CN206667715U - A kind of construction coherent-wall scaffolding cantilever arrangement - Google Patents
A kind of construction coherent-wall scaffolding cantilever arrangement Download PDFInfo
- Publication number
- CN206667715U CN206667715U CN201720350389.1U CN201720350389U CN206667715U CN 206667715 U CN206667715 U CN 206667715U CN 201720350389 U CN201720350389 U CN 201720350389U CN 206667715 U CN206667715 U CN 206667715U
- Authority
- CN
- China
- Prior art keywords
- pole
- base plate
- installation base
- wall
- cantilever arrangement
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Movable Scaffolding (AREA)
Abstract
It the utility model is related to technical field of building construction,Especially a kind of construction coherent-wall scaffolding cantilever arrangement,Including the first installation base plate,Also include two piece of second installation base plate,First installation base plate and the second installation base plate are connected with wall by the first connecting bolt,The first pole is connected with first installation base plate,The end of first pole is provided with and orthogonal 3rd pole of the first pole,The second pole is connected with second installation base plate,Second pole is connected with the 3rd pole,There is provided multiple strong points,And employ triangle rock-steady structure,Effectively increase the structural strength of scaffold,Add security,And there is provided the structure that can be finely adjusted according to Realize,Can eliminate influences caused by alignment error or the non-perpendicular situation of metope,So that the scope of application of scaffold is wider.
Description
Technical field
It the utility model is related to technical field of building construction, more particularly to a kind of construction coherent-wall scaffolding cantilever dress
Put.
Background technology
The scaffold of existing construction, it is mostly that root is in the pole type scaffold on ground, its weak point,
The scaffold of this structure, volume is big, and consumptive material is more, especially for skyscraper, shows its deficiency especially.
For this, someone devises cantilevered scaffold, is formed using the support and cantilever being fixed on wall, although section
About material, but connect not firm, but also without the horizontal function of regulation, may have influence on the normal of scaffold makes
With.
Utility model content
The purpose of this utility model be in order to solve in the prior art in the presence of it is not firm, be unable to the shortcomings that leveling, and propose
A kind of construction coherent-wall scaffolding cantilever arrangement.
To achieve these goals, the utility model employs following technical scheme:
Design a kind of construction coherent-wall scaffolding cantilever arrangement, including the first installation base plate, in addition to two piece of second peace
Substrate is filled, first installation base plate and the second installation base plate are connected with wall, first peace by the first connecting bolt
The first pole is connected with dress substrate, the end of first pole is provided with and orthogonal 3rd pole of the first pole, institute
State and the second pole is connected with the second installation base plate, second pole is connected with the 3rd pole, first pole and the 3rd
No less than two mounting seats are equipped with pole, are provided with job platform above first pole, the job platform passes through not
Less than two the second connecting bolts are connected with mounting seat, and tune is provided with close to vertical screw thread at mounting seat on the job platform
Bolt is saved, the end of the regulating bolt is set at the top of mounting seat.
Preferably, rotation seat is equipped with first installation base plate and the second installation base plate, is rotated in the rotation seat
Rotating shaft is installed, one end of first pole and the second pole is fixedly connected with rotating shaft, the other end of second pole
Provided with sleeve pipe, described sleeve pipe is sleeved on the 3rd pole.
Preferably, side of the job platform away from wall is provided with fence vertically, and the fence is stainless steel guard rail.
Preferably, the length of second pole is 1.2 times of the first strut lengths.
Preferably, first pole, the second pole and the 3rd pole are diameter 30mm stainless steel.
The utility model proposes a kind of construction coherent-wall scaffolding cantilever arrangement, beneficial effect is:There is provided more
The individual strong point, and triangle rock-steady structure is employed, the structural strength of scaffold is effectively increased, adds security, and
There is provided the structure that can be finely adjusted according to Realize, can eliminate caused by alignment error or the non-perpendicular situation of metope
Influence so that the scope of application of scaffold is wider.
Brief description of the drawings
Fig. 1 be the utility model proposes a kind of construction coherent-wall scaffolding cantilever arrangement front view;
Fig. 2 be the utility model proposes a kind of construction coherent-wall scaffolding cantilever arrangement side view;
Fig. 3 be the utility model proposes a kind of construction coherent-wall scaffolding cantilever arrangement mounting seat at structure show
It is intended to.
In figure:In figure:First installation base plate 1, the first connecting bolt 2, the first pole 3, job platform 4, fence 5, second
Connecting bolt 6, mounting seat 7, the second pole 8, rotation seat 9, the second installation base plate 10, sleeve pipe 11, the 3rd pole 12, regulating bolt
13rd, wall 14.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out
Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole
Embodiment.
Reference picture 1-3, a kind of construction coherent-wall scaffolding cantilever arrangement, including the first installation base plate 1, in addition to two pieces
Second installation base plate 10, the first installation base plate 1 and the second installation base plate 10 are connected with wall 14 by the first connecting bolt 2.
First installation base plate 1 and the second installation base plate 10 provide fixing point, and more traditional single fixing point is more stable.
The first pole 3 is connected with first installation base plate 1, the end of the first pole 3 is provided with to be mutually perpendicular to the first pole 3
The 3rd pole 12, be connected with the second pole 8 on the second installation base plate 10, the second pole 8 is connected with the 3rd pole 12, first
No less than two mounting seats 7 are equipped with the pole 12 of bar 3 and the 3rd, the top of the first pole 3 is provided with job platform 4, job platform 4
It is connected by no less than two the second connecting bolts 6 with mounting seat 7, vertical screw thread is pacified at mounting seat 7 on job platform 4
Equipped with regulating bolt 13, the end of regulating bolt 13 is set against the top of mounting seat 7.Side of the job platform 4 away from wall 14
Fence 5 is provided with vertically, fence 5 is stainless steel guard rail.First pole 3 and the second pole 8 composition triangle rock-steady structure, improve knot
Structure intensity, increase security.Job platform 4 is arranged in mounting seat 7 by the connecting bolt 6 of regulating bolt 13 and second, is passed through
The position of regulating bolt 13 can adjust the relative altitude between job platform 4 and mounting seat 7 at each mounting seat 7, so as to realize
The fine setting of the levelness of job platform 4.Fence 5 further increases security.
The length of second pole 8 is 1.2 times of the length of the first pole 3.First pole 3, the second pole 8 and the 3rd pole 12
It is diameter 30mm stainless steel.
Rotation seat 9 is equipped with first installation base plate 1 and the second installation base plate 10, rotating shaft is rotatablely equipped with rotation seat 9,
One end of first pole 3 and the second pole 8 is fixedly connected with rotating shaft, and the other end of the second pole 8 is provided with sleeve pipe 11, sleeve pipe 11
It is sleeved on the 3rd pole 12.By adjusting the position of the first installation base plate 1 and the second installation base plate 10, change the first pole 3
And the second angle between pole 8 also can carry out coarse adjustment to the levelness of job platform 4.
Embodiment:First installation base plate 1 and the second installation base plate 10 provide fixing point, and more traditional single fixing point is more
It is stable.First pole 3 and the second pole 8 composition triangle rock-steady structure, improve structural strength, increase security.Job platform 4
It is arranged on by the connecting bolt 6 of regulating bolt 13 and second in mounting seat 7, each peace can be adjusted by the position of regulating bolt 13
The relative altitude between job platform 4 and mounting seat 7 at seat 7 is filled, so as to realize the fine setting of the levelness of job platform 4.
It is described above, the only preferable embodiment of the utility model, but the scope of protection of the utility model is not
This is confined to, any one skilled in the art is in the technical scope that the utility model discloses, according to this practicality
New technical scheme and its utility model design are subject to equivalent substitution or change, should all cover in protection model of the present utility model
Within enclosing.
Claims (5)
1. a kind of construction coherent-wall scaffolding cantilever arrangement, including the first installation base plate (1), it is characterised in that:Also include two
The installation base plate of block second (10), first installation base plate (1) and the second installation base plate (10) pass through the first connecting bolt (2)
Wall (14) is connected with, the first pole (3) is connected with first installation base plate (1), the end of first pole (3) is set
Have with orthogonal 3rd pole (12) of the first pole (3), be connected with the second pole on second installation base plate (10)
(8), second pole (8) is connected with the 3rd pole (12), is equipped with not on first pole (3) and the 3rd pole (12)
Less than two mounting seats (7), the first pole (3) top are provided with job platform (4), and the job platform (4) is by many
It is connected in two the second connecting bolts (6) with mounting seat (7), close to the vertical spiral shell in mounting seat (7) place on the job platform (4)
Line is provided with regulating bolt (13), and the end of the regulating bolt (13) is set at the top of mounting seat (7).
A kind of 2. construction coherent-wall scaffolding cantilever arrangement according to claim 1, it is characterised in that:First peace
Rotation seat (9) is equipped with dress substrate (1) and the second installation base plate (10), is rotatablely equipped with rotating shaft in the rotation seat (9), institute
The one end for stating the first pole (3) and the second pole (8) is fixedly connected with rotating shaft, and the other end of second pole (8) is provided with
Sleeve pipe (11), described sleeve pipe (11) are sleeved on the 3rd pole (12).
A kind of 3. construction coherent-wall scaffolding cantilever arrangement according to claim 1, it is characterised in that:The operation horizontal
Side of the platform (4) away from wall (14) is provided with fence (5) vertically, and the fence (5) is stainless steel guard rail.
A kind of 4. construction coherent-wall scaffolding cantilever arrangement according to claim 1, it is characterised in that:Described second
The length of bar (8) is 1.2 times of the first pole (3) length.
A kind of 5. construction coherent-wall scaffolding cantilever arrangement according to claim 1, it is characterised in that:Described first
Bar (3), the second pole (8) and the 3rd pole (12) are diameter 30mm stainless steel.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720350389.1U CN206667715U (en) | 2017-04-06 | 2017-04-06 | A kind of construction coherent-wall scaffolding cantilever arrangement |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720350389.1U CN206667715U (en) | 2017-04-06 | 2017-04-06 | A kind of construction coherent-wall scaffolding cantilever arrangement |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206667715U true CN206667715U (en) | 2017-11-24 |
Family
ID=60367907
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720350389.1U Expired - Fee Related CN206667715U (en) | 2017-04-06 | 2017-04-06 | A kind of construction coherent-wall scaffolding cantilever arrangement |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206667715U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113235898A (en) * | 2021-06-04 | 2021-08-10 | 中铁大桥局上海工程有限公司 | Overhanging scaffold and construction process thereof |
-
2017
- 2017-04-06 CN CN201720350389.1U patent/CN206667715U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113235898A (en) * | 2021-06-04 | 2021-08-10 | 中铁大桥局上海工程有限公司 | Overhanging scaffold and construction process thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106884491A (en) | A kind of curtain wall is hung installation gravity self-balancing directional rotating connection hanging piece and is combined with point | |
CN206667715U (en) | A kind of construction coherent-wall scaffolding cantilever arrangement | |
CN208763205U (en) | A kind of pre-embedded steel slab positioning correcting bracket | |
CN207392796U (en) | A kind of adjustable inclined for assembled arthitecutral structure supports | |
CN103151752B (en) | Universal surge arrester support | |
CN210857961U (en) | Adjustable scaffold | |
CN211523849U (en) | Building guardrail for civil engineering | |
CN207319851U (en) | Transformer rack | |
CN206737212U (en) | A kind of curtain wall is hung installation gravity self-balancing directional rotating connection hanging piece with point and combined | |
CN206173991U (en) | Installation of iron tower anchor screw fixed knot construct | |
CN109830917A (en) | A kind of device and method setting up temporary cable | |
CN105369990B (en) | A kind of universal adjusting device for building roof system | |
CN208039290U (en) | A kind of pedestal of the good integrated house of stability | |
CN210598066U (en) | High-stability diagonal tension door type scaffold | |
CN211058284U (en) | Full hall support frame steel pipe pole setting base | |
CN209642183U (en) | A kind of device setting up temporary cable | |
CN207298314U (en) | A kind of LED display hoisting bracket | |
CN218117365U (en) | Tree house structure with adjustable | |
CN211899757U (en) | Wallboard support for assembly type building construction | |
CN219864262U (en) | Herringbone steel supporting structure | |
CN219175798U (en) | Tilting-prevention steel platform device | |
CN220888322U (en) | Cast-in-situ construction template supporting structure | |
CN219261689U (en) | Pull-up adjustable flower basket type wall outer cantilever frame | |
CN210217204U (en) | Construct interim rail guard of house floor level entrance to a cave | |
CN217054485U (en) | Building engineering template fixing device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171124 |
|
CF01 | Termination of patent right due to non-payment of annual fee |