CN206697838U - Line maintenance aerial work platform - Google Patents

Line maintenance aerial work platform Download PDF

Info

Publication number
CN206697838U
CN206697838U CN201720585229.5U CN201720585229U CN206697838U CN 206697838 U CN206697838 U CN 206697838U CN 201720585229 U CN201720585229 U CN 201720585229U CN 206697838 U CN206697838 U CN 206697838U
Authority
CN
China
Prior art keywords
platform
aerial work
railing
work platform
columns
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720585229.5U
Other languages
Chinese (zh)
Inventor
宋枭润
严玲娟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yichang Power Supply Co of State Grid Hubei Electric Power Co Ltd
State Grid Corp of China SGCC
Original Assignee
Yichang Power Supply Co of State Grid Hubei Electric Power Co Ltd
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yichang Power Supply Co of State Grid Hubei Electric Power Co Ltd, State Grid Corp of China SGCC filed Critical Yichang Power Supply Co of State Grid Hubei Electric Power Co Ltd
Priority to CN201720585229.5U priority Critical patent/CN206697838U/en
Application granted granted Critical
Publication of CN206697838U publication Critical patent/CN206697838U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Ladders (AREA)

Abstract

The utility model discloses line maintenance aerial work platform, it includes four root posts, job platform is installed at the top of the column, the both sides of the job platform are separately installed with the first railing and the second railing, cat ladder is installed between two columns, the bottom of the cat ladder is fixed on the side of job platform on the transverse reinforced bar between column at the top of the cat ladder;Rotation extendable platform is rotatably installed in operation horizontal edge of table.This aerial work platform can facilitate maintainer to carry out operation of climbing to a higher point, and conveniently be overhauled at the top of platform, can play the purpose of protection.

Description

线路检修高空作业平台Line maintenance aerial work platform

技术领域technical field

本实用新型涉及线路检修装置领域,具体涉及线路检修高空作业平台。The utility model relates to the field of line maintenance devices, in particular to a high-altitude operation platform for line maintenance.

背景技术Background technique

在进行高空输电线路检修过程中,需要登高进行作业,传统的登高采用爬梯或者登高鞋进行攀高作业,上述的检修过程存在着安全隐患,而且没有保护措施,而且采用爬梯作业,不便于进行线路维修。In the process of overhauling high-altitude transmission lines, it is necessary to climb up to carry out operations. Traditionally, climbing ladders or climbing shoes are used for climbing operations. The above-mentioned overhaul process has potential safety hazards, and there are no protective measures, and ladder operations are used, which is not convenient for line maintenance. .

实用新型内容Utility model content

本实用新型提供了线路检修高空作业平台,此高空作业平台能够方便检修人员进行攀高作业,而且在平台的顶部方便进行检修,能够起到保护的目的。The utility model provides a high-altitude operation platform for line maintenance. The high-altitude operation platform can facilitate maintenance personnel to carry out climbing operations, and is convenient for maintenance at the top of the platform, and can achieve the purpose of protection.

为了解决上述技术问题,本实用新型提出以下技术方案:线路检修高空作业平台,它包括四根立柱,所述立柱的顶部安装有作业平台,所述作业平台的两侧分别安装有第一栏杆和第二栏杆,两个所述立柱之间安装有爬梯,所述爬梯的底部位于立柱之间的横向加强杆上,所述爬梯的顶部固定在作业平台的侧面;在作业平台的边缘可转动的安装有转动延伸平台。In order to solve the above-mentioned technical problems, the utility model proposes the following technical solutions: the aerial work platform for line maintenance, which includes four columns, the top of the columns is equipped with a working platform, and the two sides of the working platform are respectively equipped with first railings and The second railing, a ladder is installed between the two columns, the bottom of the ladder is located on the transverse reinforcement bar between the columns, and the top of the ladder is fixed on the side of the work platform; Installed with rotating extension platform.

所述立柱的底部安装有垫脚。Footings are installed at the bottom of the column.

所述立柱之间安装有横向加强杆和纵向加强杆。Transverse reinforcing rods and longitudinal reinforcing rods are installed between the columns.

所述立柱和作业平台之间固定有斜加强杆。An oblique reinforcement bar is fixed between the column and the working platform.

所述第一栏杆和第二栏杆通过固定片固定安装在作业平台的两侧壁上。The first railing and the second railing are fixedly installed on the two side walls of the working platform through the fixing piece.

所述作业平台包括平台骨架,所述平台骨架与立柱固定相连,所述平台骨架的顶部固定有平台底板。The working platform includes a platform frame, the platform frame is fixedly connected with the column, and the platform bottom plate is fixed on the top of the platform frame.

所述转动延伸平台通过销轴座铰接在作业平台的侧壁上,所述转动延伸平台的另一端固定有第一吊环,所述第一吊环通过连接绳与第二吊环相连,所述第二吊环固定安装在第一栏杆的立杆上。The rotating extension platform is hinged on the side wall of the working platform through the pin shaft seat, and the other end of the rotating extension platform is fixed with a first suspension ring, and the first suspension ring is connected with the second suspension ring through a connecting rope, and the second suspension ring is fixed on the other end of the rotation extension platform. The suspension ring is fixedly installed on the vertical pole of the first railing.

本实用新型有如下有益效果:The utility model has the following beneficial effects:

1、当需要对线路进行检修时,将作业平台移动到需要检修的线路位置,然后作业人员通过爬梯爬上到作业平台上,作业人员在作业平台上对线路进行检修。1. When it is necessary to overhaul the line, move the operation platform to the position of the line that needs to be overhauled, and then the operator climbs up to the operation platform through the ladder, and the operator overhauls the line on the operation platform.

2、如果作业范围不够,可以通过放下转动延伸平台,此时转动延伸平台的末端连接绳将保持转动延伸平台处于水平状态。2. If the working range is not enough, you can put down the rotating extension platform. At this time, the connecting rope at the end of the rotating extension platform will keep the rotating extension platform in a horizontal state.

3、通过斜加强杆能够增强整个作业平台的稳定性。3. The stability of the entire working platform can be enhanced through the inclined reinforcing rod.

4、通过第一栏杆和第二栏杆能够对作业平台上的操作人员进行保护,进而保证了操作人员的安全。4. The operators on the working platform can be protected through the first railing and the second railing, thereby ensuring the safety of the operators.

附图说明Description of drawings

下面结合附图和实施例对本实用新型作进一步说明。Below in conjunction with accompanying drawing and embodiment the utility model is further described.

图1是本实用新型第一视角整体结构示意图。Fig. 1 is a schematic view of the overall structure of the utility model at a first viewing angle.

图2是本实用新型第二视角整体结构示意图。Fig. 2 is a schematic diagram of the overall structure of the utility model at a second viewing angle.

图3是本实用新型第三视角整体结构示意图。Fig. 3 is a schematic diagram of the overall structure of the utility model at a third viewing angle.

图中:垫脚1、立柱2、爬梯3、斜加强杆4、作业平台5、第一栏杆6、第二栏杆7、第二吊环8、连接绳9、第一吊环10、转动延伸平台11、固定片12、横向加强杆13、纵向加强杆14、销轴座15、平台骨架16。In the figure: stepping foot 1, column 2, climbing ladder 3, inclined reinforcing bar 4, working platform 5, first railing 6, second railing 7, second ring 8, connecting rope 9, first ring 10, rotating extension platform 11, Fixed piece 12, transverse reinforcing bar 13, longitudinal reinforcing bar 14, pin seat 15, platform skeleton 16.

具体实施方式detailed description

下面结合附图对本实用新型的实施方式做进一步的说明。Embodiments of the present utility model will be further described below in conjunction with the accompanying drawings.

如图1-3所示,线路检修高空作业平台,它包括四根立柱2,所述立柱2的顶部安装有作业平台5,所述作业平台5的两侧分别安装有第一栏杆6和第二栏杆7,两个所述立柱2之间安装有爬梯3,所述爬梯3的底部位于立柱2之间的横向加强杆13上,所述爬梯3的顶部固定在作业平台5的侧面;在作业平台5的边缘可转动的安装有转动延伸平台11。As shown in Figure 1-3, the aerial work platform for line maintenance includes four columns 2, and the top of the column 2 is equipped with a working platform 5, and the two sides of the working platform 5 are respectively equipped with a first railing 6 and a second railing. Two railings 7, a ladder 3 is installed between the two columns 2, the bottom of the ladder 3 is located on the transverse reinforcement bar 13 between the columns 2, and the top of the ladder 3 is fixed on the side of the work platform 5; A rotating extension platform 11 is rotatably installed on the edge of the working platform 5 .

进一步的,所述立柱2的底部安装有垫脚1。Further, feet 1 are installed on the bottom of the column 2 .

进一步的,所述立柱2之间安装有横向加强杆13和纵向加强杆14。通过加强杆能够保证作业平台的稳定性。Further, transverse reinforcement bars 13 and longitudinal reinforcement bars 14 are installed between the columns 2 . The stability of the working platform can be ensured by the reinforcing bar.

进一步的,所述立柱2和作业平台之间固定有斜加强杆4。通过斜加强杆4能够增强整个作业平台的稳定性。Further, an oblique reinforcement bar 4 is fixed between the column 2 and the working platform. The stability of the entire working platform can be enhanced by the inclined reinforcing rod 4 .

