CN206700995U - A kind of Novel flue gas pretreatment system - Google Patents
A kind of Novel flue gas pretreatment system Download PDFInfo
- Publication number
- CN206700995U CN206700995U CN201720556703.1U CN201720556703U CN206700995U CN 206700995 U CN206700995 U CN 206700995U CN 201720556703 U CN201720556703 U CN 201720556703U CN 206700995 U CN206700995 U CN 206700995U
- Authority
- CN
- China
- Prior art keywords
- flue gas
- spray
- arc plate
- support beam
- pretreatment system
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Treating Waste Gases (AREA)
Abstract
A kind of Novel flue gas pretreatment system, including cylinder, set spray equipment in cylinder;Spray equipment includes:Some support beams laterally are equipped with, support beam both ends are fixed on an arm;In support beam upper surface, some spray pipings are longitudinally equipped with, the tube wall top of spray piping offers several nozzles;The top of spray piping is covered with arc plate, and arc plate radius is more than the radius of spray piping;In cylinder, more than one layer spray equipment is provided with, the arc plate in adjacent two layers is staggered;Spray equipment is horizontal, be arranged in parallel, and between support beam, between spray piping, between arc plate, impartial spacing is regularly arranged.Its advantage is:Its is simple in construction, occupies little space, and input cost is low.It can reduce in flue gas 30% dust content, reduce the dust collecting electrode area of wet cottrell, substantially reduce the input and operating cost of wet cottrell;The utility model can also play uniform effect to flue gas, can replace original gas guide board.
Description
Technical field
The utility model belongs to industrial smoke abatement equipment technical field, and in particular to a kind of Novel flue gas pretreatment system
System.
Background technology
Flue gas pretreatment system, which is widely used in steam power plant, steel mill etc., needs the industry of smoke gas treatment.Mainly it is final
Discharge provides a pretreatment, reduces the operating pressure of flue gas final process equipment.The minimum discharge of national requirements flue gas at present,
Original discharge numerical value can not meet discharge standard, it is necessary to which flue gas is further processed.Especially haze is tighter in recent years
Weight, require more strict for the dust emission in flue gas, many local requirements soot emissions reach 5mg/Nm3.Wet electrostatic
Deduster is can effectively to catch one of capital equipment of dust in flue gas, and the equipment major defect is cost of investment and operation
Expense is all very high.The height of dust content has direct relation in the size and flue gas of wet cottrell specification, if into
The dust content of wet cottrell is high, then needs to increase the area of its dust collecting electrode, so as to increase input cost.Many enterprises
Industry is abandoned setting up wet cottrell, can only face stopping production;Also many enterprises are even mounted with wet cottrell,
Because operating cost is too high, also seldom operation, performs practically no function.At present also have many production units can wet cottrell it
Before set up flue gas pretreatment system, but its pretreatment system is complicated so that whole Meteorological, goes up not down.Existing flue gas
Pretreatment system mainly has tower body, spraying layer, and supporting water pump and circulatory pool form, and the effect for reducing Dust Capacity is brighter
It is aobvious.But prior art causes substantial amounts of resource wave to be continuously increased tower body height and spray flux to realize pretreating effect
Take.In addition, substantial amounts of spray to carry substantial amounts of water smoke in flue gas, wet electric operating load may be increased.
Utility model content
The technical problems to be solved in the utility model is:Overcome the deficiencies in the prior art, there is provided a kind of device structure is simple,
Occupy little space, the Novel flue gas pretreatment system that efficiency of dust collection is high, input is low with operating cost.
Technical scheme is used by the utility model solves its technical problem:A kind of Novel flue gas pretreatment system, its
It is characterised by:Including a cylinder, a spray equipment is set in the cylinder;The spray equipment includes:Laterally laying support
Beam, the support beam both ends are fixed on an arm;In the support beam, some spray pipings, the spray are longitudinally equipped with
The tube wall top in shower pipe road offers several nozzles;The top of the spray piping is covered with arc plate.
Preferably, the arc plate radius is more than the radius of the spray piping.
Preferably, in the cylinder, it is provided with one layer of spray equipment described above.
Preferably, the arc plate in adjacent two layers is staggered.
Preferably, the spray equipment is horizontal, be arranged in parallel.
Preferably, between the support beam, between the spray piping, between the arc plate, impartial spacing is regularly arranged.
Compared with prior art, the beneficial effects of the utility model are:The utility model is simple in construction, occupies little space,
Input cost is low.It can reduce in flue gas 30% dust content, reduce the dust collecting electrode area of wet cottrell, significantly
Reduce the input and operating cost of wet cottrell;The utility model can also play uniform effect to flue gas, can generation
For original gas guide board.
Brief description of the drawings
Fig. 1 is the structural representation of the utility model embodiment;
Fig. 2 is the enlarged drawing at A in Fig. 1.
In figure mark for:
1st, cylinder;2nd, support beam;3rd, spray piping;4th, nozzle;5th, arc plate.
Embodiment
Embodiment below in conjunction with the accompanying drawings, the utility model is described further:
Embodiment one
As shown in Figure 1, 2, a kind of Novel flue gas pretreatment system, including cylinder 1, in cylinder 1, two layers of spray dress is set
Put;Spray equipment includes, and is laterally equipped with some support beams 2, and the both ends of support beam 2 are fixed on an arm;In support beam 2
Surface, is longitudinally equipped with some spray pipings 3, and the tube wall top of spray piping 3 offers several nozzles 4;Every spray
The top of pipeline 3 is covered with arc plate 5, and the radius of every arc plate 5 is all higher than the radius of spray piping 3, to ensure in arc plate 5
Surface has 110% flushing coverage rate.
Arc plate in each layer be arranged in parallel, and the arc plate 5 in upper and lower two layers is staggered;Between each bar support beam 2, each bar
It is equidistantly regularly arranged between spray piping 3, between each arc plate 5.
The course of work of the present utility model is as follows:
As shown in Figure 1, 2, in the entry position of wet cottrell, gas approach and wet cottrell are utilized
Connection space or the border region using desulfurizing tower and wet cottrell, the utility model is installed;Arc plate 5 is arranged on
In support beam 2, then nozzle 4 is set on the arranged beneath spray piping 3 of arc plate 5, spray piping 3, ensures the inner surface of arc plate 5
It is provided with 110% or more flushing coverage rate.Flue gas is flowed out by desulfurizing tower, is entered first before into wet cottrell
Enter arc plate 5, the arc plate 5 that flue gas passes through in lower floor is turned back away, subsequently into the arc plate 5 in upper strata, by the flue gas of pretreatment
Wet cottrell body is directly entered, is further processed.So, before flue gas enters wet cottrell,
Go out to be additionally arranged two layers of arc plate 5 and its auxiliary equipment in gas approach, flue gas is pre-processed.The inwall of arc plate 5 is needed into
Row periodic flushing, avoid internal deposition dust excessive, be again introduced into flue gas, cause secondary pollution.
It is described above, only it is preferred embodiment of the present utility model, is not that other forms are made to the utility model
Limitation, any person skilled in the art is changed or is modified as possibly also with the technology contents of the disclosure above equivalent
The equivalent embodiment of change.But it is every without departing from the content of the technical scheme of the utility model, it is real according to technology of the present utility model
Any simple modification, equivalent variations and the remodeling that confrontation above example is made, still fall within the guarantor of technical solutions of the utility model
Protect scope.
Claims (6)
- A kind of 1. Novel flue gas pretreatment system, it is characterised in that:Including a cylinder, a spray dress is set in the cylinder Put;The spray equipment includes:The support beam laterally laid, the support beam both ends are fixed on an arm;In the support beam On, some spray pipings are longitudinally equipped with, the tube wall top of the spray piping offers several nozzles;The shower The top in road is covered with arc plate.
- 2. Novel flue gas pretreatment system according to claim 1, it is characterised in that:The arc plate radius is more than the spray The radius in shower pipe road.
- 3. Novel flue gas pretreatment system according to claim 1 or 2, it is characterised in that:In the cylinder, it is provided with One layer of spray equipment described above.
- 4. Novel flue gas pretreatment system according to claim 3, it is characterised in that:The arc plate in adjacent two layers is handed over Mistake is set.
- 5. Novel flue gas pretreatment system according to claim 4, it is characterised in that:The spray equipment is horizontal, parallel Set.
- 6. Novel flue gas pretreatment system according to claim 5, it is characterised in that:Between the support beam, the spray Between shower pipe road, between the arc plate, impartial spacing is regularly arranged.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720556703.1U CN206700995U (en) | 2017-05-19 | 2017-05-19 | A kind of Novel flue gas pretreatment system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720556703.1U CN206700995U (en) | 2017-05-19 | 2017-05-19 | A kind of Novel flue gas pretreatment system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206700995U true CN206700995U (en) | 2017-12-05 |
Family
ID=60464902
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720556703.1U Active CN206700995U (en) | 2017-05-19 | 2017-05-19 | A kind of Novel flue gas pretreatment system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206700995U (en) |
-
2017
- 2017-05-19 CN CN201720556703.1U patent/CN206700995U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP3255000B1 (en) | Arrangement structure of stacker device | |
CN204865457U (en) | Wet flue gas desulfurization carries torrent pipe bars device and desulfurization absorption tower of effect | |
CN205288078U (en) | Flue gas thick liquid distributes again sprays desulfurization dust collector | |
CN206535419U (en) | A kind of high-efficiency desulfurization absorption tower spray equipment | |
CN206700995U (en) | A kind of Novel flue gas pretreatment system | |
CN203609991U (en) | Desulphurization, flue gas pretreatment and efficiency increase integrated device | |
CN204841404U (en) | Wet flue gas desulfurization carries torrent pipe bars device and desulfurization absorption tower of effect | |
CN208287715U (en) | A kind of helical blade type even gas distribution device | |
CN106000065A (en) | Multilayer dished liquid collector used in single-column dual-cycle flue gas desulfurization process | |
CN206519023U (en) | The white dirt integrated apparatus of flue gas desulfurization | |
CN105477999A (en) | Liquid collecting device arranged in single-tower double-circulation desulfurization spray tower | |
CN208678681U (en) | A kind of flue gas condensing and dust removal integrated plant | |
CN108889097A (en) | A kind of novel calcining desulphurization plant and its working method | |
CN209802185U (en) | High-pressure water washing device and cleaning device for boiler water-cooled wall | |
CN203687663U (en) | Wet desulphurization smoke inlet guiding cooling device | |
CN203507738U (en) | Waste gas purifier | |
CN207071329U (en) | A kind of absorption tower slurries spray equipment for power plant's wet desulphurization | |
CN204601897U (en) | A kind of iron oxide red exhaust treatment system | |
CN215311095U (en) | Waste incineration fly ash treatment equipment | |
CN205815460U (en) | A kind of multilamellar dish liquid trap in single column Two-way Cycle flue gas desulfurization technique | |
CN204141604U (en) | Outer circulation chimney for wet flue gas desulfurization | |
CN204891596U (en) | Wet flue gas desulfurization tower entry flue gas equipartition device | |
CN204672130U (en) | The interactive spray system of fume desulfurating absorption tower | |
CN217909584U (en) | Waste water recycling system that electrolytic aluminum flue gas desulfurization produced | |
CN219128721U (en) | Online dust fall guide and guard device of short stress rolling mill |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |