CN206173991U - Installation of iron tower anchor screw fixed knot construct - Google Patents

Installation of iron tower anchor screw fixed knot construct Download PDF

Info

Publication number
CN206173991U
CN206173991U CN201520682559.7U CN201520682559U CN206173991U CN 206173991 U CN206173991 U CN 206173991U CN 201520682559 U CN201520682559 U CN 201520682559U CN 206173991 U CN206173991 U CN 206173991U
Authority
CN
China
Prior art keywords
fixing
anchor
installation
frame
iron tower
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520682559.7U
Other languages
Chinese (zh)
Inventor
李杏斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Cypress Semiconductor Corp
Original Assignee
Cypress Semiconductor Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Cypress Semiconductor Corp filed Critical Cypress Semiconductor Corp
Priority to CN201520682559.7U priority Critical patent/CN206173991U/en
Application granted granted Critical
Publication of CN206173991U publication Critical patent/CN206173991U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Foundations (AREA)
  • Suspension Of Electric Lines Or Cables (AREA)

Abstract

本实用新型提供了一种铁塔地脚螺丝安装固定结构,包括若干地脚底座和固定架,所述地脚底座中心形成有固定孔以及均匀分布在固定孔周边的若干螺纹孔,所述螺纹孔内设有螺纹钢,所述固定架包括顶框,顶框为多个连接杆连接的多边形框架,相邻连接杆的连接角处形成有与固定孔匹配的穿孔,以供顶框与各地脚底座固接。本实用新型铁塔地脚螺丝安装固定结构通过设置固定架,通过固定架上的若干支杆配合若干地脚底座上的固定孔,而限定地脚底座之间的位置,可以提高地脚底座的安装准度。

The utility model provides an installation and fixing structure for iron tower anchor screws, which comprises several anchor bases and fixing frames. A fixing hole and a number of threaded holes evenly distributed around the fixing holes are formed in the center of the anchor base. The threaded holes Rebar is provided inside, and the fixed frame includes a top frame, which is a polygonal frame connected by a plurality of connecting rods, and the connecting corners of adjacent connecting rods are formed with perforations matching the fixing holes for the top frame to connect with the feet of various places. The base is fixed. The installation and fixing structure of the iron tower anchor screws of the utility model can improve the installation of the anchor base by setting a fixed frame, and through a plurality of poles on the fixed frame matched with fixed holes on a plurality of anchor bases to limit the position between the anchor bases. accuracy.

Description

铁塔地脚螺丝安装固定结构Iron tower anchor screw installation and fixing structure

技术领域technical field

本实用新型涉及一种建筑施工装置,尤其涉及一种铁塔地脚螺丝安装固定结构。The utility model relates to a building construction device, in particular to a structure for installing and fixing anchor screws of an iron tower.

背景技术Background technique

安装铁塔时,通常有四个地脚底座,四个地脚底座上安装有地脚螺丝,每一地脚底座上安装有若干螺丝,螺丝凸出于基座表面以用于焊接,目前在安装地脚底座的过程中,常常通过测量划定四个安装区域将四个地脚底座安装,然在安装中,由于人为对位易出现安装偏差。When installing an iron tower, there are usually four anchor bases, and anchor screws are installed on the four anchor bases. Several screws are installed on each anchor base. The screws protrude from the surface of the base for welding. Currently, the installation In the process of the foundation base, four installation areas are often defined by measurement to install the four foundation bases. However, during the installation, installation deviations are prone to occur due to artificial alignment.

发明内容Contents of the invention

本实用新型是针对现有技术的不足,提供一种可以提高地脚底座位置安装准度的铁塔地脚螺丝安装固定结构。The utility model aims at the deficiencies of the prior art, and provides an iron tower anchor screw installation and fixing structure which can improve the installation accuracy of the anchor base.

本实用新型提供的技术方案如下:一种铁塔地脚螺丝安装固定结构,包括若干地脚底座和固定架,所述地脚底座中心形成有固定孔以及均匀分布在固定孔周边的若干螺纹孔,所述螺纹孔内设有螺纹钢,所述固定架包括顶框,顶框为多个连接杆连接的多边形框架,相邻连接杆的连接角处形成有与固定孔匹配的穿孔,以供顶框与各地脚底座固接。The technical solution provided by the utility model is as follows: an iron tower anchor screw installation and fixing structure, including several anchor bases and fixing frames, the center of the anchor base is formed with a fixing hole and a number of threaded holes evenly distributed around the fixing hole, Threaded steel is provided in the threaded hole, and the fixing frame includes a top frame, which is a polygonal frame connected by a plurality of connecting rods, and the connecting corners of adjacent connecting rods are formed with perforations matching the fixing holes for the top frame. The frame is fixedly connected with the foot bases everywhere.

进一步的,每一个所述地脚底座上螺纹孔的个数为4个,且分布在以固定孔为中心的四角处。Further, the number of threaded holes on each of the foundation bases is four, and they are distributed at the four corners centered on the fixing holes.

进一步的,所述顶框为4根连接杆连成的正方形顶框,且每相邻的2根连接杆的连接处形成有与顶框相垂直的支杆,以与固定孔套设。Further, the top frame is a square top frame formed by connecting four connecting rods, and a support rod perpendicular to the top frame is formed at the junction of every two adjacent connecting rods, so as to be sleeved with the fixing holes.

进一步的,所述固定架每一根连接杆的中部断开成两段,并且每一段在断开端的外周形成有螺纹,两段通过一螺纹套筒连接。Further, the middle part of each connecting rod of the fixing frame is broken into two sections, and each section is threaded on the outer periphery of the disconnected end, and the two sections are connected by a threaded sleeve.

与现有技术相比,本实用新型铁塔地脚螺丝安装固定结构通过设置固定架,通过固定架上的若干支杆配合若干地脚底座上的固定孔,而限定地脚底座之间的位置,可以提高地脚底座的安装准度。Compared with the prior art, the installation and fixing structure of the iron tower anchor screws of the utility model defines the position between the anchor bases by setting a fixed frame, and through a plurality of poles on the fixed frame matched with fixing holes on a plurality of anchor bases. The installation accuracy of the foundation base can be improved.

附图说明Description of drawings

图1是本实用新型铁塔地脚螺丝安装固定结构较佳实施例的结构示意图;Fig. 1 is the structural representation of the preferred embodiment of the installation and fixing structure of the iron tower anchor screws of the utility model;

图2是本实用新型铁塔地脚螺丝安装固定结构另一较佳实施例的结构示意图。Fig. 2 is a structural schematic diagram of another preferred embodiment of the installation and fixing structure of the iron tower anchor screws of the utility model.

具体实施方式detailed description

下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例,在不冲突的情况下,本申请中的实施例及实施例中的特征可以相互组合,下面将参考附图并结合实施例来详细说明本实用新型。The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. For example, in the case of no conflict, the embodiments in the present application and the features in the embodiments can be combined with each other. The utility model will be described in detail below with reference to the drawings and in combination with the embodiments.

如图1所示,一种铁塔地脚螺丝安装固定结构,包括地脚底座10以及固定架30。As shown in FIG. 1 , an iron tower anchor screw installation and fixing structure includes an anchor base 10 and a fixing frame 30 .

地脚底座10为4个,置放在呈正方形边框的四个顶点处,用以固定铁塔,地脚底座10的中部开设有固定孔11,固定孔11用以连接固定架30,地脚底座10上以固定孔11为中心的四角处设置有螺纹孔12,螺纹孔12内固接有螺纹钢,用于与铁塔底架焊接。There are 4 anchor bases 10, which are placed at the four vertices of the square frame to fix the iron tower. The middle part of the anchor base 10 is provided with a fixing hole 11, and the fixing hole 11 is used to connect the fixing frame 30. 10 is provided with threaded holes 12 at the four corners centered on the fixing hole 11, and threaded steel is fixedly connected in the threaded holes 12 for welding with the iron tower base frame.

固定架30用于连接各地脚底座10,以限定各地脚底座10的之间的间距。固定架30包括顶框31,顶框31为多边形框架。本实施例中,顶框31为4根连接杆连成的正方形顶框31,且每相邻的2根连接杆的连接处开设有与固定孔11匹配的穿孔,以供螺栓穿过穿孔与固定孔11连接,从而将固定架30与各地脚底座10固接。The fixing frame 30 is used for connecting the foot bases 10 of each place, so as to limit the distance between the foot bases 10 of each place. The fixing frame 30 includes a top frame 31, and the top frame 31 is a polygonal frame. In this embodiment, the top frame 31 is a square top frame 31 formed by connecting four connecting rods, and the connection of each adjacent two connecting rods is provided with a perforation matching the fixing hole 11 for bolts to pass through the perforation and The fixing holes 11 are connected, so that the fixing frame 30 is fixedly connected with the foot bases 10 at various places.

使用时,将各地脚底座10放置至对应的安装区域,并且通过螺栓穿过固定架30的穿孔与地脚底座10固定孔11连接,从而将各地脚底座10位置限定,此后,地脚底座10可绕螺栓转动进行微调。During use, place each foot base 10 to the corresponding installation area, and pass through the perforation of the fixing bracket 30 to connect with the anchor base 10 fixing holes 11 by bolts, thereby the position of each foot base 10 is limited. After that, the foot base 10 Can be turned around the bolt for fine adjustment.

可以理解,固定架30的四角处可一体地形成与顶框31相垂直的支杆,通过支杆与各地脚底座10的固定孔11套设。It can be understood that the four corners of the fixing frame 30 can integrally form struts perpendicular to the top frame 31 , and the struts are sleeved with the fixing holes 11 of the foot bases 10 at various places.

此外,请参阅图2,为了调节固定架30的框架尺寸,以配合多种地脚底座10的安装距离,在固定架30每一连接杆的中部安装有一螺纹套筒40,具体地,每一连接杆在中部断开成两段,并且在断开端的外周形成有螺纹,两段通过匹配的螺纹套筒40连接,如此,通过旋转螺纹套筒40,可调节连接杆的长度,从而固定架30的尺寸可调,可配合多种间隔距离的地脚底座10的安装。In addition, please refer to Fig. 2, in order to adjust the frame size of the fixed frame 30, to match the installation distance of various foundation bases 10, a threaded sleeve 40 is installed in the middle of each connecting rod of the fixed frame 30, specifically, each The connecting rod is broken into two sections in the middle, and threads are formed on the outer circumference of the disconnected end, and the two sections are connected by a matching threaded sleeve 40, so that the length of the connecting rod can be adjusted by rotating the threaded sleeve 40, thereby fixing the frame The size of 30 is adjustable, which can cooperate with the installation of the foundation base 10 of various distances.

综上所述,本实用新型铁塔地脚螺丝安装固定结构通过设置固定架,通过固定架上的若干支杆配合若干地脚底座上的固定孔,而限定地脚底座之间的位置,可以提高地脚底座的安装准度。To sum up, the installation and fixing structure of the iron tower anchor screws of the utility model can improve the position of the anchor bases by setting the fixed frame, and by coordinating the fixing holes on the several support rods on the fixed frame with the fixed holes on the several anchor bases. The installation accuracy of the foundation base.

以上所述仅为本实用新型的实施例,并非因此限制本实用新型的专利范围,凡是利用本实用新型说明书内容所作的等效结构或等效流程变换,或直接或间接运用在其他相关的技术领域,均同理包括在本实用新型的专利保护范围内。The above is only an embodiment of the utility model, and does not limit the patent scope of the utility model. Any equivalent structure or equivalent process conversion made by using the content of the utility model description, or directly or indirectly used in other related technologies fields, are all included in the scope of patent protection of the utility model in the same way.

Claims (4)

1.一种铁塔地脚螺丝安装固定结构,包括若干地脚底座(10)和固定架(30),其特征在于:所述地脚底座(10)中心形成有固定孔(11)以及均匀分布在固定孔(11)周边的若干螺纹孔(12),所述螺纹孔(12)内设有螺纹钢,所述固定架(30)包括顶框(31),顶框(31)为多个连接杆连接的多边形框架,相邻连接杆的连接角处形成有与固定孔(11)匹配的穿孔,以供顶框(31)与各地脚底座(10)固接。1. An installation and fixing structure of iron tower anchor screws, comprising several anchor bases (10) and fixing frames (30), characterized in that: the center of the anchor base (10) is formed with fixing holes (11) and evenly distributed Several threaded holes (12) on the periphery of the fixing hole (11), the threaded steel is provided in the threaded holes (12), the fixed frame (30) includes a top frame (31), and the top frame (31) is a plurality of In the polygonal frame connected by the connecting rods, perforations matching the fixing holes (11) are formed at the connecting corners of the adjacent connecting rods, for the top frame (31) to be fixedly connected to the foot bases (10) everywhere. 2.根据权利要求1所述的铁塔地脚螺丝安装固定结构,其特征在于:每一所述地脚底座(10)上螺纹孔(12)的个数为4个,且分布在以固定孔(11)为中心的四角处。2. The installation and fixing structure of iron tower anchor screws according to claim 1, characterized in that: the number of threaded holes (12) on each said anchor base (10) is 4, and the number of threaded holes (12) distributed in the fixed holes (11) is the four corners of the center. 3.根据权利要求1所述的铁塔地脚螺丝安装固定结构,其特征在于:所述顶框(31)为4根连接杆连成的正方形顶框(31),且每相邻的2根连接杆的连接处形成有与顶框(31)相垂直的支杆,以与固定孔(11)套设。3. The installation and fixing structure of iron tower anchor screws according to claim 1, characterized in that: the top frame (31) is a square top frame (31) connected by four connecting rods, and every two adjacent A support rod perpendicular to the top frame (31) is formed at the joint of the connecting rod to be sleeved with the fixing hole (11). 4.根据权利要求1至3任一项所述的铁塔地脚螺丝安装固定结构,其特征在于:所述固定架(30)每一根连接杆的中部断开成两段,并且每一段在断开端的外周形成有螺纹,两段通过一螺纹套筒(40)连接。4. The iron tower anchor screw installation and fixing structure according to any one of claims 1 to 3, characterized in that: the middle part of each connecting rod of the fixing frame (30) is broken into two sections, and each section is in the The outer periphery of the disconnected end is threaded, and the two sections are connected by a threaded sleeve (40).
CN201520682559.7U 2015-09-02 2015-09-02 Installation of iron tower anchor screw fixed knot construct Expired - Fee Related CN206173991U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520682559.7U CN206173991U (en) 2015-09-02 2015-09-02 Installation of iron tower anchor screw fixed knot construct

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520682559.7U CN206173991U (en) 2015-09-02 2015-09-02 Installation of iron tower anchor screw fixed knot construct

Publications (1)

Publication Number Publication Date
CN206173991U true CN206173991U (en) 2017-05-17

Family

ID=58672917

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520682559.7U Expired - Fee Related CN206173991U (en) 2015-09-02 2015-09-02 Installation of iron tower anchor screw fixed knot construct

Country Status (1)

Country Link
CN (1) CN206173991U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107284042A (en) * 2017-08-15 2017-10-24 镇江金海创科技有限公司 Dynamic focusing test device and laser marking machine
CN114703888A (en) * 2022-06-07 2022-07-05 中国二十二冶集团有限公司 Mounting rack for direct-buried embedded foundation bolt

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107284042A (en) * 2017-08-15 2017-10-24 镇江金海创科技有限公司 Dynamic focusing test device and laser marking machine
CN114703888A (en) * 2022-06-07 2022-07-05 中国二十二冶集团有限公司 Mounting rack for direct-buried embedded foundation bolt

Similar Documents

Publication Publication Date Title
CN204402015U (en) A kind of aluminum alloy mould plate system pulling-on piece formula diagonal brace
CN204986318U (en) Electric power iron tower vertical direction equipment fixing fastener
CN207211784U (en) A kind of positioner of prefabricated components installation reinforcing bar
CN206338548U (en) A kind of leveling support installed for heavy mechanical equipment pedestal
CN206448537U (en) Locators for tying prefabricated beams
CN205243136U (en) Adjustable interim power consumption circuit elevates device
CN206000028U (en) A kind of combination built-in fitting of steel building
CN204733118U (en) Be applied to the photovoltaic bracket system that solar photovoltaic assembly is fixed
CN202577945U (en) Retractable Formwork Support Rods
CN207278640U (en) A kind of fix bar arranges
CN206233558U (en) A kind of building template erecting device
CN205804922U (en) A kind of novel embedded tool formula scaffold wall connecting piece
CN206971810U (en) The supporting construction of structural beams and its spacing rest
CN205637632U (en) Special instrument holder is rectified in installation of shaped steel post
CN205591507U (en) Scaffold frame of easily dismantling
CN204664631U (en) The multi-functional adjustable support of a kind of horizontal pipe
CN205591556U (en) Building templates prevents down bracing piece
CN204081618U (en) A kind of cement electric power line pole tower
CN203795845U (en) Portable support for hoisting form board for pipeline blocking
CN206616884U (en) A kind of building cast template support column
CN203701278U (en) Structural support vertical adjusting device
CN202672700U (en) Height adjusting device of scaffold ricker
CN209855242U (en) A convenient and turnable pre-embedded parts installation device
CN203880641U (en) Lawn lamp installation frame
CN204590319U (en) Precast shear wall secured adjusted bar

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170517

CF01 Termination of patent right due to non-payment of annual fee