CN206701673U - One kind building special screening installation of sand - Google Patents

One kind building special screening installation of sand Download PDF

Info

Publication number
CN206701673U
CN206701673U CN201720164010.8U CN201720164010U CN206701673U CN 206701673 U CN206701673 U CN 206701673U CN 201720164010 U CN201720164010 U CN 201720164010U CN 206701673 U CN206701673 U CN 206701673U
Authority
CN
China
Prior art keywords
plate
bolted connection
guide rod
support plate
connecting rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720164010.8U
Other languages
Chinese (zh)
Inventor
曾成珠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Xingsheng Environmental Treatment Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201720164010.8U priority Critical patent/CN206701673U/en
Application granted granted Critical
Publication of CN206701673U publication Critical patent/CN206701673U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Combined Means For Separation Of Solids (AREA)

Abstract

It the utility model is related to a kind of screening installation, more particularly to a kind of building special screening installation of sand.The technical problems to be solved in the utility model is to provide that a kind of speed is fast, high efficiency, the special screening installation of building sand for making sand not dropped away during screening.In order to solve the above-mentioned technical problem, the utility model provides such a building special screening installation of sand, bottom plate, left plate, collection frame, the first support plate, the second support plate, slide rail, sliding block, screening frame, backgauge bucket, beats block, top plate, head rod, first guide pin bushing etc.;Bolted mode is passed sequentially through at the top of bottom plate from left to right left plate, the first support plate, collection frame and the second support plate are installed, left plate, the first support plate and the second support plate are all in be vertically arranged.The utility model is moved left and right by web plate, the more refinement for screening sand, and then purposes is wider, and backgauge bucket makes sand not fall out, and has prevented to waste.

