structure, the lower end of support tube (1-1) are connected by welding with the upper surface of installation pedestal (1-2), installation pedestal (1-2) Side end face corner at be provided with four mounting holes, mounting hole is manhole, the upper end setting direction lock of support tube (1-1) Tight part I (1-3), direction locking member I (1-3) upper end set multiple fan-shaped splines I, and support tube (1-1) side upper end sets locking Screwed hole (1-4), locking screw pit (1-4) are the round thread hole internal with connecting support tube (1-1);
Described front rail (2) is by interior bar (2-1), extension sleeve (2-2), interior joint element for bar (2-3) and telescopic connector (2-4) is formed, and interior bar (2-1) be cylindrical structure, joint element for bar (2-3) in the left end setting of interior bar (2-1), interior joint element for bar (2-3) is made up of two arc structures being arranged symmetrically, and interior joint element for bar (2-3) front/rear end center is provided with interior bar hinge Hole is connect, interior bar hinge hole is manhole, and the right-hand member of interior bar (2-1) is plugged in extension sleeve (2-2), extension sleeve (2-2) For cylindrical tubular structure, the right-hand member of extension sleeve (2-2) is by being welded to connect telescopic connector (2-4), telescopic connection Part (2-4) is identical with interior joint element for bar (2-3) structure, and extension sleeve hinge hole is provided with telescopic connector (2-4), stretches Sleeve hinge hole is identical with the be hinged pore structure of interior bar, left end, the right-hand member of telescopic connector (2-4) of interior joint element for bar (2-3) It is provided with connecting column (4);
Described connecting column (4) is by connecting column body (4-1), direction locking member II (4-2), direction locking member III (4-3), switching Head (4-4) is formed, and connecting column body (4-1) is cylindrical tubular structure, and the lower end of connecting column body (4-1) is welded to connect direction Locking member II (4-2), direction locking member II (4-2) are multiple arcs spline, the upper end side of being welded to connect of connecting column body (4-1) To locking member III (4-3), direction locking member III (4-3) is multiple fan-shaped splines, and the side of connecting column body (4-1) is welded to connect Adapter (4-4), adapter (4-4) and connecting column body (4-1) connection end are rectangle structure, adapter (4-4) it is another Hold and arc structure, the arc structure circle centre position of adapter (4-4) are provided with switching hinge hole, switching hinge hole is circular logical Hole;
Described vertical extension bar (3) is by vertically lengthening bar body (3-1), extension bar connecting column (3-2), extension bar adapter (3-3), direction locking member IV (3-4) are formed, and it is screw-rod structure vertically to lengthen bar body (3-1), vertically lengthens bar body (3-1) Upper end is welded to connect extension bar connecting column (3-2), and extension bar connecting column (3-2) side sets extension bar adapter (3-3), lengthens Bar connecting column (3-2) upper end setting direction locking member IV (3-4), vertical extension bar (3) upper end are socketed with fore-set (5);
Described fore-set (5) is made up of fore-set body (5-1), fore-set adapter (5-2), direction locking member V (5-3), fore-set sheet Body (5-1) side is welded to connect fore-set adapter (5-2), and fore-set body (5-1) lower end is welded to connect the (5- of direction locking member V 3);
Described clamp nut (6) is regular hexagon structure, and clamp nut (6) center is tapped through hole;
Described installation pedestal (1-2) is bolted, and is fixed in stair tread end face outside, described vertical extension bar (3) lower end sequentially passes through clamp nut (6), two connecting columns (4), vertical supporting bar (1), vertical extension bar (3) from top to bottom It is that gap coordinates with vertical supporting bar (1), connecting column (4), by screwing in bolt into locking screw pit (1-4), makes vertical Extension bar (3) is fixedly clamped in vertical supporting bar (1), and the direction of direction locking member I (1-3) and lower end connecting column (4) is locked Part II (4-2) forms gap and coordinated, the direction locking member III (4-3) of lower end connecting column (4) and the directional lock of upper end connecting column (4) Tight part II (4-2) forms gap and coordinated, and vertical extension bar (3) and clamp nut (6) are threaded connection relation, clamp nut (6) Lower surface be bonded with the upper surface of upper end connecting column (4), the formation of direction locking member V (5-3) and direction locking member IV (3-4) Gap coordinates, and second clamp nut (6) that fore-set (5) is set by fore-set (5) upper end is fixed on the upper of vertical extension bar (3) End, the adapter (4-4) of lower end connecting column (4) and fore-set adapter (5-2) are towards identical, the adapter of upper end connecting column (4) (4-4) is identical with the direction of extension bar adapter (3-3), adapter (4-4) and the fore-set adapter (5- of lower end connecting column (4) 2) front rail (2) is bolted, the adapter (4-4) and extension bar adapter (3-3) of upper end connecting column (4) are logical Bolt connection front rail (2) is crossed, the both ends of front rail (2) correspondingly connect same components.
A kind of 2. construction according to claim 1 stair provisional protection column, it is characterised in that:Described extension bar Connecting column (3-2), connecting column body (4-1), fore-set body (5-1) structure are identical;Described extension bar adapter (3-3), turn Joint (4-4), fore-set adapter (5-2) structure are identical;Described direction locking member I (1-3), direction locking member IV (3-4), side It is identical to locking member III (4-3) structure;Described direction locking member II (4-2) is identical with direction locking member V (5-3) structure.
A kind of 3. construction according to claim 1 stair provisional protection column, it is characterised in that:Described interior bar connects Fitting (2-3), telescopic connector (2-4) can be with extension bar adapter (3-3), adapter (4-4), fore-set adapter (5- 2) be bolted to be formed it is be hinged.
CN201720484529.4U 2017-05-04 2017-05-04 A kind of construction stair provisional protection column Expired - Fee Related CN206707319U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720484529.4U CN206707319U (en) 2017-05-04 2017-05-04 A kind of construction stair provisional protection column

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720484529.4U CN206707319U (en) 2017-05-04 2017-05-04 A kind of construction stair provisional protection column

Publications (1)

Publication Number Publication Date
CN206707319U true CN206707319U (en) 2017-12-05

Family

ID=60465216

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720484529.4U Expired - Fee Related CN206707319U (en) 2017-05-04 2017-05-04 A kind of construction stair provisional protection column

Country Status (1)

Country Link
CN (1) CN206707319U (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108661255A (en) * 2018-04-24 2018-10-16 怀化市港翔管桩有限公司 A kind of assembling-type precast stair and its production method
CN108828877A (en) * 2018-07-24 2018-11-16 浙江海洋大学 It is clapped outside a kind of extension type and uses background cloth bracket
CN110953463A (en) * 2019-12-06 2020-04-03 乐歌人体工学科技股份有限公司 Spliced display screen support
CN112012265A (en) * 2020-08-12 2020-12-01 新田县三知重工机械有限公司 Reinforced protection shed device of excavator and using method thereof
CN112211481A (en) * 2020-07-20 2021-01-12 中国建筑第四工程局有限公司 Adjustable rail guard of construction usefulness is built in room
CN113005957A (en) * 2019-12-18 2021-06-22 福州德兴裕祥金属制品有限公司 Guardrail is prevented wearing by movable type that municipal administration highway engineering used
CN114427305A (en) * 2022-01-28 2022-05-03 中建八局第二建设有限公司 Quickly-assembled and adjustable safety protective guard and construction method thereof
CN114482615A (en) * 2022-03-21 2022-05-13 曾春凤 Building reinforcing and repairing component
AT524584A4 (en) * 2021-03-09 2022-07-15 Herbert Brodinger handrail post
CN115949290A (en) * 2023-03-10 2023-04-11 河北中水建设工程有限公司 Protection device is used in highway engineering construction convenient to installation

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108661255A (en) * 2018-04-24 2018-10-16 怀化市港翔管桩有限公司 A kind of assembling-type precast stair and its production method
CN108828877A (en) * 2018-07-24 2018-11-16 浙江海洋大学 It is clapped outside a kind of extension type and uses background cloth bracket
CN110953463A (en) * 2019-12-06 2020-04-03 乐歌人体工学科技股份有限公司 Spliced display screen support
CN113005957A (en) * 2019-12-18 2021-06-22 福州德兴裕祥金属制品有限公司 Guardrail is prevented wearing by movable type that municipal administration highway engineering used
CN112211481A (en) * 2020-07-20 2021-01-12 中国建筑第四工程局有限公司 Adjustable rail guard of construction usefulness is built in room
CN112012265A (en) * 2020-08-12 2020-12-01 新田县三知重工机械有限公司 Reinforced protection shed device of excavator and using method thereof
AT524584A4 (en) * 2021-03-09 2022-07-15 Herbert Brodinger handrail post
AT524584B1 (en) * 2021-03-09 2022-07-15 Herbert Brodinger handrail post
CN114427305A (en) * 2022-01-28 2022-05-03 中建八局第二建设有限公司 Quickly-assembled and adjustable safety protective guard and construction method thereof
CN114482615A (en) * 2022-03-21 2022-05-13 曾春凤 Building reinforcing and repairing component
CN114482615B (en) * 2022-03-21 2024-06-04 广东郅晨建设工程有限公司 Building reinforcing and repairing member
CN115949290A (en) * 2023-03-10 2023-04-11 河北中水建设工程有限公司 Protection device is used in highway engineering construction convenient to installation

Similar Documents

Publication Publication Date Title
CN206707319U (en) A kind of construction stair provisional protection column
CN113323365B (en) Elevator shaft protection platform and construction method
CN107975251B (en) Assembled building wallboard joint support device
CN105781131A (en) Assembled building wall plate mounting support system and construction method thereof
CN206784977U (en) Construction stair are easily assembled temporary guard rail
CN109898820B (en) Outer protective frame of assembled building and assembled building construction method
CN208415747U (en) Coupling assembling and guardrail bar is prevented in prefabricated staircase regularization thereof
CN104310234B (en) Outer outstanding climbing tower crane support system
KR20210078118A (en) A mounting structure for supporting post of construction
CN216616849U (en) Adjustable support jacking for concrete inclined structure
CN206468030U (en) Independent beam combined type limb protective railing
CN214994011U (en) Municipal construction is with supporting location bed-jig
CN206616692U (en) A kind of adjustable building truss structure
CN209837658U (en) Special fastener for outer rod of cross brace of fastener type steel pipe scaffold
CN112942817A (en) Adjustable support jacking for concrete inclined structure and using method
CN209066755U (en) A kind of stair protective device of freely adjustable installation
CN207314896U (en) A kind of adjustable type building safety protects arris rail
CN218322381U (en) Bridge supporting bracket
CN216196153U (en) Mounting structure of stainless steel railing
CN213143812U (en) Guide rail type protective frame
CN221627725U (en) Temporary guardrail
CN216588030U (en) Stable form stainless steel guardrail fastening seat
CN220377808U (en) External triangular support frame fixing device of assembled building
CN207944783U (en) A kind of construction fixture type protective fence
CN217353680U (en) Adjustable tool type limb protective railing

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171205