CN206668280U - Beans gravel rockfill grouting prefabricated pipe section suitable for double-shielded TBM construction - Google Patents

Beans gravel rockfill grouting prefabricated pipe section suitable for double-shielded TBM construction Download PDF

Info

Publication number
CN206668280U
CN206668280U CN201720435013.0U CN201720435013U CN206668280U CN 206668280 U CN206668280 U CN 206668280U CN 201720435013 U CN201720435013 U CN 201720435013U CN 206668280 U CN206668280 U CN 206668280U
Authority
CN
China
Prior art keywords
section
plastic strip
jurisdiction
hollow plastic
bar shaped
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201720435013.0U
Other languages
Chinese (zh)
Inventor
张金良
汪雪英
杨晓箐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yellow River Engineering Consulting Co Ltd
Original Assignee
Yellow River Engineering Consulting Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yellow River Engineering Consulting Co Ltd filed Critical Yellow River Engineering Consulting Co Ltd
Priority to CN201720435013.0U priority Critical patent/CN206668280U/en
Application granted granted Critical
Publication of CN206668280U publication Critical patent/CN206668280U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

The utility model discloses a kind of beans gravel rockfill grouting prefabricated pipe section suitable for double-shielded TBM construction, including section of jurisdiction body, closed hollow plastic strip is circumferentially embedded with the body of section of jurisdiction, the length of hollow plastic strip and the arc length of section of jurisdiction body are adapted, and are spaced apart in hollow plastic strip side wall and are provided with slurry outlet;Closed bar shaped elasticity filling film bag is bonded with the extrados of section of jurisdiction body, corresponds in bar shaped elasticity filling film bag side wall at slurry outlet and is provided with slurry intake, slurry intake is sealed with corresponding slurry outlet and connected;Grout hole and grouting conduit disposed within are reserved with corresponding to hollow plastic strip opening position on the intrados of section of jurisdiction body, one end of grouting conduit connects with hollow plastic strip bore seal and the other end extends outside the body of section of jurisdiction.The utility model advantage is prefabricated pipe section after tail shield is left, and injects dilatant slurry to bar shaped elasticity filling film bag so as to form closed-loop by the grouting conduit being arranged on each section of jurisdiction body intrados of each ring.

Description

Beans gravel rockfill grouting prefabricated pipe section suitable for double-shielded TBM construction
Technical field
Double-shielded TBM construction prefabricated pipe section is the utility model is related to, more particularly, to the beans constructed suitable for double-shielded TBM Gravel rockfill grouting prefabricated pipe section.
Background technology
Double-shielded TBM construction beans gravel backfill and grouting, it is to ensure that the section of jurisdiction of installation does not occur after tail shield is departed from Deformation and displacement play temporary constraint effect to section of jurisdiction, it is necessary to fill beans gravel in time to the annular gap between section of jurisdiction and country rock; Cement mortar rockfill grouting is carried out again after the filling of beans gravel, and bulk beans gravel is cemented to the beans gravel adhesive bond of some strength, And it is cemented together with section of jurisdiction and country rock, common stress is allowed to, forms a self-stabilization structure.Therefore it is required that beans gravel backfill and Adhesive bond after grouting must be uniformly closely knit.To ensure the uniform density of adhesive bond, grouting should be filled continuously within the specific limits Note, needed in construction to apply closed-loop according to geological conditions, typically be in the milk to be formed using the continuous domain of dual slurry at present, but often It can not often completely enclose and spillage, grouting effect is poor.
The content of the invention
The utility model purpose is to provide a kind of beans gravel rockfill grouting prefabricated pipe section suitable for double-shielded TBM construction.
To achieve the above object, the utility model takes following technical proposals:
Beans gravel rockfill grouting prefabricated pipe section described in the utility model suitable for double-shielded TBM construction, including section of jurisdiction body, Closed hollow plastic strip, the length of the hollow plastic strip and the arc of section of jurisdiction body are circumferentially embedded with the section of jurisdiction body It is long to be adapted, it is spaced apart in hollow plastic strip side wall and is provided with least two slurry outlets;Correspond to sky on the extrados of section of jurisdiction body Heart plastic strip opening position is bonded with closed bar shaped elasticity filling film bag, corresponds in the bar shaped elasticity filling film bag side wall every The individual pulp hole location is respectively arranged with slurry intake, and each slurry intake seals with corresponding slurry outlet respectively to be connected; 2 ~ 3 grout holes are reserved with corresponding to hollow plastic strip opening position and grouting disposed within is led on the intrados of section of jurisdiction body Pipe, one end of the grouting conduit connects with hollow plastic strip bore seal and the other end extends outside the body of section of jurisdiction.
The bar shaped elasticity filling film bag is made of elastic woven material, and the green diameter of bar shaped elasticity filling film bag is 100mm, tension force is 125kg/cm at 2.5 times of the elastic stretching of bar shaped elasticity filling film bag to green diameter.
The outer wall transverse shape of the hollow plastic strip is isosceles trapezoidal structure, and the bottom of the isosceles trapezoid is located at The intrados side of the section of jurisdiction body;The slurry outlet being opened in hollow plastic strip side wall is circular cone type hole, is arranged on described Slurry intake in bar shaped elasticity filling film bag side wall is the conical tube to match with the pulp bore dia.
Circumferentially it is embedded in hollow plastic strip closed in the section of jurisdiction body, the position in the circumference of section of jurisdiction body Put.
The utility model advantage is prefabricated pipe section after tail shield is left, by each section of jurisdiction sheet for being arranged on each ring Grouting conduit in internal cambered surface injects dilatant slurry to bar shaped elasticity filling film bag, and the bar shaped elasticity filling film bag after expansion is most Major diameter is 25cm, and volume increases by 6.25 times, and so as to form closed-loop, the closed-loop site operation is quick, and cost is low, ensure that Beans gravel backfills and the continuity of grouting, and can match with TBM speedy drivages, at the same the application of the closed-loop overcome it is existing The defects of beans gravel backfills and grouting is discontinuous, quality guarantee rate is low, greatly embodies that double-shielded TBM is quick, safe construction Advantage.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model.
Fig. 2 is Fig. 1 present invention looks up structural representation.
Fig. 3 is Fig. 1 A-A to structural representation(The bar shaped elasticity filling film bag is in folded position).
Fig. 4 is the structural representation that bar shaped elasticity filling film bag described in Fig. 3 is in swelling state.
Fig. 5 is Fig. 1 I portions mplifying structure schematic diagram.
The enclosed ring schematic diagram that Fig. 6 is made up of beans gravel rockfill grouting prefabricated pipe section described in the utility model.
Embodiment
Embodiments of the invention are elaborated below in conjunction with the accompanying drawings, the present embodiment using technical solution of the present invention before Put and implemented, give detailed embodiment and specific operating process, but protection scope of the present invention is not limited to down State embodiment.
As Figure 1-5, the beans gravel rockfill grouting prefabricated pipe section described in the utility model suitable for double-shielded TBM construction, Including section of jurisdiction body 1, closed hollow plastic strip 2 is circumferentially embedded with section of jurisdiction body 1, hollow plastic strip 2 is located at section of jurisdiction At the circumferential medium position of body 1, the length and the arc length of section of jurisdiction body 1 of hollow plastic strip 2 are adapted, hollow plastic strip 2 Outer wall transverse shape is isosceles trapezoidal structure, and the bottom side wall of hollow plastic strip 2 of isosceles trapezoidal structure is located at section of jurisdiction body 1 Intrados side;It is spaced apart in the upper bottom edge side wall of hollow plastic strip 2 of isosceles trapezoidal structure and is provided with three circular cone slurry outlets, section of jurisdiction On the extrados of body 1 closed bar shaped elasticity filling film bag 3, bar shaped elasticity are bonded with corresponding to the hollow opening position of plastic strip 2 Circular cone slurry intake 4 is respectively arranged with corresponding to each circular cone pulp hole location in the side wall of filling film bag 3, each circular cone enters slurry Mouth 4 seals with corresponding circular cone slurry outlet connect respectively;Correspond to the hollow opening position of plastic strip 2 on the intrados of section of jurisdiction body 1 It is spaced apart and is provided with three grout holes and inserts the grouting conduit 5 in it, one end of grouting conduit 5 and the hollow inner chamber of plastic strip 2 is close Envelope connects and the other end extends outside the intrados of section of jurisdiction body 1.
Bar shaped elasticity filling film bag 3 is made of elastic woven material, and the green diameter of bar shaped elasticity filling film bag 3 is 100mm, The elastic stretching of bar shaped elasticity filling film bag 3 to tension force at 2.5 times of green diameter is 125kg/cm, i.e.,:When bar shaped elasticity is filled out It is 125kg/cm to fill the diameter expansion of film bag 3 to tension force at 2.5 times of green diameter.
It is of the present utility model to be summarized as follows using process:
Section of jurisdiction body 1 first coats before TBM construction and installation in three circular cone slurry outlet inner wall surfaces of hollow plastic strip 2 502 glue(Chemical molecular formula is:CH2=C(CN)-COO-C2H5), then insertion is arranged on bar shaped elasticity filling film bag 3 one by one Circular cone slurry intake 4 in side wall, finally bar shaped elasticity filling film bag 3 is circumferentially fixed on the extrados of section of jurisdiction body 1, by In now bar shaped elasticity filling film bag 3 be folded position, as shown in figure 3, to avoid bar shaped elasticity filling film bag 3 from being influenceed after scattering The installation of section of jurisdiction body 1, the bar shaped elasticity filling film bag 3 for tearing conjunction shape open is bonded on the extrados of section of jurisdiction body 1 by adhesive tape.
As shown in fig. 6, an endless tube piece is installed after releasing tail shield, you can to start to pour into bar shaped elasticity filling film bag 3 Dilatant slurry 6(Dual-component polyurethane, 5-10 times of foaming materials rate, it is desirable to which, when volume increases by 6 ~ 10 times, intensity is not less than 1mpa), dilatant slurry 6 is by the grouting conduit 5 that is arranged on each intrados of section of jurisdiction body 1 and hollow plastic strip 2 to bar shaped Injection dilatant slurry 6, the bar shaped elasticity filling film bag 3 of each section of jurisdiction body 1 have been filled in 20 seconds in elastic filling film bag 3 Into bar shaped elasticity filling film bag 3 thick 10cm after the completion of filling becomes to rouse round shape state(As shown in Figure 4), then begin to expand, Full, the bar shaped bullet after expansion is filled the gap of the extrados of section of jurisdiction body 1 and country rock according to the gap length in the outside of section of jurisdiction body 1 Property the maximum gauge of filling film bag 3 be 25cm, volume increases by 6.25 times.
The adjacent joining place of two section of jurisdiction body 1 in one endless tube piece, because the both ends of bar shaped elasticity filling film bag 3 equally exist Ring will also expand, so the end of two adjacent bar elasticity filling film bags 3 is also blocked and can mutually squeezed in seam crossing Tightly, that is, closed-loop is formd.After the completion of closed-loop, you can start to enter between the outside of section of jurisdiction body 1 of closing interannular and country rock Row beans gravel fills and rockfill grouting construction.

Claims (4)

1. a kind of beans gravel rockfill grouting prefabricated pipe section suitable for double-shielded TBM construction, including section of jurisdiction body, it is characterised in that: Closed hollow plastic strip, the length of the hollow plastic strip and the arc of section of jurisdiction body are circumferentially embedded with the section of jurisdiction body It is long to be adapted, it is spaced apart in hollow plastic strip side wall and is provided with least two slurry outlets;Correspond to sky on the extrados of section of jurisdiction body Heart plastic strip opening position is bonded with closed bar shaped elasticity filling film bag, corresponds in the bar shaped elasticity filling film bag side wall every The individual pulp hole location is respectively arranged with slurry intake, and each slurry intake seals with corresponding slurry outlet respectively to be connected; 2 ~ 3 grout holes are reserved with corresponding to hollow plastic strip opening position and grouting disposed within is led on the intrados of section of jurisdiction body Pipe, one end of the grouting conduit connects with hollow plastic strip bore seal and the other end extends outside the body of section of jurisdiction.
2. it is suitable to the beans gravel rockfill grouting prefabricated pipe section of double-shielded TBM construction according to claim 1, it is characterised in that: The bar shaped elasticity filling film bag is made of elastic woven material, and the green diameter of bar shaped elasticity filling film bag is 100mm, bar shaped bullet The elastic stretching of property filling film bag to tension force at 2.5 times of green diameter is 125kg/cm.
3. the beans gravel rockfill grouting prefabricated pipe section according to claim 1 or claim 2 suitable for double-shielded TBM construction, its feature exists In:The outer wall transverse shape of the hollow plastic strip is isosceles trapezoidal structure, and the bottom of the isosceles trapezoid is positioned at described The intrados side of section of jurisdiction body;The slurry outlet being opened in hollow plastic strip side wall is circular cone type hole, is arranged on the bar shaped Slurry intake in elastic filling film bag side wall is the conical tube to match with the pulp bore dia.
4. the beans gravel rockfill grouting prefabricated pipe section according to claim 1 or claim 2 suitable for double-shielded TBM construction, its feature exists In:Hollow plastic strip closed in the section of jurisdiction body is circumferentially embedded in, positioned at the circumferential medium position of section of jurisdiction body.
CN201720435013.0U 2017-04-24 2017-04-24 Beans gravel rockfill grouting prefabricated pipe section suitable for double-shielded TBM construction Withdrawn - After Issue CN206668280U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720435013.0U CN206668280U (en) 2017-04-24 2017-04-24 Beans gravel rockfill grouting prefabricated pipe section suitable for double-shielded TBM construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720435013.0U CN206668280U (en) 2017-04-24 2017-04-24 Beans gravel rockfill grouting prefabricated pipe section suitable for double-shielded TBM construction

Publications (1)

Publication Number Publication Date
CN206668280U true CN206668280U (en) 2017-11-24

Family

ID=60375797

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720435013.0U Withdrawn - After Issue CN206668280U (en) 2017-04-24 2017-04-24 Beans gravel rockfill grouting prefabricated pipe section suitable for double-shielded TBM construction

Country Status (1)

Country Link
CN (1) CN206668280U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108590702A (en) * 2018-04-19 2018-09-28 陈胜玉 Tunnel arch and its installation method with back sticking type granular media filling baggy fabric
CN108590703A (en) * 2018-04-19 2018-09-28 陈胜玉 Tunnel arch and its installation method with elastic slip casting bag
CN108708752A (en) * 2018-07-27 2018-10-26 西南交通大学 The method that the tunnels TBM apply the supporting apparatus and beans gravel rockfill grouting of section of jurisdiction

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108590702A (en) * 2018-04-19 2018-09-28 陈胜玉 Tunnel arch and its installation method with back sticking type granular media filling baggy fabric
CN108590703A (en) * 2018-04-19 2018-09-28 陈胜玉 Tunnel arch and its installation method with elastic slip casting bag
CN108708752A (en) * 2018-07-27 2018-10-26 西南交通大学 The method that the tunnels TBM apply the supporting apparatus and beans gravel rockfill grouting of section of jurisdiction
CN108708752B (en) * 2018-07-27 2023-11-24 西南交通大学 Temporary supporting device for TBM tunnel construction segment and bean gravel backfill grouting method

Similar Documents

Publication Publication Date Title
CN106837377B (en) Beans gravel rockfill grouting prefabricated pipe section suitable for double-shielded TBM construction
CN107191197B (en) Shield segment and construction method thereof in tunnel through mine method by shield air pushing
CN206668280U (en) Beans gravel rockfill grouting prefabricated pipe section suitable for double-shielded TBM construction
CN106884666B (en) The construction method of beans gravel rockfill grouting closed-loop
CN107989571A (en) One kind wears three pouch plugging device of formula and its application method
CN206722878U (en) A kind of mining light-duty filling counterfort
CN207892585U (en) Three stifled two note hole sealing devices of coal mine gas extraction drill hole
CN109162727B (en) Tunnel portal plugging grouting device for shield launching and construction method
CN108104865B (en) A kind of concordant drilling Anti-air-leakage gas pumping method
CN107687166A (en) Diaphram wall is anti-to stream, water-impervious I-shaped steel joint structure and construction method
CN106223897B (en) A kind of broken coal petrography deep hole segmenting slip casting method of fully-mechanized mining working
CN102913184A (en) Secondary composite high-pressure grouting and sealing process of gas drainage drilling artificial separation barrier
CN108278096A (en) A kind of seat earth layer-through drilling dynamic self-adapting hole sealing device and method
CN104947700A (en) Well closing casing pipe used for dewatering well, dewatering well and well closing method for dewatering well
CN207277319U (en) Diaphram wall is prevented streaming, water-impervious I-shaped steel joint structure
CN206887951U (en) A kind of anchor bolt support matrix and anchor bolt support
CN110016909A (en) Hydraulic squeezed joint pouch slip casting pile body expands reinforcement bored pile construction method
CN110005421A (en) Sandy soil layer shield driven Metro tunnel originates portal sealing device and encapsulating method
CN109268031A (en) Tube coupling can fill the plugging structure and construction method of bag type paste at service channel hole
CN107780873A (en) The three-stage capsule sealing device and its encapsulating method of a kind of mash gas pumping drilling
CN109026150A (en) The built-in airbag sealing unit of tunnel connection channel push bench process tube coupling and encapsulating method
CN105134223B (en) A kind of construction method for improving shield launching steel case sealing
CN107816041B (en) Non-dumping hole-forming prestressed anchor rod, anchor hole leakage-proof structure and construction method thereof
CN207513619U (en) Tunnel rich water section partitioning waterproofing system
CN209053563U (en) Injected hole sealing casing for underground extraction borehole operation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned

Granted publication date: 20171124

Effective date of abandoning: 20181228