CN206683395U - Tunnel cave vault construction - Google Patents

Tunnel cave vault construction Download PDF

Info

Publication number
CN206683395U
CN206683395U CN201720326532.3U CN201720326532U CN206683395U CN 206683395 U CN206683395 U CN 206683395U CN 201720326532 U CN201720326532 U CN 201720326532U CN 206683395 U CN206683395 U CN 206683395U
Authority
CN
China
Prior art keywords
brick
key brick
tunnel cave
block
key
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720326532.3U
Other languages
Chinese (zh)
Inventor
朱军
朱慧
王辉宇
崔恒洋
朱卫国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
DONGTAI CENTER HEAT RESISTANT MATERIALS Co Ltd
Original Assignee
DONGTAI CENTER HEAT RESISTANT MATERIALS Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by DONGTAI CENTER HEAT RESISTANT MATERIALS Co Ltd filed Critical DONGTAI CENTER HEAT RESISTANT MATERIALS Co Ltd
Priority to CN201720326532.3U priority Critical patent/CN206683395U/en
Application granted granted Critical
Publication of CN206683395U publication Critical patent/CN206683395U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model discloses a kind of tunnel cave vault construction, including key brick and skew block, and joggle block is provided between adjacent two key brick of tunnel cave width, and the joggle block both sides are connected in the connection tongue-and-groove of two key brick respectively;Connection boss is provided with below the key brick front end, connection step groove is provided with below key brick rear end, is plugged in the connection boss of the latter key brick of tunnel cave length direction in the connection step groove of previous key brick;Joggle block is provided between the key brick and adjacent skew block, the joggle block both sides are connected in key brick with the connection tongue-and-groove of adjacent skew block, buckling groove is provided with the skew block lower surface respectively.It can guarantee that using tunnel cave vault construction of the present utility model and good connection and sealing maintained to vault, and can Stability Analysis of Structures, long lifespan.

Description

Tunnel cave vault construction
Technical field
It the utility model is related to a kind of industrial furnace, more particularly to a kind of structure on the arch kiln top of Industry Tunnel Kiln.
Background technology
Tunnel cave is the Thermal Equipment that the continous way of modernization is burnt till, and is widely used in the industries such as ceramics, building materials and abrasive material In.Tunnel cave is usually a long linear tunnel, and fixed wall and vault are arranged at its both sides and top, and the gravity of vault leads to Arch springing to be crossed to be delivered on wall, common vault is built by normal refractory brick and overarched, on tunnel cave width, vault Two-side supporting is provided with the inclined-plane being connected with being built into the key brick of vault on skew block, on skew block, and skew block is arranged on On wall, such vault construction is relatively easy, practical, but correspondingly, is also easy to be damaged, because of temperature change and hot on kiln top In the case of swollen shrinkage, the high temperature in the course of work can make vault by squeezing, and terminate in the course of work, meeting after furnace temperature declines Shrink, so as to cause vault repeated deformation, the joint sealing material between key brick also can be deformed or peeled off therewith, and key brick is mutual And the attachment structure between key brick and skew block has destroyed trend, and can cause under kiln top sealing heat-insulating property Drop.In order to change this situation, some manufacturer productions trapezoidal ceiling brick in section, according to the arc on institute's built tunnel arch of furnace top Size determines the width of the top and bottom of trapezoid cross section ceiling brick, to be improved to kiln top attachment structure, although this is than general The refractory brick using effect of logical cuboid will get well, but its versatility is deteriorated, and to determine special kiln for each tunnel cave Dome brick, manufacturing cost is high, and the ceiling brick for also being difficult to be fitted on same size size, and adjacent two arch of this structure are changed in later maintenance The relative connection surface of dome brick is parallel to each other, and pointing is more hard to keep.
Utility model content
For the above-mentioned deficiency present in prior art, technical problem to be solved in the utility model is to provide a kind of tunnel Road arch of furnace roof construction, it is ensured that good connection and sealing are maintained to vault, and can Stability Analysis of Structures, long lifespan.
In order to solve the above-mentioned technical problem, a kind of tunnel cave vault construction of the present utility model, including key brick and arch springing Brick, joggle block is provided between adjacent two key brick of tunnel cave width, the joggle block both sides are connected in two arch respectively In the connection tongue-and-groove of dome brick;Connection boss is provided with below the key brick front end, the company of being provided with below key brick rear end Step groove is connect, is plugged in the connection boss of the latter key brick of tunnel cave length direction in the connection step groove of previous key brick; Joggle block is provided between the key brick and adjacent skew block, the joggle block both sides are connected in key brick and adjacent arch respectively In the connection tongue-and-groove of pin brick, buckling groove is provided with the skew block lower surface.
In said structure, due to being provided with joggle block between adjacent two key brick of tunnel cave width, the joggle Block both sides are connected in the connection tongue-and-groove of two key brick respectively, then joggle block set between adjacent two key brick can be with Strengthen the attachment structure between each key brick in vault, when causing arch deformation producing and expand with heat and contract with cold because of temperature change, respectively Annexation between key brick can be kept relative stability by connecting the joggle block of institute's grafting in tongue-and-groove, tunnel cave top Portion is also just accordingly hardly damaged, and service life is lengthened, and can also be hindered by the joggle block of institute's grafting in connection tongue-and-groove Gap between adjacent two key brick, ensure the sealing between outside at the top of tunnel cave, improve the tunnel cave thermal efficiency;And by In being provided with connection boss below the key brick front end, connection step groove is provided with below key brick rear end, in tunnel The connection boss of the latter key brick of kiln length direction is plugged in the connection step groove of previous key brick, then in tunnel cave length side Connection gap can be equally obstructed between upward each key brick, ensures the sealing between the contact surface on each key brick fore-and-aft direction, And attachment structure will not be deformed because expanding with heat and contract with cold, can equally increase the service life;Due also in the key brick and phase Joggle block is provided between adjacent skew block, the joggle block both sides are connected in the connection tongue-and-groove of key brick and adjacent skew block respectively It is interior, buckling groove is provided with the skew block lower surface, then can equally be borrowed between key brick of the skew block with contacting supporting Help set joggle block to keep good connection status, service life length, and can keep the stability of connection status with Sealing between contact surface, while the stability being connected between tunnel cave wall can be kept.
A kind of preferred embodiment of the present utility model, the joggle block are in rectangular-shape.It is rectangular using the embodiment The joggle block structure of body shape is simple, is easy to manufacture, and can guarantee that the connection reliability being connected with key brick between tongue-and-groove.
Another preferred embodiment of the present utility model, the ratio between the length A of the joggle block and the key brick length B It is equal to 1/1-3/1 for A/B, and joggle block and key brick are in tunnel cave length direction alternate.Using the embodiment, Joggle block not only plays connection function on tunnel cave width, and connection function can be also played on tunnel cave length direction, More preferably, better tightness, service life is longer for attachment structure between joggle block and key brick.
Another preferred embodiment of the present utility model, the left and right sides that the key brick is provided with connection tongue-and-groove are equal Perpendicular to the two sides up and down of the key brick.Using the embodiment, key brick is in rectangular-shape, compound with regular structure, versatility By force.
The utility model further preferred embodiment, formed on tunnel cave width between adjacent two key brick Wedge-like gap, joint sealing material is filled with the wedge-like gap.Using the embodiment, joint sealing material be filled in adjacent two key brick it Between in the wedge-like gap that is formed, on the one hand can be further ensured that the sealing property between outside in vault, on the other hand, work as vault When vault arc produced because expanding with heat and contract with cold changing, be filled in joint sealing material in wedge-like gap can therewith with both sides key brick Wedging state is kept, sealing property is ensure that, is also less prone to drop.
Another further preferred embodiment of the utility model, the key brick are provided with the front end of connection boss Each outer end face is vertical with left surface, right flank, upper side and downside;It is described be provided with connection step groove rear end on it is each Outer end face is vertical with left surface, right flank, upper side and downside.Using the embodiment, can be easy to manufacture, and just Overlap joint between front and rear adjacent two key brick during use.
The another further preferred embodiment of the utility model, it is in contact in the skew block with adjacent key brick lower end Place is provided with key brick support.Using the embodiment, the vault support being arranged on skew block can carry for key brick For more preferable supporting role.
The further preferred embodiment of the utility model, the bearing-surface and arch of the skew block arch dome brick support Angle β between dome brick installation inclined-plane is 90 degree.Using the embodiment, the bearing-surface of key brick support and key brick installation are oblique The angle in face can be adapted with the shape of key brick.
Brief description of the drawings
The utility model tunnel cave vault construction is described in further detail with specific embodiment below in conjunction with the accompanying drawings.
Fig. 1 is a kind of structural representation of embodiment of the utility model tunnel cave vault construction;
Fig. 2 is the sectional view at A-A positions in structure shown in Fig. 1;
Fig. 3 is the close-up schematic view at I positions in structure shown in Fig. 1;
Fig. 4 is the structural representation of key brick in structure shown in Fig. 1;
Fig. 5 is Fig. 4 side view;
Fig. 6 is the structural representation of skew block in structure shown in Fig. 1.
In figure:1- skew blocks, 11- arch bricks top installation inclined-plane, 12- key bricks support, 13- buckling grooves, 2- vaults Brick, 21- connections tongue-and-groove, 22- connections step groove, 23- connections boss, 3- joggles block, 4- joint sealing materials.
Embodiment
In the tunnel cave vault construction shown in Fig. 1, Fig. 2 and Fig. 3, the vault part of tunnel cave is mainly by the He of skew block 1 Key brick 2 is formed, and each key brick 2 is built into arch, and for two supports on skew block 1, skew block 1 is arranged on tunnel cave both sides wall On.It is provided with joggle block 3 between adjacent two key brick 2 of tunnel cave width, joggle block 3 is in rectangular-shape, the joggle block 3 Both sides are connected in the connection tongue-and-groove 21 of adjacent two key brick 2 respectively;Referring to Fig. 4 and Fig. 5, key brick 2 is provided with connection tongue-and-groove 21 left and right sides are each perpendicular to the two sides up and down of the key brick 2, adjacent two key brick 2 on tunnel cave width Between form wedge-like gap, joint sealing material 4 is filled with the wedge-like gap;Connection boss is provided with below the front end of key brick 2 23, connection step groove 22 is provided with below the rear end of key brick 2, key brick 2 is provided with each outer on the front end of connection boss 23 End surfaces are vertical with left surface, right flank, upper side and downside, each outer end table being provided with the rear end of connection step groove 22 Face is vertical with left surface, right flank, upper side and downside;In tunnel cave length direction, the connection boss 23 of latter key brick 2 Be plugged in the connection step groove 22 of previous key brick 2, key brick 2 and joggle block 3 in tunnel cave length direction alternate, The ratio between length A and the length B of key brick 2 of joggle block 3 are that A/B is equal to 1/1-3/1.Between key brick 2 and adjacent skew block 1 Joggle block 3 is also equipped with, the both sides of joggle block 3 are connected in key brick 2 with the connection tongue-and-groove 21 of adjacent skew block 1, joining respectively See Fig. 6, skew block 1 and the adjacent lower end touching position of key brick 2 are provided with key brick support 12, the arch dome brick of skew block 1 Angle β between bearing-surface and key brick the installation inclined-plane 11 of support 12 is 90 degree;Clamping is provided with the lower surface of skew block 1 Groove 13, skew block 1 are arranged on tunnel cave wall by the buckling groove 13.
Some embodiments of the present utility model are only listed above, but the utility model is not limited to that, also More improvement and conversion can be made, such as described joggle block 3 may not be in rectangular-shape, and can be set relatively in two The dovetail shaped put, correspondingly, set connection tongue-and-groove 21 is dovetail type groove on key brick 2 and skew block 1.And so on, As long as made improvement and conversion on the basis of general principle of the present utility model, it is regarded as falling into of the present utility model In protection domain.

Claims (8)

1. a kind of tunnel cave vault construction, including key brick(2)And skew block(1), it is characterised in that:In tunnel cave width Adjacent two key brick(2)Between be provided with joggle block(3), the joggle block(3)Both sides are connected in two key brick respectively(2)Company Joggle groove(21)It is interior;In the key brick(2)Connection boss is provided with below front end(23), in key brick(2)Set below rear end It is equipped with connection step groove(22), in the latter key brick of tunnel cave length direction(2)Connection boss(23)It is plugged in previous vault Brick(2)Connection step groove(22)It is interior;In the key brick(2)With adjacent skew block(1)Between be provided with joggle block(3), should Joggle block(3)Both sides are connected in key brick respectively(2)With adjacent skew block(1)Connection tongue-and-groove(21)It is interior, in the skew block (1)Buckling groove is provided with lower surface(13).
2. tunnel cave vault construction according to claim 1, it is characterised in that:The joggle block(3)In rectangular-shape.
3. tunnel cave vault construction according to claim 1 or 2, it is characterised in that:The joggle block(3)Length A with The key brick(2)The ratio between length B is that A/B is equal to 1/1-3/1, and joggle block(3)With key brick(2)In tunnel cave length side To alternate.
4. tunnel cave vault construction according to claim 1, it is characterised in that:The key brick(2)It is provided with joint tongue Groove(21)Left and right sides be each perpendicular to the key brick(2)Two sides up and down.
5. tunnel cave vault construction according to claim 4, it is characterised in that:Adjacent two arch on tunnel cave width Dome brick(2)Between form wedge-like gap, joint sealing material is filled with the wedge-like gap(4).
6. tunnel cave vault construction according to claim 1, it is characterised in that:The key brick(2)It is convex to be provided with connection Platform(23)Front end on each outer end face it is vertical with left surface, right flank, upper side and downside;It is described to be provided with connected unit Rank groove(22)Rear end on each outer end face it is vertical with left surface, right flank, upper side and downside.
7. tunnel cave vault construction according to claim 1, it is characterised in that:In the skew block(1)With adjacent vault Brick(2)Lower end touching position is provided with key brick support(12).
8. tunnel cave vault construction according to claim 7, it is characterised in that:The skew block(1)Arch up dome brick supporting Portion(12)Bearing-surface and key brick installation inclined-plane(11)Between angle β be 90 degree.
CN201720326532.3U 2017-03-30 2017-03-30 Tunnel cave vault construction Expired - Fee Related CN206683395U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720326532.3U CN206683395U (en) 2017-03-30 2017-03-30 Tunnel cave vault construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720326532.3U CN206683395U (en) 2017-03-30 2017-03-30 Tunnel cave vault construction

Publications (1)

Publication Number Publication Date
CN206683395U true CN206683395U (en) 2017-11-28

Family

ID=60391515

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720326532.3U Expired - Fee Related CN206683395U (en) 2017-03-30 2017-03-30 Tunnel cave vault construction

Country Status (1)

Country Link
CN (1) CN206683395U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108731480A (en) * 2018-08-23 2018-11-02 洛阳宏达炉业有限公司 A kind of furnace wall structure of lift electric kiln

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108731480A (en) * 2018-08-23 2018-11-02 洛阳宏达炉业有限公司 A kind of furnace wall structure of lift electric kiln

Similar Documents

Publication Publication Date Title
CN204612483U (en) There is the refractory brick of composite adiabatic structure
CN206683395U (en) Tunnel cave vault construction
CN204594233U (en) A kind of refractory brick dome structure of locking structure
CN201273771Y (en) Kiln top hanging brick
CN203421960U (en) Skew combination brick for industrial furnace
CN206832034U (en) Buckled tunnel cave kiln body
CN103615896B (en) Kiln hood lid Special hanging brick
CN209840721U (en) Special refractory brick for carbon black industrial reaction furnace
CN212512423U (en) Rotary kiln furnace lining brick and rotary kiln furnace lining
CN206832057U (en) Skew block with excellent support heat-proof quality
CN206683407U (en) The key brick of high attachment structure
CN2844822Y (en) Heat resistant and hollow aluminium oxide ball blocks with grooves
CN202229588U (en) Alumina bubble brick
CN206683406U (en) Skew block with high supporting stabilizer
CN201242351Y (en) Flame-proof heat insulating brick with joint tongue
CN213741858U (en) Environment-friendly refractory brick
CN202938623U (en) Special perforated precast brick for air deflecting wall of shaft furnace
CN205482359U (en) Wall structure is built by laying bricks or stones to special -shaped brick with prevent crooked device
CN212988005U (en) Kiln for firing porcelain
CN216482254U (en) High-temperature smelting furnace lining unit and high-temperature smelting furnace thereof
CN206832056U (en) Plug-in refractory brick
CN201037731Y (en) Structure integration high temperature kiln
CN215479735U (en) Claus furnace for preventing refractory wall from collapsing
CN111607675A (en) Blast furnace hearth ceramic cup side wall with embedded structure
CN208936194U (en) A kind of arch kiln special form brick

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171128