CN206707137U - A kind of roof spraying ventilating device for construction site - Google Patents
A kind of roof spraying ventilating device for construction site Download PDFInfo
- Publication number
- CN206707137U CN206707137U CN201720548234.9U CN201720548234U CN206707137U CN 206707137 U CN206707137 U CN 206707137U CN 201720548234 U CN201720548234 U CN 201720548234U CN 206707137 U CN206707137 U CN 206707137U
- Authority
- CN
- China
- Prior art keywords
- roof
- water
- charge
- construction site
- pipeline section
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000005507 spraying Methods 0.000 title claims abstract description 49
- 238000010276 construction Methods 0.000 title claims abstract description 37
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 135
- 238000001914 filtration Methods 0.000 claims description 13
- 238000004062 sedimentation Methods 0.000 claims description 12
- 238000001816 cooling Methods 0.000 abstract description 25
- 239000007921 spray Substances 0.000 abstract description 16
- 230000000694 effects Effects 0.000 abstract description 15
- 239000002699 waste material Substances 0.000 abstract description 14
- 238000009435 building construction Methods 0.000 abstract description 3
- 239000000428 dust Substances 0.000 description 14
- 229910000831 Steel Inorganic materials 0.000 description 8
- 239000010959 steel Substances 0.000 description 8
- 238000009412 basement excavation Methods 0.000 description 6
- 238000000151 deposition Methods 0.000 description 6
- 238000009413 insulation Methods 0.000 description 6
- 238000004378 air conditioning Methods 0.000 description 5
- 239000003651 drinking water Substances 0.000 description 4
- 235000020188 drinking water Nutrition 0.000 description 4
- 210000004072 lung Anatomy 0.000 description 4
- 230000007306 turnover Effects 0.000 description 4
- 238000010586 diagram Methods 0.000 description 3
- 238000010792 warming Methods 0.000 description 3
- 230000005540 biological transmission Effects 0.000 description 2
- 238000005138 cryopreservation Methods 0.000 description 2
- 201000010099 disease Diseases 0.000 description 2
- 208000037265 diseases, disorders, signs and symptoms Diseases 0.000 description 2
- JEGUKCSWCFPDGT-UHFFFAOYSA-N h2o hydrate Chemical compound O.O JEGUKCSWCFPDGT-UHFFFAOYSA-N 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 239000002245 particle Substances 0.000 description 2
- 238000001556 precipitation Methods 0.000 description 2
- 238000005057 refrigeration Methods 0.000 description 2
- 239000002689 soil Substances 0.000 description 2
- 239000007787 solid Substances 0.000 description 2
- 206010019345 Heat stroke Diseases 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000008901 benefit Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000010438 heat treatment Methods 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 238000004064 recycling Methods 0.000 description 1
- 230000009467 reduction Effects 0.000 description 1
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P80/00—Climate change mitigation technologies for sector-wide applications
- Y02P80/10—Efficient use of energy, e.g. using compressed air or pressurized fluid as energy carrier
Landscapes
- Building Environments (AREA)
Abstract
It the utility model is related to technical field of building construction, more particularly to a kind of roof spraying ventilating device for construction site, including aqueduct, described aqueduct one end is removably connected with water source, the other end is arranged at the top on roof, and the section on the roof is middle higher, the relatively low triangle in both sides, aqueduct on the roof is laid to form the first pipeline section along roof top, and some through holes are provided with the side wall of first pipeline section.Solve the problems, such as that hot weather construction building site Indoor environment is sultry using the utility model.In spraying cooling, because the heat of outdoor can not be transferred to interior, thus it is preferable and then the cooling-down effect of the cooling to indoor progress by being sprayed to roof, and the waste of electric energy will not be caused.In addition, summer is air-dried the humidity that air is added by spray.
Description
Technical field
It the utility model is related to technical field of building construction, particularly a kind of roof spraying cooling dress for construction site
Put.
Background technology
In building construction process, the building such as office space and crew quarter in construction site considers when building
To building convenient and be easy to the later stage factor such as to remove, therefore mostly built using assembled portable plate, it is contemplated that building winter
Good heat insulating, therefore the exterior wall of building using warming plate make, in order to mitigate the weight of building roof and then reduction
To the pressure of wall, thus building roof is made using color steel.
