CN206667174U - A kind of safeguard structure for engineering of being passed the flood period for flood control - Google Patents
A kind of safeguard structure for engineering of being passed the flood period for flood control Download PDFInfo
- Publication number
- CN206667174U CN206667174U CN201720853942.3U CN201720853942U CN206667174U CN 206667174 U CN206667174 U CN 206667174U CN 201720853942 U CN201720853942 U CN 201720853942U CN 206667174 U CN206667174 U CN 206667174U
- Authority
- CN
- China
- Prior art keywords
- flood
- support base
- water retaining
- engineering
- safeguard structure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Catching Or Destruction (AREA)
Abstract
It is used for the safeguard structure of engineering of passing the flood period of controlling flood the utility model discloses a kind of, including water retaining facing, the both sides of water retaining facing are connected with support base, balancing pole is provided between support base, support base is provided with holding tank, support bar is connected with holding tank, the back side of water retaining facing is uniformly distributed fluted, one end of groove connection support bar, the back side of water retaining facing is provided with locating piece, support base is provided with locating slot, locating slot is corresponding with locating piece, water retaining facing includes the first water fender and second flap, fixed mechanism is provided between first water fender and second flap.The utility model is compact-sized, and connection is flexible, and dismounting is simple, and convenient in carrying, occupied ground is small, flexible arrangement, and flood fighting effect is good, practical.
Description
Technical field
The utility model belongs to flood control apparatus field, more particularly to a kind of protection knot for engineering of being passed the flood period for flood control
Structure.
Background technology
For the flood season in river, be required for implementing flood control deployment, and during flood control, flood season level go up, it is necessary to
Take urgent measure, stop current, it is all urgent behavior to flood season to be piled up as sandbag, stone, in terms of flood control, expends people
Power, furthermore later stage cleaning, it is all not very convenient.Existing flood control sub-embankment technology is temporarily in original rivers in flood-fighting
The ground small dike of certain altitude is constructed on embankment, excessive with flood-protection, destroy by rush of water embankment.Such small dike is constructed, is not only needed big
The ground of amount, and substantial amounts of manpower and materials are expended, and construct slowly, it is difficult to meet temporal requirement.Additionally, due to original
There is embankment by prolonged immersion in water and wash away, the stability of its own is impacted, then is adding heavier rock thereon
Native small dike, it is easy to cause original embankment to come down or cave in.3rd defect is that flood is stepped back, and the cubic metre of earth and stone on embankment, which is removed, to be made
Industry amount is larger.
Utility model content
The utility model purpose is solve above-mentioned technical problem present in prior art, there is provided one kind is used for degree of flood control
The safeguard structure of flood engineering, compact-sized, connection is flexible, and dismounting is simple, and convenient in carrying, occupied ground is small, flexible arrangement, saves
Time, flood fighting effect is good, practical.
In order to solve the above-mentioned technical problem, the utility model adopts the following technical scheme that:
A kind of safeguard structure for engineering of being passed the flood period for flood control, it is characterised in that:Including water retaining facing, the both sides of water retaining facing
Support base is connected with, balancing pole is provided between support base, support base is provided with holding tank, is connected with holding tank
Support bar, the back side of water retaining facing are uniformly distributed fluted, one end of groove connection support bar, and the back side of water retaining facing, which is provided with, determines
Position block, support base are provided with locating slot, and locating slot is corresponding with locating piece, and water retaining facing includes the first water fender and the second dash
Plate, fixed mechanism is provided between the first water fender and second flap;The safeguard structure is compact-sized, and connection is flexible, dismounting letter
Single, convenient in carrying, occupied ground is small, flexible arrangement, saves the time, and flood fighting effect is good, practical.
Further, the both sides of the first water fender are respectively equipped with first raised and the first neck, the both sides point of second flap
Not She You second raised and the second neck, first it is raised match with the second neck, the second projection matches with the first neck, the
One projection is provided with spacing hole, and the second neck is provided with mounting hole, fixed mechanism connection mounting hole and spacing hole, by the during installation
First projection of one water fender is inserted into the second neck of second flap, then is attached fixation with fixed mechanism, so that it may
The stable installation of water retaining facing is completed, it is raised by the second of a safeguard structure second flap when left and right assembles safeguard structure
It is inserted into the first neck of the adjacent water fender of safeguard structure first, mutually pins down, it is not easy to disengage, you can realize multiple protection
The stable assembling of structure, forms flood fighting defence line, easy for installation, practical.
Further, fixed mechanism includes screw and nut, and screw passes through mounting hole and spacing hole, and the one of nut fixing screws
End, using thread connecting mode, the first water fender is connected with second flap, reliable and stable, convenient disassembly.
Further, support bar includes fix bar and spring lever, and spring lever is located between fix bar, when water retaining facing is by sea
During the impact of wave, a pressure can be produced to support bar so that spring lever deforms upon, and disperses this pressure, improves protection knot
Stability after structure expansion.
Further, fix bar is provided with retainer ring, is provided with reinforcement between retainer ring, need to only insert reinforcement during installation
Into retainer ring, so that it may two support bars are pind down together, are synchronized with the movement, convenient disassembly.
Further, the both ends of balancing pole are equipped with U-shaped card block, U-shaped card block connecting support seat, only need to be by support base during installation
In the groove of embedded U-shaped card block, so that it may two support bases link together, strengthens stability, also can even if by sea beat
Keep stable, it is convenient after dismounting to carry.
Further, the bottom surface of support base is provided with anchor pole, and the outer circumference surface of anchor pole is provided with helical blade, uses earth anchor
Connected mode fixes support base on the ground, stable and firm, and helical blade can accelerate earth anchor speed.
The utility model is by adopting the above-described technical solution, have the advantages that:
Support bar is connected with the utility model in holding tank, the back side of water retaining facing is uniformly distributed fluted, exhibition
When opening water retaining facing, it is shelved on by support bar in the groove on diverse location, changes the inclination angle of water retaining facing, realizes different angles
The flood control resultses of degree, regulation is simple, easy to use;First support bar is ensconced in holding tank during gathering, then water retaining facing is overturn,
Locating piece is blocked by locating slot so that water retaining facing, which folds, to be collapsed on support base, convenient to carry;Water retaining facing is detachable,
The first projection of the first water fender is inserted into the second neck of second flap during installation, with screw through mounting hole with limiting
Position hole, then one end with nut fixing screws, so that it may the stable installation of water retaining facing is completed, will when left and right assembles safeguard structure
Second projection of left side safeguard structure second flap is inserted into the first neck of the right side water fender of safeguard structure first, mutually
Pin down, it is not easy to disengage, you can realize the stable assembling of multiple safeguard structures, form flood fighting defence line, easy for installation, practicality
By force.The utility model is compact-sized, and connection is flexible, and dismounting is simple, and convenient in carrying, occupied ground is small, flexible arrangement, during saving
Between, flood fighting effect is good, practical.
Brief description of the drawings
The utility model is described in further detail below in conjunction with the accompanying drawings:
Fig. 1 be the utility model it is a kind of be used for control flood pass the flood period engineering safeguard structure structural representation;
Fig. 2 is the structural representation that water retaining facing decomposes in the utility model;
Fig. 3 is the structural representation that support bar connects with reinforcement in the utility model;
Fig. 4 is the structural representation of balancing pole in the utility model.
In figure:1- water retaining facings;2- support bases;3- balancing poles;4-U type fixture blocks;5- anchor poles;6- helical blades;7- is accommodated
Groove;8- support bars;9- grooves;10- fix bars;11- spring levers;12- retainer rings;13- reinforcements;14- locating pieces;15- is positioned
Groove;The water fenders of 16- first;17- second flaps;18- first is raised;The necks of 19- first;20- second is raised;21- second blocks
Groove;22- spacing holes;23- mounting holes;24- screws;25- nuts.
Embodiment
As shown in Figures 1 to 4, it is a kind of safeguard structure for engineering of being passed the flood period for flood control of the utility model, including obstructing surface
Plate 1, the both sides of water retaining facing 1, which are connected through the hinge, support base 2, is provided with balancing pole 3 between support base 2, and the two of balancing pole 3
End is equipped with U-shaped card block 4, the connecting support seat 2 of U-shaped card block 4, need to only be embedded in support base 2 in the groove of U-shaped card block 4 during installation, just
Two support bases 2 can be linked together, strengthen stability, can also keep stable even if by sea beat, it is convenient after dismounting
Carry.The bottom surface of support base 2 is provided with anchor pole 5, and the outer circumference surface of anchor pole 5 is provided with helical blade 6, uses the connection side of earth anchor
Formula fixes support base 2 on the ground, stable and firm, and helical blade 6 can accelerate earth anchor speed.
Support base 2 is provided with holding tank 7, is connected with support bar 8 in holding tank 7, the back side of water retaining facing 1 is uniformly divided
Have a groove 9, one end of the connection support bar 8 of groove 9, be shelved on by support bar 8 in the groove 9 on diverse location, change gear
The inclination angle of water panel 1, the flood control resultses of different angle are realized, support bar 8 can be hidden in when not in use in holding tank 7, it is convenient
Fold and collapse.Support bar 8 includes fix bar 10 and spring lever 11, and spring lever 11 is located between fix bar 10, when water retaining facing 1 by
To wave impact when, can to support bar 8 produce a pressure so that spring lever 11 deforms upon, disperse this pressure, improve
Stability after safeguard structure expansion.Fix bar 10 is provided with retainer ring 12, is provided with reinforcement 13 between retainer ring 12, during installation
Reinforcement 13 need to be only inserted into retainer ring 12, so that it may two support bars 8 are pind down together, strengthen stability, synchronous fortune
It is dynamic, convenient disassembly.
The back side of water retaining facing 1 is provided with locating piece 14, and support base 2 is provided with locating slot 15, locating slot 15 and locating piece 14
Corresponding, water retaining facing 1 includes the first water fender 16 and second flap 17, between the first water fender 16 and second flap 17
Provided with fixed mechanism, the both sides of the first water fender 16 are respectively equipped with the first projection 18 and the first neck 19, second flap 17
Both sides are respectively equipped with the second projection 20 and second neck 21, and the first projection 18 matches with the second neck 21, the second projection 20 and
First neck 19 matches, and the first projection 18 is provided with spacing hole 22, and the second neck 21 is provided with mounting hole 23, fixed mechanism bag
Include screw 24 and nut 25, screw 24 is through mounting hole 23 and spacing hole 22, one end of the fixing screws 24 of nut 25, will during installation
First projection 18 of the first water fender 16 is inserted into the second neck 21 of second flap 17, then is attached with fixed mechanism
It is fixed, so that it may the stable installation of water retaining facing 1 to be completed, when left and right assembles safeguard structure, by left side safeguard structure second flap
17 the second projection 20 is inserted into the first neck 19 of right side the first water fender of safeguard structure 16, is mutually pind down, it is not easy to de-
Open, you can the stable assembling of multiple safeguard structures is realized, forms flood fighting defence line, it is easy for installation, it is practical.
It is connected with support bar 8 in the utility model in holding tank 7, the back side of water retaining facing 1 is uniformly distributed fluted
9, when deploying water retaining facing 1, it is shelved on by support bar 8 in the groove 9 on diverse location, changes the inclination angle of water retaining facing 1, it is real
The flood control resultses of existing different angle, regulation is simple, easy to use;First support bar 8 is ensconced in holding tank 7 during gathering, then will gear
Water panel 1 is overturn, and locating piece 14 is blocked by locating slot 15 so that water retaining facing 1, which folds, to be collapsed on support base 2, is conveniently removed
Fortune;Water retaining facing 1 is detachable, and the first projection 18 of the first water fender 16 is inserted into during installation the second card of second flap 17
In groove 21, mounting hole 23 and spacing hole 22, then one end with the fixing screws 24 of nut 25 are passed through with screw 24, so that it may complete dash
The stable installation of panel 1, when left and right assembles safeguard structure, the second projection 20 of left side safeguard structure second flap 17 is inserted
Into the first neck 19 of the first water fender of right side safeguard structure 16, mutually pin down, it is not easy to disengage, you can realize multiple protection
The stable assembling of structure, forms flood fighting defence line, easy for installation, practical.The utility model is compact-sized, and connection is flexible, tears open
Dress is simple, and convenient in carrying, occupied ground is small, flexible arrangement, saves the time, and flood fighting effect is good, practical.
Specific embodiment of the utility model is these are only, but the technical characteristics of the utility model is not limited thereto.Appoint
How based on the utility model, to solve essentially identical technical problem, essentially identical technique effect is realized, it is made
Simple change, equivalent substitution or modification etc., are all covered by among the scope of protection of the utility model.
Claims (7)
- A kind of 1. safeguard structure for engineering of being passed the flood period for flood control, it is characterised in that:Including water retaining facing, the two of the water retaining facing Side is connected with support base, and balancing pole is provided between the support base, and the support base is provided with holding tank, the receiving Support bar is connected with groove, the back side of the water retaining facing is uniformly distributed fluted, the groove connection support bar One end, the back side of the water retaining facing is provided with locating piece, and the support base is provided with locating slot, the locating slot with it is described fixed Position block is corresponding, and the water retaining facing includes the first water fender and second flap, first water fender and the second gear Fixed mechanism is provided between water plate.
- A kind of 2. safeguard structure of engineering of being passed the flood period for flood control according to claim 1, it is characterised in that:The first gear The both sides of water plate are respectively equipped with first raised and the first neck, and it is raised and that the both sides of the second flap are respectively equipped with second Two draw-in groove, described first it is raised match with second neck, described second it is raised match with first neck, it is described First projection is provided with spacing hole, and second neck is provided with mounting hole, and the fixed mechanism connects the mounting hole and institute State spacing hole.
- A kind of 3. safeguard structure of engineering of being passed the flood period for flood control according to claim 2, it is characterised in that:The fixed machine Structure includes screw and nut, and the screw fixes the one of the screw through the mounting hole and the spacing hole, the nut End.
- A kind of 4. safeguard structure of engineering of being passed the flood period for flood control according to claim 1, it is characterised in that:The support bar Including fix bar and spring lever, the spring lever is located between the fix bar.
- A kind of 5. safeguard structure of engineering of being passed the flood period for flood control according to claim 4, it is characterised in that:The fix bar Retainer ring is provided with, reinforcement is provided between the retainer ring.
- A kind of 6. safeguard structure of engineering of being passed the flood period for flood control according to claim 1, it is characterised in that:The balancing pole Both ends be equipped with U-shaped card block, the U-shaped card block connects the support base.
- A kind of 7. safeguard structure of engineering of being passed the flood period for flood control according to claim 1, it is characterised in that:The support base Bottom surface be provided with anchor pole, the outer circumference surface of the anchor pole is provided with helical blade.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720853942.3U CN206667174U (en) | 2017-07-14 | 2017-07-14 | A kind of safeguard structure for engineering of being passed the flood period for flood control |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720853942.3U CN206667174U (en) | 2017-07-14 | 2017-07-14 | A kind of safeguard structure for engineering of being passed the flood period for flood control |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206667174U true CN206667174U (en) | 2017-11-24 |
Family
ID=60369971
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720853942.3U Expired - Fee Related CN206667174U (en) | 2017-07-14 | 2017-07-14 | A kind of safeguard structure for engineering of being passed the flood period for flood control |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206667174U (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108222500A (en) * | 2018-01-02 | 2018-06-29 | 南通中厦建筑工程总承包有限公司 | A kind of Core Walls Structure outrigger wall-attachment electric hydaulic climbing frame |
CN109056639A (en) * | 2018-08-17 | 2018-12-21 | 合肥五凡建筑工程有限公司 | A kind of spliced mobile anti-flood wall |
CN109083097A (en) * | 2018-08-31 | 2018-12-25 | 西京学院 | A kind of convertible river levee protective device |
CN109629533A (en) * | 2018-11-27 | 2019-04-16 | 朱军博 | A kind of reservoir spillway valve |
CN110714440A (en) * | 2019-10-28 | 2020-01-21 | 华北水利水电大学 | Ecological landscape protective structure for flood control and collapse prevention |
CN111764345A (en) * | 2020-07-23 | 2020-10-13 | 张威 | Method for building flood control wall by using splicing members |
CN112081066A (en) * | 2020-06-23 | 2020-12-15 | 湄洲湾职业技术学院 | Waterlogging prevention emergency device |
-
2017
- 2017-07-14 CN CN201720853942.3U patent/CN206667174U/en not_active Expired - Fee Related
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108222500A (en) * | 2018-01-02 | 2018-06-29 | 南通中厦建筑工程总承包有限公司 | A kind of Core Walls Structure outrigger wall-attachment electric hydaulic climbing frame |
CN109056639A (en) * | 2018-08-17 | 2018-12-21 | 合肥五凡建筑工程有限公司 | A kind of spliced mobile anti-flood wall |
CN109083097A (en) * | 2018-08-31 | 2018-12-25 | 西京学院 | A kind of convertible river levee protective device |
CN109629533A (en) * | 2018-11-27 | 2019-04-16 | 朱军博 | A kind of reservoir spillway valve |
CN109629533B (en) * | 2018-11-27 | 2021-06-01 | 天津卡尔斯阀门股份有限公司 | Reservoir flood discharge valve |
CN110714440A (en) * | 2019-10-28 | 2020-01-21 | 华北水利水电大学 | Ecological landscape protective structure for flood control and collapse prevention |
CN112081066A (en) * | 2020-06-23 | 2020-12-15 | 湄洲湾职业技术学院 | Waterlogging prevention emergency device |
CN111764345A (en) * | 2020-07-23 | 2020-10-13 | 张威 | Method for building flood control wall by using splicing members |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206667174U (en) | A kind of safeguard structure for engineering of being passed the flood period for flood control | |
CN106628267B (en) | A kind of expansion of skin Nano satellite solar energy turnover panel and locking device | |
RU2006102339A (en) | SHOULDER POSITIONING DEVICE AND DISC WITH SHOVELS CONTAINING SUCH DEVICE | |
CN106915479A (en) | A kind of deployable solar wing of cube | |
CN107806282A (en) | A kind of building site enclosing for being easily installed and dismantling | |
CN107859432A (en) | A kind of floatability enclosing for the water surface | |
CN205794324U (en) | Tree support frame | |
CN206131600U (en) | A egg frame subassembly and refrigerator for refrigerator | |
CN202925357U (en) | Folding laundry basket | |
CN105256784B (en) | The combination assembled water conservancy diversion pier structure of U-shaped plate | |
US2561225A (en) | Awning | |
DE60042597D1 (en) | Shockproof transmission means for driving a generator by a flywheel, in particular in a clock | |
CN207974910U (en) | Wind-driven generator, which folds, becomes wind face blade construction | |
CN217869923U (en) | Bridge flood-fighting structure | |
CN216842023U (en) | Flow force power generation device | |
CN220736119U (en) | Folding football door with high stability | |
CN204061071U (en) | The agent structure of power generation arrangement | |
CN108316761A (en) | A kind of municipal works protective fence | |
CN217422364U (en) | Air inlet isolating valve anti-maloperation locking device | |
CN209394627U (en) | Complete folded form saws stool | |
张晓兔 et al. | Simulation of fully nonlinear 3-D numerical wave tank | |
CN208924808U (en) | A kind of hydraulic engineering water plant safeguard structure | |
CN220080061U (en) | Highway geogrid | |
CN209178998U (en) | A kind of pile driving frame | |
CN204838710U (en) | Folding stool |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171124 Termination date: 20190714 |