CN206693272U - Control the shaft bottom structure of inspection shaft sedimentation - Google Patents

Control the shaft bottom structure of inspection shaft sedimentation Download PDF

Info

Publication number
CN206693272U
CN206693272U CN201720108269.0U CN201720108269U CN206693272U CN 206693272 U CN206693272 U CN 206693272U CN 201720108269 U CN201720108269 U CN 201720108269U CN 206693272 U CN206693272 U CN 206693272U
Authority
CN
China
Prior art keywords
shaft
shaft bottom
inspection shaft
bottom plate
inspection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720108269.0U
Other languages
Chinese (zh)
Inventor
李磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201720108269.0U priority Critical patent/CN206693272U/en
Application granted granted Critical
Publication of CN206693272U publication Critical patent/CN206693272U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a kind of shaft bottom structure for controlling inspection shaft sedimentation, including shaft bottom plate, more reinforcement concrete short piles, multiple shaft bottom plate injected holes, inspection shaft, multiple back filled region injected holes, a plurality of injecting cement paste and road surface structare layer;Construction method includes the transporting of shaft bottom structure, scene positioning, installation, electronic monitoring and inspection shaft back filled region and reinforced.The structure and construction method of the control settlement are applied to the inspection shaft of the various calibers of different type.The utility model overcomes the shortcomings that inspection well area is small and processing depth is shallower, and backfill quality can not meet design requirement and high existing inspection shaft sedimentation reparation cost.Shaft bottom structure is prefabricated in factory, simple for production, can more meet intensity and quality requirement, and backfill, which goes to reinforce, use grouting mode, has easy for construction, and monitoring is simple, the advantages of efficiency high, can solve the problem that inspection shaft settle caused by a series of inspection shaft diseases.

Description

Control the shaft bottom structure of inspection shaft sedimentation
Technical field
It the utility model is related to urban duct transformation of facility technical field, more particularly to a kind of well for controlling inspection shaft sedimentation Bottom structure.
Background technology
As the construction of underground pipe network in Process of Urban Development is more and more intensive, inspection shaft disease annoyings city road always The continual exploitation on road.Especially it is open to the traffic in road in validity period, a certain degree of disease occurs in up to 80% inspection shaft Evil, the disease of inspection shaft affect the use of urban road always.In inspection shaft disease, most commonly seen is due to inspection shaft A series of such as pavement crackings, collector pipe and the well body of the well bore changing of the relative positions caused by well bore sedimentation are destroyed, well bore is destroyed and further made Cheng Jingzhou backfill heterogeneous distortion phenomenons.(30- in the range of well Zhou Yiding is mainly excavated in maintenance for inspection shaft at present Road surface 50cm) is backfilled again, but this mode not only can not forever solve inspection shaft settlement issues, can also cause road surface Globality declines, and influences itself function of road occupation and inspection shaft.Not only need to enter at regular intervals for destroying well body Row maintenance will also pay fixed manpower and materials, and repairing is costly.
Due to checking that well construction and pavement construction management are not belonging to homology unit and construction management confusion phenomena, well is caused All backfills certainly will be extremely difficult to design strength, and because inspection well area is small, piling activity can not be carried out and driven piles Other operational procedures of the soil body in certain scope under inspection shaft, such as constructing tunnel, subway work, pipe installation can be influenceed.Cause This is avoided the sedimentation value during inspection shaft use from furtheing investigate from the optimization design angle of inspection shaft self structure.
Utility model content
The purpose of this utility model:A kind of shaft bottom structure for controlling inspection shaft sedimentation is provided, is avoided that and will be building up from now on Occur similar settlement issues in inspection shaft so as to influence the use of road or inspection shaft, prepare convenient, applied widely, installation effect Rate is high.
To achieve these goals, the technical solution of the utility model is:
A kind of shaft bottom structure for controlling inspection shaft sedimentation, including shaft bottom plate, more reinforcement concrete short piles, multiple wells Floor grouting hole, inspection shaft, multiple back filled region injected holes, a plurality of injecting cement paste and road surface structare layer;More described reinforcements Concrete short pile is evenly distributed on the lower surface edge of described shaft bottom plate, more described reinforcement concrete short piles point It is not vertical with described shaft bottom plate and with shaft bottom integrative-structure;Described shaft bottom plate level is arranged on the bottom of described inspection shaft Portion, described a plurality of injecting cement paste and inspection shaft are vertically arranged in below the road surface of described road surface structare layer respectively, and described is more Bar injecting cement paste being provided at circumferentially spaced in the outside of described inspection shaft, described a plurality of injecting cement paste along described inspection shaft respectively For single or double distribution, and the lower end of described a plurality of injecting cement paste is located at below the shaft bottom of described inspection shaft;Described is more Individual back filled region injected hole is separately positioned on the upper end of described a plurality of injecting cement paste, in described road surface structare layer, passes through institute The multiple back filled region injected holes stated are to described a plurality of slip casting internal injection;Described multiple shaft bottom plate injected holes are evenly distributed on On described shaft bottom plate.
The shaft bottom structure of above-mentioned control inspection shaft sedimentation, wherein, the surface coating of described shaft bottom plate.
The shaft bottom structure of above-mentioned control inspection shaft sedimentation, wherein, the width of described shaft bottom plate is than described inspection shaft The wide 30-50cm of shaft bottom width, the thickness of described shaft bottom plate is 100mm.
The shaft bottom structure of above-mentioned control inspection shaft sedimentation, wherein, more described reinforcement concrete short piles it is straight Footpath is 80mm, and more described reinforcement concrete short pile length are 800-1000mm.
The shaft bottom structure of above-mentioned control inspection shaft sedimentation, wherein, the aperture of described multiple shaft bottom plate injected holes is 100-500mm, and run through described shaft bottom plate.
The shaft bottom structure of above-mentioned control inspection shaft sedimentation, wherein, the reinforcing scope of described a plurality of injecting cement paste is distance The back filled region in described inspection shaft well week 30-50cm, the depth of described a plurality of injecting cement paste add for the depth of described inspection shaft Upper 200-300mm.
The shaft bottom structure of above-mentioned control inspection shaft sedimentation, wherein, the aperture of described multiple back filled region injected holes is 50mm。
The shaft bottom structure of above-mentioned control inspection shaft sedimentation, wherein, the injecting paste material in described a plurality of injecting cement paste is to mix There are early strength agent and impervious slurries.
The utility model is prefabricated in factory, simple for production, can more meet intensity, quality requirement, and inspection shaft is subsequently applied Work process does not have any influence, convenient transportation, uses light-duty machinery during construction, monitoring is simple, efficiency high, can solve the problem that inspection shaft Disease caused by sedimentation, the drawbacks of avoiding excavation from causing, reduce and check that well servicing is spent.
Brief description of the drawings
Fig. 1 is the front view of the shaft bottom structure of the utility model control inspection shaft sedimentation.
Fig. 2 is the top view of the shaft bottom structure of the utility model control inspection shaft sedimentation.
Fig. 3 is the structural representation of the shaft bottom integrative-structure of the shaft bottom structure of the utility model control inspection shaft sedimentation.
Fig. 4 is the upward view of the shaft bottom integrative-structure of the shaft bottom structure of the utility model control inspection shaft sedimentation.
Fig. 5 is the front view of the shaft bottom integrative-structure of the shaft bottom structure of the utility model control inspection shaft sedimentation.
Fig. 6 is the front view of the shaft bottom plate of the shaft bottom structure of the utility model control inspection shaft sedimentation.
Embodiment
Embodiment of the present utility model is further illustrated below in conjunction with accompanying drawing.
Refer to shown in accompanying drawing 1 to accompanying drawing 6, it is a kind of control inspection shaft sedimentation shaft bottom structure, including shaft bottom plate 1, more Reinforcement concrete short pile 2, multiple shaft bottom plate injected holes 3, inspection shaft 4, multiple back filled region injected holes 5, a plurality of injecting cement paste 6 and Road surface structare layer 7;More described reinforcement concrete short piles 2 are evenly distributed on the lower surface edge of described shaft bottom plate 1 Place, more described reinforcement concrete short piles 2 it is vertical with described shaft bottom plate 1 respectively and with shaft bottom integrative-structure;It is described Shaft bottom plate 1 be horizontally set on the bottom of described inspection shaft 4, described a plurality of injecting cement paste 6 and inspection shaft 4 are vertically arranged respectively Below the road surface of described road surface structare layer 7, described a plurality of injecting cement paste 6 is respectively along the circumferentially-spaced of described inspection shaft 4 It is arranged on the outside of described inspection shaft 4, described a plurality of injecting cement paste 6 is single or double distribution, and described a plurality of slip casting The lower end of body 6 is located at below the shaft bottom of described inspection shaft 4;Described multiple back filled region injected holes 5 are separately positioned on described The upper end of a plurality of injecting cement paste 6, in described road surface structare layer 7, by described multiple back filled region injected holes 5 to described Slip casting in a plurality of injecting cement paste 6;Described multiple shaft bottom plate injected holes 3 are evenly distributed on described shaft bottom plate 1.
The surface coating of described shaft bottom plate 1, it can play a part of protecting shaft bottom plate 1 before formal construction.
The width of described shaft bottom plate 1 is wider 30-50cm than the shaft bottom width of described inspection shaft 4, described shaft bottom plate 1 Thickness is 100mm, and shaft bottom plate 1 adds 30-50cm to determine diameter or side according to the shaft bottom actual size of the inspection shaft 4 to be constructed It is long.
A diameter of 80mm of more described reinforcement concrete short piles 2, more described reinforcement concrete are short 2 length of stake are 800-1000mm, and using concrete material, and concrete material grade must not be less than C30.
The aperture of described multiple shaft bottom plate injected holes 3 is 100-500mm, and runs through described shaft bottom plate 1, multiple shaft bottoms Plate injected hole 3 is reserved according to design when being made in processing factory.
The reinforcing scope of described a plurality of injecting cement paste 6 be apart from the back filled region in described inspection shaft well week 30-50cm, it is described The depth of a plurality of injecting cement paste 6 add 200-300mm for the depth of described inspection shaft 4.
The aperture of described multiple back filled region injected holes 5 is 50mm.
Injecting paste material in described a plurality of injecting cement paste 6 is mixed with early strength agent and impervious slurries.
The making of more reinforcement concrete short piles 2 is carried out simultaneously with shaft bottom plate 1, shaft bottom plate 1 and more reinforcements The arrangement of reinforcement of concrete short pile 2 carries out arrangement of reinforcement with reference to beam reinforcement manner combination specification, passes through the 5 direct slip casting of back filled region injected hole;Shaft bottom It must not be moved after plate and reinforcement concrete short pile complete, in 12h or the heap weight in structure, after initial set (in 12h) Cover film conserves, and uses bucket watering to ensure its wettability after final set.Curing time must not be less than 14 days, 14d days can Transported.
Construction method of the present utility model comprises the technical steps that:
A. the shaft bottom integrative-structure lifting that reaches intensity and quality requirement will be conserved in factory to get on the bus, shaft bottom during entrucking Plate 1 is down.
B. the structure is handled with care after transporting to job site, and overlay film guarantor is carried out in the shaft bottom body structure surface before formal construction Shield.
C. when formal construction starts, catch bottom plate that the structure is hung into inspection shaft construction point with hoisting machinery, concrete is short Stake is towards shaft bottom.
D. the structure is sunk to shaft bottom by hoisting machinery and the artificial cooperation in scene, and armored concrete stub 2 is towards inspection shaft well Structure is directed at inspection shaft coordinate by bottom, adjustment position.Hoisting machinery is light hoisting gear, will not be caused brokenly to not completing road surface It is bad.
E. the structure is depressed into soil to the shaft bottom projected depth of inspection shaft 4 with press.Press is small-sized static Machinery, uniformly it is pressed into for the gross area of shaft bottom plate 1 in soil, plate 1 uneven amount of deflection in shaft bottom will not be caused to change, preferably can be with It can be designed for diameter or the less inspection shaft of the length of side with drawing anchor method or artificial hammering method that shaft bottom structure is sink into inspection shaft bottom At absolute altitude.
F. using electronic equipment inspection shaft bottom plate whether occur tilting or crack, bottom plate under concrete short pile 2 whether occur Broken pile or other damages.
G. check and finish equipment of dropping back out, press etc., the upper surface sanding bed course of plate 1, backfill, are checked in shaft bottom The well bore of well 4 is constructed.
Set injected hole 5 when being H. backfilled at walling crib designed elevation in the range of well Zhou Yiding, and start to have configured In slurries hand-hole at predetermined depth.
I. black top compound and rolled after the completion of slip casting until slurry intensity reaches design strength more than 95% to road Face absolute altitude flushes to form road surface structare layer 7 with road surface.
J. the well lid of installation check well 4.
In summary, the utility model is prefabricated in factory, simple for production, can more meet intensity, quality requirement, to checking Well subsequent construction process does not have any influence, convenient transportation, uses light-duty machinery during construction, monitoring is simple, efficiency high, can solve Certainly disease, the drawbacks of avoiding excavation from causing caused by inspection shaft sedimentation, reduce and check that well servicing is spent.
Preferred embodiment of the present utility model is the foregoing is only, not thereby limits the scope of the claims of the present utility model, Every equivalent structure transformation made using the utility model description, or it is directly or indirectly related with other are attached to The technical field of product, similarly it is included in scope of patent protection of the present utility model.

Claims (7)

  1. A kind of 1. shaft bottom structure for controlling inspection shaft sedimentation, it is characterised in that:It is short including shaft bottom plate, more reinforcement concrete Stake, multiple shaft bottom plate injected holes, inspection shaft, multiple back filled region injected holes, a plurality of injecting cement paste and road surface structare layer;Described more Reinforcement concrete short pile is evenly distributed on the lower surface edge of described shaft bottom plate, more described reinforcement coagulations Native stub it is vertical with described shaft bottom plate respectively and with shaft bottom integrative-structure;Described shaft bottom plate level is arranged on described inspection The bottom of well, described a plurality of injecting cement paste and inspection shaft are vertically arranged in below the road surface of described road surface structare layer respectively, institute The a plurality of injecting cement paste stated being provided at circumferentially spaced in the outside of described inspection shaft along described inspection shaft respectively, described is a plurality of Injecting cement paste is single or double distribution, and the lower end of described a plurality of injecting cement paste is located at below the shaft bottom of described inspection shaft;Institute The multiple back filled region injected holes stated are separately positioned on the upper end of described a plurality of injecting cement paste, in described road surface structare layer, By described multiple back filled region injected holes to described a plurality of slip casting internal injection;Described multiple shaft bottom plate injected holes are uniform It is distributed on described shaft bottom plate.
  2. 2. the shaft bottom structure of control inspection shaft sedimentation according to claim 1, it is characterised in that:The table of described shaft bottom plate Face overlay film.
  3. 3. the shaft bottom structure of control inspection shaft sedimentation according to claim 1, it is characterised in that:The width of described shaft bottom plate Degree is wider 30-50cm than the shaft bottom width of described inspection shaft, and the thickness of described shaft bottom plate is 100mm.
  4. 4. the shaft bottom structure of control inspection shaft sedimentation according to claim 1, it is characterised in that:More described plate bottom steel A diameter of 80mm of reinforced concrete stub, more described reinforcement concrete short pile length are 800-1000mm.
  5. 5. the shaft bottom structure of control inspection shaft sedimentation according to claim 1, it is characterised in that:Described multiple shaft bottom plates The aperture of injected hole is 100-500mm, and runs through described shaft bottom plate.
  6. 6. the shaft bottom structure of control inspection shaft sedimentation according to claim 1, it is characterised in that:Described a plurality of injecting cement paste Reinforcing scope be apart from the back filled region in described inspection shaft well week 30-50cm, the depth of described a plurality of injecting cement paste is described The depth of inspection shaft add 200-300mm.
  7. 7. the shaft bottom structure of control inspection shaft sedimentation according to claim 1, it is characterised in that:Described multiple back filled regions The aperture of injected hole is 50mm.
CN201720108269.0U 2017-02-05 2017-02-05 Control the shaft bottom structure of inspection shaft sedimentation Expired - Fee Related CN206693272U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720108269.0U CN206693272U (en) 2017-02-05 2017-02-05 Control the shaft bottom structure of inspection shaft sedimentation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720108269.0U CN206693272U (en) 2017-02-05 2017-02-05 Control the shaft bottom structure of inspection shaft sedimentation

Publications (1)

Publication Number Publication Date
CN206693272U true CN206693272U (en) 2017-12-01

Family

ID=60440167

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720108269.0U Expired - Fee Related CN206693272U (en) 2017-02-05 2017-02-05 Control the shaft bottom structure of inspection shaft sedimentation

Country Status (1)

Country Link
CN (1) CN206693272U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111501970A (en) * 2020-04-27 2020-08-07 广东中帆建设有限公司 Prefabricated assembly type gutter inlet and construction method thereof
CN112726784A (en) * 2020-12-29 2021-04-30 福建省泷澄建筑工业有限公司 Fully-prefabricated PC sewer inspection well component assembly type structure and construction method
CN115094953A (en) * 2022-07-07 2022-09-23 西安热工研究院有限公司 Vertical shaft of gravity compressed air energy storage system for unconsolidated formation and construction method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111501970A (en) * 2020-04-27 2020-08-07 广东中帆建设有限公司 Prefabricated assembly type gutter inlet and construction method thereof
CN112726784A (en) * 2020-12-29 2021-04-30 福建省泷澄建筑工业有限公司 Fully-prefabricated PC sewer inspection well component assembly type structure and construction method
CN112726784B (en) * 2020-12-29 2024-02-02 福建省泷澄建筑工业有限公司 Full-prefabricated PC sewer inspection well component assembly structure and construction method
CN115094953A (en) * 2022-07-07 2022-09-23 西安热工研究院有限公司 Vertical shaft of gravity compressed air energy storage system for unconsolidated formation and construction method
CN115094953B (en) * 2022-07-07 2024-02-06 西安热工研究院有限公司 Vertical shaft of gravity compressed air energy storage system for loose stratum and construction method

Similar Documents

Publication Publication Date Title
CN107059667B (en) Door shape assembled armored concrete box culvert and its construction method
CN102444142B (en) Pile group column replacement expanded basement and construction method of same
CN205742213U (en) Foundation pit supporting construction
CN106088127A (en) Open caisson construction method
CN102644295A (en) Construction method for preventing peripheral and local sedimentation of road surface inspection well
CN206693272U (en) Control the shaft bottom structure of inspection shaft sedimentation
CN209227580U (en) The tower-crane foundation structure of raft foundation is placed under a kind of
CN109736354A (en) Tunnel open excavation section main structure construction method
CN106837341B (en) A kind of Metro construction construction method of shaft wall
CN109838240B (en) River-crossing tunnel arch cover covering and digging construction method
CN102434717A (en) Construction method of joist steel pipe-jacking work pit
CN109706952A (en) Large-scale well-sinking construction method
CN104328790B (en) Cast-in-situ sprayed concrete hidden bearing platform and hidden ground beam molding bed
CN107905609A (en) Underground people's air defense construction method
CN102235007B (en) Method for supporting deep foundation with upper nail-lower pile combination
CN201981543U (en) Hasp-free steel pipe pile foundation pit bracing sealing-up cofferdam structure
CN108978713A (en) A kind of prefabrication elevator shaft foundation pit and its installation method
CN104631486A (en) Independent plinth construction method in narrow environment
CN110093945B (en) Pit with elevator steel structure
CN112176947A (en) Bank protection construction method for concave bank line of sludge layer foundation
CN204919566U (en) Soft soil area tower crane foundation construction supporting construction
CN207662389U (en) A kind of sedimentation and deformation observation base point using covered culvert
CN216949733U (en) Novel reinforced concrete structure inverted cone and molding device
CN109881699A (en) The concrete moulding bed fabrication and installation method of the general raft foundation of assembled tongue and groove Miller type
TWI623669B (en) Construction method of advance pavement for preventing underground subsidence before continuous wall construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171201

Termination date: 20190205

CF01 Termination of patent right due to non-payment of annual fee