CN106837377B - Beans gravel rockfill grouting prefabricated pipe section suitable for double-shielded TBM construction - Google Patents

Beans gravel rockfill grouting prefabricated pipe section suitable for double-shielded TBM construction Download PDF

Info

Publication number
CN106837377B
CN106837377B CN201710271991.0A CN201710271991A CN106837377B CN 106837377 B CN106837377 B CN 106837377B CN 201710271991 A CN201710271991 A CN 201710271991A CN 106837377 B CN106837377 B CN 106837377B
Authority
CN
China
Prior art keywords
section
plastic strip
jurisdiction
ontology
hollow plastic
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710271991.0A
Other languages
Chinese (zh)
Other versions
CN106837377A (en
Inventor
张金良
汪雪英
杨晓箐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yellow River Engineering Consulting Co Ltd
Original Assignee
Yellow River Engineering Consulting Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yellow River Engineering Consulting Co Ltd filed Critical Yellow River Engineering Consulting Co Ltd
Priority to CN201710271991.0A priority Critical patent/CN106837377B/en
Publication of CN106837377A publication Critical patent/CN106837377A/en
Application granted granted Critical
Publication of CN106837377B publication Critical patent/CN106837377B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/08Lining with building materials with preformed concrete slabs

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Revetment (AREA)

Abstract

The invention discloses a kind of beans gravel rockfill grouting prefabricated pipe sections suitable for double-shielded TBM construction, including section of jurisdiction ontology, closed hollow plastic strip is circumferentially embedded in the ontology of section of jurisdiction, the length of hollow plastic strip and the arc length of section of jurisdiction ontology are adapted, and are spaced apart on hollow plastic strip side wall and are equipped with slurry outlet;It is bonded with closed bar shaped elasticity filling film bag on the extrados of section of jurisdiction ontology, corresponds at slurry outlet on bar shaped elasticity filling film bag side wall and is provided with slurry intake, slurry intake is sealed with corresponding slurry outlet and is connected to;Correspond at hollow plastic strip position on the intrados of section of jurisdiction ontology and be reserved with grout hole and grouting conduit disposed within, one end of grouting conduit is connected to hollow plastic strip bore seal and the other end extends except the ontology of section of jurisdiction.The invention has the advantages that prefabricated pipe section injects dilatant slurry to bar shaped elasticity filling film bag after leaving tail shield, through the grouting conduit being arranged on each section of jurisdiction ontology intrados of each ring to form closed-loop.

Description

Beans gravel rockfill grouting prefabricated pipe section suitable for double-shielded TBM construction
Technical field
The present invention relates to double-shielded TBM construction prefabricated pipe sections, more particularly, to the beans gravel for being suitable for double-shielded TBM construction Rockfill grouting prefabricated pipe section.
Background technique
Double-shielded TBM construction beans gravel backfill and grouting are to ensure that the section of jurisdiction installed does not occur after being detached from tail shield Deformation and displacement, need to fill beans gravel in time to the annular gap between section of jurisdiction and country rock, play the role of temporary constraint to section of jurisdiction; Cement slurry rockfill grouting is carried out again after the filling of beans gravel, and bulk beans gravel is cemented to the beans gravel adhesive bond of some strength, And it is cemented together with section of jurisdiction and country rock, it is allowed to common stress, forms a self-stabilization structure.Therefore it is required that beans gravel backfill and Adhesive bond after grouting must be uniformly closely knit.For the uniform density for guaranteeing adhesive bond, grouting should be filled continuously in a certain range Note, needs to apply closed-loop in construction according to geological conditions, generally is in the milk to be formed using the continuous domain of dual slurry at present, but often It cannot often completely enclose and spillage, grouting effect is poor.
Summary of the invention
It is an object of that present invention to provide a kind of beans gravel rockfill grouting prefabricated pipe sections suitable for double-shielded TBM construction.
To achieve the above object, the present invention takes following technical proposals:
Beans gravel rockfill grouting prefabricated pipe section of the present invention suitable for double-shielded TBM construction, including section of jurisdiction ontology, it is described Closed hollow plastic strip, the length and the arc length phase of section of jurisdiction ontology of the hollow plastic strip are circumferentially embedded in the ontology of section of jurisdiction It adapts to, is spaced apart on hollow plastic strip side wall and is equipped at least two slurry outlets;Correspond to hollow plastic on the extrados of section of jurisdiction ontology It is bonded with closed bar shaped elasticity filling film bag at material strip position, corresponds to each institute on the bar shaped elasticity filling film bag side wall It states and is provided with slurry intake at pulp hole site respectively, each slurry intake seals with corresponding slurry outlet be connected to respectively;Section of jurisdiction Correspond at hollow plastic strip position on the intrados of ontology and is reserved with 2 ~ 3 grout holes and grouting conduit disposed within, institute Stating one end of grouting conduit, and hollow plastic strip bore seal is connected to and the other end extends except the ontology of section of jurisdiction.
The bar shaped elasticity filling film bag is made of elastic woven material, and the green diameter of bar shaped elasticity filling film bag is 100mm, tension is 125kg/cm at 2.5 times of the elastic stretching of bar shaped elasticity filling film bag to green diameter.
The outer wall transverse shape of the hollow plastic strip is isosceles trapezoidal structure, and the bottom of the isosceles trapezoid is located at The intrados side of the section of jurisdiction ontology;The slurry outlet being provided on hollow plastic strip side wall is circular cone type hole, is arranged described Slurry intake on bar shaped elasticity filling film bag side wall is the conical tube to match with the pulp bore dia.
Circumferentially it is embedded in hollow plastic strip closed in the section of jurisdiction ontology, the position in the circumferential direction of section of jurisdiction ontology It sets.
The invention has the advantages that prefabricated pipe section is after leaving tail shield, by being arranged in each section of jurisdiction ontology of each ring Grouting conduit in cambered surface injects dilatant slurry to bar shaped elasticity filling film bag, and the bar shaped elasticity filling film bag after expansion is maximum straight Diameter is 25cm, and volume increases by 6.25 times, to form closed-loop, the closed-loop site operation is quick, at low cost, ensure that beans gravel The continuity of stone backfill and grouting, and can match with TBM speedy drivage, while the application of the closed-loop overcomes existing beans gravel Stone backfill and the defect that grouting is discontinuous, quality guarantee rate is low, it is quick, safe construction excellent greatly to embody double-shielded TBM Gesture.
Detailed description of the invention
Fig. 1 is structural schematic diagram of the invention.
Fig. 2 is the present invention looks up structural representation of Fig. 1.
Fig. 3 is the A-A of Fig. 1 to structural schematic diagram (the bar shaped elasticity filling film bag is in folded position).
Fig. 4 is the structural schematic diagram that bar shaped elasticity filling film bag is in swelling state described in Fig. 3.
Fig. 5 is the portion the I enlarged structure schematic diagram of Fig. 1.
The enclosed ring schematic diagram that Fig. 6 is made of beans gravel rockfill grouting prefabricated pipe section of the present invention.
Specific embodiment
It elaborates with reference to the accompanying drawing to the embodiment of the present invention, the present embodiment before being with technical solution of the present invention It puts and is implemented, the detailed implementation method and specific operation process are given, but protection scope of the present invention is not limited to down State embodiment.
As shown in Figs. 1-5, the beans gravel rockfill grouting prefabricated pipe section of the present invention suitable for double-shielded TBM construction, including Section of jurisdiction ontology 1, is circumferentially embedded with closed hollow plastic strip 2 in section of jurisdiction ontology 1, and hollow plastic strip 2 is located at section of jurisdiction ontology 1 Circumferential medium position at, the arc length of the length of hollow plastic strip 2 and section of jurisdiction ontology 1 is adapted, and the outer wall of hollow plastic strip 2 is horizontal Section configuration is isosceles trapezoidal structure, and the 2 bottom side wall of hollow plastic strip of isosceles trapezoidal structure is located at the inner arc of section of jurisdiction ontology 1 Face side;It is spaced apart on the 2 upper bottom edge side wall of hollow plastic strip of isosceles trapezoidal structure and is equipped with three circular cone slurry outlets, section of jurisdiction ontology 1 Extrados on correspond to hollow 2 position of plastic strip at be bonded with closed bar shaped elasticity filling film bag 3, bar shaped elasticity filling film Correspond at each circular cone pulp hole site on the side wall of bag 3 and be provided with circular cone slurry intake 4 respectively, each circular cone slurry intake 4 divides It does not seal and is connected to corresponding circular cone slurry outlet;Correspond at hollow 2 position of plastic strip on the intrados of section of jurisdiction ontology 1 and is spaced apart If there are three grout hole and inserting the grouting conduit 5 in it, one end of grouting conduit 5 is connected to hollow 2 bore seal of plastic strip And the other end extends except the intrados of section of jurisdiction ontology 1.
Bar shaped elasticity filling film bag 3 is made of elastic woven material, and the green diameter of bar shaped elasticity filling film bag 3 is 100mm, Tension is 125kg/cm when the elastic stretching of bar shaped elasticity filling film bag 3 is to 2.5 times of green diameter, it may be assumed that when bar shaped elasticity is filled out Tension is 125kg/cm when filling the diameter expansion of film bag 3 to 2.5 times of green diameter.
Use process of the invention is summarized as follows:
Section of jurisdiction ontology 1 is first coated in three circular cone slurry outlet inner wall surfaces of hollow plastic strip 2 before TBM construction and installation 502 glue (chemical molecular formula are as follows: CH2=C (CN)-COO-C2H5), then insertion is arranged in bar shaped elasticity filling film bag 3 one by one Bar shaped elasticity filling film bag 3 is finally circumferentially fixed on the extrados of section of jurisdiction ontology 1 by the circular cone slurry intake 4 on side wall, by In bar shaped elasticity filling film bag 3 at this time be folded position, as shown in figure 3, to influence after avoiding bar shaped elasticity filling film bag 3 from scattering The installation of section of jurisdiction ontology 1 is sticked to the bar shaped elasticity filling film bag 3 for closing shape is torn open on the extrados of section of jurisdiction ontology 1 by adhesive tape.
As shown in fig. 6, an endless tube piece installs after releasing tail shield, it can start to pour into bar shaped elasticity filling film bag 3 Dilatant slurry 6(dual-component polyurethane, 5-10 times of foaming materials rate, it is desirable that when volume increases by 6 ~ 10 times, intensity is not less than 1mpa), dilatant slurry 6 passes through the grouting conduit 5 being arranged on each 1 intrados of section of jurisdiction ontology and hollow plastic strip 2 to bar shaped Dilatant slurry 6 is injected in elastic filling film bag 3, the bar shaped elasticity filling film bag 3 of each section of jurisdiction ontology 1 has been filled in 20 seconds At, 10cm after the completion of filling thick bar shaped elasticity filling film bag 3 becomes to rouse round shape state (as shown in Figure 4), it then begins to expand, The gap filling of 1 extrados of section of jurisdiction ontology and country rock is expired according to the gap size in 1 outside of section of jurisdiction ontology, the bar shaped bullet after expansion Property 3 maximum gauge of filling film bag be 25cm, volume increases by 6.25 times.
Adjacent two section of jurisdiction ontologies, 1 joining place in one endless tube piece, since the both ends of bar shaped elasticity filling film bag 3 equally exist Circumferential direction will also expand, so the end of two adjacent bar elasticity filling film bags 3 is also blocked and can mutually be squeezed in seam crossing Tightly, that is, closed-loop is formd.After the completion of closed-loop, can start between the outside of section of jurisdiction ontology 1 of closing interannular and country rock into The filling of row beans gravel and rockfill grouting construction.

Claims (4)

1. a kind of beans gravel rockfill grouting prefabricated pipe section suitable for double-shielded TBM construction, including section of jurisdiction ontology, it is characterised in that: Closed hollow plastic strip, the length of the hollow plastic strip and the arc of section of jurisdiction ontology are circumferentially embedded in the section of jurisdiction ontology It is long to be adapted, it is spaced apart on hollow plastic strip side wall and is equipped at least two slurry outlets;Correspond to sky on the extrados of section of jurisdiction ontology It is bonded with closed bar shaped elasticity filling film bag at heart plastic strip position, corresponds on the bar shaped elasticity filling film bag side wall every Slurry intake is provided at a pulp hole site respectively, each slurry intake seals with corresponding slurry outlet be connected to respectively; Correspond at hollow plastic strip position on the intrados of section of jurisdiction ontology and is reserved with 2 ~ 3 grout holes and grouting disposed within is led Pipe, one end of the grouting conduit is connected to hollow plastic strip bore seal and the other end extends except the ontology of section of jurisdiction.
2. being suitable for the beans gravel rockfill grouting prefabricated pipe section of double-shielded TBM construction according to claim 1, it is characterised in that: The bar shaped elasticity filling film bag is made of elastic woven material, and the green diameter of bar shaped elasticity filling film bag is 100mm, bar shaped bullet Property filling film bag elastic stretching to 2.5 times of green diameter when tension be 125kg/cm.
3. the beans gravel rockfill grouting prefabricated pipe section according to claim 1 or claim 2 suitable for double-shielded TBM construction, feature exist In: the outer wall transverse shape of the hollow plastic strip is isosceles trapezoidal structure, and the bottom of the isosceles trapezoid is located at described The intrados side of section of jurisdiction ontology;The slurry outlet being provided on hollow plastic strip side wall is circular cone type hole, is arranged in the bar shaped Slurry intake on elastic filling film bag side wall is the conical tube to match with the pulp bore dia.
4. the beans gravel rockfill grouting prefabricated pipe section according to claim 1 or claim 2 suitable for double-shielded TBM construction, feature exist In: it is circumferentially embedded in hollow plastic strip closed in the section of jurisdiction ontology, positioned at the circumferential medium position of section of jurisdiction ontology.
CN201710271991.0A 2017-04-24 2017-04-24 Beans gravel rockfill grouting prefabricated pipe section suitable for double-shielded TBM construction Active CN106837377B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710271991.0A CN106837377B (en) 2017-04-24 2017-04-24 Beans gravel rockfill grouting prefabricated pipe section suitable for double-shielded TBM construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710271991.0A CN106837377B (en) 2017-04-24 2017-04-24 Beans gravel rockfill grouting prefabricated pipe section suitable for double-shielded TBM construction

Publications (2)

Publication Number Publication Date
CN106837377A CN106837377A (en) 2017-06-13
CN106837377B true CN106837377B (en) 2018-12-28

Family

ID=59142971

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710271991.0A Active CN106837377B (en) 2017-04-24 2017-04-24 Beans gravel rockfill grouting prefabricated pipe section suitable for double-shielded TBM construction

Country Status (1)

Country Link
CN (1) CN106837377B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106837377B (en) * 2017-04-24 2018-12-28 黄河勘测规划设计有限公司 Beans gravel rockfill grouting prefabricated pipe section suitable for double-shielded TBM construction
CN107191197B (en) * 2017-06-14 2023-05-19 中铁第四勘察设计院集团有限公司 Shield segment and construction method thereof in tunnel through mine method by shield air pushing
CN107587882B (en) * 2017-08-25 2018-10-30 中国水利水电科学研究院 A kind of double-shielded TBM section of jurisdiction form sack grouting quick supporting structure and construction method
CN107587883B (en) * 2017-08-25 2018-10-30 中国水利水电科学研究院 A kind of shield formula TBM section of jurisdiction rockfill grouting expansion type locking devices and construction method
CN109653753B (en) * 2018-12-07 2019-11-15 山东大学 A kind of shield urgency curve driving auxiliary turning construction method
CN111305872B (en) * 2020-03-10 2020-12-01 天津大学 TBM shield tunnel segment and operation method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08260894A (en) * 1995-03-23 1996-10-08 Ishikawajima Constr Materials Co Ltd Segment with bag
JPH094389A (en) * 1995-06-20 1997-01-07 Ashimori Ind Co Ltd Lining member for tunnel
JP2003247392A (en) * 2002-02-26 2003-09-05 Ishikawajima Constr Materials Co Ltd Segment equipped with bag
JP2008138409A (en) * 2006-11-30 2008-06-19 Kumagai Gumi Co Ltd Shield tunnel, method of joining wall body and portal of shield tunnel, and segment
CN106837377A (en) * 2017-04-24 2017-06-13 黄河勘测规划设计有限公司 It is suitable to the beans gravel rockfill grouting prefabricated pipe section of double-shielded TBM construction

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08260894A (en) * 1995-03-23 1996-10-08 Ishikawajima Constr Materials Co Ltd Segment with bag
JPH094389A (en) * 1995-06-20 1997-01-07 Ashimori Ind Co Ltd Lining member for tunnel
JP2003247392A (en) * 2002-02-26 2003-09-05 Ishikawajima Constr Materials Co Ltd Segment equipped with bag
JP2008138409A (en) * 2006-11-30 2008-06-19 Kumagai Gumi Co Ltd Shield tunnel, method of joining wall body and portal of shield tunnel, and segment
CN106837377A (en) * 2017-04-24 2017-06-13 黄河勘测规划设计有限公司 It is suitable to the beans gravel rockfill grouting prefabricated pipe section of double-shielded TBM construction

Also Published As

Publication number Publication date
CN106837377A (en) 2017-06-13

Similar Documents

Publication Publication Date Title
CN106837377B (en) Beans gravel rockfill grouting prefabricated pipe section suitable for double-shielded TBM construction
CN106884666B (en) The construction method of beans gravel rockfill grouting closed-loop
CN107191197B (en) Shield segment and construction method thereof in tunnel through mine method by shield air pushing
CN106837359B (en) A kind of arrival portal sealing device and seal construction method
CN206668280U (en) Beans gravel rockfill grouting prefabricated pipe section suitable for double-shielded TBM construction
CN206722878U (en) A kind of mining light-duty filling counterfort
CN101845944B (en) Method for sealing gas drainage boreholes at specified positions
CN107989571A (en) One kind wears three pouch plugging device of formula and its application method
MX349183B (en) Packer for alternate flow channel gravel packing and method for completing a wellbore.
CN105156067B (en) Coal mine underground hydraulic fracturing drilling and hole sealing device and method
CN202250166U (en) Secondary high-pressure grouting hole packer
CN108278096A (en) A kind of seat earth layer-through drilling dynamic self-adapting hole sealing device and method
CN106223897A (en) A kind of fully-mechanized mining working crushes coal petrography deep hole segmenting slip casting method
CN113202446A (en) Reusable hole packer for coal mine underground gas extraction cross-layer drilling and operation method thereof
CN202510163U (en) Goaf grouting device
CN206887951U (en) A kind of anchor bolt support matrix and anchor bolt support
CN108412540A (en) A kind of expansion filling method based on waste filling
CN103883276A (en) Simple, economic and efficient coal seam gas drainage drilling hole sealing method
CN103696787A (en) Deformed steel bar high-pressure grouting anchor rod and support method for reinforcing roadway by deformed steel bar high-pressure grouting anchor rod
CN105065010B (en) A kind of shield band water receives portal temporary sealing devices and encapsulating method
CN203175569U (en) Steel tube piece tunnel portal water-proof sealing structure in shield-driven tunnel breakthrough
CN207795142U (en) Two pouches of one kind wearing formula plugging device
CN105888708A (en) Roadway roof-fall zone detection and processing method based on radar detection technique
CN104343123A (en) Double-layer film bag device applied to injection pipe sealing in water bursting sand layer and method therefor
CN105134223B (en) A kind of construction method for improving shield launching steel case sealing

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 450003 Zhengzhou Jinshui Road, Henan, No. 109

Patentee after: Yellow River Survey Planning and Design Research Institute Co., Ltd.

Address before: 450003 Zhengzhou Jinshui Road, Henan, No. 109

Patentee before: Yellow River Engineering Consulting Co., Ltd.

CP01 Change in the name or title of a patent holder