CN206656917U - LP gas cylinder multistation automatic voltage withstanding experimental rig - Google Patents
LP gas cylinder multistation automatic voltage withstanding experimental rig Download PDFInfo
- Publication number
- CN206656917U CN206656917U CN201720348474.4U CN201720348474U CN206656917U CN 206656917 U CN206656917 U CN 206656917U CN 201720348474 U CN201720348474 U CN 201720348474U CN 206656917 U CN206656917 U CN 206656917U
- Authority
- CN
- China
- Prior art keywords
- cylinder
- supporting plate
- water
- fixed
- support base
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Filling Or Discharging Of Gas Storage Vessels (AREA)
Abstract
It the utility model is related to a kind of LP gas cylinder multistation automatic voltage withstanding experimental rig, including water filling device, cylinder feeder and discharging device, water filling device is provided with multiple experiment positions, water filling device is movably disposed on track, cylinder feeder includes cylinder feeder support base and upper bottle cylinder, discharging device includes discharging device support base and lower bottle cylinder, cylinder feeder support base and discharging device support base mirror image are set, upper bottle cylinder promotes from cylinder feeder to water filling device, lower bottle cylinder Automatic water-filling device promotes to discharging device, some roller bearings are equipped with cylinder feeder support base and discharging device support base, roller bearing and the first motor, which are realized, to link, floor space is small, the station that can be tested simultaneously is more, operating efficiency is high, labor intensity is low, improve the service life of equipment, energy-conserving and environment-protective.
Description
Technical field
It the utility model is related to a kind of gas cylinder automatic voltage withstanding experimental rig, more particularly to a kind of LP gas cylinder multistation
Automatic voltage withstanding experimental rig.
Background technology
Loading instrument of the gas cylinder as various gases, widely should have in terms of people's daily life and industrial production
With.Gas cylinder enormous amount, refitting is often moved and is repeated, use environment is also usually relatively more severe, once exploding, gives people
Lives and properties bring heavy losses, tremendous influence is caused to social safety.In order to strengthen the safety monitor of gas cylinder, ensure gas cylinder
Safe handling, the protection person and property safety, every gas cylinder must be by only examining, periodic detection.With reference to automation, computer skill
The automatic liquefied gas bottle hydraulic pressure test technology of art, including pressure test, outside measurement method experiment and internal test method experiment, are to examine gas cylinder quality
Key technology, have become one of necessary detection technique of national regulation.
Following defect be present in existing gas cylinder by hydrostatic pressure test test equipment:
1. gas cylinder is placed, move away from test position and completed by artificial lift, labor intensity is big, time-consuming, yield poorly.
2. during test, water filling pressure head is placed first in gas cylinder valve seat planes, the water filling into steel cylinder, is pressurizeed after filling water,
Thrust is acted on bottle by water filling pressure head, and gas cylinder bottle when pressurizeing pressurize is existed caused by external force by external force, gas cylinder
Bottle deforms, and influences measuring accuracy.
Utility model content
The utility model proposes a kind of LP gas cylinder multistation automatic voltage withstanding experimental rig regarding to the issue above, accounts for
Ground area is small, and the station that can be tested simultaneously is more, and operating efficiency is high, and labor intensity is low, improves the service life of equipment, energy-conservation
Environmental protection.
Specific technical scheme is as follows:
LP gas cylinder multistation automatic voltage withstanding experimental rig, including water filling device, cylinder feeder and discharging device, note
Water installations are provided with multiple experiment positions, and water filling device is movably disposed on track, and cylinder feeder supports including cylinder feeder
Seat and upper bottle cylinder, discharging device include discharging device support base and lower bottle cylinder, cylinder feeder support base and discharging device branch
Support seat mirror image to set, upper bottle cylinder promotes from cylinder feeder to water filling device, and lower bottle cylinder Automatic water-filling device pushes away to discharging device
It is dynamic, some roller bearings are equipped with cylinder feeder support base and discharging device support base, roller bearing and the first motor, which are realized, to link.
Above-mentioned LP gas cylinder multistation automatic voltage withstanding experimental rig, wherein, the cylinder feeder support base and lower bottle
Device support base includes the first supporting plate, the second supporting plate, the 3rd supporting plate, the 4th supporting plate, the 5th supporting plate, Ruo Gan
One roller bearing, some second roller bearings, the first motor;The length L1 of first supporting plate is less than the length L2 of the second supporting plate, first
Fagging and the second supporting plate are arranged in parallel, and both are mutually flush one end, the other end of the first supporting plate and the second supporting plate
The 3rd supporting plate and the 4th supporting plate are connected respectively, and the 3rd supporting plate and the 4th supporting plate are arranged in parallel, and both is another
End is connected by the 5th supporting plate, and the 5th supporting plate is parallel to each other with the first supporting plate, and what the first roller bearing was parallel to each other can
What is rotated is arranged between the first supporting plate and the second supporting plate, and what the second roller bearing was parallel to each other is spindle rotationally arranged in the 5th
Between fagging and the second supporting plate;
First supporting plate, the second supporting plate, the 3rd supporting plate, the 4th supporting plate and the 5th supporting plate are mutually spliced on composition
Bottle support base/discharging device support base, the bottom of cylinder feeder support base/discharging device support base are provided with some supports
A first gear, the second support are coaxially fixed in frame, the side that first roller bearing and the second roller bearing are located at the second supporting plate
Be provided with pinboard below plate, pinboard is provided with the second gear of three settings triangular in shape, first gear and second gear it
Between realized and link by the first chain, outermost first roller bearing is provided with the 3rd gear, and the 3rd gear is located at the first supporting plate
Side, realized and linked by the second chain between the 3rd gear and the 4th gear being fixed on the first motor, the first motor is consolidated
It is scheduled on support frame;
It is vertical in 4th supporting plate to be provided with the first side shield, in the second supporting plate vertically be provided with the second side block
Plate, the first side shield and the second side shield vertical connection, it is vertical between the 3rd supporting plate and the 5th supporting plate to be provided with the 3rd side
Baffle plate, the 3rd side shield one end is located at the junction of the 3rd supporting plate and the first supporting plate, the other end is located in the 5th supporting plate,
The first side shield formation gas cylinder access way relative with the 3rd side shield;
Upper bottle cylinder and lower bottle cylinder are fixed by cylinder supports seat, and lower bottle cylinder is located at the 5th supporting plate one
Side, and the push rod of lower bottle cylinder is set towards gas cylinder access way, lower bottle cylinder is used for lower bottle;Upper bottle cylinder is positioned at the second support
Plate side, and the push rod of upper bottle cylinder is set towards gas cylinder access way, upper bottle cylinder is used for upper bottle;The height of upper bottle cylinder is big
In the height of cylinder feeder support base, the height of lower bottle cylinder is more than the height of discharging device support base.
Above-mentioned LP gas cylinder multistation automatic voltage withstanding experimental rig, wherein, the water filling device include bottom platform,
Track, reducing motor, drive wheel assemblies, driven wheel assembly, rear roller component and water injecting mechanism, drive wheel assemblies, driven wheels
Part, rear roller component are each attached to the bottom of bottom platform;
The drive wheel assemblies include the first main shaft and are spindle rotationally arranged in first wheel at the first main shaft both ends, and first
Main shaft is provided with the first drive sprocket and the first driven sprocket;The driven wheel assembly includes the second main shaft and rotatable setting
The second wheel at the second main shaft both ends, the second main shaft are provided with the second driven sprocket, the first driven sprocket and the second driven chain
It is connected between wheel by the 3rd chain, the rear roller component includes the 3rd main shaft and is spindle rotationally arranged in the 3rd main shaft two
3rd wheel at end, the reducing motor being fixed in bottom platform are connected by the 4th chain with the first drive sprocket;First
Main shaft, the second main shaft and the 3rd main shaft are each attached in bottom platform, and the bottom of bottom platform is provided with three groups of wheel holding tank groups,
Every group of wheel holding tank group is made up of two wheel holding tanks, and the first wheel, the second wheel, the upper end of the 3rd wheel are set respectively
In corresponding wheel holding tank, the first wheel, the second wheel, the lower end of the 3rd wheel press in orbit;
The water injecting mechanism includes water injecting mechanism framework, water filling water tank, return water tank, settling tank, water filling device, pipeline
System, the first fixed platform, the second fixed platform, supporting mechanism group and the second cylinder, water injecting mechanism framework are fixed on bottom and put down
On platform, if forming dry test position by divides in water injecting mechanism framework, two are provided between adjacent two demarcation strips
Protection board, the first fixed platform are fixed on the top of water injecting mechanism framework by some first support columns, in the first fixed platform
Provided with some second cylinder channels, the internal diameter of the second cylinder channel is d1, the quantity of the second cylinder channel and the quantity for testing position
Identical, each second cylinder channel above corresponding experiment position, is provided with a support respectively below each second cylinder channel
Mechanism group, each supporting mechanism group are made up of at least four first supporting mechanisms, and the first supporting mechanism is fixed on water injecting mechanism frame
Top of the trellis, is provided with second fixed platform between each supporting mechanism group and the second cylinder channel, on the second fixed platform is
Surface is the cuboid sheet material of square structure, and the length of side of the square structure that its upper surface is in is d2, d2 > d1, the second gas
Cylinder is fixed on above the second fixed platform, and the push rod of the second cylinder is connected through the second fixed platform with first connecting rod, and first
Connecting rod passes through the connecting rod channel for being arranged on water injecting mechanism frame roof to be connected with water filling device;
The water filling device includes joint top, joint top, joint bottom, the first water injection pipe and pipe joint, described to connect
The top of overhead is provided with first connecting rod fixing groove, and joint bottom is provided with the first connection projection, and first connecting rod is consolidated with first connecting rod
Determine groove to be connected, water filling device is integrally attached on first connecting rod;The top on the joint top is provided with the first connecting groove,
The bottom on joint top is top-down recessed provided with the second interconnected connecting groove, the 3rd connecting groove and the 4th connection
Groove, the first connection projection are fixed in the first connecting groove, and joint top is additionally provided with the first Switching-through channel and the second Switching-through channel,
First Switching-through channel is connected with the second connecting groove, and the second Switching-through channel is connected with the 3rd connecting groove;The pipe joint
Quantity be two, be connected respectively with the first Switching-through channel and the second Switching-through channel;What the joint bottom was run through is provided with the
Five interface channels, the top of the 5th interface channel are provided with the connection boss of a circle the 3rd, and the bottom of the 5th interface channel is provided with the 6th
Connecting groove, the 3rd connection boss are fixed in the 4th connecting groove;First water injection pipe includes upper water injection pipe and lower water filling
Pipe, the upper end of upper water injection pipe are fixed in the 6th connecting groove, and the lower end inner wall of upper water injection pipe caves inward to form a circle the 7th
Link slot, the lower end outer wall of lower water injection pipe is outwardly to form the 4th boss of circle, and a second spring is provided with upper water injection pipe,
Second spring one end is fixed at the top of the 7th link slot, the other end and plug-type lower water injection pipe phase being arranged in upper water injection pipe
Connection, lower water injection pipe are provided with longitudinally disposed waist-shaped hole, and straight pin passes through upper water injection pipe and waist-shaped hole, lower water injection pipe is removable
Dynamic is fixed in water injection pipe;
The water filling water tank and settling tank are separately fixed at the both sides of water injecting mechanism framework, and return water tank is fixed on first
In fixed platform, it is located at the same side with settling tank, is connected between return water tank and settling tank by the first pipeline, water filling
It is connected between water tank and settling tank by second pipe;
The pipe-line system includes the water under high pressure being sequentially fixed at from top to bottom by pipeline seat board in the first fixed platform
Pipe, exhaust outlet pipe, cylinder tracheae, purging tracheae, the second water injection pipe, and some 3rd transfer tubes, some 4th switchings
The quantity of pipe, pump water inlet and water pump, the 3rd transfer tube and the 4th transfer tube is identical with testing the quantity of position, cylinder gas
Pipe connects by some branch pipe(tube)s and each second cylinders, and water pump is fixed on water filling tank top, pump water inlet one end and
Water filling water tank bottom is connected, and the other end is connected with water pump, and the closing of second water injection pipe one end, the other end are connected with water pump,
The closing of exhaust outlet pipe one end, the other end are connected with return water tank;3rd transfer tube is provided with the first extension tube attached, second
Extension tube attached, the 3rd extension tube attached and the 4th extension tube attached, the first extension tube attached, the second extension tube attached, the 3rd extension tube attached respectively with high-pressure water pipe,
Exhaust outlet pipe, cylinder are connected with tracheae, and the 4th extension tube attached is connected by the 3rd pipeline with corresponding first Switching-through channel,
4th transfer tube is provided with the 5th extension tube attached, the 6th extension tube attached and the 7th extension tube attached, the 5th extension tube attached, the 6th extension tube attached respectively with
Purging tracheae, the second water injection pipe are connected, and the 7th extension tube attached is connected by the 4th pipeline with corresponding second Switching-through channel.
Above-mentioned LP gas cylinder multistation automatic voltage withstanding experimental rig, wherein, high-pressure water pipe, exhaust outlet pipe, which combine, to be used
Extracted out in by the water in gas cylinder, purging tracheae, the second water injection pipe, which combine, is used for the water filling into gas cylinder.
Above-mentioned LP gas cylinder multistation automatic voltage withstanding experimental rig, wherein, first supporting mechanism includes support
Mechanism base and ball, ball is rotatable to be arranged in supporting mechanism base.
Above-mentioned LP gas cylinder multistation automatic voltage withstanding experimental rig, wherein, the height of second fixed platform is
H3, the vertical range between the first fixed platform lower surface and the first supporting mechanism summit are h4,1.1*h3≤h4≤1.4*h3.
Above-mentioned LP gas cylinder multistation automatic voltage withstanding experimental rig, wherein, the bottom of the lower water injection pipe concaves
Fall into the avoiding hollow groove for forming arc-shaped structure.
Above-mentioned LP gas cylinder multistation automatic voltage withstanding experimental rig, wherein, the bottom of the joint bottom is provided with one
Enclose sealing ring.
Above-mentioned LP gas cylinder multistation automatic voltage withstanding experimental rig, wherein, the cylinder tracheae, purging tracheorrhaphy
It is not connected with air pump;The high-pressure water pipe is connected with high-pressure hydraulic pump.
Above-mentioned LP gas cylinder multistation automatic voltage withstanding experimental rig, wherein, the upper bottle cylinder and lower bottle cylinder
Push rod is provided with push pedal, and the push pedal, which is provided with, to be pushed away groove and make the u-shaped structure of push pedal global sections, is pushed away in groove and is provided with top plate, top
Some first locating pieces are respectively equipped with the side wall of plate, the first locating piece is slidably disposed in the first positioning cunning for pushing away groove inwall
In groove, it is slidably disposed in top plate and pushes away in groove, some springs are provided between top plate and push pedal, top plate is circular arc plate, top
The outer surface of plate is provided with one layer of cushion rubber layer, pushes away and a circle postive stop baffle, the thickness h 1 of postive stop baffle are provided with the foreign aid of groove
Less than the thickness h 2 of cushion rubber layer.
The beneficial effects of the utility model are:
The utility model is used to carry out the gas cylinder in experiment position in pressure test, the overall work in reducing motor of water injecting mechanism
Moved back and forth under along track, being cooperated with cylinder feeder and discharging device, it is automatic synchronous up and down that gas cylinder can be achieved
Carry out, and detected, the utility model floor space is small, versatile, can adjust water filling port manually according to gas cylinder position
Position, operating efficiency is high, and labor intensity is low, improves the service life of equipment;Water filling device is used to carry out water filling to gas cylinder
And pumping operation, good airproof performance, the structure setting of water injection pipe, it is carried out according to gas cylinder specification or the different of placement location
Adaptive adjustment, while water can be recycled, energy-conserving and environment-protective.
Brief description of the drawings
Fig. 1 is the utility model top view.
Fig. 2 is the utility model side view.
Fig. 3 is the utility model water filling device upward view.
Fig. 4 is the utility model water filling device structure chart.
Fig. 5 is one experiment position sectional view of the utility model.
Fig. 6 is the utility model B portions enlarged drawing.
Fig. 7 is the utility model water filling device sectional view.
Fig. 8 is the utility model joint top cross-sectional view.
Fig. 9 is the utility model joint top sectional view.
Figure 10 is the utility model joint bottom sectional view.
Figure 11 is the utility model water injection pipe sectional view.
Figure 12 is the utility model C portions enlarged drawing.
Figure 13 is the utility model pipe-line system structure chart.
Figure 14 is the utility model Figure 10 D directions view.
Figure 15 is the transfer tube of the utility model the 3rd and the 4th transfer tube connection diagram.
Figure 16 is the transfer tube structure chart of the utility model the 3rd.
Figure 17 is the transfer tube side view of the utility model the 3rd.
Figure 18 is the transfer tube structure chart of the utility model the 4th.
Figure 19 is the transfer tube side view of the utility model the 4th.
Figure 20 is the utility model discharging device top view.
Figure 21 is the utility model cylinder feeder top view.
Figure 22 is the front view of the utility model figure (20).
Figure 23 is the rearview of the utility model figure (21).
Figure 24 is the utility model push pedal top view.
Figure 25 is the utility model A-A sectional views.
Embodiment
To make the technical solution of the utility model become apparent from clearly, below in conjunction with the accompanying drawings entering the utility model traveling one
Step description, any scheme drawn to the technical characteristic progress equivalencing of technical solutions of the utility model and conventional reasoning fall
Enter scope of protection of the utility model.
