CN206706761U - Erection of steel pipe column adjusting means - Google Patents

Erection of steel pipe column adjusting means Download PDF

Info

Publication number
CN206706761U
CN206706761U CN201720498346.8U CN201720498346U CN206706761U CN 206706761 U CN206706761 U CN 206706761U CN 201720498346 U CN201720498346 U CN 201720498346U CN 206706761 U CN206706761 U CN 206706761U
Authority
CN
China
Prior art keywords
joint hose
inner support
steel pipe
hole inner
pipe column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720498346.8U
Other languages
Chinese (zh)
Inventor
冯振鲁
宋文波
王亚丽
李兆超
李良伟
刘洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 14th Bureau Group Co Ltd
Original Assignee
China Railway 14th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 14th Bureau Group Co Ltd filed Critical China Railway 14th Bureau Group Co Ltd
Priority to CN201720498346.8U priority Critical patent/CN206706761U/en
Application granted granted Critical
Publication of CN206706761U publication Critical patent/CN206706761U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model discloses a kind of erection of steel pipe column adjusting means, including one adjusts Multi-joint hose, and fixed disk is each provided with adjusting the both ends of Multi-joint hose;Adjusting the outer wall top of Multi-joint hose to be uniformly provided with four concordant hole inner support beams of ring, adjustable telescopic device is fixed with the end of each hole inner support beam;Four concordant root hole inner support beams of ring are uniformly provided with adjusting the outer wall bottom of Multi-joint hose;Four concordant joists of ring are uniformly provided with the middle part of the outer wall for adjusting Multi-joint hose, adjustable telescopic device is provided with below each joist.The utility model adjusts the jack on three horizontal levels and completes steel pipe column in absolute altitude, vertical and supercentral positioning, reduce the technical difficulty of installation steel pipe column, improve mounting stability by the way that Multi-joint hose will be adjusted to replace original section steel pipe column in post holes.

Description

Erection of steel pipe column adjusting means
Technical field
It the utility model is related to mechanical equipment technical field, more particularly to a kind of erection of steel pipe column adjusting means.
Background technology
Station in subway construction is because station bottom plate is close to artesian water, and station overhead line is various, in order to reduce out Dig analysis of possibility of water inrush and reduce surface subsidence risk, station excavation plan can be changed to scheme of being driven piles in pilot tunnel, i.e. pile one.
Although the program is reduced and excavated and sedimentation risk, erection of steel pipe column technical difficulty is added, by traditional bright dress, Become the concealed installation scheme installed under water.Steel pipe column is the main support component of subway station, right if there is the skew of steel pipe column The stability and outward appearance of station structure are adversely affected using functional bands.
Utility model content
In view of the above-mentioned problems, the purpose of this utility model is to provide a kind of erection of steel pipe column regulation dress for installing stabilization Put.
To reach above-mentioned purpose, a kind of erection of steel pipe column adjusting means described in the utility model, including a tune Multi-joint hose, The both ends for adjusting Multi-joint hose are each provided with fixed disk;
Four concordant hole inner support beams of ring are uniformly provided with the outer wall top of the tune Multi-joint hose, in each hole The end of inner support beam is fixed with adjustable telescopic device;
Four concordant root hole inner support beams of ring are uniformly provided with the outer wall bottom of the tune Multi-joint hose;
Four concordant joists of ring are uniformly provided with the middle part of the outer wall of the tune Multi-joint hose, below each joist It is provided with adjustable telescopic device;
Wherein, the position consistency from top to bottom of the hole inner support beam and the hole inner support beam, the hole inner support beam and institute It is in be staggered to state joist.
Preferably, the hole inner support beam is the adjustable telescopic device.
Preferably, the adjustable telescopic device includes jack.
Preferably, the hole inner support beam is staggered with the joist in 45 degree of angles.
The beneficial effects of the utility model are:
Erection of steel pipe column adjusting means provided by the utility model, by that Multi-joint hose will be adjusted to replace original one in post holes Steel pipe column is saved, the jack on three horizontal levels is adjusted and completes steel pipe column in absolute altitude, vertical and supercentral positioning, reduce The technical difficulty of steel pipe column is installed, improves mounting stability.
Brief description of the drawings
Fig. 1 is the use structural representation for the erection of steel pipe column adjusting means that the utility model embodiment provides.
Embodiment
The utility model is further described with reference to Figure of description.
As Fig. 1 be the utility model embodiment shown in a kind of erection of steel pipe column adjusting means, including one adjust Multi-joint hose 1, Fixed disk 2 is each provided with the both ends of the tune Multi-joint hose, the fixed disk 2 is used to be consolidated with the steel pipe column being hidden in post holes It is fixed.
Four concordant hole inner support beams 3 of ring are uniformly provided with the outer wall top of the tune Multi-joint hose 1, i.e., at every 90 degree Position on set a hole inner support beam.Adjustable telescopic device is fixed with the end of each hole inner support beam.At this In embodiment, the adjustable telescopic device can be jack 4.
As shown in figure 1, because the top of the tune Multi-joint hose can expose post holes.And be well bus loading zone pilot tunnel 7 outside post holes, pilot tunnel Width is larger.Now, for the ease of adjusting the top of Multi-joint hose to be adjusted, need to be bolted on the outer wall for adjusting Multi-joint hose There is hole inner support beam.The hole inner support beam can be close to pilot tunnel wall after fixing.It is during regulation, it is necessary to enterprising from four direction Row fine motion adjusts, therefore is fixed with jack in the end of each hole inner support beam.By the regulation of jack, can accomplish pair Adjust the position adjustments on Multi-joint hose top.
Four concordant root hole inner support beams of ring are uniformly provided with the outer wall bottom of the tune Multi-joint hose, i.e., at every 90 degree One hole inner support beam is set on position.In the present embodiment, hole inner support beam can be adjustable telescopic device, such as jack 4.Such as Shown in Fig. 1, because the bottom of the tune Multi-joint hose can enter in post holes.Now, for the ease of adjusting the bottom of Multi-joint hose to be adjusted, Jack need to be fixed with the outer wall for adjusting Multi-joint hose.By the regulation of jack, can accomplish to exchange the position of Multi-joint hose bottom Regulation.
Four concordant joists 5 of ring are uniformly provided with the middle part of the outer wall of the tune Multi-joint hose, i.e., every 90 degree of position One joist of upper setting.Adjustable telescopic device is provided with below each joist, in the present embodiment, adjustable telescopic device For jack.As shown in figure 1, because the middle part of the tune Multi-joint hose can be located at post orifice position.Now, for the ease of tune Multi-joint hose Middle part be adjusted, need to adjust Multi-joint hose outer wall on be bolted joist, the joist is with can extend to pilot tunnel The top in face, now it is provided with jack below each joist.By the regulation of jack, can accomplish to exchange Multi-joint hose The position adjustments at middle part.
Wherein, the position consistency from top to bottom of the hole inner support beam and the hole inner support beam, the hole inner support beam and institute It is in be staggered to state joist.In the present embodiment, the hole inner support beam is staggered with the joist in 45 degree of angles.
As shown in figure 1, when installing steel pipe column, Multi-joint hose will be adjusted to replace the section steel pipe column 6 in post holes, pass through regulation The fixed disk of section pipe is fixedly connected using the port of steel pipe column of the bolt mode with being hidden in post holes 8.
The bottom of jack below joist is placed on the ground of post orifice position, by adjusting four jack, Determine the absolute altitude of steel pipe column.
The bottom of jack in post holes is placed on post holes inwall, determines that steel pipe column is in vertical by adjusting jack Nogata is upward.
Withstood at the top of the jack that hole inner support beam is connected on the pilot tunnel inwall of station, steel is determined by adjusting jack The center of tubing string.
After the completion of steel pipe column fixes backfill in post holes, tune Multi-joint hose is unloaded, original steel pipe column is installed, is carried out follow-up normal Construction.
Erection of steel pipe column adjusting means provided by the utility model, by that Multi-joint hose will be adjusted to replace original one in post holes Steel pipe column is saved, the jack on three horizontal levels is adjusted and completes steel pipe column in absolute altitude, vertical and supercentral positioning, reduce The technical difficulty of steel pipe column is installed, improves mounting stability.
More than, preferred embodiment only of the present utility model, but the scope of protection of the utility model is not limited thereto, and is appointed What those familiar with the art the change that can readily occur in or replaces in the technical scope that the utility model discloses Change, should all cover within the scope of protection of the utility model.Therefore, the scope of protection of the utility model should be with claim The protection domain defined is defined.

Claims (4)

  1. A kind of 1. erection of steel pipe column adjusting means, it is characterised in that Multi-joint hose is adjusted including one, it is each at the both ends of the tune Multi-joint hose It is provided with fixed disk;
    Four concordant hole inner support beams of ring are uniformly provided with the outer wall top of the tune Multi-joint hose, are propped up in each hole The end of support beam is fixed with adjustable telescopic device;
    Four concordant root hole inner support beams of ring are uniformly provided with the outer wall bottom of the tune Multi-joint hose;
    Four concordant joists of ring are uniformly provided with the middle part of the outer wall of the tune Multi-joint hose, are set below each joist There is adjustable telescopic device;
    Wherein, the position consistency from top to bottom of the hole inner support beam and the hole inner support beam, the hole inner support beam and the support Beam is in be staggered.
  2. 2. device according to claim 1, it is characterised in that the hole inner support beam is the adjustable telescopic device.
  3. 3. device according to claim 1 or 2, it is characterised in that the adjustable telescopic device includes jack.
  4. 4. device according to claim 1, it is characterised in that the hole inner support beam is handed over the joist in 45 degree of angles Mistake is set.
CN201720498346.8U 2017-05-05 2017-05-05 Erection of steel pipe column adjusting means Expired - Fee Related CN206706761U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720498346.8U CN206706761U (en) 2017-05-05 2017-05-05 Erection of steel pipe column adjusting means

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720498346.8U CN206706761U (en) 2017-05-05 2017-05-05 Erection of steel pipe column adjusting means

Publications (1)

Publication Number Publication Date
CN206706761U true CN206706761U (en) 2017-12-05

Family

ID=60466442

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720498346.8U Expired - Fee Related CN206706761U (en) 2017-05-05 2017-05-05 Erection of steel pipe column adjusting means

Country Status (1)

Country Link
CN (1) CN206706761U (en)

Similar Documents

Publication Publication Date Title
CN110387884B (en) Construction method for preventing inrush of ultra-deep foundation pit
CN106759416B (en) Airbag apparatus and construction method is adjusted in the pneumatic caisson sinking stage
CN105178368A (en) Method for correcting deviation of building in miniature pile hole earth taking manner
US20140227041A1 (en) Adjustable system for supporting a structure using a pile
CN205530262U (en) Adjust timing frame of steel tube column stake position among half reverse construction
CN205822220U (en) A kind of assembled open caisson
KR102000675B1 (en) Adjustable Stiffener For Steel Pipe Strut
CN206706761U (en) Erection of steel pipe column adjusting means
CN204849792U (en) Precipitation well well casing underpins support
CN206873478U (en) A kind of underground shaft robot
CN201817817U (en) Integral continuously-adjustable foundation for power transmission and transformation tower (pole)
CN107012872A (en) Construction method of sludge deep foundation pit
CN207828995U (en) Open caisson construction structure
CN106088762B (en) A kind of prefabricated assembled round underground granary of insertion slot type encased steel plate
CN112502188B (en) Power communication comprehensive pipe rack in easy-to-slide area and construction method thereof
CN204491330U (en) Bolt is adopted to regulate the tunnel excavator walking rail support of height
CN106545018A (en) Excavation slope excavation construction process and excavation slope
KR101756781B1 (en) Cut off wall construction method using the ground reinforcement mixing apparatus with the function of angle adjustment
CN205348244U (en) Loader for building engineering
CN205188978U (en) Integration stull formula bearing structure
CN219794913U (en) Protection device for water supply and drainage pipeline deep foundation pit excavation
CN109469077B (en) Highway excavation side slope for reducing land sign
CN221721659U (en) Foundation pit supporting structure
CN109853494A (en) Cha Dong and surge-chamber integral structure and its construction method
CN220644285U (en) Foundation pit steel support supporting device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171205

Termination date: 20180505