进一步的,所述第一栏杆6和第二栏杆7通过固定片12固定安装在作业平台5的两侧壁上。能够对作业平台上的操作人员进行保护,进而保证了操作人员的安全。Further, the first railing 6 and the second railing 7 are fixedly installed on the two side walls of the working platform 5 through the fixing piece 12 . The operator on the working platform can be protected, thereby ensuring the safety of the operator.

进一步的,所述作业平台5包括平台骨架16,所述平台骨架16与立柱2固定相连,所述平台骨架16的顶部固定有平台底板。Further, the working platform 5 includes a platform frame 16, which is fixedly connected to the column 2, and a platform bottom plate is fixed on the top of the platform frame 16.

进一步的,所述转动延伸平台11通过销轴座15铰接在作业平台5的侧壁上,所述转动延伸平台11的另一端固定有第一吊环10,所述第一吊环10通过连接绳9与第二吊环8相连,所述第二吊环8固定安装在第一栏杆6的立杆上。通过所述转动延伸平台11能够扩大检修人员的作业范围。Further, the rotating extension platform 11 is hinged on the side wall of the working platform 5 through a pin seat 15, and the other end of the rotating extending platform 11 is fixed with a first suspension ring 10, and the first suspension ring 10 is connected by a connecting rope 9 It is connected with the second suspension ring 8, and the second suspension ring 8 is fixedly installed on the vertical pole of the first railing 6. The working scope of maintenance personnel can be enlarged by the rotating extension platform 11 .

本实用新型的工作过程和工作原理:Working process and working principle of the present utility model:

首先,当需要对线路进行检修时,将作业平台移动到需要检修的线路位置;First, when the line needs to be overhauled, the work platform is moved to the position of the line that needs to be overhauled;

然后,作业人员通过爬梯3爬上到作业平台5上,作业人员在作业平台5上对线路进行检修;Then, the operator climbs up to the work platform 5 through the ladder 3, and the operator overhauls the circuit on the work platform 5;

如果作业范围不够时,可以通过放下转动延伸平台11,通过末端连接绳9将保持转动延伸平台11处于水平状态,此时作业人员将通过转动延伸平台11到达前端,进而方便了检修过程。If the scope of work is not enough, you can put down the rotating extension platform 11, and the connecting rope 9 at the end will keep the rotating extension platform 11 in a horizontal state.

通过上述的说明内容,本领域技术人员完全可以在不偏离本项实用新型技术思想的范围内,进行多样的变更以及修改都在本实用新型的保护范围之内。本实用新型的未尽事宜,属于本领域技术人员的公知常识。Through the above description, those skilled in the art can make various changes and modifications without departing from the technical idea of the utility model, all of which are within the protection scope of the utility model. Unfinished matters of the utility model belong to the common knowledge of those skilled in the art.

Claims (7)