Reference
Water filling device 1, cylinder feeder 2, discharging device 3, cylinder feeder support base 4, upper bottle cylinder 5, discharging device support
Seat 6, lower bottle cylinder 7, gas cylinder 8, the first supporting plate 31, the second supporting plate 32, the 3rd supporting plate 33, the 4th supporting plate the 34, the 5th
Supporting plate 35, the first roller bearing 36, the second roller bearing 37, the first motor 39, support frame 310, first gear 311, pinboard 312,
Two gears 313, the first chain 314, the 3rd gear 315, the 4th gear 316, the second chain 317, the first side shield 318, have
Two side shields 319, the 3rd side shield 320, cylinder supports seat 321, push pedal 322, top plate 323, the first locating piece 324, first are fixed
Position chute 325, push away groove 326, spring 327, cushion rubber layer 328, postive stop baffle 329,
Bottom platform 11, track 12, reducing motor 13, drive wheel assemblies 14, driven wheel assembly 15, rear roller component 16,
Water injecting mechanism 17, the first main shaft 18, the first wheel 19, the first drive sprocket 110, the first driven sprocket 111, the second main shaft 112,
Second wheel 113, the second driven sprocket 114, the 3rd chain 115, the 3rd main shaft 116, the 3rd wheel 117, the 4th chain 118,
Wheel holding tank 119, water injecting mechanism framework 71, water filling water tank 72, return water tank 73, settling tank 74, water filling device 75, pipeline
System 76, the first fixed platform 77, the second fixed platform 78, supporting mechanism group 79, the second cylinder 710, experiment position 711, first
Support column 712, the second cylinder channel 713, supporting mechanism base 714, ball 715, first connecting rod 716,717 at the top of joint, connect
Head top 718, joint bottom 719, the first water injection pipe 720, pipe joint 721, first connecting rod fixing groove 722, first connect projection
723rd, the first connecting groove 724, the second connecting groove 725, the 3rd connecting groove 726, the switching of the 4th connecting groove 727, first
Passage 728, the second Switching-through channel 729, the 5th interface channel the 730, the 3rd connection boss 731, the 6th connecting groove 732, upper note
Water pipe 733, lower water injection pipe 734, the 7th link slot 735, the 4th boss 736, second spring 737, waist-shaped hole 738, straight pin
739th, avoiding hollow groove 740, sealing ring 741, the first pipeline 742, second pipe 743, high-pressure water pipe 744, exhaust outlet pipe 745, gas
Cylinder tracheae 746, purging tracheae 747, the second water injection pipe 748, the 3rd transfer tube 749, the 4th transfer tube 750, pump water inlet
751st, water pump 752, the first extension tube attached 753, the second extension tube attached 754, the 3rd extension tube attached 755, the 4th extension tube attached 756, the 3rd pipeline
757th, the 5th extension tube attached 758, the 6th extension tube attached 759, the 7th extension tube attached 760, the 4th pipeline 761, pipeline seat board 762, protection board
763。
A kind of LP gas cylinder multistation automatic voltage withstanding experimental rig as shown in the figure, including water filling device 1, cylinder feeder
2 and discharging device 3, water filling device is provided with multiple experiment positions 711, and water filling device is movably disposed on track, upper bottled
Put includes discharging device support base 6 and lower bottle cylinder 7, upper bottle including cylinder feeder support base 4 and upper bottle cylinder 5, discharging device
Device support base and discharging device support base mirror image are set, and upper bottle cylinder promotes from cylinder feeder to water filling device, lower bottle cylinder
Automatic water-filling device is promoted to discharging device, and some roller bearings, roller bearing are equipped with cylinder feeder support base and discharging device support base
Realize and link with the first motor.
The cylinder feeder support base and discharging device support base include the first supporting plate 31, the second supporting plate 32, the
Three supporting plates 33, the 4th supporting plate 34, the 5th supporting plate 35, some first roller bearings 36, some second roller bearings 37, the first motor
39;The length L1 of first supporting plate is less than the length L2 of the second supporting plate, and the first supporting plate and the second supporting plate are parallel to each other and set
Put, both are mutually flush one end, and the other end of the first supporting plate and the second supporting plate connects the 3rd supporting plate and the 4th respectively
Fagging, the 3rd supporting plate and the 4th supporting plate are arranged in parallel, and both other ends are connected by the 5th supporting plate, the
Five supporting plates are parallel to each other with the first supporting plate, and what the first roller bearing was parallel to each other is spindle rotationally arranged in the first supporting plate and second
Between supporting plate, what the second roller bearing was parallel to each other is spindle rotationally arranged between the 5th supporting plate and the second supporting plate;
First supporting plate, the second supporting plate, the 3rd supporting plate, the 4th supporting plate and the 5th supporting plate are mutually spliced on composition
Bottle support base/discharging device support base, the bottom of cylinder feeder support base/discharging device support base are provided with some support frames
310, a first gear 311 is coaxially fixed in the side that first roller bearing and the second roller bearing are located at the second supporting plate, and second
Be provided with pinboard 312 below supporting plate, pinboard is provided with the second gear 313 of three settings triangular in shape, first gear and
Realized and linked by the first chain 314 between second gear, outermost first roller bearing is provided with the 3rd gear 315, the 3rd tooth
Wheel is located at the first supporting plate side, by the second chain between the 3rd gear and the 4th gear 316 being fixed on the first motor
317 realize linkage, and the first motor is fixed on support frame;
It is vertical in 4th supporting plate to be provided with the first side shield 318, in the second supporting plate vertically be provided with the second side
Baffle plate 319, the first side shield and the second side shield vertical connection, it is vertical between the 3rd supporting plate and the 5th supporting plate to be provided with the
Three side shields 320, the 3rd side shield one end is located at the junction of the 3rd supporting plate and the first supporting plate, the other end is located at the 5th
On fagging, the first side shield formation gas cylinder access way relative with the 3rd side shield;
Upper bottle cylinder and lower bottle cylinder are fixed by cylinder supports seat 321, and lower bottle cylinder is located at the 5th supporting plate
Side, and the push rod of lower bottle cylinder is set towards gas cylinder access way, lower bottle cylinder is used for lower bottle;Upper bottle cylinder is located at second
Fagging side, and the push rod of upper bottle cylinder is set towards gas cylinder access way, upper bottle cylinder is used for upper bottle;The height of upper bottle cylinder
More than the height of cylinder feeder support base, the height of lower bottle cylinder is more than the height of discharging device support base;
The push rod of the upper bottle cylinder and lower bottle cylinder is provided with push pedal 322, and the push pedal, which is provided with, to be pushed away groove and make push pedal whole
The u-shaped structure of body section, push away in groove and be provided with top plate 323, some first locating pieces 324 are respectively equipped with the side wall of top plate, the
A positioning block is slidably disposed in the first positioning runner 325 for pushing away groove inwall, is slidably disposed in top plate and is pushed away groove 326
In, some springs 327 are provided between top plate and push pedal, top plate is circular arc plate, and the outer surface of top plate is delayed provided with one layer of rubber
Layer 328 is rushed, pushes away and a circle postive stop baffle 329 is provided with the foreign aid of groove, the thickness h 1 of postive stop baffle is less than the thickness of cushion rubber layer
h2。
The water filling device includes bottom platform 11, track 12, reducing motor 13, drive wheel assemblies 14, driven wheel assembly
15th, rear roller component 16 and water injecting mechanism 17, drive wheel assemblies, driven wheel assembly, rear roller component are each attached to bottom platform
Bottom;
The drive wheel assemblies include the first main shaft 18 and are spindle rotationally arranged in first wheel 19 at the first main shaft both ends,
First main shaft is provided with the first drive sprocket 110 and the first driven sprocket 111;The driven wheel assembly includes the second main shaft 112
With the second wheel 113 for being spindle rotationally arranged in the second main shaft both ends, the second main shaft is provided with the second driven sprocket 114, and first
It is connected between driven sprocket and the second driven sprocket by the 3rd chain 115, the rear roller component includes the 3rd main shaft 116
With the 3rd wheel 117 for being spindle rotationally arranged in the 3rd main shaft both ends, the reducing motor in bottom platform is fixed on by the 4th
Chain 118 is connected with the first drive sprocket;First main shaft, the second main shaft and the 3rd main shaft are each attached in bottom platform, bottom
The bottom of portion's platform is provided with three groups of wheel holding tank groups, and every group of wheel holding tank group is made up of two wheel holding tanks 119, and first
Wheel, the second wheel, the upper end of the 3rd wheel are separately positioned in corresponding wheel holding tank, the first wheel, the second wheel,
The lower end of 3rd wheel presses in orbit;
The water injecting mechanism includes water injecting mechanism framework 71, water filling water tank 72, return water tank 73, settling tank 74, water filling
Device 75, pipe-line system 76, the first fixed platform 77, the second fixed platform 78, the cylinder 710 of supporting mechanism group 79 and second, note
Water institutional framework is fixed in bottom platform, adjacent if forming dry test position 711 by divides in water injecting mechanism framework
Two demarcation strips between be provided with two protection boards 763, the first fixed platform is fixed on water filling by some first support columns 712
The top of institutional framework, the first fixed platform are provided with some second cylinder channels 713, and the internal diameter of the second cylinder channel is d1,
The quantity of second cylinder channel is identical with the quantity for testing position, and each second cylinder channel is tested above position positioned at corresponding respectively,
A supporting mechanism group is provided with below each second cylinder channel, each supporting mechanism group is by least four first supporting mechanism groups
Into the first supporting mechanism is fixed on water injecting mechanism frame roof, and the first supporting mechanism includes supporting mechanism base 714 and ball
715, ball is rotatable to be arranged in supporting mechanism base, and one is provided between each supporting mechanism group and the second cylinder channel
Second fixed platform, the second fixed platform be upper surface be square structure cuboid sheet material, the pros that its upper surface is in
The length of side of shape structure is d2, d2 > d1, and the second cylinder is fixed on above the second fixed platform, and the push rod of the second cylinder passes through second
Fixed platform is connected with first connecting rod 716, and first connecting rod passes through the connecting rod channel and note for being arranged on water injecting mechanism frame roof
Water installations are connected, and the height of second fixed platform is h3, the first fixed platform lower surface and the first supporting mechanism summit
Between vertical range be h4,1.1*h3≤h4≤1.4*h3;
The water filling device includes 717, joint top 718 at the top of joint, joint bottom 719, the first water injection pipe 720 and pipe
Joint 721, the top at the top of the joint are provided with first connecting rod fixing groove 722, and joint bottom is provided with the first connection projection 723,
First connecting rod is connected with first connecting rod fixing groove, water filling device is integrally attached on first connecting rod;The joint top
Top is provided with the first connecting groove 724, and the bottom on joint top is top-down to be provided with the second interconnected connecting groove
725th, the 3rd connecting groove 726 and the 4th connecting groove 727, the first connection projection is fixed in the first connecting groove, on joint
Portion is additionally provided with the first Switching-through channel 728 and the second Switching-through channel 729, and the first Switching-through channel is connected with the second connecting groove, the
Two Switching-through channels are connected with the 3rd connecting groove;The quantity of the pipe joint is two, respectively with the first Switching-through channel and the
Two Switching-through channels are connected;What the joint bottom was run through is provided with the 5th interface channel 730, and the top of the 5th interface channel is provided with
The connection boss 731 of one circle the 3rd, the bottom of the 5th interface channel are provided with the 6th connecting groove 732, and the 3rd connection boss is fixed on
In 4th connecting groove;First water injection pipe includes upper water injection pipe 33 and lower water injection pipe 734, the upper end of upper water injection pipe are fixed on
In 6th connecting groove, the lower end inner wall of upper water injection pipe caves inward to form the link slot 735 of a circle the 7th, the lower end of lower water injection pipe
Outer wall is outwardly to form the 4th boss 736 of circle, is provided with a second spring 737 in upper water injection pipe, second spring one end is consolidated
It is scheduled at the top of the 7th link slot, the other end is connected with plug-type lower water injection pipe being arranged in upper water injection pipe, lower water injection pipe
Longitudinally disposed waist-shaped hole 738 is provided with, straight pin 739 is movably consolidated through upper water injection pipe and waist-shaped hole, by lower water injection pipe
It is scheduled in water injection pipe, the bottom of the lower water injection pipe caves inward to form the avoiding hollow groove 740 of arc-shaped structure;Under the joint
The bottom in portion is provided with a circle sealing ring 741;
The water filling water tank and settling tank are separately fixed at the both sides of water injecting mechanism framework, and return water tank is fixed on first
In fixed platform, it is located at the same side with settling tank, is connected between return water tank and settling tank by the first pipeline 742,
It is connected between water filling water tank and settling tank by second pipe 743;
The pipe-line system includes the high pressure being sequentially fixed at from top to bottom by pipeline seat board 762 in first fixed platform
Water pipe 744, exhaust outlet pipe 745, cylinder tracheae 746, purging tracheae 747, the second water injection pipe 748, and some 3rd turns
The quantity of adapter 749, some 4th transfer tube 750, pump water inlet 751 and water pumps 752, the 3rd transfer tube and the 4th transfer tube
Identical with testing the quantity of position, cylinder is connect with tracheae by some branch pipe(tube)s and each second cylinders, and water pump is fixed on
Water filling tank top, pump water inlet one end are connected with water filling water tank bottom, and the other end is connected with water pump, the second water injection pipe
One end closing, the other end are connected with water pump, and the closing of exhaust outlet pipe one end, the other end are connected with return water tank;Described
Three transfer tubes are provided with the first extension tube attached 753, the second extension tube attached 754, the 3rd extension tube attached 755 and the 4th extension tube attached 756, outside first
Adapter, the second extension tube attached, the 3rd extension tube attached are connected with high-pressure water pipe, exhaust outlet pipe, cylinder with tracheae respectively, and the 4th is external
Pipe is connected by the 3rd pipeline 757 with corresponding first Switching-through channel, and the 4th transfer tube is provided with the 5th extension tube attached 758, the
Six extension tube attacheds 759 and the 7th extension tube attached 760, the 5th extension tube attached, the 6th extension tube attached are connected with purging tracheae, the second water injection pipe respectively
Connect, the 7th extension tube attached is connected by the 4th pipeline 761 with corresponding second Switching-through channel.
The high-pressure water pipe, exhaust outlet pipe, which combine, to be used to extract out in the water in gas cylinder, purging tracheae, the second water injection pipe knot
Share in the water filling into gas cylinder.
The cylinder is connected with air pump respectively with tracheae, purging tracheae;The high-pressure water pipe is connected with high-pressure hydraulic pump.
Claims (9)
1. LP gas cylinder multistation automatic voltage withstanding experimental rig, it is characterized in that, including water filling device, cylinder feeder and lower bottle
Device, water filling device are provided with multiple experiment positions, and water filling device is movably disposed on track, and cylinder feeder includes upper bottled
Support base and upper bottle cylinder are put, discharging device includes discharging device support base and lower bottle cylinder, cylinder feeder support base and lower bottle
Device support base mirror image is set, and upper bottle cylinder promotes from cylinder feeder to water filling device, the downward bottle of lower bottle cylinder Automatic water-filling device
Device is promoted, and some roller bearings are equipped with cylinder feeder support base and discharging device support base, and roller bearing and the first motor, which are realized, to be joined
It is dynamic.
2. LP gas cylinder multistation automatic voltage withstanding experimental rig as claimed in claim 1, it is characterized in that, it is described bottled
Putting support base and discharging device support base includes the first supporting plate, the second supporting plate, the 3rd supporting plate, the 4th supporting plate, the
Five supporting plates, some first roller bearings, some second roller bearings, the first motor;The length L1 of first supporting plate is less than the second supporting plate
Length L2, the first supporting plate and the second supporting plate are arranged in parallel, and both are mutually flush one end, the first supporting plate and second
The other end of supporting plate connects the 3rd supporting plate and the 4th supporting plate respectively, and the 3rd supporting plate and the 4th supporting plate are parallel to each other and set
Put, both other ends are connected by the 5th supporting plate, and the 5th supporting plate is parallel to each other with the first supporting plate, the first roller bearing
What is be parallel to each other is spindle rotationally arranged between the first supporting plate and the second supporting plate, and the second roller bearing is parallel to each other rotatable
It is arranged between the 5th supporting plate and the second supporting plate;
It is upper bottled that first supporting plate, the second supporting plate, the 3rd supporting plate, the 4th supporting plate and the 5th supporting plate mutually splice composition
Support base/discharging device support base is put, the bottom of cylinder feeder support base/discharging device support base is provided with some support frames, institute
State the first roller bearing and the second roller bearing is located at the side of the second supporting plate and coaxially fixes a first gear, below the second supporting plate
Provided with pinboard, pinboard is provided with the second gear of three settings triangular in shape, passes through between first gear and second gear
First chain realizes linkage, and outermost first roller bearing is provided with the 3rd gear, and the 3rd gear is located at the first supporting plate side, the
Realized and linked by the second chain between three gears and the 4th gear being fixed on the first motor, the first motor is fixed on support
On frame;
It is vertical in 4th supporting plate to be provided with the first side shield, in the second supporting plate vertically be provided with the second side shield, the
One side shield and the second side shield vertical connection, it is vertical between the 3rd supporting plate and the 5th supporting plate to be provided with the 3rd side shield,
3rd side shield one end is located at the junction of the 3rd supporting plate and the first supporting plate, the other end is located in the 5th supporting plate, and first
The side shield formation gas cylinder access way relative with the 3rd side shield;
Upper bottle cylinder and lower bottle cylinder are fixed by cylinder supports seat, and lower bottle cylinder is located at the 5th supporting plate side, and
The push rod of lower bottle cylinder is set towards gas cylinder access way, and lower bottle cylinder is used for lower bottle;Upper bottle cylinder is located at the second supporting plate one
Side, and the push rod of upper bottle cylinder is set towards gas cylinder access way, upper bottle cylinder is used for upper bottle;The height of upper bottle cylinder is more than upper
The height of bottle support base, the height of lower bottle cylinder are more than the height of discharging device support base.
