CN206655715U - A kind of efficient drainage arrangement in tunnel - Google Patents

A kind of efficient drainage arrangement in tunnel Download PDF

Info

Publication number
CN206655715U
CN206655715U CN201720334779.XU CN201720334779U CN206655715U CN 206655715 U CN206655715 U CN 206655715U CN 201720334779 U CN201720334779 U CN 201720334779U CN 206655715 U CN206655715 U CN 206655715U
Authority
CN
China
Prior art keywords
tunnel
gutter
water
receiving tank
water receiving
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720334779.XU
Other languages
Chinese (zh)
Inventor
颜长春
杨敏
万平
颜超
杨勇
刘梦
韦干乐
刘义才
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Third Engineering Co Ltd Of Cccc Third Highway Engineering Co Ltd
Original Assignee
Third Engineering Co Ltd Of Cccc Third Highway Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Third Engineering Co Ltd Of Cccc Third Highway Engineering Co Ltd filed Critical Third Engineering Co Ltd Of Cccc Third Highway Engineering Co Ltd
Priority to CN201720334779.XU priority Critical patent/CN206655715U/en
Application granted granted Critical
Publication of CN206655715U publication Critical patent/CN206655715U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model belongs to tunnel drainage technical field, and in particular to a kind of efficient drainage arrangement in tunnel.Tunnel inner wall circumferentially sets water receiving tank, the water receiving tank forms drainage space with tunnel inner wall, the water receiving tank communicates with the gutter stretched along length of tunnel direction so that collecting water and can drain into gutter in the water receiving tank, the gutter is surrounded by heat-insulation layer;The heat-insulation layer includes being covered in the hard polyurethane ester layer on the gutter and the cinder layer being covered on the hard polyurethane ester layer;Also include the graded broken stone bag for being located at Tunnel Gushing breakthrough, one end of the aqueduct is through the graded broken stone bag is extended on rear side of tunnel lining structure, the other end communicates with drainage space.Its advantage is:Underground water on rear side of lining cutting can efficiently be excluded, reduce the water pressure with Tunnel Gushing breakthrough on rear side of liner structure, and gutter can be avoided to freeze, service life length.

Description

A kind of efficient drainage arrangement in tunnel
Technical field
The utility model belongs to tunnel drainage technical field, and in particular to a kind of efficient drainage arrangement in tunnel.
Background technology
" ten tunnels nine leak " is a common fault of Tunnel Engineering, is sent out especially for the tunnel of built operation through karst When educating area or rich water fault belt, over time with the change in subsurface flow path, plus what is oozed under surface water Deepen continuously, ultimately result in tunnel structure and assemble a large amount of water bodys behind;Once hydraulic pressure exceedes structure tolerance range (or because of engineering Mass defect), a large amount of percolating waters will occur in Tunnel, have a strong impact on traffic safety;At present, for the place of Tunnel Water Leakage The method for controlling method generally use " draining of raggle pipe laying ", i.e., chisel groove along the secondary lining surface of percolating water, and embedment is half-sectional Plastic tube, introduce the water into gutter;Using the method for " draining of raggle pipe laying ", there are the following problems:First, structure is damaged Wound, reduce bearing capacity, because two lining structure thickness are generally in the range of 35~55cm, and the depth of fluting normally close to 8~ 15cm, close to the 20~27% of structural thickness, therefore have an impact to structural bearing;Second, construction is relatively difficult, time-consuming bothersome, right In the situation that reinforcing bar is set in two lining structures, because thickness of protection tier is typically in 4cm or so, therefore will necessarily be run into during raggle Thickly dotted reinforcing bar, the concrete cut between reinforcing bar is not easy, then to allow exposed reinforcing bar to handle the sky to enough pipe layings Between outside scope, be even more difficulty;3rd, unfavorable pipe is supported, and finally concrete enclosing is used after half-sectional pipe is put into groove, until with lining It is equal to build surface, once drainage pipeline is blocked again, raggle pipe laying structure must be opened, constructed again, for operation tunnel To complete to repair in a short time extremely difficult.
Utility model content
The purpose of this utility model is in view of the shortcomings of the prior art, there is provided a kind of efficient drainage arrangement in tunnel, can Underground water on rear side of lining cutting is efficiently excluded, reduced on rear side of liner structure and the water pressure of Tunnel Gushing breakthrough, and can be with Gutter is avoided to freeze, service life length.
To solve the above problems, the utility model adopts the following technical scheme that:
A kind of efficient drainage arrangement in tunnel, tunnel inner wall circumferentially set water receiving tank, the water receiving tank and tunnel Inwall forms drainage space, and the water receiving tank communicates with the gutter stretched along length of tunnel direction so that in the water receiving tank Collect water and can drain into gutter, the gutter is surrounded by heat-insulation layer;The heat-insulation layer includes being covered in the row Hard polyurethane ester layer on ditch and the cinder layer being covered on the hard polyurethane ester layer;Also gushed including being located at tunnel The graded broken stone bag of water breakthrough, one end of the aqueduct extends on rear side of tunnel lining structure through the graded broken stone bag, The other end communicates with drainage space.
On the basis of above-mentioned technical proposal, the utility model can also improve as follows:
Optionally, the aqueduct includes inner plastic pipe and heat insulating outer shield pipe, and described inner plastic pipe is provided with water conservancy diversion Projection, described heat insulating outer shield pipe scribble antifouling paint.
Optionally, the thickness of the heat-insulation layer is more than the soil layer depth of freezing of the gutter location.
Optionally, the heat-insulation layer also includes the geotextiles being layed between the cinder layer and the hard polyurethane ester layer Layer.
Optionally, the graded broken stone bag is setting seal mouth ring with the junction of the aqueduct.
Optionally, in addition to for sealing the sealing plastic structure of connection gap between water receiving tank and tunnel inner wall.
Optionally, in addition to for water receiving tank to be connected to the connector of tunnel inner wall.
Optionally, the grading that the graded broken stone bag includes elastic geotextiles and is wrapped in the elastic geotextiles is broken Stone.
The beneficial effects of the utility model are compared with prior art:
1st, one end of the utility model aqueduct extends tunnel lining structure rear side, the other end through the graded broken stone bag Communicate, the underground water on rear side of lining cutting can be led in gutter and be discharged with drainage space, reduce the water on rear side of liner structure Pressure;Graded broken stone is packaged in Tunnel Gushing breakthrough simultaneously, and the country rock particle of Tunnel Gushing breakthrough is blocked in geotextiles Outside, with the continuous convergence of country rock particle, certain plugging action is formed to water burst breakthrough, prevents the lasting stream of fine particle Lose, maintain the complete of country rock and stably, prevent country rock particle to enter tunnel drainage system while ponding is discharged;Tunnel The water pressure of water burst breakthrough directly acts on graded broken stone and wrapped, and the graded broken stone wrapped up in by the geotechnological cloth bag of elasticity has dissipated water Pressure, water is flowed into by acting by external hydrostatic pressure caused by the water level discrepancy in elevation in the aqueduct that is connected with graded broken stone bag and ejectment is to connecing Tank, then by being drained into water receiving tank in gutter, efficient draining.
2nd, the heat-insulation layer set up around gutter of the present utility model, the draining knot in gutter can effectively be prevented Ice, so as to avoid the underground water outside the water or tunnel in tunnel from damaging tunnel structure, improve the security in tunnel.
3rd, aqueduct of the present utility model takes different materials to be combined into sandwich construction, and it is convex that inner plastic pipe is connected with water conservancy diversion Rise, play liquid diversion function, heat insulating outer shield avoids water pipe heat expansion shrinkage, plays antiseptic effect by antifouling paint, function is complete Face, service life are lasting.
Brief description of the drawings
Fig. 1 is the structural representation of the efficient drainage arrangement in tunnel described in the utility model embodiment;
Fig. 2 is that one end of the aqueduct described in the utility model embodiment shows through the structure of the graded broken stone bag It is intended to;
Fig. 3 is the structural representation of the aqueduct described in the utility model embodiment;
Wherein, 1- water receiving tanks, 2- drainage spaces, 3- gutters, 4- aqueducts, 5- graded broken stone bags, 6- connectors, 7- levels It is raised with rubble, 8- elasticity geotextiles, 9- seal mouth rings, 10- heat insulating outer shields, 11- inner plastic pipes, 12- water conservancy diversion.
Embodiment
The utility model is described in further detail below in conjunction with the drawings and specific embodiments.According to claims and Following explanation, advantages and features of the present utility model will become apparent from.It should be noted that accompanying drawing is using very simplified form And non-accurately ratio is used, only to purpose that is convenient, lucidly aiding in illustrating the utility model embodiment.
Embodiment
A kind of efficient drainage arrangement in tunnel, as Figure 1-3, tunnel inner wall circumferentially sets water receiving tank 1, described Water receiving tank 1 forms drainage space 2 with tunnel inner wall, and the water receiving tank 1 communicates with the gutter 3 stretched along length of tunnel direction, The water that collects in the water receiving tank 1 is drained into gutter 3, the gutter 3 is surrounded by heat-insulation layer;The insulation Layer includes being covered in the hard polyurethane ester layer on the gutter 3 and the cinder being covered on the hard polyurethane ester layer Layer;Also include the graded broken stone bag 5 for being located at Tunnel Gushing breakthrough, the graded broken stone bag 5 is run through in one end of the aqueduct 4 Extend on rear side of tunnel lining structure, the other end communicates with drainage space 2.
On the basis of above-mentioned technical proposal, the utility model can also improve as follows:
In a preferred scheme, the aqueduct 4 includes inner plastic pipe 11 and heat insulating outer shield 10 is managed, in described plastics Layer pipe 11 is provided with water conservancy diversion projection 12, and the described pipe of heat insulating outer shield 10 scribbles antifouling paint.
In a preferred scheme, the thickness of the heat-insulation layer is more than the soil layer depth of freezing of the location of gutter 3. Wherein, the heat-insulation layer also includes the geotextile layer being layed between the cinder layer and the hard polyurethane ester layer.It is such Structure causes heat insulation effect more preferably.
In a preferred scheme, the graded broken stone bag 5 is setting seal mouth ring 9 with the junction of the aqueduct 4.
In a preferred scheme, in addition to for sealing the fluid sealant of the connection gap between water receiving tank 1 and tunnel inner wall Structure.
In a preferred scheme, in addition to for water receiving tank 1 to be connected to the connector 6 of tunnel inner wall.
In a preferred scheme, the graded broken stone bag 5 includes elastic geotextiles 8 and is wrapped in the elastic geotextiles 8 Interior graded broken stone 7.
The beneficial effects of the utility model are compared with prior art:
1st, one end of the utility model aqueduct 4 extends on rear side of tunnel lining structure through the graded broken stone bag 5, is another End communicates with drainage space 2, the underground water on rear side of lining cutting can be led in gutter 3 and be discharged, and reduces on rear side of liner structure Water pressure;Graded broken stone bag 5 is located at Tunnel Gushing breakthrough simultaneously, and the country rock particle of Tunnel Gushing breakthrough is blocked in soil Outside work cloth, with the continuous convergence of country rock particle, certain plugging action is formed to water burst breakthrough, prevents continuing for fine particle It is lost in, maintains the complete of country rock and stably, prevent country rock particle to enter tunnel drainage system while ponding is discharged;Tunnel The water pressure of road water burst breakthrough is directly acted on graded broken stone bag 5, and the graded broken stone 7 wrapped up by elastic geotextiles 8 dissipates The pressure of water, water are flowed into the aqueduct 4 being connected with graded broken stone bag 5 simultaneously by acting by external hydrostatic pressure caused by the water level discrepancy in elevation Ejectment is to water receiving tank 1, then by being drained into water receiving tank 1 in gutter 3, efficient draining.
2nd, the heat-insulation layer set up around gutter 3 of the present utility model, the draining knot in gutter 3 can effectively be prevented Ice, so as to avoid the underground water outside the water or tunnel in tunnel from damaging tunnel structure, improve the security in tunnel.
3rd, aqueduct 4 of the present utility model takes different materials to be combined into sandwich construction, and inner plastic pipe 11 is connected with water conservancy diversion Projection 12, plays liquid diversion function, and heat insulating outer shield 10 avoids water pipe heat expansion shrinkage, and antiseptic effect is played by antifouling paint, Full-featured, service life is lasting.
Obviously, it is new without departing from this practicality can to carry out various changes and modification to utility model by those skilled in the art The spirit and scope of type.So, if these modifications and variations of the present utility model belong to the utility model claims and its Within the scope of equivalent technologies, then the utility model is also intended to including these changes and modification.

Claims (8)

1. a kind of efficient drainage arrangement in tunnel, it is characterised in that tunnel inner wall circumferentially sets water receiving tank, the water receiving Groove forms drainage space with tunnel inner wall, and the water receiving tank communicates with the gutter stretched along length of tunnel direction so that described Collecting water and can drain into gutter in water receiving tank, the gutter is surrounded by heat-insulation layer;The heat-insulation layer includes covering Hard polyurethane ester layer on the gutter and the cinder layer being covered on the hard polyurethane ester layer;Also include setting In the graded broken stone bag of Tunnel Gushing breakthrough, one end of aqueduct is after the graded broken stone bag extends tunnel lining structure Side, the other end communicate with drainage space.
2. the efficient drainage arrangement in tunnel according to claim 1, it is characterised in that the aqueduct includes inner plastic pipe With heat insulating outer shield pipe, described inner plastic pipe is provided with water conservancy diversion projection, and described heat insulating outer shield pipe scribbles antifouling paint.
3. the efficient drainage arrangement in tunnel according to claim 1, it is characterised in that the thickness of the heat-insulation layer is more than described The soil layer depth of freezing of gutter location.
4. the efficient drainage arrangement in tunnel according to claim 3, it is characterised in that the heat-insulation layer also includes being layed in institute State the geotextile layer between cinder layer and the hard polyurethane ester layer.
5. the efficient drainage arrangement in tunnel according to claim 1, it is characterised in that the graded broken stone bag draws with described The junction of water pipe sets seal mouth ring.
6. the efficient drainage arrangement in tunnel according to claim 1, it is characterised in that also include being used to seal water receiving tank and tunnel The sealing plastic structure of connection gap between road inwall.
7. the efficient drainage arrangement in tunnel according to claim 1, it is characterised in that also include being used to water receiving tank being connected to The connector of tunnel inner wall.
8. the efficient drainage arrangement in tunnel according to claim 1, it is characterised in that the graded broken stone bag includes elastic earth Work cloth and the graded broken stone being wrapped in the elastic geotextiles.
CN201720334779.XU 2017-03-31 2017-03-31 A kind of efficient drainage arrangement in tunnel Expired - Fee Related CN206655715U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720334779.XU CN206655715U (en) 2017-03-31 2017-03-31 A kind of efficient drainage arrangement in tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720334779.XU CN206655715U (en) 2017-03-31 2017-03-31 A kind of efficient drainage arrangement in tunnel

Publications (1)

Publication Number Publication Date
CN206655715U true CN206655715U (en) 2017-11-21

Family

ID=60315530

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720334779.XU Expired - Fee Related CN206655715U (en) 2017-03-31 2017-03-31 A kind of efficient drainage arrangement in tunnel

Country Status (1)

Country Link
CN (1) CN206655715U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110374644A (en) * 2019-08-28 2019-10-25 东北大学 A kind of the drainage waterproof construction and its construction method of full section of tunnel
CN114278375A (en) * 2021-12-18 2022-04-05 中建一局集团京通路桥建设有限公司 Tunnel hoop drainage system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110374644A (en) * 2019-08-28 2019-10-25 东北大学 A kind of the drainage waterproof construction and its construction method of full section of tunnel
CN114278375A (en) * 2021-12-18 2022-04-05 中建一局集团京通路桥建设有限公司 Tunnel hoop drainage system

Similar Documents

Publication Publication Date Title
CN101798939B (en) Maintainable tunnel drainage system
CN105927272A (en) Floor anchoring constraint tunnel lining structure
CN105484773A (en) System plugging and draining structure for tunnel leakage treatment
CN106381842A (en) Canal lining repair buried pipe water transfer and cofferdam intercepted foundation pit and method
CN106400746A (en) Water delivery of by-pass pipe and cofferdaming truncation-typed foundation trench and method for canal lining repairing
CN103696416A (en) Novel foundation treatment method
CN206655715U (en) A kind of efficient drainage arrangement in tunnel
CN105359659B (en) Wind-power vacuum alkali reduction apparatus for reclamation of saline and alkaline land and use method of apparatus
CN102425175B (en) Reinforcement protective structure of large spoil disposal area in mountainous area
CN206143722U (en) Canal lining restores pipe laying water delivery and formula foundation ditch is cuted in cofferdam
CN206143787U (en) Cofferdam island formula foundation ditch under uninterrupted water delivery condition of canal lining restoration
CN109252550B (en) Groundwater seepage prevention structure
CN205370597U (en) A system's leaking stoppage and drainage structures for tunnel seepage is administered
CN204783063U (en) Doubly -linked encircles tunnel mid -board prevents drainage structures
CN109024645B (en) Integrated waterproof curtain, sponge urban water circulation system and method
CN206143723U (en) Canal lining restores bypass pipe water delivery and formula foundation ditch is cuted in cofferdam
CN213867883U (en) Sand filling pipe bag cofferdam suitable for coastal area
CN210460755U (en) Tunnel end wall type heat preservation center ditch water outlet
CN111779503A (en) Triple baffling type partition waterproof structure of underground excavation tunnel
CN206220110U (en) A kind of sparse pipe curtain freezes supporting construction
CN110985007A (en) Construction process of subway communication channel
CN205917684U (en) Integral type well dotted calandria
CN205382473U (en) Drainage pipe system is irrigated in integration of saline and alkaline land farmland
CN105002882A (en) Transverse draining channel with longitudinal and transverse latticed drainage blind ditches and seepage collecting well points
CN215405882U (en) Novel structure of plain reservoir exhaust blind ditch

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171121

CF01 Termination of patent right due to non-payment of annual fee