Description

One kind building special screening installation of sand
Technical field
It the utility model is related to a kind of screening installation, more particularly to a kind of building special screening installation of sand.
Background technology
Building is the general name of building and structures, be people in order to meet social life needs, utilize grasped thing Matter technological means, and the artificial environment created with certain scientific law, geomantic omen theory and aesthetic principle.
Due to having mixed many debris in sand, impurity could be used preferably, it is necessary to carry out screening, wide, the people of purposes For work when sand is screened in screening, screening time is more, and speed is slow, also during screening sand can be made to drop away, and Cause to waste, therefore need badly and research and develop a kind of fast speed, high efficiency, the building sand for making sand not dropped away during screening The special screening installation of son.
Utility model content
(1)Technical problems to be solved
For the utility model in order to overcome manually when sand is screened in screening, screening time is more, and speed is slow, can also sieve The shortcomings that making sand drop away during choosing, and causing to waste, the technical problems to be solved in the utility model is to provide one Kind speed is fast, high efficiency, the special screening installation of building sand for making sand not dropped away during screening.
(2)Technical scheme
In order to solve the above-mentioned technical problem, the utility model provides such a building special screening installation of sand, bottom Plate, left plate, collection frame, the first support plate, the second support plate, slide rail, sliding block, screening frame, backgauge bucket, beat block, top plate, first connect Extension bar, the first guide pin bushing, the first guide rod, the first wedge, circular frame, the first motor, cam, the second connecting rod, pulley, the first bullet Spring, the 3rd connecting rod, second spring, bracing wire, transverse slat, the second guide rod, the first contact roller, the first fixed dam, the 3rd spring, And cross bar, bolted mode is passed sequentially through at the top of bottom plate from left to right left plate, the first support plate, collection frame and the are installed Two support plates, left plate, the first support plate and the second support plate are all in be vertically arranged, what the first support plate right flank top was bolted Mode is provided with slide rail, and slide rail is provided with the sliding block coordinated with it, and slide rail is slidably matched with sliding block, and the top of bottom plate is provided with screening Frame, screening frame bottom are netted, and screening frame bottom left is connected with slider top by bolted connection, on the second support plate Portion is provided with through hole, and the first spring, the second support plate right flank are connected between the second support plate left surface top and screening frame right flank Top is provided with the 3rd connecting rod by bolted connection, and the 3rd connecting rod is horizontally disposed, and the 3rd connecting rod is positioned at logical Hole upper right side, backgauge bucket is provided between the first support plate and the second support plate, backgauge bucket is located at below slide rail, and backgauge bucket is located at collection frame Surface, left plate top are provided with top plate by bolted connection, and top plate bottom right is by bolted connection Second connecting rod is installed, the second connecting rod bottom and the 3rd connecting rod right-hand member are all provided with cunning by bolted connection Wheel, top plate bottom left are provided with head rod by bolted connection, and head rod bottom is bolted Mode the first guide pin bushing is installed, the first guide pin bushing inner sliding type is provided with the first guide rod, and the first guide rod left end is bolted Mode the first wedge is installed, the first guide rod right-hand member is provided with circular frame by bolted connection, on the right side of circular frame Bracing wire is connected among face, bracing wire, by being connected among through hole and screening frame right flank, is led to around two pulleys among top base Cross bolted mode and the first motor is installed, the first motor is located at circular frame rear, passed through on the output shaft of the first motor Shaft coupling is connected with cam, and cam is located in circular frame, and cam coordinates with circular frame, and left plate right flank top is connected by bolt The mode connect is provided with transverse slat, is provided with the first pilot hole on the right side of transverse slat, and the first pilot hole inner sliding type is provided with the second guide rod, the Two guide rod tops are provided with the first contact roller by bolted connection, and the first contact roller connects with the first wedge inclined-plane Touch, the second guide rod bottom is provided with the first fixed dam by bolted connection, connects between the first fixed dam and transverse slat The 3rd spring is connected to, cross bar is installed by bolted connection on the right side of the second guide rod bottom, cross bar bottom right is connected with Second spring, the bottom of second spring, which is connected with, beats block, beats block and is located at directly over screening frame.
Preferably, also include the 4th spring, the 4th connecting rod, the second wedge, the 3rd guide rod, the second contact roller, Web plate and the second fixed dam, the second guide rod bottom are provided with the 4th connecting rod, the 4th connecting rod by bolted connection Bottom is provided with the second wedge by bolted connection, and the second wedge is located at the first support plate left, under the first support plate Portion is provided with the second pilot hole, and the second pilot hole inner sliding type is provided with the 3rd guide rod, what the 3rd guide rod left end was bolted Mode is provided with the second contact roller, and the second contact roller and the second wedge contact of incline plane, the 3rd guide rod right-hand member pass through bolt The mode of connection is provided with web plate, and web plate is in being horizontally disposed with, and web plate is located at the surface of collection frame, under web plate is located at backgauge bucket just Side, the 3rd guide rod left part are provided with the second fixed dam by bolted connection, and the second fixed dam is positioned at the second contact Roller right, the 4th spring is connected between the second fixed dam and the first support plate, the 4th spring housing is on the 3rd guide rod.
Preferably, the second guide pin bushing, the 5th connecting rod and the 4th guide rod are also included, the second support plate left surface bottom passes through spiral shell Tethering the mode connect and the 5th connecting rod is installed, the 5th connecting rod left end is provided with the second guide pin bushing by bolted connection, Second guide pin bushing inner sliding type is provided with the 4th guide rod, the 4th guide rod left end by bolted connection among web plate right flank Connection.
Preferably, the material of bottom plate is Q235 steel.
Preferably, the first motor is servomotor.
Preferably, the material of bracing wire is steel wire.
Operation principle:Building sand first is poured into screening frame, is started the first motor and is rotated forward, the first motor driven cam is just Turn, when the nose of cam turns to left side, the nose of cam promotes circular frame to be moved to the left, circular frame drive the first guide rod to Move left, and then drive the first wedge to be moved to the left, during this, the first contact roller and the first wedge contact of incline plane Rolling, the first contact roller moves down, and the first contact roller drives the second guide rod to move down, the 3rd spring elongation, and second Guide rod drives cross bar to move down, and then drive is beaten block and moved down, and second spring compression, at the same time, circular frame is to the left When mobile, bracing wire pulls screening frame to move right around two pulleys by through hole, and slide rail play the guiding role with sliding block, the first bullet Spring compresses, and when the nose of cam turns to right side, the nose of cam promotes circular frame to move right, and circular frame drives first to lead Bar moves right, and then drives the first wedge to move right, during this, the first contact roller and the first wedge inclined-plane Contact roll, because the effect of the 3rd spring, the first contact roller drive the second guide rod move up, the second guide rod drive cross bar to Upper movement, because of the effect of second spring, beat block and move up, in the presence of second spring, beat block and beat screening frame.With This simultaneously, when circular frame moves right, bracing wire is relaxed, and because of the effect of the first spring, screening frame is moved to the left, slide rail and sliding block It play the guiding role, in cam constantly rotates forward, beats block and constantly the building sand in screening frame is beaten, screening frame Constantly moving left and right and beat block and constantly beat screening frame, building sand is screened to be dropped down by screening frame sieve bottom, The building sand screened, which is fallen on backgauge bucket, to be flowed into collection frame, and the building sand for making screening complete does not fall out collection Outer frame, waste is not produced.
