CN206681474U - Ecological support system and the tent with the system - Google Patents

Ecological support system and the tent with the system Download PDF

Info

Publication number
CN206681474U
CN206681474U CN201621435553.0U CN201621435553U CN206681474U CN 206681474 U CN206681474 U CN 206681474U CN 201621435553 U CN201621435553 U CN 201621435553U CN 206681474 U CN206681474 U CN 206681474U
Authority
CN
China
Prior art keywords
tent
module
arc pipe
base
vertical arc
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621435553.0U
Other languages
Chinese (zh)
Inventor
江虹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Hi Tech Co Ltd
Original Assignee
Hangzhou Hi Tech Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Hi Tech Co Ltd filed Critical Hangzhou Hi Tech Co Ltd
Priority to CN201621435553.0U priority Critical patent/CN206681474U/en
Application granted granted Critical
Publication of CN206681474U publication Critical patent/CN206681474U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model, which discloses a kind of ecological support system and the tent with the system, ecological support system, includes water circulation cleaning module, generating electricity storage module, domestic rubbish disposal module and control module;Water circulation cleaning module is connected to the water supply installation of tent, to carry out circularly purifying to the domestic water in tent;Generating electricity storage module is electrically connected to the electrical equipment of tent, to manufacture or collect electric energy and storage electric energy, to be powered to tent;The house refuse that domestic rubbish disposal module is connected to tent stores up equipment, to carry out classification processing to house refuse caused by tent;Control module is connected to water circulation cleaning module, generating electricity storage module and domestic rubbish disposal module, to control water circulation cleaning module, generating electricity storage module and domestic rubbish disposal module respectively.The utility model, which carries, can provide tent ecology support and integrated manipulation, tent is possessed various ecological functions, while be easy to user to carry out centralized Control to various lifestyle devices in tent.

Description

Ecological support system and the tent with the system
Technical field
The intelligent tent technical field of ecology is the utility model is related to, in particular to a kind of ecological support system and tool There is the tent of the system.
Background technology
Existing tent-like product can be divided mainly into tent and paulin room two types.
Tent can be divided into high mountain account, four seasons account, three season account, individual layer account, the canopy of the heavens, the major class such as family's leisure tent, its mainly by Account bar and cloth composition.The number of users of tent is from a people to more people.
Above-mentioned existing tent has following defect:
Consider from space angle, the minimum widith of existing tent is to release suitable ratio according to shoulder breadth 50cm of people or so Example, double space 220cm × 135cm, height 105cm or so are comparison reasonably double account standards, are adapted to two people to lie low Body, leg also have space and are used for putting the camp appliances such as knapsack.Except the canopy of the heavens and this interim velaria of leisure tent, other classes Type tent is in warming protection against the tide, space comfort level or far from being enough for sleep overnight, and in general tent people can only be seated, A little bigger can stand, and narrow space can only be temporarily with several days, it is impossible to hang up one's hat.
Consider from using functional perspective, existing tent disclosure satisfy that some days of one or several people inhabitation, heat-holding dampproof The heat-preservation ventilating of several layers of clothes in itself is only leaned on, is also not suitable for cold or larger day and night temperature outdoor.There is no water power in tent Equipment, it can only sleep, it is impossible to wash one's face and rinse one's mouth, go to toilet, use electrical equipment etc..
Consider that existing tent forms mainly by account bar and cloth from deadweight angle, gentlier, in general one push up double account Basis weight is at 2 kilograms or so, single 1.5 kilograms or so of account.As long as windproof by ground anchor pole, strong wind day should not use.
Consider that existing tent space is narrow and small from human oriented design angle, disengaging is required for arching one's back, and no sufficient space puts it It is equipped, and ventilating opening is few and small, is natural exhaust entirely, can be very vexed, it is impossible to is used for a long time in sleet strong wind day.
Paulin room is a kind of outdoor activities temporary building, is widely used in transit depot, factory building, temporary construction, exhibitions Paulin room, construction paulin room, emergency rescue.It is made up of base movable framework and tarpaulin, framework typically has alloy and steel is main portion Part.From 3m to 60m, type mainly has product width:Small paulin room, vertex of a cone paulin, garden tent, send to paulin room, red-letter day paulin room, holiday Paulin room, wedding celebration paulin room, big paulin room, curved post paulin room, arc top room, pointed canopy room, polygon paulin room, double-deck paulin room etc., it is simultaneously Product required for client's custom-made by size, there is provided creative spatial solution, meet that the needs of customer personalized possesses entirely The accessory selection in orientation, all accessories add the function and purposes in paulin room, meet a variety of demands of client.
Above-mentioned existing paulin room has following defect:
Consider that for the span of existing paulin housing product from 3m to 60m, space is more flexible from space angle.Because the size in paulin room It is very high to the transportation condition requirement of building place periphery it is required that it, which is built, is required for large-scale hanging device and crane.For occupying Paulin room firmly is because be largely to use engineering construction accessory such as glass curtain wall, glass door, ABS hardware walls, glass door, rhone, Air-conditioning system and aluminium alloy extrusions support system so that mechanical engagement is needed in disassembly process, loss is larger, and expends a large amount of people Power material resources, poor mobility.
Consider from using functional perspective, the spatial variations in existing paulin room are larger, and interior can need to arrange house according to function Tool or facility, but there is no hydroelectric facility in inhabitation function, it is impossible to wash one's face and rinse one's mouth, go to toilet, use electrical equipment etc..
Consider that existing paulin room is aluminium alloy section structure system, heavier from deadweight angle, it is impossible to artificial to carry, it is necessary to solid Dingan County fills, and wind-proof performance is good.
Consider from human oriented design angle, the type that existing paulin room is used to live is less, because tarpaulin material mainly uses Be PVC material, can be hardened embrittlement at low temperatures.
Utility model content
A main purpose of the present utility model is at least one defect for overcoming above-mentioned prior art, there is provided Yi Zhongneng Enough a variety of vital functions to tent provide the ecological support system of ecology support.
Another main purpose of the present utility model is at least one defect for overcoming above-mentioned prior art, there is provided a kind of Tent with ecological intelligent guarantee and control function.
To achieve the above object, the utility model adopts the following technical scheme that:
According to one side of the present utility model, there is provided a kind of ecological support system, it is used to carry out ecology to a tent Support and control, wherein, the ecological support system includes water circulation cleaning module, generating electricity storage module, domestic rubbish disposal mould Block and control module;The water circulation cleaning module is connected to the water supply installation of the tent, with to the life in the tent Apply flexibly water and carry out circularly purifying;The generating electricity storage module is electrically connected to the electrical equipment of the tent, to manufacture or collect electricity Electric energy and can be stored, to be powered to the tent;The domestic rubbish disposal module is connected to the Domestic Waste Collection of the tent Equipment is stored up, to carry out classification processing to house refuse caused by the tent;The control module is connected to the water and followed Ring cleaning module, generating electricity storage module and domestic rubbish disposal module, to control the water circulation cleaning module respectively, generate electricity and store up Electric module and domestic rubbish disposal module.
According to one of embodiment of the present utility model, the control module is electrically connected to the water circulation purification mould Block, generating electricity storage module and domestic rubbish disposal module.
According to one of embodiment of the present utility model, the control module long distance wireless is connected to water circulation purification Module, generating electricity storage module and domestic rubbish disposal module.
According to one of embodiment of the present utility model, the ecological support system also includes intelligent control box;Institute State intelligent control box and be connected to the water circulation cleaning module, generating electricity storage module and domestic rubbish disposal module;Wherein, The control module is installed on the intelligent control box.
According to one of embodiment of the present utility model, the intelligent control box is provided with display panel and operation control surface Plate, the display panel is receiving and show the water circulation cleaning module, generating electricity storage module and domestic rubbish disposal mould Block feeds back to the information of the control module, and the control panel is stored up with for user to the water circulation cleaning module, generating Electric module and domestic rubbish disposal module are controlled.
According to other side of the present utility model, there is provided a kind of tent, it includes Tent frame and located at the tent Water supply installation, electrical equipment and house refuse in framework store up equipment, it is characterised in that the tent includes described ecology Support system;Wherein, the water circulation cleaning module is connected to the water supply installation, and the generating electricity storage module is electrically connected to institute Electrical equipment is stated, the domestic rubbish disposal module is connected to the house refuse and stores up equipment.
According to one of embodiment of the present utility model, the Tent frame includes chassis and supporting construction;Institute Stating chassis has respectively in two bases of semicircular arc, and the opening on two base is relative and corresponds to round heart coincidence, and described two Base is respectively the first larger base of corresponding radius of circle and corresponding less second base of radius of circle;The supporting construction is located at On the chassis, it includes more and is vertically arranged and curved vertical arc pipe, the both ends of the every vertical arc pipe are connected to Two base, and the round heart of correspondence for being projected through two base of the every vertical arc pipe in the horizontal plane;Wherein, even The height highest of a vertical arc pipe of the one end on a base and the other end on another base is connected to, is connected to one The height of the other end on the base and another vertical arc pipe of the one end on another base is minimum, remaining described vertical arc The height of pipe is sequentially incremented by by described one vertical arc pipe to another vertical arc pipe.
According to one of embodiment of the present utility model, each vertical arc Guan Juncheng circular arcs, the more vertical arcs Pipe is sequentially successively decreased by the corresponding radius of circle of wherein highly minimum one to height highest one.
According to one of embodiment of the present utility model, the one end for defining wherein one base is the first side, separately One end is the second side, and plane where plane where the highly minimum vertical arc pipe founds arc pipe with height highest is overlapped and defined One middle facade;Wherein, the every vertical arc pipe is divided into first and second, and described by the middle facade respectively One is located at first base side, and the second position is in second base side;Wherein, each described first it is common Sphere is imitated positioned at first seamlessly transitted, its sphere diameter is continuously incremented by by the first lateral second side, and height is continuously successively decreased, each described Second is co-located at the imitative sphere of second seamlessly transitted, and its sphere diameter is continuously successively decreased by the first lateral second side, and height is continuous It is incremented by.
According to one of embodiment of the present utility model, the tent also includes crust, and the crust includes basic unit And inside holding lining and external thermal insulation lining;The inside holding lining and external thermal insulation lining are respectively arranged on the inner surface of the basic unit And outer surface, the inside holding lining and external thermal insulation lining include parcel epidermis and the filling insulation material being filled in the phase.
As shown from the above technical solution, the utility model proposes ecological support system and with the system tent it is excellent Point and good effect are:
The utility model proposes a kind of ecological support system, and it can be to tent such as water supply, power supply, garbage reclamation Living needs carries out providing ecology support and integrated manipulation, the tent with the ecological support system is possessed various life State function, while it is easy to user to carry out centralized Control to the various lifestyle devices in tent.
Brief description of the drawings
The following detailed description to preferred embodiment of the present utility model is considered in conjunction with the accompanying drawings, it is of the present utility model Various targets, feature and advantage will become apparent.Accompanying drawing is only exemplary diagram of the present utility model, not necessarily It is drawn to scale.In the accompanying drawings, same reference represents same or similar part all the time.Wherein:
Fig. 1 is a kind of stereogram of Tent frame according to an illustrative embodiments;
Fig. 2 a are the top view on the chassis of the Tent frame shown in Fig. 1;
Fig. 2 b are the part-structure schematic diagram on the chassis shown in Fig. 2 a;
Fig. 2 c are the stereogram of the 3rd bottom tube on the chassis shown in Fig. 2 a;
Fig. 3 a~Fig. 3 j are respectively the exploded perspective view of the Tent frame shown in Fig. 1;
Fig. 4 a~Fig. 4 g are respectively the exploded partial perspective view of the Tent frame shown in Fig. 1;
Fig. 5 a are the structural representation of the fish-bone hinge of the Tent frame shown in Fig. 1;
Fig. 5 b are the side view of the fish-bone hinge shown in Fig. 5 a;
Fig. 5 c are two views of the fish-bone hinge shown in Fig. 5 a;
Fig. 6 is a kind of stereogram of tent according to an illustrative embodiments;
Fig. 7 is the stereogram of the crust of the tent shown in Fig. 6;
Fig. 8 is an angled arrangement schematic diagram of the tent shown in Fig. 6;
Fig. 9 is another angled arrangement schematic diagram of the tent shown in Fig. 6.
Figure 10 a are the partial enlarged drawing on the chassis shown in Fig. 2 a;
Figure 10 b are another partial enlarged drawing on the chassis shown in Fig. 2 a;
Figure 10 c are the another partial enlarged drawing on the chassis shown in Fig. 2 a;
Figure 11 is the ecological support system control principle drawing of the tent shown in Fig. 1.
Wherein, description of reference numerals is as follows:
100. Tent frame;110. chassis;111. the first bottom tube;1111. the first base;1112. the first segmentation;112. the Two bottom tubes;1121. the second base;1122. the second segmentation;113. the 3rd bottom tube;114. radial canal;1141. the first radial canal;1142. Second radial canal;115. connector;1151. bottom plate;1152. pin;1153. bolt;1154. rib;120. supporting construction; 121. vertical arc pipe;1211. first paragraph;1212. second segment;122. fish-bone hinge;1221. sleeve pipe;1222. hinge arrangement; 12221. fixture;12222. articulated elements;1231. first horizontal arc pipes;1232. second horizontal arc pipes;200. crust;210. windowing; 211. French window;310. control module;321. water circulation cleaning modules;322. generating electricity storage modules;323. domestic rubbish disposal Module;400. water supply installation;500. electrical equipment;600. house refuses store up equipment;A1. the first imitative sphere;A2. the second imitative ball Face;S1. the first side;S2. the second side;C. the center of circle;E1~E10. radial canals;B1~B10. founds arc pipe;D1~D18. plane axis number; O. facade axle number;DA. facade axle number;1/DA. facade axles number;DB. facade axle number;1/DB. facade axles number;DC. facade axle number; 1/DC. facade axles number;DD. facade axle number.
Embodiment
Embodying the exemplary embodiments of the utility model features and advantages will describe in detail in the following description.It should be understood that It is that the utility model can have various changes in different embodiments, it does not all depart from the scope of the utility model, and Explanation therein and accompanying drawing are inherently illustrative, and are not used to limit the utility model.
In to being described below different illustrative embodiments of the present utility model, carry out referring to the drawings, the accompanying drawing A part of the present utility model is formed, and wherein shows achievable many aspects of the present utility model by way of example not Same example arrangement, system and step.It should be understood that other of part, structure, exemplary means, system and step can be used Specified scheme, and structural and functional modification can be carried out in the case of without departing from the scope of the utility model.Although moreover, originally Can be used in specification term " end ", " side ", " between " etc. different example features of the present utility model and element described, But these terms are with this article merely for convenient, for example, with reference to the accompanying drawings described in example direction.In this specification Any content is not necessarily to be construed that the specific three dimensional direction of Structure of need is just fallen into the scope of the utility model.
Ecological support system embodiment
As shown in figure 11, it representatively illustrates the control for the ecological support system that can embody principle of the present utility model Schematic diagram processed.In the present embodiment, the utility model proposes ecological support system can be used for carrying out ecological branch to a tent Support control.Wherein, the ecological support system mainly includes water circulation cleaning module 321, generating electricity storage module 322, house refuse Processing module 323, control module 310 and intelligent control box.
Specifically, as shown in figure 11, in the present embodiment, water circulation cleaning module 321 is connected to the water supply of tent Device 400, to carry out circularly purifying to the domestic water in tent.The electricity consumption that generating electricity storage module 322 is electrically connected to tent is set Standby 500, to manufacture or collect electric energy and storage electric energy, to be powered to tent.Domestic rubbish disposal module 323 is connected to tent House refuse stores up equipment 600, to carry out classification processing to house refuse caused by tent.
As shown in figure 11, in the present embodiment, intelligent control box is connected to water circulation cleaning module 321, generated electricity Electricity storage module 322 and domestic rubbish disposal module 323, and control module 310 is installed on intelligent control box, so that control module 310 connect each functional module in above-mentioned tent respectively, to be respectively controlled.Wherein, its in control module 310 and tent The connected mode of his each functional module can connect according to flexible selection is actually needed for example with electrical connection or long distance wireless, It is not limited thereto.
Further, in the present embodiment, intelligent control box is provided with display panel and control panel, and display panel is used To receive and show that water circulation cleaning module 321, generating electricity storage module 322 and domestic rubbish disposal module 323 feed back to control The information of module 310, control panel is with so that user is to water circulation cleaning module 321, generating electricity storage module 322 and house refuse Processing module 323 is controlled.In addition, desktop computer, notebook computer, tablet personal computer or intelligence also can be selected in control module 310 Can mobile phone etc. be used as terminals, using matched with above-mentioned ecological support system control program (such as cell phone application or PC it is objective Family end etc.), real-time remote monitoring is carried out to ecological support system by channels such as wireless network, infrared remote sensing or electromagnetic waves, and Control module 310 is not arranged on the design of intelligent control box and is limited.
Based on above-mentioned design, the utility model proposes ecological support system can be to tent such as water supply, power supply, rubbish The living needses such as rubbish recovery carry out providing ecology support and integrated manipulation, the tent with the ecological support system is possessed Various ecological functions, while it is easy to user to carry out centralized Control to the various lifestyle devices in tent.
Below in conjunction with the illustrative embodiments of tent and its Tent frame, further to the utility model proposes have The tent of the ecological support system is described in detail.
Tent frame embodiment
What following exemplary embodiment had enumerated the Tent frame 100 that can embody principle of the present utility model one shows Example property embodiment, in this embodiment, the utility model proposes Tent frame 100 be using the framework in tent or paulin room as What example illustrated.It will be readily appreciated by those skilled in the art that for the Tent frame 100 is produced applied to other tent-likes Product, and a variety of remodeling, addition, replacement, deletion or other changes are made to following embodiments, these changes are still at this In the range of the principle for the Tent frame 100 that utility model proposes.Refering to Fig. 1, this can be embodied by being representatively illustrated in Fig. 1 The stereogram of the Tent frame 100 of utility model principle, in the present embodiment, the Tent frame 100 mainly include chassis 110 With supporting construction 120.Below in conjunction with accompanying drawing, to the utility model proposes Tent frame 100 each primary structure carry out it is detailed Explanation.
Cooperation refers to Fig. 2 a~Fig. 2 c, and wherein Fig. 2 a representatively illustrate the vertical view on the chassis 110 of Tent frame 100 Figure;Fig. 2 b representatively illustrate the part-structure schematic diagram on chassis 110;Fig. 2 c representatively illustrate the 3rd of chassis 110 The stereogram of bottom tube 113.
With reference to shown in Fig. 1, Fig. 2 a~Fig. 2 c, in the present embodiment, chassis 110 mainly includes the first bottom tube 111, second Bottom tube 112, the 3rd bottom tube 113 and multigroup radial canal 114.Wherein, the first bottom tube 111 is rounded, and the second bottom tube 112 is in semicircle Arc.The radius of the corresponding circle of second bottom tube 112 is more than the radius of the corresponding circle of the first bottom tube 111, and pair of the first bottom tube 111 The center of circle C of the center of circle C that should justify circles corresponding with the second bottom tube 112 is overlapped, and makes the second bottom tube 112 around the first bottom tube 111 Outer half cycle.
Based on the structure of the above-mentioned bottom tube 112 of first bottom tube 111 and second, what two bottom tubes defined chassis 110 is in semi arch Two bases of shape.Wherein, the first bottom tube 111 does not define the semi arch that a radian is 180 ° by the part that the second bottom tube 112 surrounds The second bottom of the semicircular arc that a radian is all 180 ° is defined on first base 1111 of shape, accordingly, the whole of the second bottom tube 112 Side 1121.Position relationship based on the first bottom tube 111 and the second bottom tube 112, then there is the center of circle of the corresponding circle on the first base 1111 The center of circle C of C circles corresponding with the second base 1121 is overlapped, and the radius of the corresponding circle on the second base 1121 is less than the first base 1111 Corresponding circle radius, and the opening on two bases is relative.
It will be readily appreciated by those skilled in the art that to set the above-mentioned bottom tube 112 of first bottom tube 111 and second, and define First base 1111 and the second base 1121, and a variety of remodeling, addition are made to above-mentioned embodiment, substitutes, delete Or other change, these change still the utility model proposes Tent frame 100 principle in the range of.For example, exist In other illustrative embodiments of the present utility model, first bottom tube 111 and the second bottom tube 112 on chassis 110 can be in semicircle Arc, and the round heart location of C of correspondence of two bottom tubes is identical with above-mentioned embodiment with the correlation of radius.That is, the first bottom tube 111 and second bottom tube 112 be Open architecture, and opening be oppositely arranged, the whole of the first bottom tube 111 defines the first base 1111, the whole of the second bottom tube 112 defines the second base 1121.
With reference to shown in Fig. 1, Fig. 2 a~Fig. 2 c, in the present embodiment, the 3rd bottom tube 113 is rounded and is arranged on the first bottom The inner circumferential of pipe 111.The center of circle C of the corresponding circle of 3rd bottom tube 113 round center of circle C corresponding with the first bottom tube 111 (that is, second The center of circle C of the corresponding circle of bottom tube 112) overlap, and the radius of the corresponding circle of the 3rd bottom tube 113 is less than the correspondence of the first bottom tube 111 Round radius.Multigroup horizontal connection of radial canal 114 is in the second bottom tube 112 and the 3rd bottom tube 113.Every group of radial canal 114 is segmented knot Structure, i.e., including the first radial canal 1141 and the second radial canal 1142.Wherein, the horizontal connection of the first radial canal 1141 in the first bottom tube 111 with 3rd bottom tube 113, the both ends of every first radial canal 1141 are connected to the first base 1111 and the 3rd bottom tube 113;Second spoke The horizontal connection of pipe 1142 is connected to second in the second bottom tube 112 and the 3rd bottom tube 113, the both ends of every second radial canal 1142 The bottom tube 113 of base 1121 and the 3rd, and the part for not defining with the first bottom tube 111 first base 1111 intersects;Wherein, with group First radial canal 1141 and the second radial canal 1142 are conllinear, and place passes straight through the center of circle C of the 3rd bottom tube 113.Based on the above-mentioned 3rd The setting of radial canal 114 so that when the quantity of radial canal 114 is more, one end of each radial canal 1142 of first radial canal 1141 and second is equal It is connected in the 3rd bottom tube 113, avoids the end of a large amount of pipe fittings from crossing and be connected to a little and cause the inconvenience in implementation.
As shown in Figure 2 a, in the present embodiment, chassis 110 include be in segmentation structure 10 groups of radial canals 114, in order to Readily appreciate, be shown in the drawings and in the content illustrated by implementation below, 10 groups of radial canals 114 respectively sequentially with E1, E2, E3, E4, E5, E6, E7, E8, E9 and E10 are represented.Wherein, radial canal E1 one end (i.e. one end of its first radial canal 1141) connects The end that the first base 1111 is located at the first side S1 is connected to, the radial canal E1 other end (i.e. one end of its second radial canal 1142) is even It is connected to the end that the second base 1121 is located at the second side S2.Accordingly, radial canal E10 one end (i.e. one of its first radial canal 1141 End) it is connected to the end that the first base 1111 is located at the second side S2, the radial canal E10 other end (i.e. the one of its second radial canal 1142 End) it is connected to the end that the second base 1121 is located at the first side S1.Based on described above, radial canal E1 is actually in radial canal E10 Partially overlap shape, i.e. radial canal E1 is located at the part weight that the part in the first bottom tube 111 is located at radial canal E10 in the first bottom tube 111 Close.Therefore, in specific implementation process, radial canal E1 and radial canal E10 can regard an overall radial canal 114 as, the overall radial canal 114 1 End is connected to the end that the second base 1121 is located at the first side S1, and the other end passes through the both ends on the first base 1111 and is connected to Second base 1121 is located at the second side S2 end, round also cross the correspondence of the above-mentioned bottom tube 112 of first bottom tube 111 and second Heart C.Other 8 groups of radial canal E2~E9 are then sequentially spaced apart on radial canal E1 to radial canal E10 circumferencial direction.
Further, as shown in Figure 2 a, in the present embodiment, can be by each group in order to further optimize structural stress Radial canal 114 is preferably to be uniformly distributed.That is, between each adjacent sets radial canal 114 angle (equivalent to each adjacent first radial canal 1141 it Between angle or each adjacent second radial canal 1142 between angle) it is equal that (by taking 10 groups of radial canals 114 as an example, above-mentioned angle is 20 °), that is, each link position on one end of each group radial canal 114 and the first base 1111 is (equivalent to each first radial canal 1141 and the Each link position on one base 1111), it is uniformly distributed on the first base 1111, accordingly, the other end of each group radial canal 114 With each link position (equivalent to each link position on each base 1121 of second radial canal 1142 and second) on the second base 1121, It is uniformly distributed on second base 1121.
It will be readily appreciated by those skilled in the art that to set above-mentioned 3rd bottom tube 113, and by the radial canal of every component segmentation 114 are connected in the first bottom tube 111, the second bottom tube 112 and the 3rd bottom tube 113, and above-mentioned embodiment are made more Kind remodeling, addition, substitute, delete or other change, these change still the utility model proposes Tent frame 100 principle In the range of.For example, in other illustrative embodiments of the present utility model, above-mentioned 3rd radial canal can be also not provided with 114, during such as 114 negligible amounts of radial canal, can cross the one end of each first radial canal 1141 and each second radial canal 1142 connection In a bit, i.e., the round heart location of C of correspondence of above-mentioned first bottom tube 111 (the second bottom tube 112).Now, it is every in above-mentioned embodiment The first radial canal 1141 and the second radial canal 1142 of group radial canal 114 are connected, and are considered also regard every group of radial canal as by geometrical relationship 114 be a complete radial canal 114, wherein, the both ends of every radial canal 114 are connected to two bases on chassis 110, and more Radial canal 114 intersects at the center of circle location of C of the corresponding circle on two bases (i.e. the first bottom tube 111 or the second bottom tube 112) jointly.
Further, as shown in Figure 10 a~Figure 10 c, the partial enlarged drawing on chassis 110 is shown in Figure 10 a;In Figure 10 b Show another partial enlarged drawing on chassis 110;The another partial enlarged drawing on chassis 110 is shown in Figure 10 c.Wherein, each One bottom tube 111 is segmentation structure and is segmented 1112 including multistage first, divides between the first adjacent segmentation 1112 of each two Not connected by connector 115, the position that each connector 115 is connected to the first bottom tube 111 with each radial canal respectively corresponds, and Radial canal is connected to connector 115.Similar, each second bottom tube 112 is segmentation structure and is segmented 1122 including multistage second, Connected respectively by connector 115 between the second adjacent segmentation 1122 of each two, each connector 115 connects with each radial canal respectively The position for being connected to the second bottom tube 112 corresponds, and radial canal is connected to connector 115.Specifically, above-mentioned connector 115 is led To include bottom plate 1151 and the multiple pins 1152 being fixed on bottom plate.By taking the first bottom tube 111 as an example, two section of first segmentation 1112 Relative end be fixed on respectively by bolt 1153 and above-mentioned pin 1152 on bottom plate 1151, and the both ends are separated by one end Distance, so that corresponding radial canal is set up or is passed through, radial canal can be also fixed on bottom plate 1151 by pin 1152.Still with first Exemplified by bottom tube 111, three species can be at least divided into according to the first bottom tube 111 of diverse location and the annexation of radial canal, connector Type, including cross (i.e. radial canal passes through the first bottom tube 111), yi word pattern (i.e. radial canal end is connected to the first bottom tube 111) andType (i.e. radial canal end is connected with the end of the first bottom tube 111).In addition, according to the first bottom tube 111 (or the second bottom tube 112) with the setting direction of radial canal, the part edge of bottom plate 1151 can be folded upward at forming rib 1154, to lift connector 115 Connect structural strength during different structure.Furthermore the size for corresponding to the part that different structure is connected of bottom plate 1151, can be more than The size of other parts, to increase the contact area of different structure junction and bottom plate, further optimize bonding strength.
Cooperation refers to Fig. 3 a~Fig. 3 j, and wherein Fig. 3 a~Fig. 3 j respectively illustrate the account that can embody the utility model principle The exploded perspective view of paulin framework 100.Specifically, in the present embodiment, supporting construction 120 is arranged on chassis 110, its Including 10 vertical arc pipes 121 and more horizontal arc pipes.In order to make it easy to understand, being shown in the drawings and described in implementation below In bright content, 10 vertical arc pipes 121 are sequentially represented with B1, B2, B3, B4, B5, B6, B7, B8, B9 and B10 respectively, correspondingly, Fig. 3 a then show the exploded perspective view that two vertical arc pipe B1, B10 are set on chassis 110, and Fig. 3 b are shown on the basis of Fig. 3 a Vertical arc pipe B2 exploded perspective view is set up, Fig. 3 c show the exploded perspective view that vertical arc pipe B3 is set up on the basis of Fig. 3 b, with this Analogize, until Fig. 3 i show the exploded perspective view that vertical arc pipe B9 is set up on the basis of Fig. 3 h.In addition, Fig. 3 j are shown in Fig. 3 i On the basis of set up the exploded perspective views of more horizontal arc pipes.It should be noted that above-mentioned accompanying drawing be not intended as it is each to supporting construction 120 The restriction of partial installation procedure, illustrates hereby.
With reference to shown in Fig. 3 a~Fig. 3 i, in the present embodiment, each vertical arc pipe 121 is to be vertically arranged and is in circular arc, It is so-called to be vertically arranged that to refer to the vertical place plane of arc pipe 121 be perpendicular.Wherein, the both ends of every vertical arc pipe 121 connect respectively In two bases, and the round heart C of the correspondence for being projected through two bases of every vertical arc pipe 121 in the horizontal plane, i.e. every vertical arc pipe Perpendicular where 121 both passes through the round heart C of above-mentioned correspondence.In addition, the said structure based on chassis 110, for the ease of saying Bright, the one end on two base defined below is the first side S1, and the other end on two bases is the second side S2.
Specifically, as shown in Figure 3 a, in the present embodiment, stand arc pipe B1 one end and be connected to the one of the first base 1111 Hold (i.e. the first base 1111 is located at the first side S1 end), the vertical arc pipe B1 other ends are connected to the other end on the second base 1121 (i.e. the second base 1121 is located at the second side S2 end).Vertical arc pipe B10 one end is connected to the other end on the first base 1111 (i.e. First base 1111 is located at the second side S2 end), the vertical arc pipe B10 other ends are connected to the one end (i.e. the on the second base 1121 Two bases 1121 are located at the first side S1 end).Based on above-mentioned vertical arc pipe B1 and the annexation on vertical arc pipe B10 and two bases And position relationship, it is known that the perpendicular where vertical arc pipe B1 and vertical arc pipe B10 is overlapped, i.e., two vertical arc pipe B1, B10 are defined jointly One middle facade.
With reference to shown in Fig. 3 b~Fig. 3 i, in the present embodiment, remaining 8 vertical arc pipe B2~B9 are arranged on chassis 110, And the respective wherein one ends of this 8 vertical arc pipe B2~B9 and the link position on the first base 1111, on the first base 1111 It is sequentially to be arranged at intervals to vertical arc pipe B10 from vertical arc pipe B1, and from the first side S1 to the second side S2's on the first base 1111 Direction is sequentially spaced apart, that is, the connection position on the respective wherein other ends of 8 vertical arc pipe B2~B9 and the second base 1121 Put, be sequentially arranged at intervals to vertical arc pipe B10 from vertical arc pipe B1 on the second base 1121, and on the second base 1121 by The direction of from second side S2 to the first side S1 are sequentially spaced apart.And, it is preferable that vertical arc pipe 121 can be to be uniformly distributed, i.e., Angle between each adjacent vertical place perpendicular of arc pipe 121 is equal, and (by taking 10 vertical arc pipes 121 as an example, above-mentioned angle is 20°)。
Further, as shown in figure 1, in the present embodiment, based on the design of above-mentioned radial canal 114, each group radial canal 114 is in fact It is to be corresponded with the position of each vertical arc pipe 121 on border.Specifically, radial canal E1 be connected to the position on the first base 1111 with The position that vertical arc pipe B1 is connected to the first base 1111 overlaps, and the position that both are connected to the second base 1121 overlaps, i.e., Vertical arc pipe B1 overlaps in the projection on horizontal plane with radial canal E1;Radial canal E2 is connected to the position on the first base 1111 and vertical arc pipe B2 The position for being connected to the first base 1111 overlaps, and the position that both are connected to the second base 1121 overlaps, i.e., vertical arc pipe B2 Overlapped in the projection on horizontal plane with radial canal E2;……;Radial canal E10 is connected to the position on the first base 1111 and vertical arc pipe B10 The position for being connected to the first base 1111 overlaps, and the position that both are connected to the second base 1121 overlaps, i.e., vertical arc pipe B10 Overlapped in the projection on horizontal plane with radial canal E10.
Cooperation refers to Fig. 4 a~Fig. 4 g, and wherein Fig. 4 a~Fig. 4 g respectively illustrate the account that can embody the utility model principle The exploded partial perspective view of paulin framework 100, it specifically illustrates the three-dimensional amplification knot of the tip position close to each vertical arc pipe 121 Structure.Specifically, with reference to shown in Fig. 3 a~Fig. 3 j and Fig. 4 a~Fig. 4 g, in the present embodiment, the height of each vertical arc pipe 121 is equal It is unequal, i.e., vertical arc pipe B1 height highest, and sequentially successively decreased by vertical arc pipe B1 to vertical arc pipe B10, until vertical arc pipe B10 height Spend minimum.Be due to each vertical arc pipe 121 circular arc and place arch chord length (i.e. each length of radial canal 114) it is equal, based on several What relation, the radius for founding arc pipe B1 to vertical arc pipe B10 corresponding circle are sequentially incremented by.Further, in the present embodiment, each phase The difference of the height of the vertical arc pipe 121 of neighbour is preferably equal, i.e., the difference of the corresponding radius of circle of each adjacent vertical arc pipe 121 is equal.Base In said structure, in the present embodiment, every vertical arc pipe 121 is divided into first and second by middle facade respectively, and First position is in the side of the first base 1111, and second position is in the side of the second base 1121.Wherein, each first is co-located at The the first imitative sphere A1 seamlessly transitted, its sphere diameter is continuously incremented by from the first side S1 to the second side S2, and height is continuously successively decreased, and each the Two are co-located at the imitative sphere A2 of second seamlessly transitted, and its sphere diameter is continuously successively decreased from the first side S1 to the second side S2, and height It is continuous to be incremented by.
Further, in the present embodiment, the radian for founding arc pipe B1 is preferably 180 °, also can it is slightly larger or slightly smaller in 180 °, the radian (also referring to its height) of the vertical arc pipe B1 then determines the maximum height of Tent frame 100.Each vertical arc pipe 121 Radian sequentially uniformly successively decreases, until vertical arc pipe B10 radian is minimum.(it is high to also refer to it accordingly, due to vertical arc pipe B10 radian Degree) it is minimum, the vertical arc pipe B10 then determines the minimum constructive height of Tent frame 100.For the maximum arc of above-mentioned each vertical arc pipe 121 Degree and minimum curvature design, can combine Tent frame 100 specific size and actual demand be adjusted flexibly, not as Limit.
It will be readily appreciated by those skilled in the art that to set the vertical arc pipe 121 that above-mentioned more height are sequentially successively decreased, make it Define above-mentioned two and correspond to the imitative sphere that sphere diameter seamlessly transits, and above-mentioned embodiment is made it is a variety of remodeling, addition, Substitute, delete or other change, these change still the utility model proposes Tent frame 100 principle in the range of.Lift For example, in other illustrative embodiments of the present utility model, the quantity for founding arc pipe 121 can be with the quantity of radial canal 114 not Together, the link position on each base of vertical arc pipe 121 and two can not correspond with the link position on each base of radial canal 114 and two, and The layout pitch of each vertical arc pipe 121 also can be uneven design.
In addition, with reference to shown in Fig. 1 and Fig. 3 j, in the present embodiment, the supporting construction 120 of the Tent frame 100 is also wrapped Include more horizontal arc pipes, i.e. more first horizontal arc pipes 1231 and more second horizontal arc pipes 1232.Wherein, more first horizontal arc pipes 1231 between the upper and lower every and laterally set, every first horizontal arc pipe 1231 is located at the side of the first base 1111 with each vertical arc pipe 121 Part (first of i.e. vertical arc pipe 121) connect respectively.More second horizontal arc pipes 1232 between the upper and lower every and laterally set, every Second horizontal arc pipe 1232 and part (second of i.e. vertical arc pipe 121) difference of the side of the second base 1121 of each vertical arc pipe 121 Connection.Specifically, in description of the present embodiment, the horizontal arc pipe is to be directed to the name that vertical arc pipe 121 is carried out, its " horizontal stroke " It is not limited to be horizontally disposed with, is only generally bright relative to the set-up mode of vertical arc pipe 121.
Preferably, in the present embodiment, each horizontal arc pipe is inclined design, so-called to tilt the institute for referring to every horizontal arc pipe It is with respect to the horizontal plane slightly inclined in plane.Specifically, illustrated by taking a first horizontal arc pipe 1231 as an example, it two End is connected on vertical arc pipe B1 and vertical arc pipe B10, and in the first horizontal arc pipe 1231 by founding arc pipe B1 to vertical arc pipe B10's On direction, sequentially successively decrease with the height of the link position of each vertical arc pipe 121, and make the first vertical arc pipe 121 in above-mentioned middle facade Upper projection form an angled straight lines.Correspondingly, every second horizontal arc pipe 1232 is by founding arc pipe B1 to vertical arc pipe B10 direction On, sequentially successively decrease with the height of the link position of each vertical arc pipe 121, and make the first vertical arc pipe 121 in the upper of above-mentioned middle facade Projection formed an angled straight lines.
Further, based on the above-mentioned explanation to horizontal arc pipe, in the present embodiment, set location from low to high each Projection of the one horizontal arc pipe 1231 on middle facade is not parallel, the design sequentially increased into angle of inclination from low to high.It is right Ying Di, projection of each second horizontal arc pipe 1232 on middle facade of set location from low to high is also not parallel, into by low The design sequentially increased to high tilt angle.The above-mentioned change for being designed to the corresponding sphere diameter for two imitative spheres, further Optimize structural stress, but be not limited thereto.
It should be noted here that the Tent frame 100 for showing in accompanying drawing and describing in this manual is only to use An example in many kinds of Tent frames 100 of the utility model principle.It should be clearly understood that principle of the present utility model Be only limitted to absolutely not show in accompanying drawing or this specification described in Tent frame 100 any details or Tent frame 100 appoint What part.
For example, general principle of the present utility model is not limited to, cooperation refers to Fig. 5 a~Fig. 5 c, wherein Fig. 5 a generations Show the structural representation of the fish-bone hinge 122 for the Tent frame 100 that can embody the utility model principle table;Fig. 5 b Representatively illustrate the side view of the fish-bone hinge 122 shown in Fig. 5 a;Fig. 5 c representatively illustrate the fish-bone shown in Fig. 5 a Two views of hinge 122.
With reference to shown in Fig. 5 a~Fig. 5 c, each vertical arc pipe 121 is two-part structure and includes first paragraph 1211 and second Section 1212, and the segmental structure of the first paragraph 1211 and second segment 1212 and the above-mentioned subregion explanation of first and second And differ, illustrate hereby.Wherein, the first paragraph 1211 of every vertical arc pipe 121 and one end of second segment 1212 are connected to First base 1111 and the second base 1121.Based on said structure, the utility model proposes Tent frame 100 also include connecting Connection mechanism, for the first paragraph 1211 of each vertical arc pipe 121 to be connected with the other end of second segment 1212.
Specifically, in the present embodiment, the bindiny mechanism can be preferably fish-bone hinge 122.The fish-bone hinge 122 Mainly include multiple sleeve pipes 1221 and multigroup hinge arrangement 1222.Wherein, multiple sleeve pipes are arranged at intervals about 1221, and respectively Corresponded with more vertical arc pipes 121, the first paragraph 1211 of every vertical arc pipe 121 and the other end of second segment 1212 respectively by Two mouths of pipe of sleeve pipe 1221 are planted and docked.Multigroup hinge arrangement 1222 is connected between adjacent two sleeve pipe 1221, every group Hinge arrangement 1222 includes two fixtures 12221 and articulated elements 12222.Two fixtures 12221 are respectively arranged on sleeve 1221 Bottom and the top of another sleeve pipe 1221 adjacent thereto.Articulated elements 12222 has two hinged ends, is hingedly connected to two fixtures 12221, and adjacent two sleeve pipe 1221 is relatively rotated in horizontal direction.
Further, in the present embodiment, in order to further optimize stress and structural strength, the fish-bone hinge 122 can It is preferably located in the round heart C of correspondence of the first bottom tube 111 and the second bottom tube 112 surface, i.e. point of every vertical arc pipe 121 Fragment position is respectively positioned on the round heart C of above-mentioned correspondence surface, but is not limited thereto.
Tent embodiment
As shown in fig. 6, it representatively illustrates a kind of stereogram for the tent that can embody the utility model principle, In the embodiment, the utility model proposes tent illustrated by taking tent or paulin room as an example.Those skilled in the art It is easily understood that for set the tent, and following embodiments is made it is a variety of remodeling, addition, substitute, delete or Other change, these change still the utility model proposes tent principle in the range of.
As shown in fig. 6, in the present embodiment, the utility model proposes tent mainly include framework, crust 200 and raw State support system.Cooperation refers to Fig. 7~Fig. 9, and the tent that can embody the utility model principle is representatively illustrated in Fig. 7 The stereogram of crust 200;An angled arrangement schematic diagram of the tent shown in Fig. 6 is representatively illustrated in Fig. 8;Represented in Fig. 9 Show to property another angled arrangement schematic diagram of the tent shown in Fig. 6.Below in conjunction with accompanying drawing, to the utility model proposes account Each chief component of paulin is described in detail.
With reference to shown in Fig. 6~Fig. 9, in the present embodiment, the utility model proposes tent framework can select this The Tent frame 100 that utility model proposes.Crust 200 is covered on framework, and crust 200 mainly includes basic unit and interior guarantor Warm lining and inside holding lining.Specifically, inside holding lining and external thermal insulation lining are respectively arranged on the inner surface and appearance of basic unit Face, inside holding lining and external thermal insulation lining include parcel epidermis and the filling insulation material being filled in the phase.Wherein, based on upper The structure of Tent frame 100 is stated, when crust 200 is covered when on Tent frame 100, crust 200 is formed in middle facade both sides The imitative sphere A1 and second of relative first imitates sphere A2, and (the first imitative sphere A1 and second defined with each vertical arc pipe 121 is imitative Sphere A2 is identical), and the transition structure to form approximate helical line is covered with the top of tent.Based on said structure, ensureing to tie While structure intensity, crust 200 is formed screw type and fairshaped design, greatly improve the overall wind resistance of tent.
Preferably, composite material fabric can be selected in the material of basic unit, and further comprises the soft compound fabric of individual layer and list Some combinations such as the soft compound fabric combination rigid composite material of layer.Three proofings fabric can be selected in the material for wrapping up epidermis.Filling is protected Insulation fibre can be selected in the material of adiabator.Based on said structure and selection, the utility model proposes tent can ensure to prevent Fiery dustproof and waterproof function, its hydrostatic pressing can reach more than 5000mm, have certain elasticity and gas permeability.
For convenience of description, further each vertical arc pipe is marked in a manner of plane axis number and facade axle number in Fig. 8 and Fig. 9 The substantially axial position of 121 (radial canals 114) and each horizontal arc pipe, wherein, plane axis number is respectively D1~D18, that is, is indicated each vertical Arc pipe 121 and the link position on chassis 110 (each base 1111 of radial canal 114 and first and the second base 1121).Facade axle number point Wei not O, DA, 1/DA, DB, 1/DB, DC, 1/DC, DD.
With reference to shown in Fig. 6~Fig. 9, in the present embodiment, multiple windowings 210 can be set on crust 200, it is above-mentioned to open Window 210 can be made up of transparent material.Wherein, above-mentioned be split into is preferably to include French window 211 and louver(-vre).Specifically, exist In present embodiment, French window 211 made of transparent material is arranged on the first imitative sphere A1 or second and imitated (to be shown on sphere A2 in figure Go out to be preferably provided on the first imitative sphere A1), first base 1111 on the base of French window 211 and chassis 110 (or second Base 1121) connection.Specifically, in the present embodiment, reference, the French window are used as using plane axis number and facade axle number 211 setting scope is in the range of plane axis D11 to plane axis D18, and between facade axle DD and DB.It is logical Transom window is preferably fan-shaped or hexagon etc., the additional structure such as its settable screen window, rainhat and indoor closure, and louver(-vre) Selectively in the range of plane axis D1 axles to plane axis D10, and located at facade axle DD to facade axle DB's In the range of.
It will be readily appreciated by those skilled in the art that to set above-mentioned crust 200, cover it above-mentioned to be formed in framework The imitative spheres that two corresponding sphere diameters seamlessly transit, and above-mentioned embodiment is made and a variety of retrofit, add, substituting, deleting Remove or other change, these change still the utility model proposes tent principle in the range of.For example, in this practicality In other new illustrative embodiments, the structure of crust 200 and each layer material can be adjusted flexibly and selection, crust 200 On type, quantity, size or the set location of windowing 210 can be adjusted flexibly according to the actual requirements, be not limited thereto.
It should be noted that above to the utility model proposes Tent frame 100 or the explanation of tent be merely illustrative , various change can be carried out in other embodiments by having no effect on the utility model.For example, in embodiment of above, It is to be illustrated around semicircular arc, circle, circular arc, imitative sphere etc..However, in other exemplary implementations of the present utility model In mode, the chassis 110 of Tent frame 100 can be ellipse, rectangle, polygon or irregular figure, only need to ensure chassis 110 have the first base 1111 and the second base 1121 that opening is oppositely arranged.Similar, found arc pipe 121 and ellipse also may be selected Arc, rectangle, polygon or irregular figure so that two imitative spheres defining of each vertical arc pipe 121 in be approximately spheroid shape, Cube or other irregular stereochemical structures.No matter how said structure changes, and based on the base of the application two and is arranged on chassis The design of the highly gradient of each vertical arc pipe 121 on 110, the utility model proposes the height that is defined by it of tent or sky Between size gradation two parts, that is, reach the effect structures such as lifting wind resistance, enhancing structure intensity and cosmetic structure outward appearance.
In addition, in the explanation of embodiment of above, " title such as vertical arc pipe 121 ", " bottom tube " and " horizontal arc pipe ", only To be exemplary.For example, in other illustrative embodiments of the present utility model, it can be pipe, square tube etc. to found arc pipe 121 Various types of pipe fittings, also or other structures or the rod member of material or beam etc. are selected, be not limited.
Compared to prior art, the utility model proposes tent careat and indoor maximum height can be in a big way Inside it is designed and selects, the area of general hotel guest room can be fully equivalent to.Existing wine is no less than in comfort level Customer room.Because crust 200 used in the tent is not engineering construction accessory, has and dismount convenient, saving manpower, dismounting zero The advantages of loss, and fast quick-detach can be built after use an infield and transports second infield to and is quickly taken Build, and build and the Large-scale Hoisting equipment such as crane are not needed in disassembly process, to place peripheral path also without particular/special requirement.
Furthermore the utility model proposes tent can be used for field long and short phase to live, it uses the heat-insulated system of Double insulating System, make wall, roof and ground, form complete sealing system, detail design on meet ventilation, waterproof, protection against the tide, prevent Condensation etc..These designs make internal living space adapt to various climate changes and day-night change.The ecology support system that tent is set System can meet such as bathing, go to toilet, force ventilation, and the various normal lifves such as use of electrical equipment need, and can adapt to various Natural environment, pollution can't be produced to environment.
In addition, the utility model proposes tent weight between existing tent and paulin room, manually single-piece can remove Fortune.
Furthermore the utility model proposes tent space it is moderate, furniture interior trim can be arranged by hotel's standard room, it is double-deck Heat preserving exterior wall and ground, waterproof and breathable compound fabric crust are adapted to various weathers, can be used in sleet strong wind day, consider The natural cause that consumer runs into use.
It is described in detail above and/or illustrate the utility model proposes tent and its Tent frame exemplary implementation Mode.But embodiment of the present utility model is not limited to particular implementation as described herein, on the contrary, each embodiment Part and/or step can be independent with other parts as described herein and/or step and are used separately.One reality The each part and/or each step for applying mode also can be with the other parts and/or step knot of other embodiment Close and use.Introducing described here and/or diagram key element/part/when waiting, term "one", " one " and " above-mentioned " Deng to represent to exist one or more elements/part/etc..Term "comprising", " comprising " and " having " are representing out Put formula be included look like and refer to the key element except listing/part/also may be present in addition to waiting other key element/ Part/etc..In addition, term " big " and " small " in claims and specification etc. only uses as mark, it is not pair The numerical limit of its object.
Although according to different specific embodiments to the utility model proposes tent and its Tent frame retouched State, but it will be recognized by those skilled in the art can implement to carry out to of the present utility model in the spirit and scope of the claims Change.

Claims (10)

1. a kind of ecological support system, it is used to carry out ecological support and control to a tent, it is characterised in that the ecology support System includes:
Water circulation cleaning module (321), the water supply installation (400) of the tent is connected to, to use the life in the tent Water carries out circularly purifying;
Generating electricity storage module (322), the electrical equipment (500) of the tent is electrically connected to, to manufacture or collect electric energy and storage Electric energy, to be powered to the tent;
Domestic rubbish disposal module (323), the house refuse for being connected to the tent stores up equipment (600), with to the tent Caused house refuse carries out classification processing;And
Control module (310), it is connected to the water circulation cleaning module (321), generating electricity storage module (322) and life rubbish Rubbish processing module (323), to control the water circulation cleaning module (321), generating electricity storage module (322) and house refuse respectively Processing module (323).
2. ecological support system according to claim 1, it is characterised in that the control module (310) is electrically connected to institute State water circulation cleaning module (321), generating electricity storage module (322) and domestic rubbish disposal module (323).
3. ecological support system according to claim 1, it is characterised in that control module (310) long distance wireless connects It is connected to water circulation cleaning module (321), generating electricity storage module (322) and domestic rubbish disposal module (323).
4. the ecological support system according to any one of claims 1 to 3, it is characterised in that the ecological support system is also Including:
Intelligent control box, it is connected to the water circulation cleaning module (321), generating electricity storage module (322) and house refuse Processing module (323);Wherein, the control module (310) is installed on the intelligent control box.
5. ecological support system according to claim 4, it is characterised in that the intelligent control box is provided with display panel And control panel, the display panel is receiving and show the water circulation cleaning module (321), generating electricity storage module (322) and domestic rubbish disposal module (323) feeds back to the information of the control module, and the control panel is with for user couple The water circulation cleaning module (321), generating electricity storage module (322) and domestic rubbish disposal module (323) are controlled.
6. a kind of tent, it includes Tent frame and water supply installation, electrical equipment and life rubbish in the Tent frame Rubbish stores up equipment, it is characterised in that the tent includes the ecological support system as described in any one of Claims 1 to 5;Its In, the water circulation cleaning module is connected to the water supply installation, and the generating electricity storage module is electrically connected to the electrical equipment, The domestic rubbish disposal module is connected to the house refuse and stores up equipment.
7. tent according to claim 6, it is characterised in that the Tent frame (100) includes:
Chassis (110), have respectively in two bases of semicircular arc, the opening on two base is relative and corresponds to the round heart (C) Overlap, two base is respectively larger the first base (1111) of corresponding radius of circle and corresponding less second base of radius of circle (1121);And
Supporting construction (120), on the chassis (110), it includes more and is vertically arranged and curved vertical arc pipe (121), the both ends of the every vertical arc pipe (121) are connected to two base, and the every vertical arc pipe (121) is in water The round heart of correspondence (C) for being projected through two base in plane;
Wherein, it is connected to a vertical arc pipe (121) of the one end on a base and the other end on another base Height highest, it is connected to another vertical arc pipe (121) of the other end on a base and the one end on another base Height it is minimum, the height of remaining vertical arc pipe (121) is by described one vertical arc pipe (121) to another vertical arc pipe (121) Sequentially it is incremented by.
8. tent according to claim 7, it is characterised in that each vertical arc pipe (121) is in circular arc, described more Vertical arc pipe (121) is sequentially successively decreased by the corresponding radius of circle of wherein highly minimum one to height highest one.
9. tent according to claim 8, it is characterised in that the one end for defining wherein one base is the first side (S1), the other end is the second side (S2), and plane founds arc pipe with height highest where the highly minimum vertical arc pipe (121) (121) plane overlaps and defines a middle facade where;
Wherein, the every vertical arc pipe (121) is divided into first and second, and described first by the middle facade respectively Portion is located at the first base (1111) side, and the second position is in the second base (1121) side;
Wherein, each described first is co-located at the imitative sphere (A1) of first seamlessly transitted, and its sphere diameter is from the first side (S1) to the Two sides (S2) are continuously incremented by, and height is continuously successively decreased, and each described second is co-located at the imitative sphere (A2) of second seamlessly transitted, Its sphere diameter is continuously successively decreased from the first side (S1) to the second side (S2), and height is continuous incremental.
10. tent according to claim 7, it is characterised in that the tent also includes crust (200), the crust (200) include:
Basic unit;And
Inside holding lining and external thermal insulation lining, are respectively arranged on inner surface and the outer surface of the basic unit, the inside holding lining and External thermal insulation lining includes parcel epidermis and the filling insulation material being filled in the phase.
CN201621435553.0U 2016-12-23 2016-12-23 Ecological support system and the tent with the system Active CN206681474U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621435553.0U CN206681474U (en) 2016-12-23 2016-12-23 Ecological support system and the tent with the system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621435553.0U CN206681474U (en) 2016-12-23 2016-12-23 Ecological support system and the tent with the system

Publications (1)

Publication Number Publication Date
CN206681474U true CN206681474U (en) 2017-11-28

Family

ID=60395848

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621435553.0U Active CN206681474U (en) 2016-12-23 2016-12-23 Ecological support system and the tent with the system

Country Status (1)

Country Link
CN (1) CN206681474U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108240133A (en) * 2016-12-23 2018-07-03 杭州旅家科技有限公司 Spiral tent and its Tent frame

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108240133A (en) * 2016-12-23 2018-07-03 杭州旅家科技有限公司 Spiral tent and its Tent frame
CN108240133B (en) * 2016-12-23 2019-09-20 杭州旅家科技有限公司 Spiral tent and its Tent frame

Similar Documents

Publication Publication Date Title
CN206681474U (en) Ecological support system and the tent with the system
CN206495558U (en) Spiral shape supporting construction and the spiral tent with the structure
CN205206376U (en) Simple and easy room of solar -powered outdoor
CN206477668U (en) Fish-bone attachment structure, Tent frame and tent with the structure
CN206238626U (en) A kind of three layers of sun-proof rain-proof fishing umbrella
CN206477665U (en) Tent chassis and the spiral tent with the chassis
CN108240133B (en) Spiral tent and its Tent frame
Saprykina INNOVATIVE CONCEPTIONS OF NATURAL LIGHT USING AS AN ESSENTIAL COMPONENT OF THE FORMAION OF ARCHITECTURAL SPACE.
Frighi et al. What Is a Smart Architecture?
CN203295490U (en) Heating and heat-preservation building for biogas fermentation tank
CN202311626U (en) Foldable telescopic umbrella
CN206503428U (en) A kind of new type auto type tent bracket
CN105401749A (en) Multifunctional solar Chinese-style landscape pavilion
CN207211820U (en) A kind of multifunctional landscape booth
Gill A tall, green future
CN106760629B (en) A kind of yurt with wind-power electricity generation and solar power generation function
Cheng et al. The New Mission of Abandoned Architectural Heritage: Design and Research on the Renovation of Pit Cave Courtyard in Sanmenxia City
CN202248276U (en) Adjustable supporting rod provided with guy cables and used for daylighting roof
CN204060119U (en) A kind of fast bridging type canopy of the heavens, the Room, room tent
CN107461704A (en) A kind of outdoor street lamp with health-care facilities
Liu et al. Research on Mongolian yurts from the perspective of regionalism
CN109488049B (en) Movable foldable assembled multifunctional micro building structure
CN102383514B (en) Cable system for circular lighting roof
CN216156633U (en) Eggshell building group comprehensively utilizing underground space
CN213282208U (en) Novel landscape seat

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant