CN206683561U CN201720357141.8U CN201720357141U CN206683561U CN 206683561 U CN206683561 U CN 206683561U CN 201720357141 U CN201720357141 U CN 201720357141U CN 206683561 U CN206683561 U CN 206683561U
Authority
CN
China
Prior art keywords
detection
chute
wheel shaft
circular arc
depth gauge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720357141.8U
Other languages
Chinese (zh)
Inventor
杨雄才
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 12th Bureau Group Co Ltd
Third Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd
Original Assignee
China Railway 12th Bureau Group Co Ltd
Third Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 12th Bureau Group Co Ltd, Third Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd filed Critical China Railway 12th Bureau Group Co Ltd
Priority to CN201720357141.8U priority Critical patent/CN206683561U/en
Application granted granted Critical
Publication of CN206683561U publication Critical patent/CN206683561U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

A kind of device to the detection of standard circular arc section construction error, belong to tunnel construction detection technique field, can solve that when current tunnel excavation contour line, preliminary bracing flatness and two lining chassis curved panel deformation detections precision instrument must be relied on(Total powerstation)To detect, the shortcomings that detection time is long, the depth gauge rule, wheel shaft and pulley of perforation are arranged with including chute with a scale, measurement pedestal, among the chute bottom groove is provided with along track length direction, the blade of groove and depth gauge rule forms gap and coordinated, wheel shaft is located at wheel shaft both ends respectively through perforation, pulley.The utility model can save manpower and save the time, increase the benefit.

Description

A kind of device to the detection of standard circular arc section construction error
Technical field
The utility model belongs to tunnel construction detection technique field, and in particular to a kind of to standard circular arc section construction error The device of detection.
Background technology
With China's infrastructure fast development, to entity quality criteria requirements more and more higher of constructing, particularly with tunnel The process control of construction quality is most important.Tunnel excavation is as an important step in constructing tunnel, wherein outline excavation The control of line is even more important, and detects whether excavation contour line meets design requirement now, frequently with method be that explosion is slagged tap knot Shu Houyong measuring instruments carry out sweeping section, then by software change figure mode detect contour line whether meet design will Ask, detection time length be present, it is necessary to by precision instrument(Total powerstation)The shortcomings that to detect.
Tunnel is whether to examine preliminary bracing as a concealed work, wherein Tunnel flatness Qualified important indicator, if the time-consuming construction that will excessively largely effect on next process of flatness detection, at present using guiding ruler Method detects, i.e., is detected using the long guiding rulers of 2m, and detection method is close to detected face for detection ulnar surface(First branch face), for crack Gap, detected using wedge clearance gauge, its numerical value is flatness deviation, for concavo-convex more serious position, using by steel ruler perpendicular to Guiding ruler measure mode, exist in-convenience in use, detection time is long, and flatness detection data are not accurate enough.
Last process of two lining constructions as closing country rock, the two main frocks of lining construction are using by integrated hydraulic platform The sizing punching block of car composition, hydraulic jumbo service life are grown, it may appear that under occurring in the middle part of local deformation, particularly chassis Scratch, it is attractive in appearance to largely effect on two linings, can locally even occupy two lining headroom.Use at present method for:Completed in two lining constructions de- Detected after mould using measurement precision instrument, be then converted into figure by software contrasts to determine to become with two lining chassis contour lines Shaped position and deflection.Detection time length be present, it is necessary to by precision instrument(Full battle instrument)The shortcomings that to detect.
The content of the invention
The utility model in order to solve current tunnel excavation contour line, preliminary bracing flatness and two lining chassis curved panels Precision instrument must be relied on during deformation detection(Total powerstation)To detect, the shortcomings that detection time is long, there is provided a kind of to standard circular arc The device of section construction error detection.
The utility model adopts the following technical scheme that:
A kind of device to the detection of standard circular arc section construction error, including chute with a scale, measurement pedestal are symmetrically set There are the depth gauge rule, wheel shaft and pulley of perforation, groove, groove and depth gauge rule are provided with along track length direction among the chute bottom Blade form gap and coordinate, for wheel shaft through perforation, pulley is located at wheel shaft both ends respectively.
The length of the groove is shorter than the length of chute, is arranged with the both ends of chute along its length and does not stay groove Section.
Detect circular arc rise(Flatness)When chute need to be only positioned in measured circular arc sagittal plane, depth gauge rule is slid To chute midpoint, after stretching depth gauge rule blade contacts with cambered surface, trip bolt fixed ruler frame, lift depth gauge rule, depth gauge rule reading As tested surface is actual loses height(Or flatness)Numerical value, then it can draw error with theoretical value comparison.
The beneficial effects of the utility model are as follows:
1. the utility model is reasonable in design, be skillfully constructed novelty, and break traditions detection mode.
2. the utility model is easy to operate, detection is quick, can detect immediately tunnel excavation contour line whether meet design will Ask, whether two lining chassis deflections or preliminary bracing flatness meet code requirement.
3. the utility model can save manpower and save the time, increase the benefit.
Brief description of the drawings
Fig. 1 is the utility model main structure diagram;
Fig. 2 is the utility model overlooking the structure diagram;
Fig. 3 is the utility model side structure schematic view;
Fig. 4 is that the utility model detects tunnel excavation silhouettes detection schematic diagram;
Wherein:1- chutes;2- depth gauge rules;3- pulleys;4- wheel shafts;5- grooves.
Embodiment
With reference to accompanying drawing, the utility model is described in further detail.
A kind of device to the detection of standard circular arc section construction error, including chute 1 with a scale, measurement pedestal are symmetrically set There are the depth gauge rule 2, wheel shaft 4 and pulley 3 of perforation, groove 5, groove 5 are provided with along the length direction of chute 1 among the bottom of chute 1 Gap is formed with the blade of depth gauge rule 2 to coordinate, wheel shaft 4 is located at the both ends of wheel shaft 4 respectively through perforation, pulley 3.
The length of the groove 5 is shorter than the length of chute 1, be arranged with the both ends of chute 1 along its length do not stay it is recessed Groove section.
1 long 2m of chute, the range of depth gauge rule 2 are 30cm, 4 long 25mm of wheel shaft, the diameter 10mm of pulley 3, the length of groove 5 1900mm, width 50mm, each reserved 50mm in the length direction both ends of chute 1.
Application method when whether detection tunnel excavation contour line meets design requirement is detected for the device is positioned over Position, such as:Design paper detection position is looked into, X is to detect reading, rise formula:, wherein:R is excavation Profile arc radius, L are detection ruler length=2000mm, and the position, which is excavated, if X=Y meets design requirement.The position if X < Y Deficient digging is put, the position is backbreak if X > Y.
Detect tunnel just branch flatness, it is known that just branch flatness is not more than 5cm with the detection of 2m guiding rulers in code requirement tunnel.I.e. The device is positioned over inspection basal plane, depth gauge rule is then slided into chute reading maximum, reading is read, if reading > 50mm, then preliminary bracing flatness do not meet code requirement, it should re-start and fill spray according to code requirement;If reading≤50mm Then preliminary bracing flatness meets code requirement.
The lining chassis deflections of detection two, test position is placed in by detection means, the reading * of depth gauge rule on device(Chassis is grown Degree/2000)The deflection of as two lining chassis(Because the steel form that two lining trolley formworks use is rigid material).

Claims (2)

  1. A kind of 1. device to the detection of standard circular arc section construction error, it is characterised in that:Including chute with a scale(1), survey Amount pedestal is arranged with the depth gauge rule of perforation(2), wheel shaft(4)And pulley(3), the chute(1)Along chute among bottom(1)It is long Degree direction is provided with groove(5), groove(5)With depth gauge rule(2)Blade formed gap coordinate, wheel shaft(4)Through perforation, pulley (3)It is located at wheel shaft respectively(4)Both ends.
  2. A kind of 2. device to the detection of standard circular arc section construction error according to claim 1, it is characterised in that:It is described Groove(5)Length compare chute(1)Length it is short, in chute(1)Both ends along its length, which are arranged with, does not stay groove segment.
CN201720357141.8U 2017-04-07 2017-04-07 A kind of device to the detection of standard circular arc section construction error Expired - Fee Related CN206683561U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720357141.8U CN206683561U (en) 2017-04-07 2017-04-07 A kind of device to the detection of standard circular arc section construction error

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720357141.8U CN206683561U (en) 2017-04-07 2017-04-07 A kind of device to the detection of standard circular arc section construction error

Publications (1)

Publication Number Publication Date
CN206683561U true CN206683561U (en) 2017-11-28

Family

ID=60399417

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720357141.8U Expired - Fee Related CN206683561U (en) 2017-04-07 2017-04-07 A kind of device to the detection of standard circular arc section construction error

Country Status (1)

Country Link
CN (1) CN206683561U (en)

Similar Documents

Publication Publication Date Title
CN106403754A (en) Crane part multidimensional comprehensive measuring tool
CN107537868A (en) A kind of cold rolling mill window space position dimension precision online test method
CN103411584B (en) Method and device for inspection measurement of fan-shaped section base of continuous casting machine
CN104613886A (en) Long-gauge FBG (Fiber Bragg Grating) based settlement joint two-dimensional deformation and opposite inclination monitoring method
CN206683561U (en) A kind of device to the detection of standard circular arc section construction error
CN103344214B (en) 1.6-degree parabolic extralarge pier measuring and pier body linear control method
CN206160865U (en) Hoist part multidimension comprehensive testing measuring tool
CN203869638U (en) Plug gauge
CN206113949U (en) High -efficient detection ruler of straightness that hangs down
CN210154481U (en) Be used for railway rail side to grind data detection chi
CN206670541U (en) A kind of big surface evenness detection means in tunnel
CN202974245U (en) Full section rail head profile measuring mechanism
CN212512998U (en) A detect guiding rule for building engineering
CN206803894U (en) A kind of wheel checker
CN207215124U (en) Detection tool for detecting verticality
CN111846141A (en) Method for hoisting high-load liquefied gas carrier tank by using crane with low hoisting capacity
CN102506639A (en) Measuring tool for sectional dimension of special-shaped pile and measuring method thereof
CN203132467U (en) Pass-stop gauge used for examining size of lock mouth of steel sheet pile
CN207066310U (en) A kind of clearance measurement tool
CN203807902U (en) Detection scale for rail cant of railway track
CN201346563Y (en) Aided measuring tool for measuring opening degree and centration of vertical rolling mill
CN206015446U (en) A kind of medium-and low-speed maglev track magnetic pole strength detector
CN201575808U (en) Sleeper slope distortion measuring device
CN208921040U (en) It is a kind of for checking the measuring device of curved surfaces flatness
CN206113928U (en) Special detection instrument of template

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171128

CF01 Termination of patent right due to non-payment of annual fee