CN206655468U - A kind of wall pre-embedded line box once mounting mould - Google Patents

A kind of wall pre-embedded line box once mounting mould Download PDF

Info

Publication number
CN206655468U
CN206655468U CN201720419757.3U CN201720419757U CN206655468U CN 206655468 U CN206655468 U CN 206655468U CN 201720419757 U CN201720419757 U CN 201720419757U CN 206655468 U CN206655468 U CN 206655468U
Authority
CN
China
Prior art keywords
line box
once mounting
box frame
box
frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720419757.3U
Other languages
Chinese (zh)
Inventor
雷俊清
毛家平
余卫
程成
雷奇灵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei Jingbiao Construction Engineering Co Ltd
Original Assignee
Hubei Jingbiao Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hubei Jingbiao Construction Engineering Co Ltd filed Critical Hubei Jingbiao Construction Engineering Co Ltd
Priority to CN201720419757.3U priority Critical patent/CN206655468U/en
Application granted granted Critical
Publication of CN206655468U publication Critical patent/CN206655468U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

A kind of wall pre-embedded line box once mounting mould, including mold box, module, the mold box include the framework of upper and lower opening, and framework is interior to be provided with line box frame by end face, and line box frame is adapted with pre-buried line box size;It is provided with perforation hole on line box frame, plug-in-sleeve in perforation hole, the module is coagulation block, coagulation block pouring molding in framework.A kind of wall pre-embedded line box once mounting mould provided by the utility model, by setting mold box, module, line box can be installed while during building a wall, improve the steadiness of pre-buried line box and the accuracy of position.

Description

A kind of wall pre-embedded line box once mounting mould
Technical field
Mould is the utility model is related to, especially a kind of wall pre-embedded line box once mounting mould.
Background technology
Traditional wall pre-embedded line box installation is mainly the installation that holes in the later stage, not only very big to wall injury, and the later stage Hole irregular, and it is regular and closely knit should to fill up mortar when installing by electrician, it is also necessary to line box absolute altitude is adjusted to design attitude, Take a lot of work material, and installation accuracy and line box steadiness cannot ensure.In addition, in masonry bottom and surrounding position be not beaten it is close Real, empty existence rate is higher, and line box bottom has part masonry disintegrating slag, has had a strong impact on steadiness and the position of the installation of wall line box The accuracy put.
The content of the invention
Technical problem to be solved in the utility model is to provide a kind of wall pre-embedded line box once mounting mould, can keep away Exempting from the later stage holes installation, ensures the steadiness of pre-buried line box and the accuracy of position.
In order to solve the above technical problems, technical scheme is used by the utility model:
A kind of wall pre-embedded line box once mounting mould, including mold box, module, the mold box include upper and lower opening Framework, framework is interior to be provided with line box frame by end face, and line box frame is adapted with pre-buried line box size;Perforation hole is provided with line box frame, is worn Plug-in-sleeve in pore, the module are coagulation block, coagulation block pouring molding in framework.
The wide * of the long * of mold box two kinds of specifications of a height of 390*190*190mm or 190*190*190mm, corresponding line box Frame is respectively double line box frame, single line box frame.
The Outside Dimensions of the line box frame are more major 5mm than corresponding line box base external diameter.
Described sleeve pipe is DN20PVC sleeve pipes, and sleeve pipe one end is provided with the direct joints of DN20 of port sealing, and the joint with Upper end flushes, and the sleeve pipe other end extend into line box inframe.
The mold box both ends are provided with handle.
A kind of wall pre-embedded line box once mounting mould of the utility model, by setting the framework with line box frame, common structure Into mold box, module can be molded using the mold box, so as to obtain with building block line box mounting seat of the same size, such phase can The line box mounting seat is built a wall together with other building blocks, does not influence metope building block entirety typesetting, and pre-buried line box can be carried out simultaneously Installation, holed without the later stage.Further, since the module is to mix concrete clout by the damaged small-sized masonry block in job site to pour Build and form, waste material can be made to obtain secondary use, it is cost-effective.It is convenient to position and beat because the apparatus structure is more upright in itself Slurry, be advantageous to keep steadiness and accuracy.
Brief description of the drawings
The utility model is described in further detail with reference to the accompanying drawings and examples:
Fig. 1 is the schematic diagram of mold box in the utility model(Plug-in-sleeve).
Fig. 2 is the schematic diagram of mold box in the utility model.
Fig. 3 is the schematic diagram of module in the utility model(It is single).
Fig. 4 is the schematic diagram of module in the utility model(It is double).
In figure:Mold box 1, module 2, framework 3, line box frame 4, perforation hole 5, sleeve pipe 6, handle 7.
Embodiment
As Figure 1-4, a kind of wall pre-embedded line box once mounting mould, including mold box 1, module 2.The mold box 1 is made from 3mm steel plates, and mold box 1 includes the framework 3 of upper and lower opening, and the internal diameter of framework 3 has two kinds of specifications, respectively with wall Light aggregate concrete hollow block is in the same size, specially 390*190*190mm and 190*190*190mm.End face is leaned in framework 3 Provided with line box frame 4, line box frame 4 has two kinds of double line box frame, single line box frame specifications.Line box frame 4 leans on end face one end open, remote End face one end is closed state.Line box frame 4 is adapted with pre-buried line box size, and Outside Dimensions are more each than corresponding line box base external diameter Big 5mm, line box installation and building wall are so may insure in finishing operations while is carried out.So, line box can letter Single firm installation, reduce secondary hole in similar traditional construction and this process and the infringement to wall material are installed, really Play and subtract this synergy.It is provided with perforation hole 5 on line box frame 4, plug-in-sleeve 6 in perforation hole 5, double line box inframe is 4, single Line box inframe is 2.Sleeve pipe 6 is DN20PVC sleeve pipes, and sleeve pipe one end is provided with the direct joints of DN20 of port sealing, and this connects Head flushes with upper end, and the sleeve pipe other end, which extend into line box frame 4 and stretches out the sole length of line box frame 4, reaches 10mm.By mould Box 1 is placed on bottom surface with the end face of the opening of line box frame 4 side, mixes concrete clout using the damaged small-sized masonry block in job site Mold box 1 is poured, is poured out before treating the final set of module 2, examination water is conserved formation model as Figure 2-3.Later stage can be by the module 2 Built a wall together with other building blocks, do not influence metope building block entirety typesetting, and the installation of pre-buried line box can be carried out simultaneously, without the later stage Hole.
Pre-buried line box installation process and principle:Bricklayer is built a wall together in masonry panel, by module 2 with other building blocks, electricity Work team's group is installed to wall surface line box base simultaneously, using the M10 masonry mortars pair of a grade higher than building wall during installation Line box base and its surrounding are beaten;Before installation, spool threading pad is removed, then back box is penetrated in prominent spool, according to There is gap mashing to surrounding and fill up closely knit in design drawings explanation adjustment back box position and perpendicularity, right to precise location Line box is consolidated and is accurately positioned to correspondence position;The pre-buried end of back box, will by drawing when entering line box installation procedure Installation line box is sought, and checks the steadiness of back box and line box installation.

Claims (5)

  1. A kind of 1. wall pre-embedded line box once mounting mould, it is characterised in that:Including mold box(1), module(2), the mould Box(1)Framework including upper and lower opening(3), framework(3)It is interior to be provided with line box frame by end face(4), line box frame(4)It is big with pre-buried line box It is small to be adapted;Line box frame(4)On be provided with perforation hole(5), perforation hole(5)Interior plug-in-sleeve(6), the module(2)For coagulation block, Coagulation block is in framework(3)Interior pouring molding.
  2. A kind of 2. wall pre-embedded line box once mounting mould according to claim 1, it is characterised in that:The mold box (1)The a height of 390*190*190mm of long wide * of * or two kinds of specifications of 190*190*190mm, corresponding line box frame(4)It is respectively double Line box frame, single line box frame.
  3. A kind of 3. wall pre-embedded line box once mounting mould according to claim 1, it is characterised in that:The line box frame (4)Outside Dimensions it is more major 5mm than corresponding line box base external diameter.
  4. A kind of 4. wall pre-embedded line box once mounting mould according to claim 1, it is characterised in that:Described sleeve pipe(6) For DN20PVC sleeve pipes, sleeve pipe one end is provided with the direct joints of DN20 of port sealing, and the joint flushes with upper end, and sleeve pipe is another One end extend into line box frame(4)It is interior.
  5. A kind of 5. wall pre-embedded line box once mounting mould according to claim 1, it is characterised in that:The mold box (1)Both ends are provided with handle(7).
CN201720419757.3U 2017-04-20 2017-04-20 A kind of wall pre-embedded line box once mounting mould Active CN206655468U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720419757.3U CN206655468U (en) 2017-04-20 2017-04-20 A kind of wall pre-embedded line box once mounting mould

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720419757.3U CN206655468U (en) 2017-04-20 2017-04-20 A kind of wall pre-embedded line box once mounting mould

Publications (1)

Publication Number Publication Date
CN206655468U true CN206655468U (en) 2017-11-21

Family

ID=60319126

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720419757.3U Active CN206655468U (en) 2017-04-20 2017-04-20 A kind of wall pre-embedded line box once mounting mould

Country Status (1)

Country Link
CN (1) CN206655468U (en)

Similar Documents

Publication Publication Date Title
CN101225909B (en) Locating preburied sleeve for electrical installation project
CN104264676A (en) Construction method of mass concrete of high-rise building foundations
CN206971732U (en) A kind of doubly-linked beam forms pouring structure
CN206408655U (en) The top plate sidewall structure of covered back-digging construction
CN206655468U (en) A kind of wall pre-embedded line box once mounting mould
CN206319620U (en) A kind of floor concrete casting controls scale
CN108729669A (en) A kind of wall pre-embedded wire box once mounting mold
CN206986727U (en) A kind of device to be vibrated for bridge skew web plate
CN207633342U (en) A kind of bridge pile foundation pile crown abolishes device
CN205577430U (en) Concrete placement structure is managed to big scale of construction composite steel concrete column body swift current ball formula pipe cluster in ground
CN107762135A (en) The construction method of skin scaffold wall connecting piece
CN201406834Y (en) Reserved opening die for top plate
CN205976503U (en) Vertical concrete structure's template lacing device
CN204551173U (en) Pull bar locating support
CN208267362U (en) A kind of constructing device of deformation joint concrete wall formwork
CN206942140U (en) A kind of shear wall formwork support meanss
CN206189449U (en) Soleplate with lead integrated plank sheathing system of wall
CN105952002B (en) A kind of terrace heavy steel plate pre-embedded device and construction method
CN114704293A (en) Tunnel secondary lining vault anti-run-out multi-angle slip casting device
CN205875714U (en) A consolidate fixture for retainer plate beam mold board
CN209538669U (en) A kind of architectural engineering seismic hardening plate
CN104912209B (en) Bars In Poured Concrete Slab reserved holes of pipes plugging device and processing and plugging construction method
CN108678377A (en) Constructional column concrete pouring construction method
CN105780815B (en) The constructing device and method of diaphragm wall leakproof
CN208329613U (en) Mouth structure is poured at the top of constructional column

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant