CN206694003U - A kind of horizontal well physical simulation experiment device - Google Patents
A kind of horizontal well physical simulation experiment device Download PDFInfo
- Publication number
- CN206694003U CN206694003U CN201720464921.2U CN201720464921U CN206694003U CN 206694003 U CN206694003 U CN 206694003U CN 201720464921 U CN201720464921 U CN 201720464921U CN 206694003 U CN206694003 U CN 206694003U
- Authority
- CN
- China
- Prior art keywords
- power transmission
- transmission shaft
- bottom plate
- horizontal well
- fixed bottom
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Testing Resistance To Weather, Investigating Materials By Mechanical Methods (AREA)
Abstract
The utility model discloses a kind of horizontal well physical simulation experiment device,Including steelframe,Steelframe middle and upper part sets and penetrates connecting tube,Connecting tube is penetrated to be connected with steelframe axle sleeve,The fixed bottom plate of installation immediately below steelframe,Taper support frame is installed in top on the right side of fixed bottom plate,Taper support frame is welded to connect with fixed bottom plate,Taper support frame is formed by the casting of high intensity high-carbon steel,Connecting rod in the middle part of chuck among taper support frame,Middle part connecting rod surface uniformly-coating nickel alloy,Wire is transmitted in connection in the middle part of the connecting rod of middle part,Transmit wire right end placement information storage cross box,Connection master control box on the right side of information storage cross box,Installation power transmission shaft on the right side of fixed bottom plate,Steel support underframe is installed immediately below power transmission shaft,Steel support underframe is formed by the casting of high tenacity mild steel,This kind of horizontal well physical simulation experiment device,The situation that segmenting perforating is commonly used in current horizontal well development can be simulated in time,Meet the needs of society.
Description
Technical field
Oil development experimental technique field is the utility model is related to, specially a kind of horizontal well physical simulation experiment device.
Background technology
In oil development experimental technique field, horizontal wells PHYSICAL MODELING OF IN is mainly filled out using three-dimensional physical simulation
Sand mo(u)ld type carries out simulation extracting experiment to the horizontal well of different type oil-gas reservoir, and this traditional experimental model typically uses homogeneous
Fill out sand tube, it is impossible to reflect the anisotropism on true stratum and the physical property of formation fluid and flow regime, and filler
Can only approximate simulation stratum, can not be consistent with actual formation rock core physical property, be still not able to reflect true stratum truly layer bar
Horizontal wells situation under part, the segmenting perforating situation commonly used in current horizontal well development can not be simulated, is existed many
Defect, it is not suitable with the needs of social development.
So how to design a kind of horizontal well physical simulation experiment device, turning into us will currently solve the problems, such as.
Utility model content
The purpose of this utility model is to provide a kind of horizontal well physical simulation experiment device, to solve above-mentioned background technology
Middle proposition can not simulate the technical problem that segmenting perforating situation is commonly used in current horizontal well development.
To achieve the above object, the utility model provides following technical scheme:A kind of horizontal well physical simulation experiment device,
Including steelframe, the steelframe middle and upper part is set and penetrates connecting tube, and the connecting tube that penetrates is connected with the steelframe axle sleeve, the steel
The fixed bottom plate of installation immediately below frame, taper support frame is installed in top on the right side of the fixed bottom plate, the taper support frame with it is described
Fixed bottom plate is welded to connect, and the taper support frame is formed by the casting of high intensity high-carbon steel, chuck among the taper support frame
Middle part connecting rod, the middle part connecting rod surface uniformly-coating nickel alloy, the middle part connecting rod and the taper support frame axle
Wire is transmitted in set connection, middle part connecting rod middle part connection, and the transmission wire is closely connected with the middle part connecting rod, institute
State and transmit wire right end placement information storage cross box, connection master control box on the right side of described information storage cross box is described solid
Determine installation power transmission shaft on the right side of bottom plate, install steel support underframe immediately below the power transmission shaft, the steel support underframe is by high-ductility
Property mild steel casting form.
Further, described information storage cross box front side wall installation USB interface, the USB interface are deposited with described information
Storage cross box inlays setting, and described information storage cross box rear wall sets current stabilization jack, the current stabilization jack and described information
Cross box nail joint connection is stored, fine copper pressed metal piece, described information storage cross box rear side are equipped with inside the current stabilization jack
Positioned inside bluetooth receiver, the bluetooth receiver are connected with described information storage cross box fastened by screw, and the bluetooth connects
The a large amount of super nm waterproof material of receipts machine outer wrap.
Further, the master control box front side wall is provided with LCDs, and the LCDs is inlayed with the master control box
It is embedded and puts, the liquid crystal display screen surfaces covers high-permeability safety glass, and connection danger warning dodges directly over the master control box
Light lamp, the hazard warning lamp are connected with the master control box signal, and the internal electroplated red of hazard warning lamp is dilute
Earth metal.
Further, radiating dustproof net is installed at middle part immediately below the fixed bottom plate, the radiating dustproof net with it is described solid
To determine bottom plate to be welded to connect, the radiating dustproof net is worked out by pure tungsten steel wire, the fixed bottom plate corner installation rubber base plate,
The rubber base plate is formed by the cutting of branded tire rubber.
Further, the power transmission shaft left distal end installation motor, the motor are connected with the transmission shaft driven,
The power transmission shaft is formed by high-strength aluminum alloy forging, and the power transmission shaft outer cover even protects axle sleeve, and the protection axle sleeve is by low
The cutting of density plastic-steel material forms.
Further, the power transmission shaft right front installation pressure sensor, the pressure sensor and the power transmission shaft
Close connection, the pressure sensor is assembled by countless sensitive optical fiber to be formed, and humidity sense is uniformly provided with directly over the power transmission shaft
Device is answered, temperature analysis device is uniformly wrapped up on the outside of the power transmission shaft.
Compared with prior art, the beneficial effects of the utility model are:This kind of horizontal well physical simulation experiment device, at it
Pressure sensor is installed on surface, so can accurate reaction experiment room in time pressure change, bluetooth receiver is installed, entered
And cause device experimental implementation can be facilitated with remote control, device has also installed temperature analysis device and humidity sensor, can and
When simulate in current horizontal well development commonly use segmenting perforating situation, meet society needs.
Brief description of the drawings
Fig. 1 is overall structure diagram of the present utility model;
Fig. 2 is partial structural diagram of the present utility model;
Fig. 3 is part plan structural representation of the present utility model;
In figure:1- steelframes;2- penetrates connecting tube;3- motor;4- temperature analysis devices;5- power transmission shafts;6- humidity inductives
Device;7- pressure sensors;8- protects axle sleeve;9- steel support underframes;10- hazard warning lamps;11- fixes bottom plate;In 12-
Portion's connecting rod;13- taper support framves;14- transmits wire;15- information stores cross box;16-USB interfaces;17- liquid crystal displays
Screen;18- master control boxes;19- current stabilization jacks;20- bluetooth receivers;21- radiating dustproof nets;22- rubber base plates.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out
Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole
Embodiment, based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made
The every other embodiment obtained, belong to the scope of the utility model protection.
Fig. 1-3 are referred to, the utility model provides a kind of technical scheme:A kind of horizontal well physical simulation experiment device, bag
Steelframe 1 is included, the middle and upper part of steelframe 1 is set and penetrates connecting tube 2, and the connecting tube 2 that penetrates is connected with the axle sleeve of steelframe 1, institute
The fixed bottom plate 11 of installation immediately below steelframe 1 is stated, taper support frame 13, the taper are installed in the fixed right side of bottom plate 11 top
Support frame 13 is welded to connect with the fixed bottom plate 11, and the taper support frame 13 is formed by the casting of high intensity high-carbon steel, described
Connecting rod 12 in the middle part of 13 middle chuck of taper support frame, the surface uniformly-coating nickel alloy of middle part connecting rod 12, the middle part
Connecting rod 12 is connected with the axle sleeve of taper support frame 13, and wire 14, the biography are transmitted in the middle part of middle part connecting rod 12 connection
Pass wire 14 to be closely connected with the middle part connecting rod 12, the transmission wire 14 right end placement information storage cross box
15, the right side connection master control box 18 of described information storage cross box 15, the fixed right side of the bottom plate 11 installation power transmission shaft 5, the biography
Steel support underframe 9 is installed immediately below moving axis 5, the steel support underframe 9 is formed by the casting of high tenacity mild steel.
Further, described information storage cross box 15 front side wall installation usb 16, the usb 16 with it is described
Information storage cross box 15 inlays setting, and described information storage cross box 15 rear wall sets current stabilization jack 19, and the current stabilization is inserted
Hole 19 is connected with the described information storage nail joint of cross box 15, and fine copper pressed metal piece is equipped with inside the current stabilization jack 19, described
Information storage cross box 15 rear interior placement bluetooth receiver 20, the bluetooth receiver 20 and described information storage cross box
15 fastened by screw connect, and largely super nm waterproof material, the bluetooth receiver 20 make the outer wrap of bluetooth receiver 20
Obtaining device can be with remote control, convenient operation.
Further, the front side wall of master control box 18 is provided with LCDs 17, the LCDs 17 with it is described total
Control case 18 inlays setting, and the surface of LCDs 17 covers high-permeability safety glass, connected directly over the master control box 18
Hazard warning lamp 10 is connect, the hazard warning lamp 10 is connected with the signal of master control box 18, and the danger warning dodges
The internal electroplated red lanthanide metal of light lamp 10, the LCDs 17 can reflect experimental correlation data in time.
Further, radiating dustproof net 21 is installed at middle part immediately below the fixed bottom plate 11, the radiating dustproof net 21 with
The fixed bottom plate 11 is welded to connect, and the radiating dustproof net 21 is worked out by pure tungsten steel wire, fixed 11 4 jiaos of the bottom plate
Rubber base plate 22 is installed, the rubber base plate 22 is formed by the cutting of branded tire rubber, and the rubber base plate 22 can subtract to device
Shake, and then avoid vibrations from interfering experimental data.
Further, the left distal end of the power transmission shaft 5 installation motor 3, the motor 3 are driven with the power transmission shaft 5
Connection, the power transmission shaft 5 are formed by high-strength aluminum alloy forging, and the outer cover of power transmission shaft 5 even protects axle sleeve 8, the protection
Axle sleeve 8 is formed by the cutting of low-density plastic-steel material, and the protection axle sleeve 8 can allow power transmission shaft 5 to be less likely to be damaged.
Further, the right front of the power transmission shaft 5 installation pressure sensor 7, the pressure sensor 7 and the biography
Moving axis 5 closely connects, and humidity sensor 6 is uniformly provided with directly over the power transmission shaft 5, uniformly parcel is warm in the outside of power transmission shaft 5
Analyzer 4 is spent, the temperature analysis device 4 can carry out comprehensive analysis to external environment in time.
Operation principle:First, work switches on power before starting, and is seen by the LCDs 17 installed in master control box 18
The state of device is examined, then operating personnel are installed device, and steelframe 1 is fixed on level ground, with penetrating connecting tube 2
It is fixed, then allow the rubber base plate 22 of the fixed bottom of bottom plate 11 to be stably placed on level ground, by long-range distant after installing
The running of the actuation means of bluetooth receiver 20 is controlled, motor 3 starts running first, drives power transmission shaft 5 to operate, is then installed on device
Temperature analysis device 4, humidity sensor 6 and pressure sensor 7 simulate immediately commonly uses segmenting perforating in current horizontal well development
Situation, then pass information to information storage cross box 15, information is now duplicated into two parts, a to pass through information storage and turn
Change case 15 and pass to master control box 18, another, which is stayed in information storage cross box 15, facilitates operating personnel to be taken by usb 16
With device is once being operated, and caused heat is discharged in time from the radiating dustproof net 21 of the fixed bottom of bottom plate 11, in addition
The hazard warning lamp 10 of the top of master control box 18 installation flashing light alarm immediately, protection device when working state of device is abnormal
Normal operation, information storage cross box 15 rear portion is mounted with current stabilization jack 19 so that master control box 18 can control more simultaneously
Machine is operated, and staff takes out device after the completion of work, then copies experimental data.
While there has been shown and described that embodiment of the present utility model, for the ordinary skill in the art,
It is appreciated that these embodiments can be carried out with a variety of changes in the case where not departing from principle of the present utility model and spirit, repaiied
Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.
Claims (6)
1. a kind of horizontal well physical simulation experiment device, including steelframe (1), it is characterised in that:Steelframe (1) middle and upper part is set
Connecting tube (2) is penetrated, the connecting tube (2) that penetrates is connected with the steelframe (1) axle sleeve, and installation is solid immediately below the steelframe (1)
Determine bottom plate (11), taper support frame (13), the taper support frame (13) and institute are installed in top on the right side of the fixed bottom plate (11)
State fixed bottom plate (11) to be welded to connect, the taper support frame (13) is formed by the casting of high intensity high-carbon steel, the taper support
Connecting rod (12) in the middle part of chuck among frame (13), middle part connecting rod (12) surface uniformly-coating nickel alloy, the middle part connects
Extension bar (12) is connected with taper support frame (13) axle sleeve, connection transmission wire (14) in the middle part of the middle part connecting rod (12),
The transmission wire (14) is closely connected with the middle part connecting rod (12), transmission wire (14) right end placement information
Cross box (15) is stored, master control box (18), fixed bottom plate (11) right side are connected on the right side of described information storage cross box (15)
Power transmission shaft (5) is installed, installs steel support underframe (9) immediately below the power transmission shaft (5), the steel support underframe (9) is by height
Malleable mild steel casting forms.
A kind of 2. horizontal well physical simulation experiment device according to claim 1, it is characterised in that:Described information storage turns
Case (15) front side wall installation USB interface (16) is changed, the USB interface (16) is inlayed with described information storage cross box (15) to be set
Put, described information storage cross box (15) rear wall sets current stabilization jack (19), and the current stabilization jack (19) is deposited with described information
Cross box (15) nail joint connection is stored up, fine copper pressed metal piece, described information storage conversion are equipped with inside the current stabilization jack (19)
Case (15) rear interior placement bluetooth receiver (20), the bluetooth receiver (20) and described information storage cross box (15) spiral shell
Silk is fastenedly connected, a large amount of super nm waterproof material of bluetooth receiver (20) outer wrap.
A kind of 3. horizontal well physical simulation experiment device according to claim 1, it is characterised in that:The master control box (18)
Front side wall is provided with LCDs (17), and the LCDs (17) inlays setting, the liquid crystal with the master control box (18)
Display screen (17) surface covers high-permeability safety glass, and hazard warning lamp is connected directly over the master control box (18)
(10), the hazard warning lamp (10) is connected with the master control box (18) signal, in the hazard warning lamp (10)
Electroplate red lanthanide metal in portion.
A kind of 4. horizontal well physical simulation experiment device according to claim 1, it is characterised in that:The fixed bottom plate
(11) radiating dustproof net (21) is installed at middle part immediately below, and the radiating dustproof net (21) connects with fixed bottom plate (11) welding
Connecing, the radiating dustproof net (21) is worked out by pure tungsten steel wire, fixed bottom plate (11) the corner installation rubber base plate (22),
The rubber base plate (22) is formed by the cutting of branded tire rubber.
