CN206677596U - A kind of pipeline processing fixture - Google Patents
A kind of pipeline processing fixture Download PDFInfo
- Publication number
- CN206677596U CN206677596U CN201720364566.1U CN201720364566U CN206677596U CN 206677596 U CN206677596 U CN 206677596U CN 201720364566 U CN201720364566 U CN 201720364566U CN 206677596 U CN206677596 U CN 206677596U
- Authority
- CN
- China
- Prior art keywords
- chute
- holding finger
- pipeline processing
- tubing
- shaped
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Supports For Pipes And Cables (AREA)
Abstract
The utility model discloses a kind of pipeline processing fixture, belong to pipeline processing technical field of auxiliary equipment, for that can not be adjusted with solving existing pipeline processing fixture according to the big freedom in minor affairs of caliber, the tubing of single model can only be clamped, need to carry out clamp-replacing, ineffective problem before the tubing of processing different model.Including adjusting bracket, the first holding finger and the second holding finger, the left end of first holding finger is fixedly connected on the bottom righthand side of adjusting bracket, second holding finger is installed on the surface of the first holding finger, the right-hand member of adjusting bracket is provided with the first chute, the left side of first chute is provided with the second chute, and the front and rear depth of the second chute is more than the front and rear depth of the first chute.The pipeline processing fixture provided by this real technical scheme, the big freedom in minor affairs for being capable of more caliber adjust, so as to reach the purpose of clamping Multiple Type tubing, fixture are changed without the model according to tubing, greatly increases operating efficiency.
Description
Technical field
The utility model belongs to pipeline processing technical field of auxiliary equipment, is a kind of pipeline processing fixture specifically.
Background technology
Pipeline is for conveying gas, liquid or the device of fluid with solid particle.Generally, fluid is through air blower, pressure
After the supercharging such as contracting machine, pump and boiler, flowed at the high pressure of pipeline at low pressure, pressure or the gravity that fluid itself can also be used are defeated
Send.Having many uses for pipeline is general, is used primarily in feedwater, draining, heat supply, gives gas, long distance delivery oil and natural gas, agricultural
Irrigate, in hydraulic engineering and various commercial plants.Root is needed when in use to the metal tube with certain degree of hardness or plastic tube
Cut according to actual conditions, the processing such as screw thread process, steel pipe must be fixed during processing, to prevent it from moving or
Person rotates, and therefore, the structure of stepping up for fixing steel pipe plays an important role in steel pipe fixation.
However, existing pipeline processing fixture can not be adjusted according to the big freedom in minor affairs of caliber, single model can only be clamped
Tubing, need to carry out clamp-replacing before the tubing of processing different model, greatly reduce operating efficiency.
Utility model content
The utility model purpose is intended to provide a kind of pipeline processing fixture, with solve existing pipeline processing fixture without
Method is adjusted according to the big freedom in minor affairs of caliber, can only clamp the tubing of single model, needed before the tubing of processing different model into
Row clamp-replacing, ineffective problem.
To realize above-mentioned technical purpose, the technical solution adopted in the utility model is as follows:
A kind of pipeline processing fixture, including adjusting bracket, the first holding finger and the second holding finger, the first holding finger
Left end be fixedly connected on the bottom righthand side of adjusting bracket, the second holding finger is installed on the surface of the first holding finger, adjusts
The right-hand member of support is provided with the first chute, and the left side of the first chute is provided with the second chute, and the front and rear depth of the second chute is more than first
The front and rear depth of chute, the left end of the second holding finger are embedded in the first chute, and the left end of the second holding finger is fixedly connected with
The positioning sliding block to match with the second chute, the surface of the second chute are provided with fastening thread hole, are inserted with fastening thread hole
Fastening bolt, the upper end of the first holding finger are symmetrically set with the first adjustment structure, the lower end of the second holding finger or so
It is symmetrically arranged with the second adjustment structure, the first adjustment structure and the setting symmetrical above and below of the second adjustment structure.
The pipeline processing fixture that this real technical scheme provides, the big freedom in minor affairs for being capable of more caliber is adjusted, so as to reach folder
The purpose of Multiple Type tubing is held, fixture is changed without the model according to tubing, greatly increases operating efficiency.
Using the utility model of above-mentioned technical proposal, its operation principle is:When clamping tubing, tubing is placed on the first folder
Between holding two the first adjustment structures on finger, two the first adjustment structures rotate in opposite directions in the presence of tubing gravity, enter
And be in close contact with the curved surface of tubing, then rotational fastener bolt, positioning sliding block is promoted along the second chute by fastening bolt
Slide downward, and then drive the second holding finger close to the first holding finger, under the promotion of the second holding finger, two the
After two adjustment structures contact with tubing, rotate backward under the promotion of the second holding finger, and then closely connect with the curved surface of tubing
Touch, continue rotational fastener bolt until tubing is clamped.Fastening bolt is rotated backward after machining, makes itself and positioning sliding block point
From.
Further limit, the first adjustment structure adjustment structure includes U-shaped connector and T-shaped spacer, under U-shaped connector
End is fixedly connected on the first holding finger, and the lower end of T-shaped spacer is articulated with U-shaped connector, and the second adjustment structure includes
Inverted U connector and inverted T shaped spacer, the upper end of inverted U connector are fixedly connected on the second holding finger, inverted T shaped regulation
The upper end of pad is articulated with inverted U connector.
After between two the first adjustment structures that tubing is placed on the first holding finger, two T-shaped spacers are in tubing
U-shaped connector of being had mercy in the presence of gravity rotates in opposite directions, until two T-shaped spacers reach balance with tubing gravity;When two
After two adjustment structures contact with tubing, the rich inverted U connector of two inverted T shaped spacers is reverse under the promotion of the second holding finger
Rotate, to be in close contact with the curved surface of tubing, during continuing rotational fastener bolt, two inverted T shaped spacers continue rich inverted U
Connector rotates backward, until tubing is clamped, to reach freely regulated purpose.
Further limit, the bottom of the second chute is fixedly connected with back-moving spring, the upper end of back-moving spring and positioning sliding block
Lower end be fixedly connected.
During fastening bolt being rotated backward after the completion of tubular object extruding, the second holding finger under the promotion of back-moving spring
Tubing is gradually disengaged with the rising of fastening bolt, is effectively reduced and is taken out tubing and manually lift second when being put into tubing
The operation of holding finger, be advantageous to the raising of operating efficiency.
Further limit, the lower end of the upper end of T-shaped spacer and inverted T shaped spacer is respectively equipped with arc-shaped groove.
By designing arc-shaped groove, be advantageous to positioning of the spacer to tubing, while make T-shaped spacer and inverted T shaped tune
Section pad can be contacted more fully with tubing, increase the contact area of spacer and tubing, be subject to tube surfaces crowded
Pressure is more uniform, avoids tubing deformation or damage caused by local pressure is excessive.
Further limit, the upper end of fastening bolt is provided with regulation handle.
By regulation handle come rotational fastener bolt, it is not necessary to by other instruments, make operation more convenient laborsaving.
The utility model, it is simple in construction compared with prior art, it is easy to use.
Brief description of the drawings
The utility model can be further illustrated by the nonlimiting examples that accompanying drawing provides;
Fig. 1 is a kind of structural representation of pipeline processing fixture of the utility model;
Fig. 2 is a kind of working state structure schematic diagram of pipeline processing fixture of the utility model;
Major components symbol description is as follows:
Adjusting bracket 1, the first holding finger 2, the second holding finger 3, the first chute 4, the second chute 5, positioning sliding block 6,
Fastening thread hole 7, fastening bolt 8, the first adjustment structure 9, U-shaped connector 91, T-shaped spacer 92, the second adjustment structure 10, fall
U-shaped connector 101, inverted T shaped spacer 102, back-moving spring 11, regulation handle 12.
Embodiment
In order that the utility model may be better understood in those skilled in the art, it is right with reference to the accompanying drawings and examples
Technical solutions of the utility model further illustrate.
Embodiment 1,
Such as Fig. 1, shown in Fig. 2, a kind of pipeline processing fixture described in the utility model, including adjusting bracket 1, first clamp
The holding finger 3 of finger 2 and second, the left end of the first holding finger 2 are fixedly connected on the bottom righthand side of adjusting bracket 1, the second clamping
Hand 3 refers to the surface for being installed on the first holding finger 2, and the right-hand member of adjusting bracket 1 is provided with the first chute 4, the left side of the first chute 4
Provided with the second chute 5, the front and rear depth of the second chute 5 is more than the front and rear depth of the first chute 4, the left end of the second holding finger 3
In embedded first chute 4, the left end of the second holding finger 3 is fixedly connected with the positioning sliding block 6 to match with the second chute 5, the
The surface of two chutes 5 is provided with fastening thread hole 7, is inserted with fastening bolt 8 in fastening thread hole 7, the first holding finger 2 it is upper
End is symmetrically set with the first adjustment structure 9, and the lower end of the second holding finger 3 is symmetrically set with the second adjustment structure
10,10 setting symmetrical above and below of the first adjustment structure 9 and the second adjustment structure.
The adjustment structure of first adjustment structure 9 includes U-shaped connector 91 and T-shaped spacer 92, and the lower end of U-shaped connector 91 is consolidated
Surely it is connected on the first holding finger 2, the lower end of T-shaped spacer 92 is articulated with U-shaped connector 91, and the second adjustment structure 10 is wrapped
Inverted U connector 101 and inverted T shaped spacer 102 are included, the upper end of inverted U connector 101 is fixedly connected on the second holding finger 3
On, the upper end of inverted T shaped spacer 102 is articulated with inverted U connector 101.
The upper end of T-shaped spacer 92 and the lower end of inverted T shaped spacer 102 are respectively equipped with arc-shaped groove.
The upper end of fastening bolt 8 is provided with regulation handle 12.
Embodiment 2,
Such as Fig. 1, shown in Fig. 2, a kind of pipeline processing fixture described in the utility model, including adjusting bracket 1, first clamp
The holding finger 3 of finger 2 and second, the left end of the first holding finger 2 are fixedly connected on the bottom righthand side of adjusting bracket 1, the second clamping
Hand 3 refers to the surface for being installed on the first holding finger 2, and the right-hand member of adjusting bracket 1 is provided with the first chute 4, the left side of the first chute 4
Provided with the second chute 5, the front and rear depth of the second chute 5 is more than the front and rear depth of the first chute 4, the left end of the second holding finger 3
In embedded first chute 4, the left end of the second holding finger 3 is fixedly connected with the positioning sliding block 6 to match with the second chute 5, the
The surface of two chutes 5 is provided with fastening thread hole 7, is inserted with fastening bolt 8 in fastening thread hole 7, the first holding finger 2 it is upper
End is symmetrically set with the first adjustment structure 9, and the lower end of the second holding finger 3 is symmetrically set with the second adjustment structure
10,10 setting symmetrical above and below of the first adjustment structure 9 and the second adjustment structure.
The adjustment structure of first adjustment structure 9 includes U-shaped connector 91 and T-shaped spacer 92, and the lower end of U-shaped connector 91 is consolidated
Surely it is connected on the first holding finger 2, the lower end of T-shaped spacer 92 is articulated with U-shaped connector 91, and the second adjustment structure 10 is wrapped
Inverted U connector 101 and inverted T shaped spacer 102 are included, the upper end of inverted U connector 101 is fixedly connected on the second holding finger 3
On, the upper end of inverted T shaped spacer 102 is articulated with inverted U connector 101.
The bottom of second chute 5 is fixedly connected with back-moving spring 11, the upper end of back-moving spring 11 and the lower end of positioning sliding block 6
It is fixedly connected.
The upper end of T-shaped spacer 92 and the lower end of inverted T shaped spacer 102 are respectively equipped with arc-shaped groove.
The upper end of fastening bolt 8 is provided with regulation handle 12.
Its difference is embodiment 2 compared with Example 1:Embodiment 2 is fixedly connected with reset in the bottom of the second chute
Spring, the upper end of back-moving spring are fixedly connected with the lower end of positioning sliding block;Fastening bolt is rotated backward after the completion of tubular object extruding
During, the second holding finger gradually disengages tubing with the rising of fastening bolt under the promotion of back-moving spring, effectively
Reduce the operation taken out tubing and manually lift the second holding finger when being put into tubing, be advantageous to the raising of operating efficiency.
Compared with prior art, pipeline processing fixture that this real technical scheme provides being capable of more caliber for the utility model
Big freedom in minor affairs regulation, so as to reach the purpose of clamping Multiple Type tubing, fixture is changed without the model according to tubing, greatly
The earth improves operating efficiency.
Its operation principle is:When clamping tubing, two the first adjustment structures tubing being placed on the first holding finger
Between, two T-shaped spacers rich U-shaped connector in the presence of tubing gravity rotates in opposite directions, until two T-shaped spacers and pipe
Material gravity reaches balance, then rotational fastener bolt, and positioning sliding block is promoted along the second chute slide downward by fastening bolt,
And then drive the second holding finger close to the first holding finger, after two the second adjustment structures contact with tubing, second
The rich inverted U connector of the lower two inverted T shaped spacers of promotion of holding finger rotates backward, to be in close contact with the curved surface of tubing,
During continuing rotational fastener bolt, two inverted T shaped spacers continue rich inverted U connector and rotated backward, until tubing is pressed from both sides
Tightly, to reach freely regulated purpose.Fastening bolt is rotated backward after machining, it is separated with positioning sliding block.
Above to a kind of pipeline processing fixture provided by the utility model.The explanation of specific embodiment is only intended to help and managed
Solve method and its core concept of the present utility model.It should be pointed out that for those skilled in the art, not
On the premise of departing from the utility model principle, some improvement and modification can also be carried out to the utility model, these improve and repaiied
Decorations are also fallen into the protection domain of the utility model claims.
Claims (5)
1. a kind of pipeline processing fixture, including adjusting bracket, the first holding finger and the second holding finger, it is characterised in that:Institute
The left end for stating the first holding finger is fixedly connected on the bottom righthand side of adjusting bracket, and second holding finger is installed on the first clamping
The surface of finger, the right-hand member of the adjusting bracket are provided with the first chute, and the left side of first chute is provided with the second chute, institute
The front and rear depth for stating the second chute is more than the front and rear depth of the first chute, and the left end of second holding finger is embedded in the first chute
Interior, the left end of second holding finger is fixedly connected with the positioning sliding block to match with the second chute, second chute
Surface is provided with fastening thread hole, and fastening bolt is inserted with the fastening thread hole, and the upper end of first holding finger is left
The right side is symmetrically arranged with the first adjustment structure, and the lower end of second holding finger is symmetrically set with the second adjustment structure, institute
State the first adjustment structure and the setting symmetrical above and below of the second adjustment structure.
A kind of 2. pipeline processing fixture according to claim 1, it is characterised in that:The first adjustment structure adjustment structure
Including U-shaped connector and T-shaped spacer, the lower end of the U-shaped connector is fixedly connected on the first holding finger, described T-shaped
The lower end of spacer is articulated with U-shaped connector, and second adjustment structure includes inverted U connector and inverted T shaped spacer, institute
The upper end for stating inverted U connector is fixedly connected on the second holding finger, and the upper end of the inverted T shaped spacer is articulated with inverted U
On connector.
A kind of 3. pipeline processing fixture according to claim 2, it is characterised in that:The bottom of second chute, which is fixed, to be connected
Back-moving spring is connected to, the upper end of the back-moving spring is fixedly connected with the lower end of positioning sliding block.
A kind of 4. pipeline processing fixture according to claim 3, it is characterised in that:The upper end of the T-shaped spacer and T
The lower end of type spacer is respectively equipped with arc-shaped groove.
A kind of 5. pipeline processing fixture according to any one of Claims 1-4 claim, it is characterised in that:It is described tight
The upper end of fixing bolt is provided with regulation handle.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720364566.1U CN206677596U (en) | 2017-04-10 | 2017-04-10 | A kind of pipeline processing fixture |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720364566.1U CN206677596U (en) | 2017-04-10 | 2017-04-10 | A kind of pipeline processing fixture |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206677596U true CN206677596U (en) | 2017-11-28 |
Family
ID=60399498
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720364566.1U Expired - Fee Related CN206677596U (en) | 2017-04-10 | 2017-04-10 | A kind of pipeline processing fixture |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206677596U (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107900736A (en) * | 2017-12-22 | 2018-04-13 | 乐清市拓普数控机床有限公司 | A kind of Numerical control machine tool fixture of good fixing effect |
CN108067509A (en) * | 2017-12-14 | 2018-05-25 | 天津腾飞钢管有限公司 | A kind of seamless steel pipe stabilizing mechanism |
CN108190168A (en) * | 2017-12-24 | 2018-06-22 | 中山市得高行知识产权中心(有限合伙) | Cambered surface labels positioning device in a kind of compressor intelligence manufacture |
CN108406459A (en) * | 2018-03-07 | 2018-08-17 | 广东派博钢管有限公司 | Steel pipe inside and outside integrative automatic grinding system |
CN108422219A (en) * | 2018-03-09 | 2018-08-21 | 海宁鼎合工程技术开发有限公司 | A kind of mechanical automation production fixture |
CN108971666A (en) * | 2018-09-05 | 2018-12-11 | 合肥银泉铸造有限责任公司 | A kind of drum gear clamp for machining |
CN110596515A (en) * | 2019-09-18 | 2019-12-20 | 重庆欧世德科技有限公司 | Oil pump electronic detection fixed disk with electric leakage detection function |
CN110587132A (en) * | 2019-10-17 | 2019-12-20 | 马鞍山楚锐科技信息咨询有限公司 | Processing device for processing cylindrical pipe wall |
-
2017
- 2017-04-10 CN CN201720364566.1U patent/CN206677596U/en not_active Expired - Fee Related
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108067509A (en) * | 2017-12-14 | 2018-05-25 | 天津腾飞钢管有限公司 | A kind of seamless steel pipe stabilizing mechanism |
CN108067509B (en) * | 2017-12-14 | 2024-02-27 | 天津腾飞钢管有限公司 | Steel pipe sizing and straightening equipment |
CN107900736A (en) * | 2017-12-22 | 2018-04-13 | 乐清市拓普数控机床有限公司 | A kind of Numerical control machine tool fixture of good fixing effect |
CN107900736B (en) * | 2017-12-22 | 2019-12-31 | 乐清市拓普数控机床有限公司 | Fixed effectual anchor clamps for digit control machine tool |
CN108190168A (en) * | 2017-12-24 | 2018-06-22 | 中山市得高行知识产权中心(有限合伙) | Cambered surface labels positioning device in a kind of compressor intelligence manufacture |
CN108406459A (en) * | 2018-03-07 | 2018-08-17 | 广东派博钢管有限公司 | Steel pipe inside and outside integrative automatic grinding system |
CN108422219A (en) * | 2018-03-09 | 2018-08-21 | 海宁鼎合工程技术开发有限公司 | A kind of mechanical automation production fixture |
CN108971666A (en) * | 2018-09-05 | 2018-12-11 | 合肥银泉铸造有限责任公司 | A kind of drum gear clamp for machining |
CN110596515A (en) * | 2019-09-18 | 2019-12-20 | 重庆欧世德科技有限公司 | Oil pump electronic detection fixed disk with electric leakage detection function |
CN110596515B (en) * | 2019-09-18 | 2022-03-11 | 重庆欧世德科技有限公司 | Oil pump electronic detection fixed disk with electric leakage detection function |
CN110587132A (en) * | 2019-10-17 | 2019-12-20 | 马鞍山楚锐科技信息咨询有限公司 | Processing device for processing cylindrical pipe wall |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206677596U (en) | A kind of pipeline processing fixture | |
CN209213201U (en) | Building pipe is laid with fixed device in a kind of hydraulic engineering | |
CN215357064U (en) | Supporting and positioning clamp for pipeline welding | |
CN205128532U (en) | Pipe clearing apparatus of variable diameter | |
CN203993744U (en) | Valve body cushion rubber extracting tool | |
CN205078929U (en) | Hydraulic support feed liquor pipe fixing device | |
CN211738234U (en) | Piping lane strutting arrangement for piping erection | |
CN205806800U (en) | The portable online leakage compensating device of oil field pipe | |
CN205927853U (en) | Copper pipe swan neck system | |
CN107378371A (en) | It is a kind of to be easy to clamp the accurate method for welding pipeline docked | |
CN209439143U (en) | A kind of water conservancy tube cleaning arrangement | |
CN207682002U (en) | A kind of short tube processing air-actuated jaw | |
CN208535326U (en) | A kind of floor heating pipeline strip | |
CN206474741U (en) | A kind of pipe cutter with clamp system | |
CN209681527U (en) | A kind of pipeline welding jigs and fixtures | |
CN208231677U (en) | A kind of height adjustment device in saw blade tooth sheath installation equipment | |
CN208528585U (en) | A kind of pipeline processing positioning fixture | |
CN204365729U (en) | A kind of device for clamping for drawbench | |
CN207261853U (en) | A kind of aqueduct for being used to adjust pressure | |
CN207547278U (en) | A kind of caliber metal tubing drawbench | |
CN205756129U (en) | A kind of novel water-saving irrigation rig | |
CN213497684U (en) | Fixture tooling structure for pipeline machining | |
CN214721084U (en) | Industrial legacy pipe jacking cutting device with positioning mechanism | |
CN215133639U (en) | But frame is fed to height-adjusting's gravity | |
CN220920297U (en) | Pipeline self-adaptation cleaning device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171128 Termination date: 20200410 |
|
CF01 | Termination of patent right due to non-payment of annual fee |