The wall built using warming plate, although the effect of insulation can be played in winter, and the roof that color steel is formed
It is smaller to the pressure of wall, but during the broiling summer when, sunlight is impinged upon made of color steel on roof, due to color steel itself
Specific heat capacity it is smaller and effect of heat insulation is poor thus roof temperature raises rapidly under irradiation by sunlight, so as to transfer heat to room
Inside cause the temperature of interior will raise.Because good heat-insulation effect is made using warming plate in the wall of building, when indoor temperature liter
Gao Shi, heat can not be by wall to outdoor transmission, thus can feel suitable sultry when Indoor environment is rested or is handled official business,
The phenomenon of heatstroke is there is also when serious, so as to be impacted to project construction.
Traditional construction site reduces the mode of Indoor environment as indoor location air-conditioning is cooled, and is dropped using air-conditioning
Temperature needs to consume substantial amounts of electric energy, the temperature that roof temperature while air-conditioning temperature-reducing under sunlight will be significantly larger than indoor,
Thus roof act as the effect of heater heated to interior, and so air-conditioning is to room temperature lowering, and roof
Heated up to heating indoor, the refrigeration in turn resulting in air-conditioning to interior is bad, and causes the waste of electric energy.
Utility model content
Goal of the invention of the present utility model is:It is sultry and logical for existing construction site building Summer Indoor temperature
It is bad and the problem of cause the waste of electric energy to cross air conditioner refrigeration effect, there is provided a kind of roof spraying cooling dress for construction site
Put.
To achieve these goals, the technical solution adopted in the utility model is:
A kind of roof spraying ventilating device for construction site, including aqueduct, described aqueduct one end and water
Source removably connects, and the other end is arranged at the top on roof, and the section on the roof is middle higher, the relatively low triangle in both sides
Shape, the aqueduct on the roof lay to form the first pipeline section along roof top, set in the side wall of first pipeline section
It is equipped with some through holes.
The water source with water supply function is selected at water source, and such as running water water source, water is transported on roof by aqueduct,
The heat that the water on roof absorbs roof after being contacted with roof is delivered to, because the specific heat capacity of color steel material is relatively low, thus
The temperature on roof is quickly drop to below the temperature of interior after water contacts with roof, so as to which indoor heat starts to pass to roof
Pass.The heat of thermal insulation of roof poor performance thus interior is absorbed by roof by the water on roof made of color steel, and then room
Interior temperature reduces.Because the effect of heat insulation of wall is preferable, thus outdoor heat can not be transferred to interior to rise by wall
High indoor temperature, thus indoor temperature will be less than the temperature of outdoor, so that it is indoor very nice and cool, solve hot weather construction work
The problem of ground Indoor environment is sultry.In spraying cooling, because the heat of outdoor can not be transferred to interior, thus by room
Top spray is drenched and then preferable to the cooling-down effect of the cooling of indoor progress, and will not cause the waste of electric energy.In addition, summer air ten
Divide and dry by spray to add the humidity of air.
Preferably, be provided with and be in charge of on the through hole of first pipeline section, it is described be in charge of it is horizontally disposed, it is described to be in charge of setting
There are some through holes.
Be in charge of being set on first pipeline section, and by it is described be in charge of it is horizontally disposed, if while by it is described be in charge of it is upper set
Dry through hole, come out so that shower water sprays from the through hole on described be in charge of, so that spraying effect is more preferable, further
Improve the efficiency of spraying cooling.
Preferably, it is provided with and is in charge of on the through hole of first pipeline section, the side laying being in charge of along the roof, phase
Neighbour be in charge of it is be spaced apart, it is described be in charge of be provided with some through holes.
Be in charge of by will be set on the through hole on first pipeline section, and make it is described be in charge of along roof side lay, and
It is described to be in charge of some through holes of setting, so that being out that can ensure to enter roof when water sprays from the through hole being in charge of
Row sprays comprehensively, adds the area that roof is sprayed, and further improves the efficiency of spraying cooling.
Preferably, the roof spraying ventilating device for construction site also includes being arranged under the eaves on the roof
The collection device for being used to collect shower water of side and the storage device for storing shower water, the collection device and the storage
Cryopreservation device is connected by the second pipeline section.
The collection device of shower water is collected by that will set below the eaves on the roof, and by by the second pipeline section and institute
Storage device is stated to connection, shower water is flowed into along collection device along roof when spraying cooling, and the water in collection device passes through the
Two pipeline sections, which are flowed into storage device, to be stored, and then can be used as other purposes, it is ensured that the recycling of water resource, is kept away
The waste of water resource is exempted from.In addition, rainwater is flowed into collection device to flow into quilt in storage device by roof during rainy day
Store, in case follow-up use, and then efficiently utilize rainwater resource, and then saved originally water resource.
Preferably, the roof spraying ventilating device for construction site also includes booster water pump, the booster water pump
One end is connected by the 3rd pipeline section with the storage device, and the other end is connected by the 4th pipeline section with the aqueduct, described
The valve for cutting off the water supply is provided with the aqueduct between water source and the 4th pipeline section.
When cooling spray, shower water flows into storage device and is collected, when the water in storage device reaches a certain amount of
When, the valve is closed, booster water pump is opened immediately and the water in storage device is extracted into roof for spraying again again, water leads to
Cross roof to flow into collection device and then again flow into storage device, so circulation is carried out the water in the storage device repeatedly sharp
With required water, avoids the waste of water resource during so as to save spraying cooling.
Preferably, the storage device includes filtering ponds, sedimentation basin and clear water reserviors, described filtering ponds one end and described second
Pipeline section is connected, and the other end is connected by the first water delivery device with described sedimentation basin one end, and the sedimentation basin other end passes through
Second water delivery device is connected with the clear water reserviors.
Need to carry out earth excavation before construction, the earthwork after excavation needs to transport to specified by earthwork transportation car
Place is stacked, and mostly being carried out by excavator for the entrucking of the earthwork, i.e., has dug the earthwork by the hopper of excavator, hopper is transported
To earthwork transportation car top, the earthwork is poured onto on slag-soil truck by Turnover bunker.During Turnover bunker topples over the earthwork easily
Substantial amounts of dust is produced, so as to cause the dust pollution of job site, and caused dust is easily inhaled by the workmen at scene
Enter lung, so as to cause workmen lung to produce disease.Topple over dust caused by dregs to reduce excavator hopper, lead to
Normal mode be transport vehicle uppermost spray running water so as to play the purpose of depositing dust, running water is the direct drinking-water water for being available for people
Resource, running water is used to spray depositing dust so as to cause the waste to drinking water sources, and increases construction input.
Shower water or it is rainy when rainwater be flowed into by the second pipeline section in filtering ponds, in filtering ponds, be mingled with water
Solid particle is filtered, and the water after filtering is transported to sedimentation basin by the first water delivery device and precipitated, and precipitation is completed
Water afterwards is transported in clear water reserviors by the second water delivery device and preserved., can be with the clear water reserviors in earth excavation
Water carry out sprinkling depositing dust instead of running water, so as to reduce the use of running water.In addition, the water in clear water reserviors can also be used as life
Water use is applied flexibly, so as to further save the use of running water, reduces the input of cost.
Preferably, the roof spraying ventilating device for construction site also include temperature sensor, computer and
The electric-controlled switch of the booster water pump circuit is controlled, the temperature sensor is arranged at Indoor environment, the temperature sensor
It is connected by wire with the computer, the computer is connected by wire with the electric-controlled switch.
The design temperature standard value in the computer, the temperature sensor gather the temperature number of Indoor environment in real time
According to, and the data are sent to computer, the computer is by the way that the data are compared with the standard value set, when the number
During according to more than standard value, computer sends the instruction of unlatching to electric-controlled switch, and electric-controlled switch is opened, and booster water pump connects with power supply
It is logical, carry out spraying cooling so as to which the water in the storage device is extracted into roof by booster water pump work.When the temperature sensor
When the data collected after standard value contrast with being less than the standard value, computer sends the instruction of closing to electric-controlled switch, automatically controlled
Switch is closed, and booster water pump disconnects with power supply to be stopped.
By the mutual cooperation of temperature sensor, electric-controlled switch and intercomputer, so as to be set when indoor temperature is reduced to
After fixed standard temperature, spraying cooling can be automatically stopped, and then avoids the waste to electric energy.
Preferably, on the through hole being in charge of on shower nozzle is installed.
By the way that shower nozzle will be installed on the through hole being in charge of, so that spraying effect is more preferable, spray is further increased
Water improves the efficiency of spraying cooling to the coverage rate on roof.
Compared with prior art, the beneficial effects of the utility model are:It is vexed to solve hot weather construction building site Indoor environment
The problem of hot.In cooling, because the heat of outdoor can not be transferred to interior, thus it is preferable to the cooling-down effect of indoor progress,
And the waste of electric energy will not be caused.
Brief description of the drawings
Fig. 1 is schematic diagram of the present utility model;
Fig. 2 is the schematic diagram of the utility model preferred embodiment;
Fig. 3 is the schematic diagram of the utility model preferred embodiment another way,
Marked in figure:1- aqueducts, 2- water sources, 3- roofs, the pipeline sections of 4- first, 5- are in charge of, 6- shower nozzles, and 7- collects dress
Put, the pipeline sections of 8- second, 9- booster water pumps, the pipeline sections of 10- the 3rd, the pipeline sections of 11- the 4th, 12- valves, 13- filtering ponds, 14- sedimentation basins,
15- clear water reserviors, the water delivery devices of 16- first, the water delivery devices of 17- second, 18- temperature sensors, 19- computers, 20 electric-controlled switch,
21- power supplys.
Embodiment
Below in conjunction with the accompanying drawings, the utility model is described in detail.
In order that the purpose of this utility model, technical scheme and advantage are more clearly understood, below in conjunction with accompanying drawing and implementation
Example, the utility model is further elaborated.It should be appreciated that specific embodiment described herein is only explaining this
Utility model, it is not used to limit the utility model.
Embodiment 1
A kind of roof spraying ventilating device for construction site, including aqueduct 1, described one end of aqueduct 1 with
Water source 2 removably connects, and the other end is arranged at the top on roof 3, and to be middle higher, both sides are relatively low in the section on the roof 3
Triangle, the aqueduct 1 on the roof 3 forms the first pipeline section 4 along the laying of the top of roof 3, in first pipeline section 4
Side wall on be provided with some through holes.
Water source 2 is from the water source with water supply function, and such as running water water source, water is transported to roof 3 by aqueduct 1
On, the water being delivered on roof 3 absorbs the heat on roof 3 after being contacted with roof 3, due to color steel material specific heat capacity compared with
It is low, thus water contacted with roof 3 after the temperature on roof 3 be quickly drop to below the temperature of interior, so as to which indoor heat starts
Transmitted to roof 3.Made of color steel the heat-proof quality of roof 3 difference thus indoor heat by roof 3 by the water on roof 3
Absorb, and then indoor temperature reduces.Because the effect of heat insulation of wall is preferable, thus outdoor heat can not pass through wall transmission
To temperature indoor and that rise is indoor, thus indoor temperature will be less than the temperature of outdoor, and then indoor very nice and cool, solve
The problem of hot weather construction building site Indoor environment is sultry.In spraying cooling, because the heat of outdoor can not be transferred to interior, because
And it is preferable and then the cooling-down effect of the cooling to indoor progress by being sprayed to roof 3, and the waste of electric energy will not be caused.Separately
Outside, the very dry humidity by spraying to add air of summer air.
Embodiment 2
It is further, described on the basis of the roof spraying ventilating device for construction site as described in Example 1
Be provided with the through hole of first pipeline section 4 and be in charge of 5, it is described be in charge of it is 5 horizontally disposed, it is described be in charge of on 5 be provided with some through holes.
To be set on first pipeline section 4 and be in charge of 5, and be in charge of 5 by described and be horizontally disposed with, at the same by it is described be in charge of on 5 set
Some through holes are put, are come out so that shower water sprays from the through hole being in charge of on 5, so that spraying effect is more preferable,
Further increase the efficiency of spraying cooling.
Embodiment 3
It is further, described on the basis of the roof spraying ventilating device for construction site as described in Example 1
Be provided with the through hole of first pipeline section 4 and be in charge of 5, it is described to be in charge of 5 and laid along the side on the roof 3, it is adjacent be in charge of 5 interval
Open, it is described be in charge of on 5 be provided with some through holes.
Be in charge of 5 by that will be set on the through hole on first pipeline section 4, and make it is described be in charge of 5 and laid along the side of roof 3,
And it is described be in charge of on 5 some through holes are set so that being out that can ensure pair when water sprays from the through hole for be in charge of 5
Roof 3 is sprayed comprehensively, adds the area that roof 3 is sprayed, and further improves the efficiency of spraying cooling.
Embodiment 4
On the basis of the roof spraying ventilating device for construction site as described in Example 1, further, also wrap
Include and be arranged on the collection device 7 for being used to collect shower water below the eaves on the roof 3 and the storage for storing shower water
Cryopreservation device, the collection device 7 are connected with the storage device by the second pipeline section 8.
The collection device 7 of shower water is collected by that will set below the eaves on the roof 3, and by by the second pipeline section 8
With the storage device to being connected, when spraying cooling, shower water is flowed into collection device 7 along roof, the water in collection device 7
It is flowed into storage device and is stored by the second pipeline section 8, and then can be used as other purposes, it is ensured that the repetition of water resource
Utilize, avoid the waste of water resource.In addition, rainwater is flowed into collection device 7 to flow into storage by roof 3 during rainy day
It is stored in device, in case follow-up use, and then efficiently utilizes rainwater resource, and then saved originally water resource.
Embodiment 5
On the basis of the roof spraying ventilating device for construction site as described in Example 4, further, also wrap
Booster water pump 9 is included, described one end of booster water pump 9 is connected by the 3rd pipeline section 10 with the storage device, and the other end passes through the 4th
Pipeline section 11 is connected with the aqueduct 1, is set on the aqueduct 1 between the water source 2 and the 4th pipeline section 11
There is the valve 12 for cutting off the water supply.
When cooling spray, shower water flows into storage device and is collected, when the water in storage device reaches a certain amount of
When, the valve 12 is closed, booster water pump 9 is opened immediately and the water in storage device is extracted into roof 3 for spraying again again,
Water flows into collection device 7 to again flow into storage device by roof 3, and so circulation is carried out to the water in the storage device
Recycle, required water, avoids the waste of water resource during so as to save spraying cooling.
Embodiment 6
It is further, described on the basis of the roof spraying ventilating device for construction site as described in Example 4
Storage device includes filtering ponds 13, sedimentation basin 14 and clear water reserviors 15, and described one end of filtering ponds 13 is connected with second pipeline section 8
Connect, the other end is connected by the first water delivery device 16 with described one end of sedimentation basin 14, and the other end of sedimentation basin 14 passes through
Two water delivery devices 17 are connected with the clear water reserviors 15.
Need to carry out earth excavation before construction, the earthwork after excavation needs to transport to specified by earthwork transportation car
Place is stacked, and mostly being carried out by excavator for the entrucking of the earthwork, i.e., has dug the earthwork by the hopper of excavator, hopper is transported
To earthwork transportation car top, the earthwork is poured onto on slag-soil truck by Turnover bunker.During Turnover bunker topples over the earthwork easily
Substantial amounts of dust is produced, so as to cause the dust pollution of job site, and caused dust is easily inhaled by the workmen at scene
Enter lung, so as to cause workmen lung to produce disease.Topple over dust caused by dregs to reduce excavator hopper, lead to
Normal mode be transport vehicle uppermost spray running water so as to play the purpose of depositing dust, running water is the direct drinking-water water for being available for people
Resource, running water is used to spray depositing dust so as to cause the waste to drinking water sources, and increases construction input.
Shower water or it is rainy when rainwater be flowed into by the second pipeline section in filtering ponds 13, in filtering ponds 13, pressed from both sides in water
Miscellaneous solid particle is filtered, and the water after filtering is transported to sedimentation basin 14 by the first water delivery device 16 and precipitated,
Water after the completion of precipitation is transported in clear water reserviors 15 by the second water delivery device 17 to be preserved.In earth excavation, can use
Water in the clear water reserviors 17 carries out sprinkling depositing dust instead of running water, so as to reduce the use of running water.In addition, clear water reserviors 17
In water can also be used as domestic water, so as to further save the use of running water, reduce the input of cost.
Embodiment 7
On the basis of the roof spraying ventilating device for construction site as described in Example 5, further, also wrap
Include the electric-controlled switch 20 of temperature sensor 18, computer 19 and the control circuit of booster water pump 9, the temperature sensor 18
Indoor environment is arranged at, the temperature sensor 18 is connected by wire with the computer 19, and the computer 19 is logical
Wire is crossed with the electric-controlled switch 20 to be connected.
The design temperature standard value in the computer, the temperature sensor 18 gather the temperature of Indoor environment in real time
Data, and the data are sent to computer 19, the computer 19 by the way that the data are compared with the standard value set,
When the data are more than standard value, computer 19 sends the instruction of unlatching to electric-controlled switch 20, and electric-controlled switch 20 is opened, pressurized water
Pump 9 is connected with power supply 21, the water in the storage device is extracted into roof 3 carries out spraying cooling so as to which booster water pump 19 works.
When data that the temperature sensor 18 collects after standard value contrast with being less than the standard value, computer 19 is to electric-controlled switch
20 send the instruction of closing, and electric-controlled switch 20 is closed, and booster water pump 9 disconnects with power supply 21 to be stopped.
By the mutual cooperation between temperature sensor 18, electric-controlled switch 20 and computer 19, so as to be dropped when indoor temperature
After the standard temperature as little as set, spraying cooling can be automatically stopped, and then avoids the waste to electric energy.
Embodiment 8
On the basis of the roof spraying ventilating device for construction site as described in embodiment 2 or 3, further,
It is described be in charge of on 5 through hole shower nozzle 6. is installed
By being in charge of installation shower nozzle 6 on 5 through hole by described, so that spraying effect is more preferable, spray is further increased
Water drenching improves the efficiency of spraying cooling to the coverage rate on roof 3.
Preferred embodiment of the present utility model is the foregoing is only, it is all at this not to limit the utility model
All any modification, equivalent and improvement made within the spirit and principle of utility model etc., should be included in the utility model
Protection domain within.
Claims (8)
- A kind of 1. roof spraying ventilating device for construction site, it is characterised in that:Including aqueduct(1), the water delivery Pipeline(1)One end and water source(2)Dismountable connection, the other end are arranged at roof(3)Top, the roof(3)Section For middle higher, the relatively low triangle in both sides, the roof(3)On aqueduct(1)Along roof(3)Top is laid to be formed First pipeline section(4), in first pipeline section(4)Side wall on be provided with some through holes.
- 2. the roof spraying ventilating device according to claim 1 for construction site, it is characterised in that:First pipe Section(4)Through hole on be provided with and be in charge of(5), it is described to be in charge of(5)It is horizontally disposed, it is described to be in charge of(5)On be provided with some through holes.
- 3. the roof spraying ventilating device according to claim 1 for construction site, it is characterised in that:First pipe Section(4)Through hole on be provided with and be in charge of(5), it is described to be in charge of(5)Along the roof(3)Side laying, it is adjacent to be in charge of(5)Between Separate, it is described to be in charge of(5)On be provided with some through holes.
- 4. the roof spraying ventilating device according to claim 1 for construction site, it is characterised in that:Also include setting On the roof(3)Eaves below be used for collect the collection device of shower water(7)And for storing the storage of shower water Device, the collection device(7)Pass through the second pipeline section with the storage device(8)It is connected.
- 5. the roof spraying ventilating device according to claim 4 for construction site, it is characterised in that:Also include supercharging Water pump(9), the booster water pump(9)One end passes through the 3rd pipeline section(10)It is connected with the storage device, the other end passes through the 4th Pipeline section(11)With the aqueduct(1)Connection, the water source(2)With the 4th pipeline section(11)Between the aqueduct (1)On be provided with valve for cutting off the water supply(12).
- 6. the roof spraying ventilating device according to claim 4 for construction site, it is characterised in that:The storage dress Put including filtering ponds(13), sedimentation basin(14)And clear water reserviors(15), the filtering ponds(13)One end and second pipeline section(8)Phase Connection, the other end pass through the first water delivery device(16)With the sedimentation basin(14)One end is connected, the sedimentation basin(14)It is another End passes through the second water delivery device(17)With the clear water reserviors(15)It is connected.
- 7. the roof spraying ventilating device according to claim 5 for construction site, it is characterised in that:Also include temperature Sensor(18), computer(19)And the control booster water pump(9)The electric-controlled switch of circuit(20), the temperature sensor (18)It is arranged at Indoor environment, the temperature sensor(18)Pass through wire and the computer(19)It is connected, the meter Calculation machine(19)Pass through wire and the electric-controlled switch(20)It is connected.
- 8. the roof spraying ventilating device for construction site according to Claims 2 or 3, it is characterised in that:Described point Pipe(5)Through hole on shower nozzle is installed(6).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720548234.9U CN206707137U (en) | 2017-05-17 | 2017-05-17 | A kind of roof spraying ventilating device for construction site |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720548234.9U CN206707137U (en) | 2017-05-17 | 2017-05-17 | A kind of roof spraying ventilating device for construction site |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206707137U true CN206707137U (en) | 2017-12-05 |
Family
ID=60463552
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720548234.9U Expired - Fee Related CN206707137U (en) | 2017-05-17 | 2017-05-17 | A kind of roof spraying ventilating device for construction site |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206707137U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108895583A (en) * | 2018-07-19 | 2018-11-27 | 长安大学 | A kind of external wall cooling system and cool-down method |
CN109442636A (en) * | 2018-11-02 | 2019-03-08 | 湖南华振供水设备有限公司 | The energy saving and environment friendly outdoor pump house cool-down method of one kind and device |
CN109440859A (en) * | 2018-11-02 | 2019-03-08 | 广西建工集团第五建筑工程有限责任公司 | A kind of rainwater circulatory system blended with landscape garden |
CN113350928A (en) * | 2021-04-26 | 2021-09-07 | 郑州工业应用技术学院 | Self-adaptation surrounding type construction dust device |
-
2017
- 2017-05-17 CN CN201720548234.9U patent/CN206707137U/en not_active Expired - Fee Related
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108895583A (en) * | 2018-07-19 | 2018-11-27 | 长安大学 | A kind of external wall cooling system and cool-down method |
CN108895583B (en) * | 2018-07-19 | 2021-01-01 | 长安大学 | Building outer wall cooling system and cooling method |
CN109442636A (en) * | 2018-11-02 | 2019-03-08 | 湖南华振供水设备有限公司 | The energy saving and environment friendly outdoor pump house cool-down method of one kind and device |
CN109440859A (en) * | 2018-11-02 | 2019-03-08 | 广西建工集团第五建筑工程有限责任公司 | A kind of rainwater circulatory system blended with landscape garden |
CN113350928A (en) * | 2021-04-26 | 2021-09-07 | 郑州工业应用技术学院 | Self-adaptation surrounding type construction dust device |
CN113350928B (en) * | 2021-04-26 | 2022-05-10 | 郑州工业应用技术学院 | Self-adaptation surrounding type construction dust device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206707137U (en) | A kind of roof spraying ventilating device for construction site | |
CN104025947B (en) | A kind of self-loopa green house | |
CN202164835U (en) | BRT (Bus Rapid Transit) intelligent bus shelter | |
CN104145747A (en) | Active-passive cooperative heat storage wall heating system of solar greenhouse | |
CN103411283B (en) | Water air-conditioning system coupling cooling spray device water circulation with air current cooler | |
CN109026121B (en) | Shallow cold energy circulation mine cooling dehumidification and waste heat utilization system | |
CN207006420U (en) | Energy Efficiency of Rural Residential Building system based on rainwater-collecting with comprehensive utilization | |
CN1936440A (en) | Super-energy-saving comfortible health-care type local air-conditioner | |
CN107517724A (en) | A kind of combined type water storage ventilation planted roof heat-proof device | |
CN206919498U (en) | High-efficient Water circulating frozen storehouse | |
CN208312591U (en) | Build heat circulating system | |
CN203053089U (en) | Low-temperature heat energy recovering system of mine return air source | |
CN201093792Y (en) | Freezing system of underground engineering tunnel | |
CN201652572U (en) | Novel ground source heat pump system | |
CN106440131A (en) | Method for saving embedded pipes of ground source heat pump system | |
CN207196757U (en) | Roof energy-saving cooling system | |
CN202607829U (en) | Water-cooled concrete coarse aggregate device | |
CN101825317B (en) | Seasonal low-level energy surface water cool storage air-conditioning method and device | |
CN108731300A (en) | A kind of building comprehensive energy feed system | |
CN202792691U (en) | Device capable of eliminating unbalance of heat absorbing and heat releasing of buried pipe in winter and summer using air exhaust device of air-conditioning | |
CN101825316A (en) | Snowcover refrigerated energy-saving central air-conditioning system | |
CN113250489B (en) | Energy-saving temporary board house for house construction engineering | |
CN112128894B (en) | Liquid refrigerant circulating device capable of utilizing ice and snow cold energy in season-crossing mode and using method | |
JP2020101309A (en) | Geothermal heat utilization system | |
CN106766381A (en) | A kind of radiant heat mass transter concurrent heating system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171205 |
|
CF01 | Termination of patent right due to non-payment of annual fee |