Because also include the 4th spring, the 4th connecting rod, the second wedge, the 3rd guide rod, the second contact roller, web plate With the second fixed dam, the second guide rod bottom is provided with the 4th connecting rod, the 4th connecting rod bottom by bolted connection Second wedge is installed by bolted connection, the second wedge is located at the first support plate left, and the first support plate bottom is opened There is the second pilot hole, the second pilot hole inner sliding type is provided with the 3rd guide rod, and the 3rd guide rod left end is by bolted connection Second contact roller is installed, the second contact roller and the second wedge contact of incline plane, the 3rd guide rod right-hand member are bolted Mode web plate is installed, web plate is in horizontally disposed, and web plate be located at the surface of collection frame, and web plate is located at backgauge bucket underface, 3rd guide rod left part is provided with the second fixed dam by bolted connection, and the second fixed dam is located at the second contact roller Right, the 4th spring is connected between the second fixed dam and the first support plate, the 4th spring housing is led on the 3rd guide rod, when second When bar moves down, the 4th connecting rod also moves down, and then drives the second wedge to move down, the second contact roller and the During two wedge contact of incline plane roll, the second contact roller moves right, and the 3rd guide rod also moves right, the 4th spring-compressed, And then drive web plate to move right, similarly, when the second guide rod moves up, because of the effect of the 4th spring, web plate is moved to the left, During this, web plate is constantly moved left and right, and the building sand screened is further screened.
Because also including the second guide pin bushing, the 5th connecting rod and the 4th guide rod, the second support plate left surface bottom passes through bolt The mode of connection is provided with the 5th connecting rod, and the 5th connecting rod left end is provided with the second guide pin bushing by bolted connection, the Two guide pin bushing inner sliding types are provided with the 4th guide rod, and the 4th guide rod left end among web plate right flank by bolted connection with connecting Connect, during web plate moves left and right, web plate drives the 4th guide rod to be moved left and right in guide pin bushing, so moves left and right web plate During it is more steady.
Because the material of bottom plate is Q235 steel, the weight capacity of Q235 steel is strong, acidproof corrosion-resistant, adds the longevity of bottom plate Life.
Because the first motor is servomotor, servomotor can more be accurately controlled rotating speed, make operation more steady.
Because the material of bracing wire is steel wire, steel wire antiseptic property is excellent, is not easy to break.
(3)Beneficial effect
The utility model is moved left and right by web plate, the more refinement for screening sand, and then purposes is wider, and backgauge bucket makes Sand is not fallen out, and has prevented to waste, and has been reached fast speed, high efficiency, has been made what sand did not dropped away during screening Effect.
Brief description of the drawings
Fig. 1 is the first main structure diagram of the present utility model.
Fig. 2 is second of main structure diagram of the present utility model.
Fig. 3 is the third main structure diagram of the present utility model.
Mark in accompanying drawing for:1- bottom plates, 2- left plates, 3- collection frames, the support plates of 4- first, the support plates of 5- second, 6- slide rails, 7- sliding blocks, 8- screening frames, 9- backgauge buckets, 10- beat block, 11- through holes, 12- top plates, 13- head rods, the guide pin bushings of 14- first, The guide rods of 15- first, the wedges of 16- first, 17- circular frames, the motors of 18- first, 19- cams, the connecting rods of 20- second, 21- are slided Wheel, the springs of 22- first, the connecting rods of 23- the 3rd, 24- second springs, 25- bracing wires, 26- transverse slats, the pilot holes of 27- first, 28- the Two guide rods, the contact rollers of 29- first, the fixed dams of 30- first, the springs of 31- the 3rd, 32- cross bars, the springs of 33- the 4th, 34- Two pilot holes, the connecting rods of 35- the 4th, the wedges of 36- second, the guide rods of 37- the 3rd, the contact rollers of 38- second, 39- web plates, 40- Second fixed dam, the guide pin bushings of 41- second, the connecting rods of 42- the 5th, the guide rods of 43- the 4th.
Embodiment
The utility model is further described with reference to the accompanying drawings and examples.
Embodiment 1
One kind building the special screening installation of sand, as Figure 1-3, bottom plate 1, left plate 2, collection frame 3, the first support plate 4, Second support plate 5, slide rail 6, sliding block 7, screening frame 8, backgauge bucket 9, beat block 10, top plate 12, head rod 13, the first guide pin bushing 14th, the first guide rod 15, the first wedge 16, circular frame 17, the first motor 18, cam 19, the second connecting rod 20, pulley 21, One spring 22, the 3rd connecting rod 23, second spring 24, bracing wire 25, transverse slat 26, the second guide rod 28, the first contact roller 29, first Fixed dam 30, the 3rd spring 31 and cross bar 32, the top of bottom plate 1 pass sequentially through bolted mode and are provided with from left to right Left plate 2, the first support plate 4, the support plate 5 of collection frame 3 and second, left plate 2, the first support plate 4 and the second support plate 5 are all in set vertically Put, the right flank top of the first support plate 4 is provided with slide rail 6 by bolted connection, and slide rail 6 is provided with the sliding block coordinated with it 7, slide rail 6 is slidably matched with sliding block 7, and the top of bottom plate 1 is provided with screening frame 8, and the bottom of screening frame 8 is netted, and the bottom of screening frame 8 is left Side is connected with the top of sliding block 7 by bolted connection, and the top of the second support plate 5 is provided with through hole 11, on the left surface of the second support plate 5 The first spring 22 is connected between portion and the right flank of screening frame 8, the right flank top of the second support plate 5 is pacified by bolted connection Equipped with the 3rd connecting rod 23, the 3rd connecting rod 23 is horizontally disposed, and the 3rd connecting rod 23 is located at the upper right side of through hole 11, the first support plate 4 and second are provided with backgauge bucket 9 between support plate 5, and backgauge bucket 9 is located at the lower section of slide rail 6, and backgauge bucket 9 be located at directly over collection frame 3, a left side The top of side plate 2 is provided with top plate 12 by bolted connection, and the bottom right of top plate 12 is installed by bolted connection There is the second connecting rod 20, the bottom of the second connecting rod 20 and the right-hand member of the 3rd connecting rod 23 are all provided with cunning by bolted connection Wheel 21, the bottom left of top plate 12 is provided with head rod 13 by bolted connection, and the bottom of head rod 13 passes through Bolted mode is provided with the first guide pin bushing 14, and the inner sliding type of the first guide pin bushing 14 is provided with the first guide rod 15, the first guide rod 15 Left end is provided with the first wedge 16 by bolted connection, and the right-hand member of the first guide rod 15 is installed by bolted connection There is circular frame 17, bracing wire 25 is connected among the right flank of circular frame 17, bracing wire 25 passes through through hole 11 and screening around two pulleys 21 Connected among the right flank of frame 8, the first motor 18, the first 18, motor are installed by bolted connection among top base In being connected with cam 19 by shaft coupling on the rear of circular frame 17, the output shaft of the first motor 18, cam 19 is located at circular frame 17 Interior, cam 19 coordinates with circular frame 17, and the right flank top of left plate 2 is provided with transverse slat 26, transverse slat by bolted connection 26 right sides are provided with the first pilot hole 27, and the inner sliding type of the first pilot hole 27 is provided with the second guide rod 28, and the top of the second guide rod 28 leads to Cross bolted mode and the first contact roller 29, the first contact roller 29 and the contact of incline plane of the first wedge 16 are installed, the The bottom of two guide rod 28 is provided with the first fixed dam 30 by bolted connection, between the first fixed dam 30 and transverse slat 26 The 3rd spring 31 is connected with, cross bar 32, the bottom of cross bar 32 are installed by bolted connection on the right side of the bottom of the second guide rod 28 Right side is connected with second spring 24, and the bottom of second spring 24, which is connected with, beats block 10, beat block 10 be located at screening frame 8 just on Side.
Embodiment 2
One kind building the special screening installation of sand, as Figure 1-3, bottom plate 1, left plate 2, collection frame 3, the first support plate 4, Second support plate 5, slide rail 6, sliding block 7, screening frame 8, backgauge bucket 9, beat block 10, top plate 12, head rod 13, the first guide pin bushing 14th, the first guide rod 15, the first wedge 16, circular frame 17, the first motor 18, cam 19, the second connecting rod 20, pulley 21, One spring 22, the 3rd connecting rod 23, second spring 24, bracing wire 25, transverse slat 26, the second guide rod 28, the first contact roller 29, first Fixed dam 30, the 3rd spring 31 and cross bar 32, the top of bottom plate 1 pass sequentially through bolted mode and are provided with from left to right Left plate 2, the first support plate 4, the support plate 5 of collection frame 3 and second, left plate 2, the first support plate 4 and the second support plate 5 are all in set vertically Put, the right flank top of the first support plate 4 is provided with slide rail 6 by bolted connection, and slide rail 6 is provided with the sliding block coordinated with it 7, slide rail 6 is slidably matched with sliding block 7, and the top of bottom plate 1 is provided with screening frame 8, and the bottom of screening frame 8 is netted, and the bottom of screening frame 8 is left Side is connected with the top of sliding block 7 by bolted connection, and the top of the second support plate 5 is provided with through hole 11, on the left surface of the second support plate 5 The first spring 22 is connected between portion and the right flank of screening frame 8, the right flank top of the second support plate 5 is pacified by bolted connection Equipped with the 3rd connecting rod 23, the 3rd connecting rod 23 is horizontally disposed, and the 3rd connecting rod 23 is located at the upper right side of through hole 11, the first support plate 4 and second are provided with backgauge bucket 9 between support plate 5, and backgauge bucket 9 is located at the lower section of slide rail 6, and backgauge bucket 9 be located at directly over collection frame 3, a left side The top of side plate 2 is provided with top plate 12 by bolted connection, and the bottom right of top plate 12 is installed by bolted connection There is the second connecting rod 20, the bottom of the second connecting rod 20 and the right-hand member of the 3rd connecting rod 23 are all provided with cunning by bolted connection Wheel 21, the bottom left of top plate 12 is provided with head rod 13 by bolted connection, and the bottom of head rod 13 passes through Bolted mode is provided with the first guide pin bushing 14, and the inner sliding type of the first guide pin bushing 14 is provided with the first guide rod 15, the first guide rod 15 Left end is provided with the first wedge 16 by bolted connection, and the right-hand member of the first guide rod 15 is installed by bolted connection There is circular frame 17, bracing wire 25 is connected among the right flank of circular frame 17, bracing wire 25 passes through through hole 11 and screening around two pulleys 21 Connected among the right flank of frame 8, the first motor 18, the first 18, motor are installed by bolted connection among top base In being connected with cam 19 by shaft coupling on the rear of circular frame 17, the output shaft of the first motor 18, cam 19 is located at circular frame 17 Interior, cam 19 coordinates with circular frame 17, and the right flank top of left plate 2 is provided with transverse slat 26, transverse slat by bolted connection 26 right sides are provided with the first pilot hole 27, and the inner sliding type of the first pilot hole 27 is provided with the second guide rod 28, and the top of the second guide rod 28 leads to Cross bolted mode and the first contact roller 29, the first contact roller 29 and the contact of incline plane of the first wedge 16 are installed, the The bottom of two guide rod 28 is provided with the first fixed dam 30 by bolted connection, between the first fixed dam 30 and transverse slat 26 The 3rd spring 31 is connected with, cross bar 32, the bottom of cross bar 32 are installed by bolted connection on the right side of the bottom of the second guide rod 28 Right side is connected with second spring 24, and the bottom of second spring 24, which is connected with, beats block 10, beat block 10 be located at screening frame 8 just on Side.
Also include the 4th spring 33, the 4th connecting rod 35, the second wedge 36, the 3rd guide rod 37, the second contact roller 38th, the fixed dam 40 of web plate 39 and second, the bottom of the second guide rod 28 are provided with the 4th connecting rod 35 by bolted connection, The bottom of 4th connecting rod 35 is provided with the second wedge 36 by bolted connection, and the second wedge 36 is located at the first support plate 4 lefts, the bottom of the first support plate 4 are provided with the second pilot hole 34, and the inner sliding type of the second pilot hole 34 is provided with the 3rd guide rod 37, and the 3rd The left end of guide rod 37 is provided with the second contact roller 38, the second contact roller 38 and the second wedge 36 by bolted connection Contact of incline plane, the right-hand member of the 3rd guide rod 37 are provided with web plate 39 by bolted connection, and web plate 39 is in horizontally disposed, web plate 39 Positioned at the surface of collection frame 3, web plate 39 is located at immediately below backgauge bucket 9, and the left part of the 3rd guide rod 37 is by bolted connection Second fixed dam 40 is installed, the second fixed dam 40 is located at the right of the second contact roller 38, the second fixed dam 40 and The 4th spring 33 is connected between one support plate 4, the 4th spring 33 is enclosed on the 3rd guide rod 37.
Embodiment 3
One kind building the special screening installation of sand, as Figure 1-3, bottom plate 1, left plate 2, collection frame 3, the first support plate 4, Second support plate 5, slide rail 6, sliding block 7, screening frame 8, backgauge bucket 9, beat block 10, top plate 12, head rod 13, the first guide pin bushing 14th, the first guide rod 15, the first wedge 16, circular frame 17, the first motor 18, cam 19, the second connecting rod 20, pulley 21, One spring 22, the 3rd connecting rod 23, second spring 24, bracing wire 25, transverse slat 26, the second guide rod 28, the first contact roller 29, first Fixed dam 30, the 3rd spring 31 and cross bar 32, the top of bottom plate 1 pass sequentially through bolted mode and are provided with from left to right Left plate 2, the first support plate 4, the support plate 5 of collection frame 3 and second, left plate 2, the first support plate 4 and the second support plate 5 are all in set vertically Put, the right flank top of the first support plate 4 is provided with slide rail 6 by bolted connection, and slide rail 6 is provided with the sliding block coordinated with it 7, slide rail 6 is slidably matched with sliding block 7, and the top of bottom plate 1 is provided with screening frame 8, and the bottom of screening frame 8 is netted, and the bottom of screening frame 8 is left Side is connected with the top of sliding block 7 by bolted connection, and the top of the second support plate 5 is provided with through hole 11, on the left surface of the second support plate 5 The first spring 22 is connected between portion and the right flank of screening frame 8, the right flank top of the second support plate 5 is pacified by bolted connection Equipped with the 3rd connecting rod 23, the 3rd connecting rod 23 is horizontally disposed, and the 3rd connecting rod 23 is located at the upper right side of through hole 11, the first support plate 4 and second are provided with backgauge bucket 9 between support plate 5, and backgauge bucket 9 is located at the lower section of slide rail 6, and backgauge bucket 9 be located at directly over collection frame 3, a left side The top of side plate 2 is provided with top plate 12 by bolted connection, and the bottom right of top plate 12 is installed by bolted connection There is the second connecting rod 20, the bottom of the second connecting rod 20 and the right-hand member of the 3rd connecting rod 23 are all provided with cunning by bolted connection Wheel 21, the bottom left of top plate 12 is provided with head rod 13 by bolted connection, and the bottom of head rod 13 passes through Bolted mode is provided with the first guide pin bushing 14, and the inner sliding type of the first guide pin bushing 14 is provided with the first guide rod 15, the first guide rod 15 Left end is provided with the first wedge 16 by bolted connection, and the right-hand member of the first guide rod 15 is installed by bolted connection There is circular frame 17, bracing wire 25 is connected among the right flank of circular frame 17, bracing wire 25 passes through through hole 11 and screening around two pulleys 21 Connected among the right flank of frame 8, the first motor 18, the first 18, motor are installed by bolted connection among top base In being connected with cam 19 by shaft coupling on the rear of circular frame 17, the output shaft of the first motor 18, cam 19 is located at circular frame 17 Interior, cam 19 coordinates with circular frame 17, and the right flank top of left plate 2 is provided with transverse slat 26, transverse slat by bolted connection 26 right sides are provided with the first pilot hole 27, and the inner sliding type of the first pilot hole 27 is provided with the second guide rod 28, and the top of the second guide rod 28 leads to Cross bolted mode and the first contact roller 29, the first contact roller 29 and the contact of incline plane of the first wedge 16 are installed, the The bottom of two guide rod 28 is provided with the first fixed dam 30 by bolted connection, between the first fixed dam 30 and transverse slat 26 The 3rd spring 31 is connected with, cross bar 32, the bottom of cross bar 32 are installed by bolted connection on the right side of the bottom of the second guide rod 28 Right side is connected with second spring 24, and the bottom of second spring 24, which is connected with, beats block 10, beat block 10 be located at screening frame 8 just on Side.
Also include the 4th spring 33, the 4th connecting rod 35, the second wedge 36, the 3rd guide rod 37, the second contact roller 38th, the fixed dam 40 of web plate 39 and second, the bottom of the second guide rod 28 are provided with the 4th connecting rod 35 by bolted connection, The bottom of 4th connecting rod 35 is provided with the second wedge 36 by bolted connection, and the second wedge 36 is located at the first support plate 4 lefts, the bottom of the first support plate 4 are provided with the second pilot hole 34, and the inner sliding type of the second pilot hole 34 is provided with the 3rd guide rod 37, and the 3rd The left end of guide rod 37 is provided with the second contact roller 38, the second contact roller 38 and the second wedge 36 by bolted connection Contact of incline plane, the right-hand member of the 3rd guide rod 37 are provided with web plate 39 by bolted connection, and web plate 39 is in horizontally disposed, web plate 39 Positioned at the surface of collection frame 3, web plate 39 is located at immediately below backgauge bucket 9, and the left part of the 3rd guide rod 37 is by bolted connection Second fixed dam 40 is installed, the second fixed dam 40 is located at the right of the second contact roller 38, the second fixed dam 40 and The 4th spring 33 is connected between one support plate 4, the 4th spring 33 is enclosed on the 3rd guide rod 37.
Also include the second guide pin bushing 41, the 5th connecting rod 42 and the 4th guide rod 43, the left surface bottom of the second support plate 5 passes through spiral shell Tether the mode connect and the 5th connecting rod 42 is installed, the left end of the 5th connecting rod 42 is provided with second and led by bolted connection Set 41, the inner sliding type of the second guide pin bushing 41 are provided with the 4th guide rod 43, the left end of the 4th guide rod 43 by bolted connection with net Connected among the right flank of plate 39.
Embodiment 4
One kind building the special screening installation of sand, as Figure 1-3, bottom plate 1, left plate 2, collection frame 3, the first support plate 4, Second support plate 5, slide rail 6, sliding block 7, screening frame 8, backgauge bucket 9, beat block 10, top plate 12, head rod 13, the first guide pin bushing 14th, the first guide rod 15, the first wedge 16, circular frame 17, the first motor 18, cam 19, the second connecting rod 20, pulley 21, One spring 22, the 3rd connecting rod 23, second spring 24, bracing wire 25, transverse slat 26, the second guide rod 28, the first contact roller 29, first Fixed dam 30, the 3rd spring 31 and cross bar 32, the top of bottom plate 1 pass sequentially through bolted mode and are provided with from left to right Left plate 2, the first support plate 4, the support plate 5 of collection frame 3 and second, left plate 2, the first support plate 4 and the second support plate 5 are all in set vertically Put, the right flank top of the first support plate 4 is provided with slide rail 6 by bolted connection, and slide rail 6 is provided with the sliding block coordinated with it 7, slide rail 6 is slidably matched with sliding block 7, and the top of bottom plate 1 is provided with screening frame 8, and the bottom of screening frame 8 is netted, and the bottom of screening frame 8 is left Side is connected with the top of sliding block 7 by bolted connection, and the top of the second support plate 5 is provided with through hole 11, on the left surface of the second support plate 5 The first spring 22 is connected between portion and the right flank of screening frame 8, the right flank top of the second support plate 5 is pacified by bolted connection Equipped with the 3rd connecting rod 23, the 3rd connecting rod 23 is horizontally disposed, and the 3rd connecting rod 23 is located at the upper right side of through hole 11, the first support plate 4 and second are provided with backgauge bucket 9 between support plate 5, and backgauge bucket 9 is located at the lower section of slide rail 6, and backgauge bucket 9 be located at directly over collection frame 3, a left side The top of side plate 2 is provided with top plate 12 by bolted connection, and the bottom right of top plate 12 is installed by bolted connection There is the second connecting rod 20, the bottom of the second connecting rod 20 and the right-hand member of the 3rd connecting rod 23 are all provided with cunning by bolted connection Wheel 21, the bottom left of top plate 12 is provided with head rod 13 by bolted connection, and the bottom of head rod 13 passes through Bolted mode is provided with the first guide pin bushing 14, and the inner sliding type of the first guide pin bushing 14 is provided with the first guide rod 15, the first guide rod 15 Left end is provided with the first wedge 16 by bolted connection, and the right-hand member of the first guide rod 15 is installed by bolted connection There is circular frame 17, bracing wire 25 is connected among the right flank of circular frame 17, bracing wire 25 passes through through hole 11 and screening around two pulleys 21 Connected among the right flank of frame 8, the first motor 18, the first 18, motor are installed by bolted connection among top base In being connected with cam 19 by shaft coupling on the rear of circular frame 17, the output shaft of the first motor 18, cam 19 is located at circular frame 17 Interior, cam 19 coordinates with circular frame 17, and the right flank top of left plate 2 is provided with transverse slat 26, transverse slat by bolted connection 26 right sides are provided with the first pilot hole 27, and the inner sliding type of the first pilot hole 27 is provided with the second guide rod 28, and the top of the second guide rod 28 leads to Cross bolted mode and the first contact roller 29, the first contact roller 29 and the contact of incline plane of the first wedge 16 are installed, the The bottom of two guide rod 28 is provided with the first fixed dam 30 by bolted connection, between the first fixed dam 30 and transverse slat 26 The 3rd spring 31 is connected with, cross bar 32, the bottom of cross bar 32 are installed by bolted connection on the right side of the bottom of the second guide rod 28 Right side is connected with second spring 24, and the bottom of second spring 24, which is connected with, beats block 10, beat block 10 be located at screening frame 8 just on Side.
Also include the 4th spring 33, the 4th connecting rod 35, the second wedge 36, the 3rd guide rod 37, the second contact roller 38th, the fixed dam 40 of web plate 39 and second, the bottom of the second guide rod 28 are provided with the 4th connecting rod 35 by bolted connection, The bottom of 4th connecting rod 35 is provided with the second wedge 36 by bolted connection, and the second wedge 36 is located at the first support plate 4 lefts, the bottom of the first support plate 4 are provided with the second pilot hole 34, and the inner sliding type of the second pilot hole 34 is provided with the 3rd guide rod 37, and the 3rd The left end of guide rod 37 is provided with the second contact roller 38, the second contact roller 38 and the second wedge 36 by bolted connection Contact of incline plane, the right-hand member of the 3rd guide rod 37 are provided with web plate 39 by bolted connection, and web plate 39 is in horizontally disposed, web plate 39 Positioned at the surface of collection frame 3, web plate 39 is located at immediately below backgauge bucket 9, and the left part of the 3rd guide rod 37 is by bolted connection Second fixed dam 40 is installed, the second fixed dam 40 is located at the right of the second contact roller 38, the second fixed dam 40 and The 4th spring 33 is connected between one support plate 4, the 4th spring 33 is enclosed on the 3rd guide rod 37.
Also include the second guide pin bushing 41, the 5th connecting rod 42 and the 4th guide rod 43, the left surface bottom of the second support plate 5 passes through spiral shell Tether the mode connect and the 5th connecting rod 42 is installed, the left end of the 5th connecting rod 42 is provided with second and led by bolted connection Set 41, the inner sliding type of the second guide pin bushing 41 are provided with the 4th guide rod 43, the left end of the 4th guide rod 43 by bolted connection with net Connected among the right flank of plate 39.
The material of bottom plate 1 is Q235 steel.
First motor 18 is servomotor.
The material of bracing wire 25 is steel wire.
Operation principle:Building sand first is poured into screening frame 8, is started the first motor 18 and is rotated forward, the first motor 18 drives Cam 19 rotates forward, and when the nose of cam 19 turns to left side, the nose of cam 19 promotes circular frame 17 to be moved to the left, circular frame 17 the first guide rods 15 of drive are moved to the left, and then drive the first wedge 16 to be moved to the left, during this, the first contact roller 29 and the contact of incline plane of the first wedge 16 roll, the first contact roller 29 moves down, and the first contact roller 29 drives second to lead Bar 28 moves down, and the 3rd spring 31 stretches, and the second guide rod 28 drives cross bar 32 to move down, and then drives that to beat block 10 downward Mobile, second spring 24 is compressed, and at the same time, when circular frame 17 is moved to the left, bracing wire 25 passes through through hole 11 around two pulleys 21 Screening frame 8 is pulled to move right, slide rail 6 play the guiding role with sliding block 7, and the first spring 22 compresses, when the nose of cam 19 turns When moving to right side, the nose of cam 19 promotes circular frame 17 to move right, and circular frame 17 drives the first guide rod 15 to move right, and enters And drive the first wedge 16 to move right, during this, the first contact roller 29 and the contact of incline plane of the first wedge 16 roll Dynamic, because of the effect of the 3rd spring 31, the first contact roller 29 drives the second guide rod 28 to move up, and the second guide rod 28 drives cross bar 32 move up, and because of the effect of second spring 24, beat block 10 and move up, in the presence of second spring 24, beat block 10 Beat screening frame 8.At the same time, when circular frame 17 moves right, bracing wire 25 is relaxed, because of the effect of the first spring 22, screening Frame 8 is moved to the left, and slide rail 6 play the guiding role with sliding block 7, in cam 19 constantly rotates forward, beats block 10 constantly to screening Building sand in frame 8 is beaten, and screening frame 8, which constantly moves left and right and beats block 10, constantly beats screening frame 8, and building is husky Son is screened to be dropped down by the sieve bottom of screening frame 8, and the building sand screened falls on backgauge bucket 9 and flows into collection frame In 3, the building sand for making screening complete is not fallen out outside collection frame 3, does not produce waste.
Because also include the 4th spring 33, the 4th connecting rod 35, the second wedge 36, the contact of the 3rd guide rod 37, second Roller 38, the fixed dam 40 of web plate 39 and second, the bottom of the second guide rod 28 are provided with the 4th connection by bolted connection Bar 35, the bottom of the 4th connecting rod 35 are provided with the second wedge 36 by bolted connection, and the second wedge 36 is positioned at the The left of one support plate 4, the bottom of the first support plate 4 are provided with the second pilot hole 34, and the inner sliding type of the second pilot hole 34 is provided with the 3rd guide rod 37, the left end of the 3rd guide rod 37 is provided with the second contact roller 38, the second contact roller 38 and second by bolted connection The contact of incline plane of wedge 36, the right-hand member of the 3rd guide rod 37 are provided with web plate 39 by bolted connection, and web plate 39 is set in level Put, web plate 39 is located at the surface of collection frame 3, and web plate 39 is located at immediately below backgauge bucket 9, and the left part of the 3rd guide rod 37 is connected by bolt The mode connect is provided with the second fixed dam 40, and the second fixed dam 40 is located at the right of the second contact roller 38, and second fixes gear Be connected with the 4th spring 33 between the support plate 4 of plate 40 and first, the 4th spring 33 is enclosed on the 3rd guide rod 37, when the second guide rod 28 to When lower mobile, the 4th connecting rod 35 also moves down, and then drives the second wedge 36 to move down, the second contact roller 38 with During the contact of incline plane of second wedge 36 rolls, the second contact roller 38 moves right, and the 3rd guide rod 37 also moves right, the 4th bullet Spring 33 compresses, and then drives web plate 39 to move right, similarly, when the second guide rod 28 moves up, because of the work of the 4th spring 33 With web plate 39 is moved to the left, and during this, web plate 39 constantly moves left and right, and the building sand screened is further screened.
Because also including the second guide pin bushing 41, the 5th connecting rod 42 and the 4th guide rod 43, the left surface bottom of the second support plate 5 leads to Cross bolted mode and the 5th connecting rod 42 is installed, the left end of the 5th connecting rod 42 is provided with by bolted connection Two guide pin bushings 41, the inner sliding type of the second guide pin bushing 41 are provided with the 4th guide rod 43, and the left end of the 4th guide rod 43 is by bolted connection With being connected among the right flank of web plate 39, during web plate 39 moves left and right, web plate 39 drives the 4th guide rod 43 in guide pin bushing Move left and right, so make web plate 39 more steady during moving left and right.
Because the material of bottom plate 1 is Q235 steel, the weight capacity of Q235 steel is strong, acidproof corrosion-resistant, adds the longevity of bottom plate 1 Life.
Because the first motor 18 is servomotor, servomotor can more be accurately controlled rotating speed, make operation more steady.
Because the material of bracing wire 25 is steel wire, steel wire antiseptic property is excellent, is not easy to break.
Embodiment described above only expresses preferred embodiment of the present utility model, and its description is more specific and detailed, But therefore it can not be interpreted as the limitation to the utility model patent scope.It should be pointed out that for the common of this area For technical staff, without departing from the inventive concept of the premise, some deformations can also be made, improves and substitutes, these are all Belong to the scope of protection of the utility model.Therefore, the protection domain of the utility model patent should be determined by the appended claims.

Claims (6)

1. one kind building special screening installation of sand, it is characterised in that bottom plate(1), left plate(2), collection frame(3), first Plate(4), the second support plate(5), slide rail(6), sliding block(7), screening frame(8), backgauge bucket(9), beat block(10), top plate(12), One connecting rod(13), the first guide pin bushing(14), the first guide rod(15), the first wedge(16), circular frame(17), the first motor (18), cam(19), the second connecting rod(20), pulley(21), the first spring(22), the 3rd connecting rod(23), second spring (24), bracing wire(25), transverse slat(26), the second guide rod(28), the first contact roller(29), the first fixed dam(30), the 3rd bullet Spring(31)And cross bar(32), bottom plate(1)Top passes sequentially through bolted mode and is provided with left plate from left to right(2), One support plate(4), collection frame(3)With the second support plate(5), left plate(2), the first support plate(4)With the second support plate(5)All it is in set vertically Put, the first support plate(4)Right flank top is provided with slide rail by bolted connection(6), slide rail(6)It is provided with and coordinates with it Sliding block(7), slide rail(6)With sliding block(7)It is slidably matched, bottom plate(1)Top be provided with screening frame(8), screening frame(8)Bottom is It is netted, screening frame(8)Bottom left by bolted connection with sliding block(7)Top connects, the second support plate(5)Top is provided with Through hole(11), the second support plate(5)Left surface top and screening frame(8)The first spring is connected between right flank(22), second Plate(5)Right flank top is provided with the 3rd connecting rod by bolted connection(23), the 3rd connecting rod(23)Set for level Put, the 3rd connecting rod(23)Positioned at through hole(11)Upper right side, the first support plate(4)With the second support plate(5)Between be provided with backgauge bucket (9), backgauge bucket(9)Positioned at slide rail(6)Lower section, backgauge bucket(9)Positioned at collection frame(3)Surface, left plate(2)Top passes through spiral shell Tether the mode connect and top plate is installed(12), top plate(12)Bottom right is provided with the second connecting rod by bolted connection (20), the second connecting rod(20)Bottom and the 3rd connecting rod(23)Right-hand member is all provided with pulley by bolted connection (21), top plate(12)Bottom left is provided with head rod by bolted connection(13), head rod(13)Bottom End is provided with the first guide pin bushing by bolted connection(14), the first guide pin bushing(14)Inner sliding type is provided with the first guide rod (15), the first guide rod(15)Left end is provided with the first wedge by bolted connection(16), the first guide rod(15)Right-hand member Circular frame is installed by bolted connection(17), circular frame(17)Bracing wire is connected among right flank(25), bracing wire (25)Around two pulleys(21)Pass through through hole(11)With screening frame(8)Connected among right flank, pass through bolt among top base The mode of connection is provided with the first motor(18), the first motor(18)Positioned at circular frame(17)Rear, the first motor(18)It is defeated Cam is connected with by shaft coupling on shaft(19), cam(19)Positioned at circular frame(17)It is interior, cam(19)With circular frame(17) Coordinate, left plate(2)Right flank top is provided with transverse slat by bolted connection(26), transverse slat(26)Right side is provided with first Pilot hole(27), the first pilot hole(27)Inner sliding type is provided with the second guide rod(28), the second guide rod(28)Top passes through bolt The mode of connection is provided with the first contact roller(29), the first contact roller(29)With the first wedge(16)Contact of incline plane, the Two guide rods(28)Bottom is provided with the first fixed dam by bolted connection(30), the first fixed dam(30)With transverse slat (26)Between be connected with the 3rd spring(31), the second guide rod(28)Cross bar is installed by bolted connection on the right side of bottom (32), cross bar(32)Bottom right is connected with second spring(24), second spring(24)Bottom be connected with and beat block(10), strike Block hitting(10)Positioned at screening frame(8)Surface.
2. a kind of building special screening installation of sand according to claim 1, it is characterised in that also include the 4th spring (33), the 4th connecting rod(35), the second wedge(36), the 3rd guide rod(37), the second contact roller(38), web plate(39)With Two fixed dams(40), the second guide rod(28)Bottom is provided with the 4th connecting rod by bolted connection(35), the 4th connects Extension bar(35)Bottom is provided with the second wedge by bolted connection(36), the second wedge(36)Positioned at the first support plate (4)Left, the first support plate(4)Bottom is provided with the second pilot hole(34), the second pilot hole(34)Inner sliding type is led provided with the 3rd Bar(37), the 3rd guide rod(37)Left end is provided with the second contact roller by bolted connection(38), the second contact roller (38)With the second wedge(36)Contact of incline plane, the 3rd guide rod(37)Right-hand member is provided with web plate by bolted connection (39), web plate(39)In horizontally disposed, web plate(39)Positioned at collection frame(3)Surface, web plate(39)Positioned at backgauge bucket(9)Just Lower section, the 3rd guide rod(37)Left part is provided with the second fixed dam by bolted connection(40), the second fixed dam (40)Positioned at the second contact roller(38)Right, the second fixed dam(40)With the first support plate(4)Between be connected with the 4th spring (33), the 4th spring(33)It is enclosed on the 3rd guide rod(37)On.
3. a kind of building special screening installation of sand according to claim 2, it is characterised in that also include the second guide pin bushing (41), the 5th connecting rod(42)With the 4th guide rod(43), the second support plate(5)Install by bolted connection left surface bottom There is the 5th connecting rod(42), the 5th connecting rod(42)Left end is provided with the second guide pin bushing by bolted connection(41), second Guide pin bushing(41)Inner sliding type is provided with the 4th guide rod(43), the 4th guide rod(43)Left end by bolted connection with web plate (39)Connected among right flank.
A kind of 4. building special screening installation of sand according to claim 3, it is characterised in that bottom plate(1)Material be Q235 steel.
A kind of 5. building special screening installation of sand according to claim 4, it is characterised in that the first motor(18)To watch Take motor.
A kind of 6. building special screening installation of sand according to claim 5, it is characterised in that bracing wire(25)Material be Steel wire.
CN201720164010.8U 2017-02-23 2017-02-23 One kind building special screening installation of sand Expired - Fee Related CN206701673U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720164010.8U CN206701673U (en) 2017-02-23 2017-02-23 One kind building special screening installation of sand