1.线路检修高空作业平台,其特征在于:它包括四根立柱(2),所述立柱(2)的顶部安装有作业平台(5),所述作业平台(5)的两侧分别安装有第一栏杆(6)和第二栏杆(7),两个所述立柱(2)之间安装有爬梯(3),所述爬梯(3)的底部位于立柱(2)之间的横向加强杆(13)上,所述爬梯(3)的顶部固定在作业平台(5)的侧面;在作业平台(5)的边缘可转动的安装有转动延伸平台(11)。1. The aerial work platform for line maintenance is characterized in that it includes four columns (2), the top of the columns (2) is equipped with a working platform (5), and the two sides of the working platform (5) are respectively installed with The first railing (6) and the second railing (7), a ladder (3) is installed between the two columns (2), and the bottom of the ladder (3) is located at the transverse reinforcement bar between the columns (2) (13), the top of the ladder (3) is fixed on the side of the working platform (5); a rotating extension platform (11) is rotatably installed on the edge of the working platform (5). 2.根据权利要求1所述的线路检修高空作业平台,其特征在于:所述立柱(2)的底部安装有垫脚(1)。2. The aerial work platform for line maintenance according to claim 1, characterized in that: feet (1) are installed on the bottom of the column (2). 3.根据权利要求1所述的线路检修高空作业平台,其特征在于:所述立柱(2)之间安装有横向加强杆(13)和纵向加强杆(14)。3. The aerial work platform for line inspection and maintenance according to claim 1, characterized in that: transverse reinforcing bars (13) and longitudinal reinforcing bars (14) are installed between the columns (2). 4.根据权利要求1所述的线路检修高空作业平台,其特征在于:所述立柱(2)和作业平台之间固定有斜加强杆(4)。4. The aerial work platform for line inspection and maintenance according to claim 1, characterized in that: an oblique reinforcing rod (4) is fixed between the column (2) and the work platform. 5.根据权利要求1所述的线路检修高空作业平台,其特征在于:所述第一栏杆(6)和第二栏杆(7)通过固定片(12)固定安装在作业平台(5)的两侧壁上。5. The aerial work platform for line maintenance according to claim 1, characterized in that: the first railing (6) and the second railing (7) are fixedly installed on the two sides of the working platform (5) through the fixing piece (12). on the side wall. 6.根据权利要求1所述的线路检修高空作业平台,其特征在于:所述作业平台(5)包括平台骨架(16),所述平台骨架(16)与立柱(2)固定相连,所述平台骨架(16)的顶部固定有平台底板。6. The aerial work platform for line maintenance according to claim 1, characterized in that: the working platform (5) includes a platform frame (16), and the platform frame (16) is fixedly connected to the column (2), and the The top of the platform frame (16) is fixed with a platform bottom plate. 7.根据权利要求1所述的线路检修高空作业平台,其特征在于:所述转动延伸平台(11)通过销轴座(15)铰接在作业平台(5)的侧壁上,所述转动延伸平台(11)的另一端固定有第一吊环(10),所述第一吊环(10)通过连接绳(9)与第二吊环(8)相连,所述第二吊环(8)固定安装在第一栏杆(6)的立杆上。7. The aerial work platform for line maintenance according to claim 1, characterized in that: the rotating extension platform (11) is hinged on the side wall of the working platform (5) through a pin seat (15), and the rotating extension The other end of the platform (11) is fixed with a first suspension ring (10), the first suspension ring (10) is connected with the second suspension ring (8) through a connecting rope (9), and the second suspension ring (8) is fixedly installed on on the pole of the first railing (6).
CN201720585229.5U 2017-05-24 2017-05-24 Line maintenance aerial work platform Expired - Fee Related CN206697838U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720585229.5U CN206697838U (en) 2017-05-24 2017-05-24 Line maintenance aerial work platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720585229.5U CN206697838U (en) 2017-05-24 2017-05-24 Line maintenance aerial work platform

Publications (1)

Publication Number Publication Date
CN206697838U true CN206697838U (en) 2017-12-01

Family

ID=60450229

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720585229.5U Expired - Fee Related CN206697838U (en) 2017-05-24 2017-05-24 Line maintenance aerial work platform

Country Status (1)

Country Link
CN (1) CN206697838U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111472534A (en) * 2020-04-30 2020-07-31 中建四局第六建设有限公司 Steel operation platform for assisting hoisting of super high-rise steel bar
CN115892116A (en) * 2022-11-19 2023-04-04 中铁济南工程建设监理有限公司 Construction method for joint debugging of electromechanical equipment in rail transit rail area

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111472534A (en) * 2020-04-30 2020-07-31 中建四局第六建设有限公司 Steel operation platform for assisting hoisting of super high-rise steel bar
CN115892116A (en) * 2022-11-19 2023-04-04 中铁济南工程建设监理有限公司 Construction method for joint debugging of electromechanical equipment in rail transit rail area

Similar Documents

Publication Publication Date Title
CN201158933Y (en) High-rise maintaining scaffold device with extruding structure
CN103206074B (en) Elevator shaft template construction method, platform and support
CN206088920U (en) Construction scaffold
CN205476401U (en) Elevator well type steel protection construction platform
CN205804190U (en) A kind of travelling bridge for the guardrail construction that builds a bridge
CN205046827U (en) Movable slope face operation construction platform
CN206697838U (en) Line maintenance aerial work platform
CN202913679U (en) Double-function construction operation protection derrick in elevator shaft way
CN204532049U (en) Novel iron tower cat ladder structure
CN211548680U (en) A scaffolding for building construction
CN206053272U (en) A kind of traveling centering
CN205347999U (en) Bridge construction bracket constructional device
CN206616840U (en) A kind of portable construction operation platform
CN207017618U (en) Lift adjustable climbing operation platform
CN211949696U (en) A protective device for prefabricated building construction
CN205617762U (en) A platform truck that is used for waterproof and reinforcing bar of side wall to execute work
CN204038917U (en) Detachable external hanging type operating platform
CN211644382U (en) Tower crane attached stay bar walkway platform system
CN207974499U (en) A kind of whole hanger of movable type outer wall of basement
CN221073640U (en) Support that high altitude construction constructor was prevented falling
CN210918174U (en) Liftable scaffold
CN207017931U (en) A kind of Vacuum sand pump work high above the ground climbing device
CN205712465U (en) Free end constructional column walk away safety frame is chosen outside a kind of balcony partition
CN205397936U (en) Supplementary cat ladder is demolishd to tower crane pull rod
CN206625520U (en) External scaffolding device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant