CN206682452U - Clip and quickly jointed tubular workpieces - Google Patents
Clip and quickly jointed tubular workpieces Download PDFInfo
- Publication number
- CN206682452U CN206682452U CN201720436662.2U CN201720436662U CN206682452U CN 206682452 U CN206682452 U CN 206682452U CN 201720436662 U CN201720436662 U CN 201720436662U CN 206682452 U CN206682452 U CN 206682452U
- Authority
- CN
- China
- Prior art keywords
- lug
- pipe joint
- elastic tube
- clip
- lateral wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000007789 sealing Methods 0.000 claims description 15
- 239000007788 liquid Substances 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 230000007547 defect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000012530 fluid Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
Landscapes
- Quick-Acting Or Multi-Walled Pipe Joints (AREA)
Abstract
A kind of clip and quickly jointed tubular workpieces are the utility model is related to, the clip includes being used for the elastic tube being adapted with pipe joint lateral wall.The elastic tube side wall has the hole that the elastic tube other end is extended to from described elastic tube one end, and the elastic tube lateral wall is connected with first lug and the second lug.The first lug is located at the both sides of the hole with second lug respectively, and the first lug is detachably connected with second lug by fastener.Above-mentioned clip, elastic tube is broken into two with one's hands by first lug, the second lug, and the madial wall due to elastic tube is adapted with pipe joint lateral wall, so elastic tube preferably can be installed on outside pipe joint, and first lug, the second lug are fixedly connected by fastener, can be so that pipe joint be fastened on into pipe end, operating efficiency is higher.
Description
Technical field
Pipe fitting technical field is the utility model is related to, more particularly to a kind of clip and quickly jointed tubular workpieces.
Background technology
Traditional quickly jointed tubular workpieces include pipe joint and clip.Pipe joint one end is used for connecting fluid device, and pipeline connects
The head other end is used to be inserted into pipeline, and pipe joint is fixed on into pipe end by clip.Wherein, clip be two-part or
The Split type structure of multisection type, it is required to be attached fastening by fasteners such as bolt nuts between adjacent Split type structure, so
The operation that clip is fixed on outside pipe joint and pipeline is relatively complicated, wastes time and energy.
Utility model content
Based on this, it is necessary to the defects of overcoming prior art, there is provided a kind of clip and quickly jointed tubular workpieces, it can be easy to pipe
Road joint and pipeline connection fastening, simple to operate, operating efficiency is higher.
Its technical scheme is as follows:A kind of clip, including:It is described for the elastic tube being adapted with pipe joint lateral wall
Elastic tube side wall has the hole that the elastic tube other end is extended to from described elastic tube one end, the elastic tube lateral wall
It is connected with first lug and the second lug;The first lug is located at the both sides of the hole with second lug respectively,
The first lug is detachably connected with second lug by fastener.
A kind of quickly jointed tubular workpieces, including:Pipe joint and described clip, the pipe joint end are used to be inserted into pipe
In road, the clip is used to the pipe joint being fixed on the pipeline.
Above-mentioned clip and quickly jointed tubular workpieces, elastic tube is broken into two with one's hands by first lug, the second lug, and due in elastic tube
Side wall is adapted with pipe joint lateral wall, and such elastic tube preferably can be installed on outside pipe joint, and is passed through
First lug, the second lug are fixedly connected by fastener, can be so that pipe joint is fastened on into pipe end, operating efficiency
It is higher.
In one of the embodiments, the first lug is arranged in the elastic tube with second lug
Portion;The first lug and the second lug relative set.
In one of the embodiments, the first lug is provided with the first mounting hole, second lug be provided with it is described
Corresponding second mounting hole of first lug, the first lug pass through the first lug, described second by the fastener
Lug is connected with second lug.Alternatively, fastener is bolt and nut.
In one of the embodiments, the elastic tube madial wall is provided with around its circumferentially disposed projection.In this way, elastic tube
Projection be installed up in the neck of pipe joint after, can cause elastic tube be better secured in pipe joint.
In one of the embodiments, the pipe joint lateral wall is provided with around its circumferentially disposed neck.It is in this way, elastic
After the projection of pipe is installed up in the neck of pipe joint, elastic tube can be better secured in pipe joint.
In one of the embodiments, the pipe joint lateral wall is provided with around its circumferentially disposed groove, the groove
In be equiped with sealing ring, the sealing ring is arranged between the pipeline and the pipe joint.In this way, by pipe joint
Lateral wall setting is fluted, and sets sealing ring in a groove, just can improve the sealing between pipe joint and pipeline, prevents
Only gas in pipelines or liquid overflow, and can also prevent ambient atmos from entering in pipeline.
In one of the embodiments, the pipe joint lateral wall is provided with around its circumferentially disposed lines, the lines
For being contacted with the insides of pipes wall.Lines set by pipe joint lateral wall can make it preferably tight with insides of pipes wall
Closely connected conjunction, it is possible to increase the sealing between pipe joint and pipeline.
In one of the embodiments, the lines be around the pipe joint lateral wall it is circumferentially disposed several are convex
Edge.
Brief description of the drawings
Fig. 1 is the top view of clip described in the utility model embodiment;
Fig. 2 is sectional view at A-A in Fig. 1;
Fig. 3 is the structural representation of quickly jointed tubular workpieces described in the utility model embodiment;
Fig. 4 is the structural representation of pipe joint described in the utility model embodiment.
10th, elastic tube, 11, hole, 12, first lug, the 121, first mounting hole, the 13, second lug, the 131, second peace
Fill hole, 14, projection, 20, pipe joint, 21, neck, 22, groove, 23, lines, 24, sealing ring, 30, pipeline.
Embodiment
To enable above-mentioned purpose of the present utility model, feature and advantage more obvious understandable, below in conjunction with the accompanying drawings to this
The embodiment of utility model is described in detail.Elaborate many details in order to abundant in the following description
Understand the utility model.But the utility model can be to be much different from other manner described here to implement, this area
Technical staff can do similar improvement in the case of without prejudice to the utility model connotation, therefore the utility model is not by following public affairs
The limitation for the specific embodiment opened.
In description of the present utility model, it is to be understood that term " first ", " second " are only used for describing purpose, and
It is not intended that instruction or hint relative importance or the implicit quantity for indicating indicated technical characteristic.Thus, define
At least one this feature can be expressed or be implicitly included to the feature of " first ", " second ".In description of the present utility model,
" multiple " are meant that at least two, such as two, three etc., unless otherwise specifically defined.
, can be with when an element is considered as " connection " another element it should be noted that in embodiment described above
It is directly to another element or may be simultaneously present intermediary element.On the contrary, when element for be referred to as " direct " with it is another
When element connects, in the absence of intermediary element.
As shown in Figures 1 to 4, a kind of clip, including the elastic tube 10 for being adapted with the lateral wall of pipe joint 20.Institute
Stating the side wall of elastic tube 10 has the hole 11 that the other end of elastic tube 10 is extended to from described one end of elastic tube 10, the bullet
The property lateral wall of pipe 10 is connected with the lug 13 of first lug 12 and second.The first lug 12 and second lug 13 difference position
In the both sides of the hole 11, the first lug 12 is detachably connected with second lug 13 by fastener.
Above-mentioned clip, elastic tube 10 is broken into two with one's hands by first lug 12, the second lug 13, and due to the inner side of elastic tube 10
Wall is adapted with the lateral wall of pipe joint 20, and such elastic tube 10 can be preferably installed on outside pipe joint 20, and
First lug 12, the second lug 13 are fixedly connected by fastener, can be so that pipe joint 20 be fastened on into pipeline 30
End, operating efficiency are higher.
In the present embodiment, the first lug 12 is arranged at the middle part of the elastic tube 10 with second lug 13;
The first lug 12 and the relative set of the second lug 13.
In addition, the first lug 12 is provided with the first mounting hole 121, second lug 13 is provided with and the first lug
12 corresponding second mounting holes 131.The first lug 12 passes through the first lug 12, described second by the fastener
Lug 13 is connected with second lug 13.Alternatively, fastener is bolt and nut.
In addition, the madial wall of elastic tube 10 is provided with around its circumferentially disposed projection 14.In this way, the projection 14 of elastic tube 10
After being installed up in the neck 21 of pipe joint 20, elastic tube 10 can be better secured in pipe joint 20.
As shown in Figures 3 and 4, a kind of quickly jointed tubular workpieces, including pipe joint 20 and described clip.The pipe joint
20 ends are used to be inserted into pipeline 30, and the clip is used to the pipe joint 20 being fixed on the pipeline 30.It is above-mentioned
Quickly jointed tubular workpieces employ described clip, its technique effect is brought by clip, identical with the technique effect of clip, without
Repeat.
In addition, the lateral wall of pipe joint 20 is provided with around its circumferentially disposed neck 21.In this way, the projection of elastic tube 10
After 14 are installed up in the neck 21 of pipe joint 20, elastic tube 10 can be better secured in pipe joint 20.
It is equiped with addition, the lateral wall of pipe joint 20 is provided with its circumferentially disposed groove 22, the groove 22
Sealing ring 24, the sealing ring 24 are arranged between the pipeline 30 and the pipe joint 20.In this way, by pipe joint
20 lateral walls set fluted 22, and sealing ring 24 is set in groove 22, just can improve pipe joint 20 and pipeline 30 it
Between sealing, prevent in pipeline 30 gas or liquid to overflow, also can prevent ambient atmos from entering in pipeline 30.
In the present embodiment, the lateral wall of pipe joint 20 is provided with and used around its circumferentially disposed lines 23, the lines 23
Contacted in the madial wall of pipeline 30.Lines 23 set by the lateral wall of pipe joint 20 can make its preferably with pipeline 30
Side wall is brought into close contact, it is possible to increase the sealing between pipe joint 20 and pipeline 30.
Specifically, the lines 23 is around several circumferentially disposed flanges of the lateral wall of pipe joint 20.It is each convex
Edge can be to carrying out once sealing between pipe joint 20 and pipeline 30, several flanges just can realize pipe joint 20 and pipe
Sealed several times between road 30, the sealing between such pipe joint 20 and pipeline 30 is preferable.Lines 23 can also be
Spiral flange.
Each technical characteristic of embodiment described above can be combined arbitrarily, to make description succinct, not to above-mentioned reality
Apply all possible combination of each technical characteristic in example to be all described, as long as however, the combination of these technical characteristics is not deposited
In contradiction, the scope that this specification is recorded all is considered to be.
Embodiment described above only expresses several embodiments of the present utility model, and its description is more specific and detailed,
But therefore it can not be interpreted as the limitation to utility model patent scope.It should be pointed out that the common skill for this area
For art personnel, without departing from the concept of the premise utility, various modifications and improvements can be made, these are belonged to
The scope of protection of the utility model.Therefore, the protection domain of the utility model patent should be determined by the appended claims.
Claims (9)
- A kind of 1. clip, it is characterised in that including:For the elastic tube being adapted with pipe joint lateral wall, the elastic tube Side wall has the hole that the elastic tube other end is extended to from described elastic tube one end, and the elastic tube lateral wall is connected with First lug and the second lug;The first lug and second lug are located at the both sides of the hole respectively, and described the One lug is detachably connected with second lug by fastener.
- 2. clip according to claim 1, it is characterised in that the first lug is arranged at institute with second lug State the middle part of elastic tube;The first lug and the second lug relative set.
- 3. clip according to claim 2, it is characterised in that the first lug is provided with the first mounting hole, and described second Lug is provided with the second mounting hole corresponding with the first lug, and the first lug passes through described first by the fastener Lug, second lug are connected with second lug.
- 4. according to the clip described in any one of claims 1 to 3, it is characterised in that the elastic tube madial wall was provided with around its week To the projection of setting.
- A kind of 5. quickly jointed tubular workpieces, it is characterised in that including:Pipe joint and the clip as described in any one of Claims 1-4, The pipe joint end is used to be inserted into pipeline, and the clip is used to the pipe joint being fixed on the pipeline.
- 6. quickly jointed tubular workpieces according to claim 5, it is characterised in that the pipe joint lateral wall is provided with and set around its circumference The neck put.
- 7. the quickly jointed tubular workpieces according to claim 5 or 6, it is characterised in that the pipe joint lateral wall was provided with around its week To the groove of setting, be equiped with sealing ring in the groove, the sealing ring be arranged on the pipeline and the pipe joint it Between.
- 8. quickly jointed tubular workpieces according to claim 5, it is characterised in that the pipe joint lateral wall is provided with and set around its circumference The lines put, the lines are used to contact with the insides of pipes wall.
- 9. quickly jointed tubular workpieces according to claim 8, it is characterised in that the lines is around pipe joint lateral wall week To several flanges of setting.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720436662.2U CN206682452U (en) | 2017-04-24 | 2017-04-24 | Clip and quickly jointed tubular workpieces |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720436662.2U CN206682452U (en) | 2017-04-24 | 2017-04-24 | Clip and quickly jointed tubular workpieces |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206682452U true CN206682452U (en) | 2017-11-28 |
Family
ID=60404253
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720436662.2U Active CN206682452U (en) | 2017-04-24 | 2017-04-24 | Clip and quickly jointed tubular workpieces |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206682452U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108930855A (en) * | 2018-08-04 | 2018-12-04 | 广州力冠液压器材有限公司 | A kind of hydraulic pipeline flexible connecting structure and method suitable for tight space |
-
2017
- 2017-04-24 CN CN201720436662.2U patent/CN206682452U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108930855A (en) * | 2018-08-04 | 2018-12-04 | 广州力冠液压器材有限公司 | A kind of hydraulic pipeline flexible connecting structure and method suitable for tight space |
CN108930855B (en) * | 2018-08-04 | 2020-08-11 | 广州力冠液压器材有限公司 | Hydraulic pipeline flexible connection structure and method suitable for compact space |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206280658U (en) | A kind of duct closing type device | |
CN206682452U (en) | Clip and quickly jointed tubular workpieces | |
CN201246554Y (en) | Corrugated tube joint | |
CN205745740U (en) | A kind of conduit coupling of good airproof performance | |
CN207514393U (en) | A kind of multi-purpose formula pipe clamp | |
CN206234516U (en) | The convenient oil pipe hoop installed | |
CN202254809U (en) | Tubular furnace pipe device for fluoride heat treatment | |
CN105299323B (en) | A kind of pipe clamp being fixedly mounted for high-pressure hose | |
CN204420411U (en) | A kind of ready-package pipe joint | |
CN202195068U (en) | Valve with quick-connection structure | |
CN207093967U (en) | A kind of hard tube quick union | |
CN206246866U (en) | A kind of petroleum pipeline box cupling | |
CN207034270U (en) | A kind of F types tee ball valve pipe | |
CN107701833B (en) | A kind of Mobile flange for tube furnace | |
CN206831005U (en) | A kind of oil field gas transmission joint | |
CN205956641U (en) | A ready -package blind plate for in liquid conveying equipment | |
CN206817026U (en) | A kind of pipe fitting joint for being used for plastics petroleum pipeline and metal petroleum pipeline | |
CN207246625U (en) | The connector and connection system of a kind of hose and equipment | |
CN206889899U (en) | Pipeline connecting structure | |
WO2021022581A1 (en) | Pipe connection assembly allowing quick installation upon insertion | |
CN206036505U (en) | Novel blind flange | |
CN106224684A (en) | Novel blind flange | |
CN206018033U (en) | A kind of oil-feed tubular construction being applied on automobile | |
CN203927141U (en) | With leading directly to of Double seal ring | |
CN209146542U (en) | Interior pushing-type pipe connection device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20181018 Address after: 510890 101 of Jintian Industrial Road, Huadong Town, Huadu District, Guangzhou, Guangdong, 101 Patentee after: Guangzhou stable oil equipment Co., Ltd. Address before: 510600 a1-3, Che Po West Road, Tianhe District, Guangzhou, Guangdong, China. 198 Patentee before: Ma Tengfei |