CN206677167U - The instrument that a kind of bottom of steel ladle brick is locked when building by laying - Google Patents

The instrument that a kind of bottom of steel ladle brick is locked when building by laying Download PDF

Info

Publication number
CN206677167U
CN206677167U CN201720407804.2U CN201720407804U CN206677167U CN 206677167 U CN206677167 U CN 206677167U CN 201720407804 U CN201720407804 U CN 201720407804U CN 206677167 U CN206677167 U CN 206677167U
Authority
CN
China
Prior art keywords
arm
steel ladle
laying
locked
brick
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720407804.2U
Other languages
Chinese (zh)
Inventor
刘丛平
李旭
陈希来
吴晓燕
陈宪法
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Hongfeng Furnace Material Co Ltd
Original Assignee
Zhejiang Hongfeng Furnace Material Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Hongfeng Furnace Material Co Ltd filed Critical Zhejiang Hongfeng Furnace Material Co Ltd
Priority to CN201720407804.2U priority Critical patent/CN206677167U/en
Application granted granted Critical
Publication of CN206677167U publication Critical patent/CN206677167U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Treatment Of Steel In Its Molten State (AREA)

Abstract

The instrument locked when being built by laying the utility model discloses a kind of bottom of steel ladle brick, including straight-bar handle, and laterally it is fixed in the lever sled arm of the front end of straight-bar handle, lever sled arm is formed by prizing arm and supporting arm, the front end for prizing arm is welded with rotating shaft, the first follow block is connected with rotating shaft, first follow block center is welded with a connecting rod, the other end of connecting rod, which is welded on, to be prized on arm, connecting rod includes at least two first sleeves being mutually socketed, supporting arm includes at least two the second sleeve pipes being mutually socketed, positioned at supporting arm end the second sleeve pipe front end integrally formed with the second follow block;Compared with existing technical scheme, the utility model is easy to use, the bottom of steel ladle brick built by laying is locked, reduce the brickwork joint of bottom of steel ladle brick, provided safeguard for normal, the safe operation of steel ladle, accelerate bottom of steel ladle brick masonry speed, improve production efficiency, ladle utilization rate and safety coefficient are effectively improved, ensure that worker's safe operation.

Description

The instrument that a kind of bottom of steel ladle brick is locked when building by laying
Technical field
The instrument locked when a kind of bottom of steel ladle brick is built by laying is the utility model is related to, belongs to bottom of steel ladle brick and piles up auxiliary dress Put technical field.
Background technology
Steel ladle is used to accept molten steel before steel mill electric furnace or converter, carries out pouring practice.Due to the erosion of refractory brick, steel Ladle needs to be built by laying again after bag use to certain life-span.When being repaiied in the thorough overhaul of ladle or part, in repairing for bag bottom brick During block, bag bottom brick needs are snugly into each other seamless, and avoiding the position of brickwork joint from being split after being impacted by molten steel causes bag bottom to be worn Steel, but when building by laying to containment wall, due to insufficient space, it is impossible to tap bag bottom brick using iron hammer and be allowed to abut, sled can only be used The upper end of rod sled brick is allowed to be close to, but can accordingly produce three angle seams using crowbar posterior end, and it is seamless just to generate bag basal surface, But the apertured situation in lower end, have a strong impact on the safe handling of ladle.
The content of the invention
(One)Technical problems to be solved
A kind of to solve the above problems, instrument locked when being built by laying the utility model proposes bottom of steel ladle brick.
(Two)Technical scheme
The instrument that bottom of steel ladle brick of the present utility model is locked when building by laying, including straight-bar handle, and laterally it is fixed in institute The lever sled arm of the front end of straight-bar handle is stated, the lever sled arm is formed by prizing arm and supporting arm, the front end for prizing arm Be welded with rotating shaft, be connected with the first follow block in the rotating shaft, the first follow block center is welded with a connecting rod, the connecting rod it is another One end is prized on arm described in being welded on, and the connecting rod includes at least two first sleeves being mutually socketed, and the supporting arm includes At least two the second sleeve pipes being mutually socketed, positioned at the supporting arm end second sleeve pipe front end integrally formed with Two follow blocks.
By the latch of mutual cooperation and inserted as preferable technical scheme, between the first sleeve and the second sleeve pipe Borehole jack connects, and it is some right that the latch and jack are evenly distributed with.
As preferable technical scheme, the length for prizing arm is more than the length of the supporting arm.
(Three)Beneficial effect
Compared with prior art, it has the advantages that the utility model:Bottom of steel ladle brick of the present utility model The setting of the instrument locked when building by laying, its first sleeve and the second sleeve pipe can change the direction of the first follow block and the length of supporting arm Degree, it is allowed to adapt to various sizes of ladle, the setting of the first follow block, which ensure that, prizes the smooth of arm and bag bottom brick contact surface, similarly The setting of second follow block ensure that the smooth of supporting arm and ladle inner wall contact surface, avoids lever and prizes arm to bag bottom brick and ladle The damage of inwall;In summary, the utility model is easy to use, has locked the bottom of steel ladle brick built by laying, has reduced bottom of steel ladle The brickwork joint of brick, provided safeguard for normal, the safe operation of steel ladle, accelerate bottom of steel ladle brick masonry speed, improve production Efficiency, ladle utilization rate and safety coefficient are effectively improved, ensure that worker's safe operation.
Brief description of the drawings
, below will be to embodiment in order to illustrate more clearly of the utility model embodiment or technical scheme of the prior art Or the required accompanying drawing used is briefly described in description of the prior art, it should be apparent that, drawings in the following description are only It is some embodiments of the utility model, for those of ordinary skill in the art, is not paying the premise of creative work Under, other accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 is front view of the present utility model.
1- straight-bar handles;2- levers prize arm;21- prizes arm;22- supporting arms;The sleeve pipes of 221- second;The follow blocks of 222- second; 23- rotating shafts;The follow blocks of 24- first;241- connecting rods;2411- first sleeves.
Embodiment
The instrument that a kind of bottom of steel ladle brick as shown in drawings is locked when building by laying, including straight-bar handle 1, and it is laterally affixed Lever in the front end of the straight-bar handle 1 prizes arm 2, and the lever sled arm 2 is formed by prizing arm 21 and supporting arm 22, the sled The front end of swing arm 21 is welded with rotating shaft 23, and the first follow block 24, the center of the first follow block 24 weldering are connected with the rotating shaft 23 Have a connecting rod 241, the other end of the connecting rod 241 be welded on it is described prize on arm 21, the connecting rod 241 includes at least two phases The first sleeve 2411 being mutually socketed, the supporting arm 22 includes at least two the second sleeve pipes 221 being mutually socketed, positioned at the branch The front end of second sleeve pipe 221 of the end of bearing arm 22 is integrally formed with the second follow block 222.
Further, the latch and jack of mutual cooperation are passed through between the sleeve pipe 221 of first sleeve 2411 and second Socket, it is some right that the latch and jack are evenly distributed with.
Further, the length for prizing arm 21 is more than the length of the supporting arm 22.
The utility model specific implementation is as follows:When that need to lock the refractory brick for uniformly arranging and building by laying bricks or stones, the second of supporting arm supports Plate prizes the first follow block insertion refractory brick of arm with propping up refractory brick in gap caused by containment wall, pushed up using containment wall as supporting Straight-bar handle, you can lock the refractory brick uniformly arranged, if during ladle size difference, need to only be adjusted by changing latch and jack The direction of the first follow block and the length of supporting arm are saved to better conform to ladle size.
The instrument that bottom of steel ladle brick of the present utility model is locked when building by laying, the setting of its first sleeve and the second sleeve pipe can be with Change the direction of the first follow block and the length of supporting arm, allow it to adapt to various sizes of ladle, the setting of the first follow block ensure that The smooth of arm and bag bottom brick contact surface is prized, the similarly setting of the second follow block ensure that the flat of supporting arm and ladle inner wall contact surface It is whole, avoid damage of the lever sled arm to bag bottom brick and ladle inner wall;In summary, the utility model is easy to use, locking The bottom of steel ladle brick built by laying, reduce the brickwork joint of bottom of steel ladle brick, provided safeguard for normal, the safe operation of steel ladle, accelerated Bottom of steel ladle brick masonry speed, improves production efficiency, effectively improves ladle utilization rate and safety coefficient, ensure that duty Work safe operation.
Embodiment described above is only that preferred embodiment of the present utility model is described, not to this practicality New spirit and scope are defined.On the premise of the utility model design conception is not departed from, ordinary people in the field couple The all variations and modifications that the technical solution of the utility model is made, the scope of protection of the utility model, this reality all should be dropped into With new claimed technology contents, all record in detail in the claims.

Claims (3)

  1. A kind of 1. instrument that bottom of steel ladle brick is locked when building by laying, it is characterised in that:Including straight-bar handle(1), and it is laterally affixed In the straight-bar handle(1)Front end lever sled arm(2), the lever sled arm(2)By prizing arm(21)And supporting arm(22) Form, it is described to prize arm(21)Front end be welded with rotating shaft(23), the rotating shaft(23)On be connected with the first follow block(24), described One follow block(24)Center is welded with a connecting rod(241), the connecting rod(241)The other end be welded on and described prize arm(21) On, the connecting rod(241)Including at least two first sleeves being mutually socketed(2411), the supporting arm(22)Including at least two Individual the second sleeve pipe being mutually socketed(221), positioned at the supporting arm(22)Second sleeve pipe of end(221)Front end one Form the second follow block(222).
  2. 2. the instrument that bottom of steel ladle brick according to claim 1 is locked when building by laying, it is characterised in that:The first sleeve (2411)With the second sleeve pipe(221)Between be socketed by the latch and jack of mutual cooperation, the uniform cloth of latch and jack There have to be some right.
  3. 3. the instrument that bottom of steel ladle brick according to claim 1 is locked when building by laying, it is characterised in that:It is described to prize arm(21) Length be more than the supporting arm(22)Length.
CN201720407804.2U 2017-04-18 2017-04-18 The instrument that a kind of bottom of steel ladle brick is locked when building by laying Expired - Fee Related CN206677167U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720407804.2U CN206677167U (en) 2017-04-18 2017-04-18 The instrument that a kind of bottom of steel ladle brick is locked when building by laying

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720407804.2U CN206677167U (en) 2017-04-18 2017-04-18 The instrument that a kind of bottom of steel ladle brick is locked when building by laying

Publications (1)

Publication Number Publication Date
CN206677167U true CN206677167U (en) 2017-11-28

Family

ID=60403628

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720407804.2U Expired - Fee Related CN206677167U (en) 2017-04-18 2017-04-18 The instrument that a kind of bottom of steel ladle brick is locked when building by laying

Country Status (1)

Country Link
CN (1) CN206677167U (en)

Similar Documents

Publication Publication Date Title
CN106282480A (en) Mammoth conveter furnace lining and building method
CN103302280B (en) A kind of building method of steel ladle bottom for ultra-low carbon steel
CN105618725A (en) Compositely-bricked small-medium-sized steel ladle work lining
CN206677167U (en) The instrument that a kind of bottom of steel ladle brick is locked when building by laying
CN104131124B (en) Blast furnace cooling stave laid on end edge brick construction method
CN105041340A (en) Structure and construction method for increasing arch crown concrete pouring speed in tunnel engineering
CN205712151U (en) A kind of concrete foundation precoated plate
CN207347590U (en) A kind of blast furnace iron mouth mud sleeve cleaning plant
CN108971471B (en) Construction process for carbon-free steel ladle composite ladle bottom
CN212842938U (en) Furnace dismantling machine is with increase working radius's extension arm
CN205587642U (en) Instrument of ladle package end locking during brick building
CN211229633U (en) Anti-punching pre-buried structure for large-aperture static crushing of reinforced concrete member
CN208467248U (en) A kind of ladle tank bottom working lining distributed architecture
CN210676934U (en) Easily empty ladle structure
CN211248315U (en) Manual/electric stopper rod steel ladle for wind power casting
CN211614303U (en) Prefabricated magnesia carbon brick for ladle bottom
CN102535471B (en) Secondary grouting method applied to space between bottom plate and foundation in installation work of mechanical equipment
CN208594308U (en) Waste material clears up system in a kind of large blast furnace overhaul furnace
CN208917231U (en) A kind of blast furnace goes out residual iron device
CN207143993U (en) Steel Wall for subway station shield hole side
CN206677173U (en) Rare earth steel and the mouth of a river used for aluminum-containing steel and middle steel ladle
CN204052874U (en) A kind of working lining structure for hot-metal bottle
CN204177202U (en) A kind of refractory brick improving the stove life-span
CN214819550U (en) A form removal instrument for hydraulic engineering concrete prefabricated plate
CN204421587U (en) Zinc oxide settling bin top arcuate cast template

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171128

Termination date: 20210418

CF01 Termination of patent right due to non-payment of annual fee