A kind of 5. horizontal well physical simulation experiment device according to claim 1, it is characterised in that:The power transmission shaft (5)
Left distal end installation motor (3), the motor (3) are connected with the power transmission shaft (5), and the power transmission shaft (5) is by height
Strength aluminium alloy wrought is formed, and power transmission shaft (5) outer cover even by low-density moulded by protection axle sleeve (8), the protection axle sleeve (8)
Steel material cutting forms.
A kind of 6. horizontal well physical simulation experiment device according to claim 1, it is characterised in that:The power transmission shaft (5)
Right front installation pressure sensor (7), the pressure sensor (7) are closely connected with the power transmission shaft (5), the power transmission shaft
(5) humidity sensor (6) is uniformly provided with directly over, temperature analysis device (4) is uniformly wrapped up on the outside of the power transmission shaft (5).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720464921.2U CN206694003U (en) | 2017-04-28 | 2017-04-28 | A kind of horizontal well physical simulation experiment device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720464921.2U CN206694003U (en) | 2017-04-28 | 2017-04-28 | A kind of horizontal well physical simulation experiment device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206694003U true CN206694003U (en) | 2017-12-01 |
Family
ID=60447553
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720464921.2U Expired - Fee Related CN206694003U (en) | 2017-04-28 | 2017-04-28 | A kind of horizontal well physical simulation experiment device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206694003U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111852442A (en) * | 2019-06-06 | 2020-10-30 | 重庆科技学院 | Evaluation method for flow capacity of oil-gas-sand three-phase fluid in horizontal section |
-
2017
- 2017-04-28 CN CN201720464921.2U patent/CN206694003U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111852442A (en) * | 2019-06-06 | 2020-10-30 | 重庆科技学院 | Evaluation method for flow capacity of oil-gas-sand three-phase fluid in horizontal section |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105738216B (en) | For tunnel gushing water model assay systems and its method under high-ground stress-hypertonic pressure | |
CN104499485B (en) | One pile for one column fully automatic hydraulic verticality-regulating system and vertical adjustment method | |
CN206694003U (en) | A kind of horizontal well physical simulation experiment device | |
CN206591893U (en) | A kind of multiple bay of hydrologic monitoring instrument | |
CN103295463B (en) | Rock cavity construction simulation test device | |
CN110766562B (en) | Method for determining oil well interval pumping time | |
CN202544744U (en) | Multi-functional road pile driller | |
CN205643289U (en) | Synchronous slip casting analogue test system of shield tunnel | |
CN104153762B (en) | A kind of Based Intelligent Control drill hole geologic parameter measuring apparatus | |
CN206070321U (en) | A kind of road surface reparation device | |
CN209353766U (en) | A kind of deep pit monitor protective device based on road engineering | |
CN206888913U (en) | A kind of highway construction drilling machine | |
CN116163710A (en) | Visual simulation device and method for inhibiting migration of pulverized coal in volume fracturing fracture to well bore | |
CN105625721B (en) | The boring and coring method and its servicing unit in concrete lamp hole | |
CN207597370U (en) | Subgrade Compaction tests drawing out soil equipment | |
CN106769548A (en) | There is bump simulation test device and its method in coal seam with gas | |
CN107763399A (en) | A kind of novel outdoor display screen | |
CN209098126U (en) | A kind of communications maintenance highrise operation safety platform | |
CN206752535U (en) | Concrete casting monitors sensor | |
CN215298715U (en) | Economic evaluation model demonstration system of low development technology of fractured low-permeability oil reservoir | |
CN201246139Y (en) | Automatic rope pulling apparatus of oil salvaging vehicle | |
CN211234403U (en) | Road and bridge construction measuring device | |
CN211740844U (en) | Highway engineering compression test device | |
CN211713933U (en) | Highway compactness test detection device | |
CN202853915U (en) | Cutting track simulator for cutting equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171201 Termination date: 20180428 |
|
CF01 | Termination of patent right due to non-payment of annual fee |