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720164010.8U CN206701673U (en) 2017-02-23 2017-02-23 One kind building special screening installation of sand

Publications (1)

Publication Number Publication Date
CN206701673U true CN206701673U (en) 2017-12-05

Family

ID=60469099

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720164010.8U Expired - Fee Related CN206701673U (en) 2017-02-23 2017-02-23 One kind building special screening installation of sand

Country Status (1)

Country Link
CN (1) CN206701673U (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108160444A (en) * 2017-12-11 2018-06-15 长沙德科投资管理咨询有限公司 A kind of swing building sand screening plant
CN108273725A (en) * 2018-01-22 2018-07-13 深圳市晟腾企业管理有限公司 A kind of municipal works Sand screen
CN108296162A (en) * 2018-01-19 2018-07-20 南昌叁润科技有限公司 A kind of finishing sand dusting cover optional equipment
CN108325833A (en) * 2018-01-12 2018-07-27 袁萍 A kind of sub- screening installation of finishing fine sand
CN108325838A (en) * 2018-01-22 2018-07-27 深圳市晟腾企业管理有限公司 A kind of construction Sand screen
CN108355948A (en) * 2017-12-30 2018-08-03 铜陵日科电子有限责任公司 A kind of screening plant of quartz crystal
CN108487000A (en) * 2018-03-09 2018-09-04 高子逸 A kind of road construction powder, which is efficiently spread, spills equipment
CN108529033A (en) * 2018-03-30 2018-09-14 刘桂兰 A kind of architectural engineering sand screening installation
CN110721518A (en) * 2019-11-11 2020-01-24 徐州杰汇环保科技有限公司 Quick primary filter device of merchant's concrete sewage
CN112275428A (en) * 2020-09-28 2021-01-29 柳州衍生科技有限公司 Portable crushing screening all-in-one of cordwood system
CN113210250A (en) * 2021-05-25 2021-08-06 福建自然天纯健康产业有限公司 Processing equipment for dietary nutrition rice

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108160444A (en) * 2017-12-11 2018-06-15 长沙德科投资管理咨询有限公司 A kind of swing building sand screening plant
CN108355948A (en) * 2017-12-30 2018-08-03 铜陵日科电子有限责任公司 A kind of screening plant of quartz crystal
CN108325833A (en) * 2018-01-12 2018-07-27 袁萍 A kind of sub- screening installation of finishing fine sand
CN108296162A (en) * 2018-01-19 2018-07-20 南昌叁润科技有限公司 A kind of finishing sand dusting cover optional equipment
CN108273725B (en) * 2018-01-22 2020-04-14 湖北倬晟建设工程有限公司 Screening sand device for municipal works
CN108273725A (en) * 2018-01-22 2018-07-13 深圳市晟腾企业管理有限公司 A kind of municipal works Sand screen
CN108325838A (en) * 2018-01-22 2018-07-27 深圳市晟腾企业管理有限公司 A kind of construction Sand screen
CN108487000A (en) * 2018-03-09 2018-09-04 高子逸 A kind of road construction powder, which is efficiently spread, spills equipment
CN108487000B (en) * 2018-03-09 2020-06-26 广西现代路桥工程有限责任公司 High-efficient powder spreading and sprinkling equipment for road construction
CN108529033B (en) * 2018-03-30 2019-11-22 浙江方圆市政工程有限公司 A kind of architectural engineering sand screening installation
CN108529033A (en) * 2018-03-30 2018-09-14 刘桂兰 A kind of architectural engineering sand screening installation
CN110721518A (en) * 2019-11-11 2020-01-24 徐州杰汇环保科技有限公司 Quick primary filter device of merchant's concrete sewage
CN112275428A (en) * 2020-09-28 2021-01-29 柳州衍生科技有限公司 Portable crushing screening all-in-one of cordwood system
CN113210250A (en) * 2021-05-25 2021-08-06 福建自然天纯健康产业有限公司 Processing equipment for dietary nutrition rice
CN113210250B (en) * 2021-05-25 2022-06-21 福建自然天纯健康产业有限公司 Processing equipment for dietary nutrition rice

Similar Documents

Publication Publication Date Title
CN206701673U (en) One kind building special screening installation of sand
CN206613967U (en) A kind of making apparatus for L-type steel muscle
CN107715984A (en) A kind of building materials crushing material screening installation
CN207324925U (en) A kind of traffic bridge cement block breaker
CN206325603U (en) A kind of useless brick efficiency crushing device of building wall material
CN107115924A (en) A kind of mining industry ore efficiency crushing device
CN107138393A (en) A kind of bridge sand screening plant
CN107335609A (en) A kind of quick screening installation of highway construction sand
CN107042457A (en) A kind of reinforced bar rust cleaning equipment for bridge construction
CN107175198A (en) A kind of Bridge guardrail casting and constructing concrete raw material fast screening devices
CN107252767A (en) A kind of Bridge guardrail cast crosses sieve apparatus with sand multistage
CN107321606A (en) A kind of bridge raw material high frequency zone equipment
CN107716457A (en) A kind of hardware production high effect dust cleaner
CN206810382U (en) A kind of mining industry ore efficiency crushing device
CN107138385A (en) A kind of Bridge guardrail cast efficient sieving equipment of sand
CN107971781A (en) A kind of gray cast iron production machine table
CN207071519U (en) A kind of bridge sand screening plant
CN208415229U (en) A kind of hydraulic engineering levee foundation compaction apparatus
CN107225624B (en) A kind of bridge construction sawing apparatus
CN103470226B (en) High-efficiency and energy-saving type is without beam type double-well pumping unit
CN201902199U (en) Power combined type oil pumping machine with ultra long stroke for a plurality of wells
CN107671295A (en) A kind of metallurgical powder Making mold device
CN205521751U (en) Building templates cutting device
CN109939775B (en) Coal washing device with anti-blocking function
CN207086287U (en) A kind of bridge sand screening plant

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20191112

Address after: 102605 1000m south of village committee, shizhouying village, Qingyundian Town, Daxing District, Beijing (BUNGALOW)

Patentee after: Beijing Xingsheng environmental treatment Co., Ltd

Address before: No. 100, Fujian, Quanzhou City, Quangang District, new mansion community

Patentee before: Zeng Chengzhu

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171205

Termination date: 20210223

CF01 Termination of patent right due to non-payment of annual fee