3. LP gas cylinder multistation automatic voltage withstanding experimental rig as claimed in claim 1, it is characterized in that, the water filling dress
Put including bottom platform, track, reducing motor, drive wheel assemblies, driven wheel assembly, rear roller component and water injecting mechanism, active
Wheel assembly, driven wheel assembly, rear roller component are each attached to the bottom of bottom platform;
The drive wheel assemblies include the first main shaft and are spindle rotationally arranged in first wheel at the first main shaft both ends, the first main shaft
It is provided with the first drive sprocket and the first driven sprocket;The driven wheel assembly includes the second main shaft and is spindle rotationally arranged in the
Second wheel at two main shaft both ends, the second main shaft are provided with the second driven sprocket, the first driven sprocket and the second driven sprocket it
Between be connected by the 3rd chain, the rear roller component includes the 3rd main shaft and being spindle rotationally arranged in the 3rd main shaft both ends
3rd wheel, the reducing motor being fixed in bottom platform are connected by the 4th chain with the first drive sprocket;First main shaft,
Second main shaft and the 3rd main shaft are each attached in bottom platform, and the bottom of bottom platform is provided with three groups of wheel holding tank groups, every group
Wheel holding tank group is made up of two wheel holding tanks, and the first wheel, the second wheel, the upper end of the 3rd wheel are separately positioned on phase
In corresponding wheel holding tank, the first wheel, the second wheel, the lower end of the 3rd wheel press in orbit;
The water injecting mechanism includes water injecting mechanism framework, water filling water tank, return water tank, settling tank, water filling device, pipeline system
System, the first fixed platform, the second fixed platform, supporting mechanism group and the second cylinder, water injecting mechanism framework are fixed on bottom platform
On, if forming dry test position by divides in water injecting mechanism framework, two guarantors are provided between adjacent two demarcation strips
Backplate, the first fixed platform are fixed on the top of water injecting mechanism framework by some first support columns, set in the first fixed platform
There are some second cylinder channels, the internal diameter of the second cylinder channel is d1, the quantity of the second cylinder channel and the quantity phase for testing position
Together, each second cylinder channel is provided with a support machine respectively above corresponding experiment position below each second cylinder channel
Structure group, each supporting mechanism group are made up of at least four first supporting mechanisms, and the first supporting mechanism is fixed on water injecting mechanism framework
Top, second fixed platform is provided between each supporting mechanism group and the second cylinder channel, the second fixed platform is upper table
Face is the cuboid sheet material of square structure, and the length of side of the square structure that its upper surface is in is d2, d2 > d1, the second cylinder
It is fixed on above the second fixed platform, the push rod of the second cylinder is connected through the second fixed platform with first connecting rod, and first connects
Bar passes through the connecting rod channel for being arranged on water injecting mechanism frame roof to be connected with water filling device;
The water filling device includes joint top, joint top, joint bottom, the first water injection pipe and pipe joint, the joint top
The top in portion is provided with first connecting rod fixing groove, and joint bottom is provided with the first connection projection, first connecting rod and first connecting rod fixing groove
It is connected, water filling device is integrally attached on first connecting rod;The top on the joint top is provided with the first connecting groove, joint
The bottom on top is top-down to be provided with interconnected the second connecting groove, the 3rd connecting groove and the 4th connecting groove, the
One connection projection is fixed in the first connecting groove, and joint top is additionally provided with the first Switching-through channel and the second Switching-through channel, and first
Switching-through channel is connected with the second connecting groove, and the second Switching-through channel is connected with the 3rd connecting groove;The number of the pipe joint
Measure as two, be connected respectively with the first Switching-through channel and the second Switching-through channel;What the joint bottom was run through is provided with the 5th company
Road is connected, the top of the 5th interface channel is provided with the connection boss of a circle the 3rd, and the bottom of the 5th interface channel is provided with the 6th connection
Groove, the 3rd connection boss are fixed in the 4th connecting groove;First water injection pipe includes upper water injection pipe and lower water injection pipe, on
The upper end of water injection pipe is fixed in the 6th connecting groove, and the lower end inner wall of upper water injection pipe caves inward to form a circle the 7th connection
Groove, the lower end outer wall of lower water injection pipe is outwardly to form the 4th boss of circle, is provided with a second spring in upper water injection pipe, and second
Spring one end is fixed at the top of the 7th link slot, and the other end is connected with plug-type lower water injection pipe being arranged in upper water injection pipe
Connect, lower water injection pipe is provided with longitudinally disposed waist-shaped hole, and straight pin may move through upper water injection pipe and waist-shaped hole, by lower water injection pipe
Be fixed in water injection pipe;
The water filling water tank and settling tank are separately fixed at the both sides of water injecting mechanism framework, and return water tank is fixed on the first fixation
On platform, it is located at the same side with settling tank, is connected between return water tank and settling tank by the first pipeline, water filling water tank
It is connected between settling tank by second pipe;
The pipe-line system includes high-pressure water pipe, the row being sequentially fixed at from top to bottom by pipeline seat board in the first fixed platform
Gas drainpipe, cylinder tracheae, purging tracheae, the second water injection pipe, and some 3rd transfer tubes, some 4th transfer tubes, water
The quantity of pump water inlet pipe and water pump, the 3rd transfer tube and the 4th transfer tube is identical with testing the quantity of position, and cylinder tracheae leads to
Cross some branch pipe(tube)s to connect with each second cylinders, water pump is fixed on water filling tank top, pump water inlet one end and water filling
Water tank bottom is connected, and the other end is connected with water pump, and the closing of second water injection pipe one end, the other end are connected with water pump, are vented
The closing of drainpipe one end, the other end are connected with return water tank;3rd transfer tube is provided with the first extension tube attached, second external
Pipe, the 3rd extension tube attached and the 4th extension tube attached, the first extension tube attached, the second extension tube attached, the 3rd extension tube attached respectively with high-pressure water pipe, exhaust
Drainpipe, cylinder are connected with tracheae, and the 4th extension tube attached is connected by the 3rd pipeline with corresponding first Switching-through channel, and the 4th
Transfer tube is provided with the 5th extension tube attached, the 6th extension tube attached and the 7th extension tube attached, the 5th extension tube attached, the 6th extension tube attached respectively with purging
Tracheae, the second water injection pipe are connected, and the 7th extension tube attached is connected by the 4th pipeline with corresponding second Switching-through channel.
4. LP gas cylinder multistation automatic voltage withstanding experimental rig as claimed in claim 3, it is characterized in that, high-pressure water pipe,
Exhaust outlet pipe, which combines, to be used to extract out in the water in gas cylinder, and purging tracheae, the second water injection pipe, which combine, is used for the water filling into gas cylinder.
5. LP gas cylinder multistation automatic voltage withstanding experimental rig as claimed in claim 3, it is characterized in that, described first
Support mechanism includes supporting mechanism base and ball, and ball is rotatable to be arranged in supporting mechanism base.
6. LP gas cylinder multistation automatic voltage withstanding experimental rig as claimed in claim 3, it is characterized in that, described second is solid
The height of fixed platform is h3, and the vertical range between the first fixed platform lower surface and the first supporting mechanism summit is h4,1.1*
h3≤h4≤1.4*h3。
7. LP gas cylinder multistation automatic voltage withstanding experimental rig as claimed in claim 3, it is characterized in that, the lower water filling
The bottom of pipe caves inward to form the avoiding hollow groove of arc-shaped structure.
8. LP gas cylinder multistation automatic voltage withstanding experimental rig as claimed in claim 3, it is characterized in that, under the joint
The bottom in portion is provided with a circle sealing ring.
9. LP gas cylinder multistation automatic voltage withstanding experimental rig as claimed in claim 3, it is characterized in that, the cylinder is used
Tracheae, purging tracheae are connected with air pump respectively;The high-pressure water pipe is connected with high-pressure hydraulic pump.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720348474.4U CN206656917U (en) | 2017-04-05 | 2017-04-05 | LP gas cylinder multistation automatic voltage withstanding experimental rig |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720348474.4U CN206656917U (en) | 2017-04-05 | 2017-04-05 | LP gas cylinder multistation automatic voltage withstanding experimental rig |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206656917U true CN206656917U (en) | 2017-11-21 |
Family
ID=60317251
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720348474.4U Active CN206656917U (en) | 2017-04-05 | 2017-04-05 | LP gas cylinder multistation automatic voltage withstanding experimental rig |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206656917U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111458232A (en) * | 2020-06-17 | 2020-07-28 | 湖南省特种设备检验检测研究院 | Manual-automatic integrated pressure test device for loading and unloading hose |
CN112858027A (en) * | 2021-02-27 | 2021-05-28 | 刘�文 | Chip packaging test system and test method thereof |
-
2017
- 2017-04-05 CN CN201720348474.4U patent/CN206656917U/en active Active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111458232A (en) * | 2020-06-17 | 2020-07-28 | 湖南省特种设备检验检测研究院 | Manual-automatic integrated pressure test device for loading and unloading hose |
CN111458232B (en) * | 2020-06-17 | 2020-09-01 | 湖南省特种设备检验检测研究院 | Manual-automatic integrated pressure test device for loading and unloading hose |
CN112858027A (en) * | 2021-02-27 | 2021-05-28 | 刘�文 | Chip packaging test system and test method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102042935B (en) | Method for detecting hydrostatic pressure of thin-wall steel pipe under end face seal condition | |
CN104089769B (en) | Reciprocating type liquid shock absorber simulation test device | |
CN105776067B (en) | Lifting device and the flip-chip method on reducing absorption tower | |
JP5852115B2 (en) | Tube clamp device and water pressure tester | |
CN206656917U (en) | LP gas cylinder multistation automatic voltage withstanding experimental rig | |
CN110823612B (en) | Tunnel surrounding rock lining composite structure stress waterproof test system and method | |
CN206348114U (en) | Pipe fitting sealing property detection device | |
CN110735799A (en) | lifting clamping device for automatic test of water pump and working method thereof | |
CN104181047B (en) | Steel pipe device for detecting water pressure | |
CN106896020A (en) | LP gas cylinder multistation automatic voltage withstanding experimental rig | |
CN109296933B (en) | CNG gas cylinder washs and gas tightness test air entrainment device | |
CN203224342U (en) | Air tightness detection device | |
CN206832420U (en) | A kind of single port pressure testing device for large diameter pipeline | |
CN206656924U (en) | Linear reciprocating multistation gas cylinder water filling device | |
CN204758233U (en) | Gasoline engine generator box gas tightness testing arrangement | |
CN106829442A (en) | The gas cylinder propulsion ejecting mechanism being automatically positioned | |
CN211174658U (en) | Lifting clamping device for automatic test of water pump | |
CN106840902A (en) | Linear reciprocating multistation gas cylinder water filling device | |
CN202057460U (en) | Double-station airtight testing machine | |
CN211955027U (en) | Multi-station water pressure detection platform for drill rod | |
CN204924578U (en) | Steel pipe water pressure test system | |
CN220289261U (en) | Seamless steel pipe acceptance and compression detection device for pipeline transformation | |
CN206656923U (en) | Circulation water injecting mechanism for gas cylinder multistation automatic voltage withstanding experimental rig | |
CN206764201U (en) | A kind of elbow pipeline section counterpart mold | |
CN205786111U (en) | A kind of cell pressure detection equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |