CN206655486U - A kind of elongated steel column temporary fixing structure - Google Patents

A kind of elongated steel column temporary fixing structure Download PDF

Info

Publication number
CN206655486U
CN206655486U CN201720324969.3U CN201720324969U CN206655486U CN 206655486 U CN206655486 U CN 206655486U CN 201720324969 U CN201720324969 U CN 201720324969U CN 206655486 U CN206655486 U CN 206655486U
Authority
CN
China
Prior art keywords
steel column
elongated steel
elongated
fixing structure
temporary fixing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720324969.3U
Other languages
Chinese (zh)
Inventor
刘晓英
付长春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingjian Group Co Ltd
Original Assignee
Qingjian Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingjian Group Co Ltd filed Critical Qingjian Group Co Ltd
Priority to CN201720324969.3U priority Critical patent/CN206655486U/en
Application granted granted Critical
Publication of CN206655486U publication Critical patent/CN206655486U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

A kind of elongated steel column temporary fixing structure is the utility model is related to, belongs to building basic technology field, which solves that elongated steel column is yielding and the problems such as poor is stablized in installation.The utility model includes the crossbeam and vertical beam of some square crossings connection, the elongated steel column parallel with vertical beam is arranged between vertical beam, some plating procedure platforms are surrounded by along elongated steel column short transverse and around elongated steel column, plating procedure platform is by the vertical beam support around elongated steel column surrounding, plating procedure platform includes stull I arranged in a crossed manner, cable rope is provided with the top of elongated steel column, cable rope passes through earth anchorage, support is tight by throwing in the middle part of elongated steel column, and the bottom of elongated steel column is fixed by the foundation bolt being embedded in concrete cushion.The utility model sets interim fixed support and plating procedure platform in elongated steel column peripheral branch, and whole elongated steel column is disposably lifted, simple in construction, reduces engineering cost, and easy construction, work efficiency are high.

Description

A kind of elongated steel column temporary fixing structure
Technical field
A kind of elongated steel column temporary fixing structure is the utility model is related to, belongs to building basic technology field.
Background technology
Steel reinforced concrete structure is the flush type combining structure using steel column as skeleton reinforced concrete enveloped, in this knot In structure, steel sections form entirety with reinforced concrete enveloped part, and cooperation undertakes load, has steel construction concurrently and reinforcing bar mixes The advantages of Xtah Crude Clay structure, therefore steel reinforced concrete structure largely uses in engineering construction, and steel column be difficult point in construction with Emphasis, for steel reinforced concrete structure because its structure section is small, anti-seismic performance is good, and is widely used in steel reinforced concrete structure. Due to leptosomatic steel column transport and installation process in it is yielding, and stability is poor, therefore the construction of elongated steel column needs Want interim fixed support structure could intact construction.
Utility model content
The purpose of this utility model is to overcome drawbacks described above present in elongated steel column installation process, it is proposed that a kind of Elongated steel column temporary fixing structure, interim fixed support and plating procedure platform is set in elongated steel column peripheral branch, by whole Elongated steel column disposably lifts, and sets cable rope at the top of elongated steel column, by using the whole installation of elongated steel column, subtracts The number of segmentation installation and the workload of welding are lacked, easy construction, work efficiency are high, can accelerate speed of application, ensure construction quality And safety.
The utility model is realized using following technical scheme:Crossbeam including some square crossings connection and perpendicular Beam, the elongated steel column parallel with vertical beam are arranged between vertical beam, along elongated steel column short transverse and surround elongated steel column Some plating procedure platforms are surrounded by, plating procedure platform is by the vertical beam support around elongated steel column surrounding, plating procedure Platform includes stull I arranged in a crossed manner, is provided with cable rope at the top of elongated steel column, cable rope passes through earth anchorage, slender type Support is tight by throwing in the middle part of steel column, and the bottom of elongated steel column is fixed by the foundation bolt being embedded in concrete cushion.
Preferably, bridging is provided between two adjacent vertical beams of elongated steel column and two adjacent beams.
Preferably, bridging is arranged at intervals.
Preferably, two pairs of cable ropes are provided with the top of elongated steel column, each pair cable rope is symmetricly set on slender type Steel column both sides.
Preferably, elongated steel column throws support support at least through a pair, and each pair throws support and is symmetricly set on elongated shaped steel Post both sides, each pair are thrown and are fixedly connected with stull II among support.
Preferably, throwing support supports the strong point of elongated steel column to be highly at least the 1/2 of elongated steel column height.
Preferably, crossbeam and vertical beam include thin with elongated steel column by reinforcing bar colligation bean column node, bean column node Sleeve, the prick post reinforcing bar with sleeve connection welded on long steel column web.
Preferably, bean column node also include be arranged on the outside of elongated steel column around post reinforcing bar and stirrup, prick post steel Muscle and it is connected around post reinforcing bar with stirrup.
Preferably, elongated steel column uses cross, H types or hollow.
The beneficial effects of the utility model are:A kind of elongated steel column temporary fixing structure described in the utility model, knot Structure is simple, and interim fixed support and plating procedure platform is set in elongated steel column peripheral branch, and whole elongated steel column is disposable Lifting, and cable rope is set at the top of elongated steel column, by using the whole installation of elongated steel column, reduce time of segmentation installation Number and the workload of welding, the workload and resource consumption at the scene of reducing, engineering cost is reduced, easy construction, work efficiency are high, and protect Demonstrate,prove construction quality and safety.
Brief description of the drawings
Fig. 1 is one of structural representation of the present utility model.
Fig. 2 is the two of structural representation of the present utility model.
Fig. 3 is the structural representation of this reinforcing bar colligation bean column node.
In figure:1st, cable rope;2nd, elongated steel column;3rd, plating procedure platform;4th, crossbeam;5th, vertical beam;6th, bridging;7th, throw Support;8th, stull I;9th, stull II;10th, cushion block;11st, earth anchor;12nd, stirrup;13rd, sleeve;14th, prick post reinforcing bar;15th, around post reinforcing bar.
Embodiment
It is below in conjunction with the accompanying drawings and specific real to make the purpose of this utility model, technical scheme and advantage clearer, clear Example, to the utility model proposes a kind of elongated steel column temporary fixing structure be further described.It should be appreciated that this place The specific embodiment of description is only used for explaining the utility model, is not used to limit the utility model.
A kind of elongated steel column temporary fixing structure described in the utility model, as shown in Figure 1 to Figure 3, including it is some vertical The crossbeam 4 and vertical beam 5 of straight interconnection, vertical beam 5 have cushion block 10.The elongated steel column 2 parallel with vertical beam 5 is arranged on vertical beam Between 5, some plating procedure platforms 3, bed board behaviour are surrounded by along the elongated short transverse of steel column 2 and around elongated steel column 2 Make platform 3 by being supported around the vertical beam 5 of the elongated surrounding of steel column 2, plating procedure platform 3 includes stull I 8 arranged in a crossed manner, carefully The long top of steel column 2 is provided with two pairs of cable ropes 1, and each pair cable rope 1 is symmetricly set on the elongated both sides of steel column 2, and cable rope 1 is logical Cross earth anchor 11 to fix, elongated steel column 2, which is thrown at least through two Duis, supports 7 supports, and each pair throws support 7 and is symmetricly set on elongated steel column 2 Both sides, each pair are thrown and are fixedly connected with stull II 9 among support 7, and the bottom of elongated steel column 2 is by being embedded in concrete cushion Foundation bolt is fixed.Crossbeam 4 and vertical beam 5 include slender type with elongated steel column 2 by reinforcing bar colligation bean column node, bean column node The sleeve 13 welded on the web of steel column 2, the prick post reinforcing bar 14 being connected with sleeve 13, sleeve 13 avoid the perforate on web, beam Column border node also include being arranged on the outside of elongated steel column 2 around post reinforcing bar 15 and stirrup 12, prick post reinforcing bar 14 and around post reinforcing bar 15 Be connected with stirrup 12, stirrup 12 can be inserted in from the elongated capital of steel column 2, or by stirrup 12 opening be inserted in it is rear re-closed.
Bridging 6 is provided between the two adjacent adjacent beams 4 of vertical beam 5 and two of elongated steel column 2 to strengthen stability, Bridging 6 is arranged at intervals.
The strong point for throwing the elongated steel column 2 of the support of support 7 is highly at least the 1/2 of the elongated height of steel column 2, it is preferable that branch Support point is highly the 1/2 of the elongated height of steel column 2, and the middle part of elongated steel column 2 is held out against by throwing support 7.
The utility model around elongated steel column 2 by installing temporary fixing structure and plating procedure platform 3, by whole Elongated disposable lifting, and cable rope 1 is set to install elongated steel column 2, the preferential choosing of steel column lifting at the elongated top of steel column 2 With tower crane or other hoisting machineries, in order to prevent the elongated shaft of steel column 2 from deforming, elongated steel column 2 should be according to calculating when lifting by crane Hang using 2 points or a bit.When being hung using binding, rubber or chock etc. should be padded at suspension centre, also can push up to set in elongated steel column 2 and hang Ear or the bolt hole using the elongated end of steel column 2, are lifted using Special rigging.
Because steel reinforced concrete structure can reduce structure section, improving the anti-seismic performance of structure, application is increasingly extensive, and The utility model can accelerate the speed of application of elongated steel column 2, reduce cost, improve quality, reduce scene workload and Resource consumption, therefore with preferably society and environmental benefit.Elongated steel column 2 processing and fabricating in the factory, reduces elongated On-site consolidation, docking and the lifting time of steel column 2, speed of application can be accelerated, reduce engineering cost.It is soft with Qingdao City Shinan District Exemplified by the second stage of the project of part garden, the Wan ㎡ of project occupation of land area about 10, overall floorage is 123391 ㎡, is divided into A, B, C, D, E five Balcony, frame structure, the elongated steel column 2 of seismic behavior level Four, wherein AB seats 66 altogether, 38, Building A, 28, Building B.Cross AB Seat has a man-made lake, and elongated steel column 2 focuses primarily upon in the section lake region of lake region 41,26, lake region side.Elongated steel column 2 is ten Font, its basis use two kinds of forms of natural single column foundation and pile foundation, slender type are fixedly mounted temporarily by using utility model Steel column 2, the construction period of 20 days is shortened, reduce by 20,000 yuan of cost.
Certainly, the above is only specific embodiment of the present utility model, it is impossible to is considered as being used to limit to this practicality New protection domain.The utility model is also not limited to the example above, and those skilled in the art are in this reality With equivalent change and improvement made in new essential scope etc., all should belong in covering scope of the present utility model.

Claims (9)

  1. A kind of 1. elongated steel column temporary fixing structure, it is characterised in that:Including some square crossings connection crossbeam (4) and erect Beam (5), the elongated steel column (2) parallel with vertical beam (5) are arranged between vertical beam (5), along elongated steel column (2) short transverse and Some plating procedure platforms (3) are surrounded by around elongated steel column (2), plating procedure platform (3) is by around elongated steel column (2) vertical beam (5) support of surrounding, plating procedure platform (3) include stull I (8) arranged in a crossed manner, elongated steel column (2) top Cable rope (1) is provided with, cable rope (1) is fixed by earth anchor (11), is held out against in the middle part of elongated steel column (2) by throwing support (7), carefully The bottom of long steel column (2) is fixed by the foundation bolt being embedded in concrete cushion.
  2. A kind of 2. elongated steel column temporary fixing structure according to claim 1, it is characterised in that:Around elongated steel column (2) bridging (6) is provided between two adjacent vertical beams (5) and two adjacent beams (4).
  3. A kind of 3. elongated steel column temporary fixing structure according to claim 2, it is characterised in that:Bridging (6) is spaced Set.
  4. A kind of 4. elongated steel column temporary fixing structure according to claim 1, it is characterised in that:Elongated steel column (2) Top is provided with two pairs of cable ropes (1), and each pair cable rope (1) is symmetricly set on elongated steel column (2) both sides.
  5. A kind of 5. elongated steel column temporary fixing structure according to claim 1, it is characterised in that:Elongated steel column (2) Thrown at least through a pair and support (7) support, each pair throws support (7) and is symmetricly set on elongated steel column (2) both sides, and each pair is thrown in support (7) Between be fixedly connected with stull II (9).
  6. A kind of 6. elongated steel column temporary fixing structure according to claim 1, it is characterised in that:It is thin to throw support (7) support The strong point of long steel column (2) is highly at least the 1/2 of elongated steel column (2) height.
  7. A kind of 7. elongated steel column temporary fixing structure according to claim 1, it is characterised in that:Crossbeam (4) and vertical beam (5) include what is welded on elongated steel column (2) web by reinforcing bar colligation bean column node, bean column node with elongated steel column (2) Sleeve (13), the prick post reinforcing bar (14) being connected with sleeve (13).
  8. A kind of 8. elongated steel column temporary fixing structure according to claim 7, it is characterised in that:Bean column node also includes It is arranged on around post reinforcing bar (15) and stirrup (12), prick post reinforcing bar (14) and equal around post reinforcing bar (15) on the outside of elongated steel column (2) It is connected with stirrup (12).
  9. A kind of 9. elongated steel column temporary fixing structure according to claim 1, it is characterised in that:Elongated steel column (2) Using cross, H types or hollow.
CN201720324969.3U 2017-03-30 2017-03-30 A kind of elongated steel column temporary fixing structure Expired - Fee Related CN206655486U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720324969.3U CN206655486U (en) 2017-03-30 2017-03-30 A kind of elongated steel column temporary fixing structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720324969.3U CN206655486U (en) 2017-03-30 2017-03-30 A kind of elongated steel column temporary fixing structure

Publications (1)

Publication Number Publication Date
CN206655486U true CN206655486U (en) 2017-11-21

Family

ID=60316431

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720324969.3U Expired - Fee Related CN206655486U (en) 2017-03-30 2017-03-30 A kind of elongated steel column temporary fixing structure

Country Status (1)

Country Link
CN (1) CN206655486U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110374234A (en) * 2019-07-19 2019-10-25 杭州三丰装配式建筑科技有限公司 A kind of the cavity node structure and construction method of assembled wall and building frame

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110374234A (en) * 2019-07-19 2019-10-25 杭州三丰装配式建筑科技有限公司 A kind of the cavity node structure and construction method of assembled wall and building frame
CN110374234B (en) * 2019-07-19 2024-04-09 杭州三丰装配式建筑科技有限公司 Cavity node structure of assembled wall body and building frame and construction method

Similar Documents

Publication Publication Date Title
CN100543235C (en) The method and system of erecting steel trusses by stay cable auxiliary complete cantilever
CN101886468B (en) Construction method of suspension type template support in high-position conjoined structure
CN101649604B (en) Construction bracket of 1# block of inclined pull bridge and constructing method thereof
CN107299643A (en) Steel lattice column combined type tower crane foundation structure in foundation pit and construction method
CN201106155Y (en) Inclined guy cable auxiliary full cantaliver crane trussed steel beam device
CN202787271U (en) Stacked inner supporting structure for foundation pit supporting
CN203080400U (en) Extra-large span suspension bridge with uniparted hyperboloid space cable net main cables
CN106639346A (en) Construction method for existing building downward storey-adding by using inclined strut underpinning structure
CN206581147U (en) The support system constructed for bridge long-cantilever capping beam
CN107524096A (en) A kind of continuous girders by suspension grouting 0# blocks cast-in-place support and erection method
CN206655486U (en) A kind of elongated steel column temporary fixing structure
CN205242238U (en) Be applied to self anchored suspension bridge's main girder structure
CN206503378U (en) Newly-increased outrigger constructing structure
CN206233656U (en) Steel frame mill building structure
CN112554043A (en) Transverse self-balancing antisymmetric cable-stayed bridge structure system
CN208201658U (en) A kind of steel trestle rapid construction device
CN106499211A (en) Newly-increased outrigger framework Baogang anchor traction therapy structure and technique
CN213978546U (en) Assembled bridge abutment structure and assembled bridge abutment using same
CN212533734U (en) Cable buckle integrated tower
CN102852150A (en) Superposed inner support structure for foundation pit support
CN210369025U (en) Floor-free tower crane foundation construction structure with steel structure
CN206873449U (en) Pile pulling device
CN202830935U (en) Leveling supporting structure of pit-in-pit inside deep foundation pit
CN107558607B (en) Tower crane system arranged on existing concrete structure and construction method thereof
CN206902719U (en) Preassembling support beam combines support system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171121

Termination date: 20180330

CF01 Termination of patent right due to non-payment of annual fee