CN206665839U - Novel heavy duty pay off rack - Google Patents

Novel heavy duty pay off rack Download PDF

Info

Publication number
CN206665839U
CN206665839U CN201720392614.8U CN201720392614U CN206665839U CN 206665839 U CN206665839 U CN 206665839U CN 201720392614 U CN201720392614 U CN 201720392614U CN 206665839 U CN206665839 U CN 206665839U
Authority
CN
China
Prior art keywords
main beam
pay
duty
rear support
new heavy
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720392614.8U
Other languages
Chinese (zh)
Inventor
王伟东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201720392614.8U priority Critical patent/CN206665839U/en
Application granted granted Critical
Publication of CN206665839U publication Critical patent/CN206665839U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Details Of Indoor Wiring (AREA)

Abstract

A kind of novel heavy duty pay off rack is the utility model is related to, by girder, rear support mechanism, locating part and bindiny mechanism, it is characterised in that:It is arranged in the middle part of described bindiny mechanism on described girder, bindiny mechanism side is provided with the neck for being used for placing cable shafts, bindiny mechanism's opposite side is connected with described rear support mechanism, connected between girder bottom and rear support mechanism bottom by described locating part, described rear support mechanism includes drive mechanism, brace, inner cylinder and the back rest, brace one end is hinged with described bindiny mechanism, the brace other end is connected with described inner cylinder upper outside, and inner cylinder is connected by described drive mechanism with the back rest;The utility model is reasonable in design, has the advantages of big regulation span, light-duty good movement, lifting unwrapping wire is good.

Description

新型重型放线架New heavy-duty pay-off rack

技术领域technical field

本实用新型涉及机械工具技术领域,尤其涉及一种新型重型放线架。The utility model relates to the technical field of mechanical tools, in particular to a novel heavy-duty pay-off frame.

背景技术Background technique

电线或电缆通常缠绕在线轴上,使用过程中,需要转动线轴进行放线,为了方便使用,通常将线轴放置在支架上,支架支撑的线轴能够转动,便于线轴放线,现有的线轴支架不能用于重型线缆轴的安装,同时具有整体不稳、调节跨度小、生产成本高的缺点。Electric wire or cable is usually wound on the spool, in use, need to rotate the spool to pay off, in order to use conveniently, usually put the spool on the support, the spool supported by the support can rotate, easy to pay off the spool, the existing spool support cannot It is used for the installation of heavy-duty cable shafts, but it also has the disadvantages of overall instability, small adjustment span, and high production cost.

发明内容Contents of the invention

为了解决现有技术中的不足,本实用新型提供一种新型重型放线架。In order to solve the deficiencies in the prior art, the utility model provides a novel heavy-duty pay-off frame.

本实用新型解决其技术问题所采用的技术方案是:The technical scheme that the utility model solves its technical problem adopts is:

一种新型重型放线架,由主梁、后支撑机构、限位件和连接机构,其特征在于:所述的连接机构中部安装在所述的主梁上,连接机构一侧设有用于放置线缆轴的卡槽,连接机构另一侧与所述的后支撑机构连接,主梁底端与后支撑机构底端之间通过所述的限位件连接,所述的后支撑机构包括驱动机构、斜拉杆、内筒和后梁,斜拉杆一端与所述的连接机构铰接,斜拉杆另一端与所述的内筒上部外侧连接,内筒通过所述的驱动机构与后梁连接。A new type of heavy-duty pay-off frame, consisting of a main beam, a rear support mechanism, a limiter and a connecting mechanism, characterized in that: the middle part of the connecting mechanism is installed on the main beam, and one side of the connecting mechanism is provided for placing The other side of the connecting mechanism is connected to the rear support mechanism, the bottom end of the main beam and the bottom end of the rear support mechanism are connected through the stopper, and the rear support mechanism includes a drive One end of the diagonal stay is hinged to the connecting mechanism, the other end of the diagonal stay is connected to the upper outer side of the inner cylinder, and the inner cylinder is connected to the back beam through the driving mechanism.

所述的驱动机构为手轮和丝杠的组合结构或千斤顶或液压缸。The driving mechanism is a combined structure of a hand wheel and a lead screw or a jack or a hydraulic cylinder.

所述的手轮转动设置在内筒顶端,丝杆与手轮螺纹连接且丝杆底端与后梁内部连接。The hand wheel is rotated and arranged at the top of the inner cylinder, the screw rod is threadedly connected with the hand wheel and the bottom end of the screw rod is connected with the inside of the back beam.

所述的千斤顶或液压缸设置在内筒和后梁之间且其两端分别与内筒和后梁连接。The jack or hydraulic cylinder is arranged between the inner tube and the back beam, and its two ends are respectively connected with the inner tube and the back beam.

所述的卡槽内设有用于支撑线缆轴的轴承套。A bearing sleeve for supporting the cable shaft is arranged in the card slot.

所述的主梁底端与后梁底端均设有固定件,固定件用于与连接件端部连接固定。Both the bottom end of the main beam and the bottom end of the back beam are provided with fixing parts, and the fixing parts are used to connect and fix the ends of the connecting parts.

所述的连接机构由两个连接片构成,连接片之间通过若干固定杆连接,主梁穿过连接片之间的固定杆设置使主梁与连接机构之间滑动连接,所述的连接机构中部通过固定销与主梁连接。The connecting mechanism is composed of two connecting pieces, the connecting pieces are connected by a number of fixed rods, and the main beam passes through the fixed rods between the connecting pieces to make sliding connection between the main beam and the connecting mechanism. The middle part is connected with the main beam through the fixed pin.

所述的主梁上设有若干与固定销对应的固定孔。The main beam is provided with several fixing holes corresponding to the fixing pins.

所述的新型重型放线架的主梁和后梁底端均设有底座,不同新型重型放线架的主梁之间和后梁之间均通过连接杆连接,连接杆两端与对应的底座可拆卸连接。The main beam and the bottom end of the back beam of the new heavy-duty pay-off frame are provided with a base, and the main beams and the back beams of different new heavy-duty pay-off frames are connected by connecting rods, and the two ends of the connecting rod can be connected with the corresponding bases. Disconnect the connection.

综上所述,本实用新型的有益效果是:结构设计合理,具有调节跨度大、轻型好移动、起重放线佳的优点。To sum up, the beneficial effects of the utility model are: the structure design is reasonable, and it has the advantages of large adjustment span, light weight, easy to move, and good lifting and setting-out.

附图说明Description of drawings

下面结合附图和实施例对本实用新型进一步说明。Below in conjunction with accompanying drawing and embodiment the utility model is further described.

图1是本实用新型的结构示意图。Fig. 1 is a structural representation of the utility model.

图中:1底座、2主梁、3固定孔、4连接机构、5卡槽、6轴承套、7固定杆、8固定销、9连接片、10斜拉杆、11手轮、12内筒、13丝杆、14后梁、15连接杆、16固定件、17限位件。In the figure: 1 base, 2 main beam, 3 fixing hole, 4 connecting mechanism, 5 card slot, 6 bearing sleeve, 7 fixing rod, 8 fixing pin, 9 connecting piece, 10 diagonal tie rod, 11 handwheel, 12 inner cylinder, 13 screw mandrels, 14 rear beams, 15 connecting rods, 16 fixing parts, 17 limit parts.

具体实施方式detailed description

以下由特定的具体实施例说明本实用新型的实施方式,熟悉此技术的人士可由本说明书所揭露的内容轻易地了解本实用新型的其他优点及功效。The implementation of the present utility model is illustrated by specific specific examples below, and those skilled in the art can easily understand other advantages and effects of the present utility model from the content disclosed in this specification.

根据附图1所示:一种新型重型放线架,由主梁2、后支撑机构、限位件17和连接机构4,其中所述的连接机构4中部安装在所述的主梁2上,连接机构4一侧设有用于放置线缆轴的卡槽5,卡槽5内设有用于支撑线缆轴的轴承套6,通过轴承套6使线缆轴在转动过程中阻力减小,操作过程更加轻便,连接机构4另一侧与所述的后支撑机构连接,主梁2底端与后支撑机构底端之间通过所述的限位件17连接,通过上述结构,使主梁2、后支撑机构、限位件17和连接机构4之间相互连接构成一个稳定的三角形整体,用于对线缆轴进行支撑,实现放线、收线作业;As shown in accompanying drawing 1: a new type of heavy-duty pay-off rack, consisting of a main beam 2, a rear support mechanism, a limiter 17 and a connecting mechanism 4, wherein the middle part of the connecting mechanism 4 is installed on the main beam 2 , one side of the connecting mechanism 4 is provided with a card slot 5 for placing the cable shaft, and a bearing sleeve 6 for supporting the cable shaft is provided in the card slot 5, and the resistance of the cable shaft during rotation is reduced through the bearing sleeve 6, The operation process is more convenient. The other side of the connecting mechanism 4 is connected to the rear support mechanism. 2. The rear support mechanism, the limiter 17 and the connecting mechanism 4 are connected to each other to form a stable triangular whole, which is used to support the cable shaft and realize the wire releasing and winding operations;

所述的后支撑机构包括手轮11、丝杆13、斜拉杆10、内筒12和后梁14,斜拉杆10一端与所述的连接机构4铰接,斜拉杆10另一端与所述的内筒12上部外侧连接,内筒12插入至后梁14内部,所述的手轮11转动设置在内筒12顶端,丝杆13与手轮11螺纹连接且丝杆13底端与后梁14内部底壁连接,使用时,通过转动手轮11使其与丝杠的相对位置发生变化,同时手轮11带动斜拉杆10和内筒12同时发生移动,使后支撑机构的长度得到调整。The rear support mechanism includes a hand wheel 11, a screw rod 13, a diagonal stay rod 10, an inner cylinder 12 and a rear beam 14, one end of the diagonal stay rod 10 is hinged to the connecting mechanism 4, and the other end of the diagonal stay rod 10 is connected to the inner cylinder 12 is connected to the outer side of the upper part, the inner cylinder 12 is inserted into the inside of the back beam 14, the handwheel 11 is rotated and set on the top of the inner cylinder 12, the screw mandrel 13 is screwed to the handwheel 11 and the bottom end of the screw mandrel 13 is connected to the inner bottom wall of the back beam 14 , during use, by turning the hand wheel 11 to make its relative position with the lead screw change, and the hand wheel 11 drives the diagonal stay rod 10 and the inner tube 12 to move simultaneously, so that the length of the rear support mechanism is adjusted.

所述的主梁2底端与后梁14底端均设有固定件16,固定件16可以为挂钩结构或挂环结构等,固定件16用于与连接件端部连接固定,连接件可以采用铁链、软绳、铁片等,主要用于实现主梁2底端与后梁14底端之间间距的固定。The bottom end of the main beam 2 and the bottom end of the rear beam 14 are all provided with a fixing piece 16, the fixing piece 16 can be a hook structure or a hanging ring structure, etc., the fixing piece 16 is used to connect and fix with the end of the connector, and the connector can adopt Iron chains, soft ropes, iron sheets, etc. are mainly used to realize the fixing of the spacing between the bottom of the main beam 2 and the bottom of the rear beam 14.

所述的连接机构4由两个连接片9构成,连接片9之间通过若干固定杆7连接,主梁2穿过连接片9之间的固定杆7设置使主梁2与连接机构4之间滑动连接,所述的连接机构4中部通过固定销8与主梁2连接,所述的主梁2上设有若干与固定销8对应的固定孔3,固定孔3之间根据使用需要间隔一段距离设置,通过该结构使连接机构4与主梁2的连接位置可以变化,根据需要与不同的固定孔3进行安装即可。The connecting mechanism 4 is composed of two connecting pieces 9, and the connecting pieces 9 are connected by a plurality of fixed rods 7, and the main beam 2 passes through the fixed rods 7 between the connecting pieces 9 to make the connection between the main beam 2 and the connecting mechanism 4 The middle part of the connecting mechanism 4 is connected to the main beam 2 through the fixing pin 8. The main beam 2 is provided with a number of fixing holes 3 corresponding to the fixing pins 8, and the fixing holes 3 are spaced according to the needs of use. Set at a certain distance, through this structure, the connection position between the connecting mechanism 4 and the main beam 2 can be changed, and it can be installed with different fixing holes 3 as required.

所述的新型重型放线架的主梁2和后梁14底端均设有底座1,不同新型重型放线架的主梁2之间和后梁14之间均通过连接杆15连接,连接杆15两端与对应的底座1可拆卸连接,通过底座1和连接杆15将两个新型重型放线架连接成一个结构稳定的整体,底座1和连接杆15均采用管体结构,连接杆15端部插入至底座1内实现快速连接,通过采用管体结构便于在后支撑机构长度调整时,底座1随之进行小角度转动。The main beam 2 of the new heavy-duty pay-off frame and the bottom end of the back beam 14 are all provided with a base 1, and the main beams 2 and the back beams 14 of different new heavy-duty pay-off frames are connected by connecting rods 15, and the connecting rods 15 The two ends are detachably connected to the corresponding base 1, and the two new heavy-duty pay-off racks are connected into a structurally stable whole through the base 1 and the connecting rod 15. Both the base 1 and the connecting rod 15 adopt a tubular structure, and the end of the connecting rod 15 The part is inserted into the base 1 to achieve quick connection, and the tube structure is used to facilitate the base 1 to rotate at a small angle when the length of the rear support mechanism is adjusted.

以上所述仅为本实用新型的优先实施方式,只要以基本相同手段实现本实用新型的目的技术方案,都属于本实用新型的保护范围之内。The above descriptions are only the preferred implementation modes of the present utility model, as long as the purpose and technical solutions of the present utility model are realized by basically the same means, they all fall within the protection scope of the present utility model.

Claims (9)

1.一种新型重型放线架,由主梁、后支撑机构、限位件和连接机构,其特征在于:所述的连接机构中部安装在所述的主梁上,连接机构一侧设有用于放置线缆轴的卡槽,连接机构另一侧与所述的后支撑机构连接,主梁底端与后支撑机构底端之间通过所述的限位件连接,所述的后支撑机构包括驱动机构、斜拉杆、内筒和后梁,斜拉杆一端与所述的连接机构铰接,斜拉杆另一端与所述的内筒上部外侧连接,内筒通过所述的驱动机构与后梁连接。1. A new type of heavy-duty pay-off frame, consisting of a main beam, a rear support mechanism, a limiter and a connecting mechanism, is characterized in that: the middle part of the connecting mechanism is installed on the main beam, and one side of the connecting mechanism is provided with a The other side of the connecting mechanism is connected to the rear support mechanism, the bottom end of the main beam and the bottom end of the rear support mechanism are connected through the limit piece, and the rear support mechanism It includes a driving mechanism, a diagonal stay rod, an inner cylinder and a rear beam, one end of the diagonal stay rod is hinged to the connecting mechanism, the other end of the diagonal stay rod is connected to the upper outer side of the inner cylinder, and the inner cylinder is connected to the rear beam through the driving mechanism. 2.根据权利要求1所述的新型重型放线架,其特征在于:所述的驱动机构为手轮和丝杠的组合结构或千斤顶或液压缸。2. The new heavy-duty pay-off rack according to claim 1, characterized in that: the driving mechanism is a combined structure of a hand wheel and a lead screw or a jack or a hydraulic cylinder. 3.根据权利要求2所述的新型重型放线架,其特征在于:所述的手轮转动设置在内筒顶端,丝杆与手轮螺纹连接且丝杆底端与后梁内部连接。3. The new heavy-duty pay-off stand according to claim 2, characterized in that: the hand wheel is set on the top of the inner cylinder, the screw is screwed to the hand wheel and the bottom end of the screw is connected to the back beam. 4.根据权利要求2所述的新型重型放线架,其特征在于:所述的千斤顶或液压缸设置在内筒和后梁之间且其两端分别与内筒和后梁连接。4. The new heavy-duty pay-off rack according to claim 2, characterized in that: said jack or hydraulic cylinder is arranged between the inner tube and the back beam, and its two ends are respectively connected with the inner tube and the back beam. 5.根据权利要求1所述的新型重型放线架,其特征在于:所述的卡槽内设有用于支撑线缆轴的轴承套。5. The new heavy-duty pay-off stand according to claim 1, characterized in that: a bearing sleeve for supporting the cable shaft is arranged in the slot. 6.根据权利要求1所述的新型重型放线架,其特征在于:所述的主梁底端与后梁底端均设有固定件,固定件用于与连接件端部连接固定。6. The new heavy-duty pay-off rack according to claim 1, characterized in that: the bottom end of the main beam and the bottom end of the back beam are provided with fixing parts, and the fixing parts are used to connect and fix the ends of the connecting parts. 7.根据权利要求1所述的新型重型放线架,其特征在于:所述的连接机构由两个连接片构成,连接片之间通过若干固定杆连接,主梁穿过连接片之间的固定杆设置使主梁与连接机构之间滑动连接,所述的连接机构中部通过固定销与主梁连接。7. The new heavy-duty pay-off rack according to claim 1, characterized in that: the connecting mechanism is composed of two connecting pieces, the connecting pieces are connected by a number of fixed rods, and the main beam passes through the gap between the connecting pieces. The fixed rod is arranged to make sliding connection between the main beam and the connecting mechanism, and the middle part of the connecting mechanism is connected with the main beam through a fixing pin. 8.根据权利要求7所述的新型重型放线架,其特征在于:所述的主梁上设有若干与固定销对应的固定孔。8. The new heavy-duty pay-off rack according to claim 7, characterized in that: the main beam is provided with a number of fixing holes corresponding to the fixing pins. 9.根据权利要求1至8任意一项所述的新型重型放线架,其特征在于:所述的新型重型放线架的主梁和后梁底端均设有底座,不同新型重型放线架的主梁之间和后梁之间均通过连接杆连接,连接杆两端与对应的底座可拆卸连接。9. The new heavy-duty pay-off stand according to any one of claims 1 to 8, characterized in that: the bottom ends of the main beam and the rear beam of the new heavy-duty pay-off stand are provided with bases, and different new heavy-duty pay-off stands Both the main beams and the rear beams are connected by connecting rods, and the two ends of the connecting rods are detachably connected to the corresponding bases.
CN201720392614.8U 2017-04-14 2017-04-14 Novel heavy duty pay off rack Expired - Fee Related CN206665839U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720392614.8U CN206665839U (en) 2017-04-14 2017-04-14 Novel heavy duty pay off rack

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720392614.8U CN206665839U (en) 2017-04-14 2017-04-14 Novel heavy duty pay off rack

Publications (1)

Publication Number Publication Date
CN206665839U true CN206665839U (en) 2017-11-24

Family

ID=60380251

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720392614.8U Expired - Fee Related CN206665839U (en) 2017-04-14 2017-04-14 Novel heavy duty pay off rack

Country Status (1)

Country Link
CN (1) CN206665839U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109399330A (en) * 2018-10-11 2019-03-01 北京中科中电电力工程管理有限公司 Cable pay-off rack
CN112723036A (en) * 2020-12-24 2021-04-30 中国十九冶集团有限公司 Cable winding and unwinding tool

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109399330A (en) * 2018-10-11 2019-03-01 北京中科中电电力工程管理有限公司 Cable pay-off rack
CN109399330B (en) * 2018-10-11 2020-12-22 北京中科中电电力工程管理有限公司 Cable pay-off rack
CN112723036A (en) * 2020-12-24 2021-04-30 中国十九冶集团有限公司 Cable winding and unwinding tool

Similar Documents

Publication Publication Date Title
CN203562708U (en) Bulk cable pay-off rack with adjustable volume diameter
CN204835375U (en) Column cable wire rack
CN202687622U (en) Portable power cable and wire pay-off device
CN206665839U (en) Novel heavy duty pay off rack
CN204384597U (en) Telescopic pay off rack
CN206645639U (en) Heavy pay off rack
CN205222266U (en) Electric power pay -off
CN203545304U (en) Cable coil storage rack with adjustable height
CN206125686U (en) Section of jurisdiction structural bar deposits work or material rest
CN206697897U (en) A kind of cable bearer for being easy to laying-out
CN108817632A (en) Steel reinforcement cage hydraulic pressure unloads cage device for steel reinforcement framework seam welder
CN204252614U (en) High voltage iron tower inner support Telescopic contracted-pole
CN201785098U (en) Wire coil bracket
CN204528875U (en) A kind of screw type coil spring unit unfolding frame
CN203281655U (en) Straightener allowing roller to be rapidly replaced
CN203938295U (en) A kind of twisted and released of the cable line apparatus
CN204454108U (en) Multi-functional retractable cable car
CN204825651U (en) Basket is hung in construction of chain slat type bridge
CN205016914U (en) Wire releasing frame
CN102570352A (en) Power cable laying bracket
CN204809741U (en) Hold in palm bottleholder
CN202333630U (en) Electric power cable pay-off support
CN203734222U (en) Portable cable folding and unfolding bracket
CN203747358U (en) Spool stand for wire setting-out of power transmission line construction aircraft
CN216918146U (en) Auxiliary device is laid to large-span transmission line

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171124