CN206654661U - A kind of device for adjusting bridge crane steel wire rope counter-jib - Google Patents
A kind of device for adjusting bridge crane steel wire rope counter-jib Download PDFInfo
- Publication number
- CN206654661U CN206654661U CN201720386758.2U CN201720386758U CN206654661U CN 206654661 U CN206654661 U CN 206654661U CN 201720386758 U CN201720386758 U CN 201720386758U CN 206654661 U CN206654661 U CN 206654661U
- Authority
- CN
- China
- Prior art keywords
- wire rope
- steel wire
- upper plate
- shaped frame
- jib
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 80
- 239000010959 steel Substances 0.000 title claims abstract description 80
- 238000003466 welding Methods 0.000 claims 2
- 210000003205 muscle Anatomy 0.000 claims 1
- 230000009286 beneficial effect Effects 0.000 abstract description 2
- 238000009434 installation Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 1
- 238000004021 metal welding Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
Landscapes
- Jib Cranes (AREA)
Abstract
A kind of device for adjusting bridge crane steel wire rope counter-jib is the utility model is related to, belongs to bridge crane auxiliary apparatus for repairing technical field.Technical scheme is:Include upper plate(1), riser(2), lower plate(3), brace(4), bolt hole and steel wire rope one(6), upper plate(1)And lower plate(3)Parallel arrangement, upper plate(1)And lower plate(3)Between pass through riser(2)It is fixedly connected, forms U-shaped frame, the upper plate of U-shaped frame(1)It is provided with bolt hole and wire rope hole, steel wire rope one(6)One end through wire rope hole and being fixed in U-shaped frame, the upper plate in U-shaped frame(1)And riser(2)Between be provided with brace(4).The beneficial effects of the utility model are:Bridge crane steel wire rope counter-jib can be quickly adjusted, improves operating efficiency, reduces the labor intensity of worker.
Description
Technical field
A kind of device for adjusting bridge crane steel wire rope counter-jib is the utility model is related to, especially large-tonnage bridge-type rises
Heavy-duty machine, belong to bridge crane auxiliary apparatus for repairing technical field.
Background technology
When changing bridge crane steel wire rope, especially large-tonnage bridge crane steel wire rope, master file steel wire rope are all
Acted on and formed simultaneously by four steel wire ropes.At present, well known steel rope replacing method is all to drive new steel wire rope with old steel wire rope,
Change when, the wire rope wedge form joint installed on old steel wire rope counter-jib is dismantled, by the steel wire rope head at wedge joint with
New steel wire rope connection, while the pressing plate of old steel wire rope other end is disassembled, the new steel wire rope into disk is placed on steel wire rope pallet,
Pallet can rotate, and the steel wire rope so newly changed is not in just the phenomenon tightened.Start master file motor, old steel wire rope is immediately
By on new rope belt to reel, after the completion of four steel wire ropes are all changed, then fixation and the steel wire rope wedge shape of pressing plate are carried out
The installment work of joint, after whole installations, it is necessary to be adjusted to steel wire rope counter-jib, ensure that four steel wire ropes are same
When uniform stressed.Found in real work, if steel wire rope counter-jib is uneven, plate hook is landed must again and be laid flat, will
After the bearing pin and steel cable clamp of wire rope wedge form joint are all removed, then readjust installation, so since, steel of adjustment
Cord counter-jib needs a hour at the soonest, wastes time and energy, and influences to produce.
Utility model content
The utility model purpose is to provide a kind of device for adjusting bridge crane steel wire rope counter-jib, can quickly adjust
Bridge crane steel wire rope counter-jib, operating efficiency is improved, solve problem present in background technology.
The technical solution of the utility model is:
A kind of device for adjusting bridge crane steel wire rope counter-jib, includes upper plate, riser, lower plate, brace, bolt hole
With steel wire rope one, upper plate and lower plate parallel arrangement, it is fixedly connected between upper plate and lower plate by riser, forms U-shaped frame, U-shaped frame
Interior upper plate is provided with bolt hole and wire rope hole, and one end of steel wire rope one through wire rope hole and is fixed in U-shaped frame, U-shaped
Brace is provided between upper plate and riser in frame.
The other end of the steel wire rope one is connected with one end of steel wire rope two, the other end and the overhead traveling crane main drum of steel wire rope two
Connection, that one end that steel wire rope two is connected with steel wire rope one are provided with wedge joint, and U-shaped frame is stuck in overhead traveling crane plate hook by fixing bolt
On crossbeam.
The lower plate upper surface is in broached-tooth design.
One end of the brace and upper plate weld, the other end and the riser of brace weld.
Using the utility model, in steel wire rope counter-jib pre-adjustment, one is accomplished fluently in wedge joint one end of steel wire rope two
After individual steel cable clamp, wedge joint one end of steel wire rope two is connected on steel wire rope one, at the same four U-shaped framves are symmetrical
Be stuck on overhead traveling crane plate hook crossbeam, start overhead traveling crane master file, progressively stretch the wedge joint of steel wire rope two tightly, stretch next, see steel wire
Rope two wedge joint relative to overhead traveling crane plate hook bottom distance, it is possible to measure the length of steel wire rope two, and then be adjusted.
The beneficial effects of the utility model are:Bridge crane steel wire rope counter-jib can be quickly adjusted, improves work
Efficiency, reduce the labor intensity of worker.
Brief description of the drawings
Fig. 1 is the utility model front view;
Fig. 2 is the utility model top view;
Fig. 3 is the utility model use state diagram;
In figure:Upper plate 1, riser 2, lower plate 3, brace 4, fixing bolt 5, steel wire rope 1, overhead traveling crane plate hook crossbeam 7.
Embodiment
Below in conjunction with accompanying drawing, by example, the utility model is described in further detail.
Referring to the drawings 1,2, a kind of device for adjusting bridge crane steel wire rope counter-jib, upper plate 1, riser 2, lower plate are included
3rd, brace 4, bolt hole and steel wire rope 1, upper plate 1 and lower plate 3 are arranged in parallel, solid by riser 2 between upper plate 1 and lower plate 3
Fixed connection, forms U-shaped frame, and the upper plate 1 in U-shaped frame is provided with bolt hole and wire rope hole, and one end of steel wire rope 1 passes through steel wire
Cord hole is simultaneously fixed in U-shaped frame, and brace 4 is provided between the upper plate 1 and riser 2 in U-shaped frame.
In the present embodiment, the length of steel wire rope 1 is one meter, a diameter of 15mm, and fixing bolt 5 is M24 high-strength bolts, on
Plate 1, riser 2 and lower plate 3 are 20mm steel plates, and upper plate 1, riser 2 and lower plate 3 are welded into U-shaped frame, and the upper surface of lower plate 3 is saw
Tooth-shape structure, to increase its end-face friction, one end of steel wire rope 1 is penetrated in U-shaped frame by wire rope hole, and make a call to one
Wire line hitch, then by one piece of sheet metal welding, prevent steel wire rope from coming off.
In steel wire rope counter-jib pre-adjustment, beaten in wedge joint one end of steel wire rope two what a steel cable clamp it
Afterwards, wedge joint one end of steel wire rope two is connected on steel wire rope 1, while four U-shaped framves is symmetrically stuck in a day sweep
On hook crossbeam 7, start overhead traveling crane master file, progressively stretch the wedge joint of steel wire rope two tightly, stretch next, see that the wedge shape of steel wire rope two connects
Head need not adjust counter-jib relative to the distance of overhead traveling crane plate hook bottom if being of the required size.If size difference is super
Bid alignment request, it is possible to according to corresponding size, readjust the steel cable clamp position of fastening steel wire rope two.Adjustment is completed
Afterwards, the steel cable clamp of steel wire rope two is stuck on steel wire rope 1.
Claims (4)
1. a kind of device for adjusting bridge crane steel wire rope counter-jib, it is characterised in that include upper plate(1), riser(2), lower plate
(3), brace(4), bolt hole and steel wire rope one(6), upper plate(1)And lower plate(3)Parallel arrangement, upper plate(1)And lower plate(3)It
Between pass through riser(2)It is fixedly connected, forms U-shaped frame, the upper plate in U-shaped frame(1)It is provided with bolt hole and wire rope hole, steel wire rope
One(6)One end through wire rope hole and being fixed in U-shaped frame, the upper plate in U-shaped frame(1)And riser(2)Between be provided with oblique pull
Muscle(4).
2. a kind of device for adjusting bridge crane steel wire rope counter-jib according to claim 1, it is characterised in that described
Steel wire rope one(6)The other end be connected with one end of steel wire rope two, the other end of steel wire rope two is connected with overhead traveling crane main drum, steel wire
Rope two and steel wire rope one(6)That one end of connection is provided with wedge joint, and U-shaped frame passes through fixing bolt(5)It is stuck in overhead traveling crane plate hook horizontal stroke
Beam(7)On.
3. a kind of device for adjusting bridge crane steel wire rope counter-jib according to claim 1, it is characterised in that described
Lower plate(3)Upper surface is in broached-tooth design.
4. a kind of device for adjusting bridge crane steel wire rope counter-jib according to claim 1, it is characterised in that described
Brace(4)One end and upper plate(1)Welding, brace(4)The other end and riser(2)Welding.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720386758.2U CN206654661U (en) | 2017-04-13 | 2017-04-13 | A kind of device for adjusting bridge crane steel wire rope counter-jib |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720386758.2U CN206654661U (en) | 2017-04-13 | 2017-04-13 | A kind of device for adjusting bridge crane steel wire rope counter-jib |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206654661U true CN206654661U (en) | 2017-11-21 |
Family
ID=60317523
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720386758.2U Expired - Fee Related CN206654661U (en) | 2017-04-13 | 2017-04-13 | A kind of device for adjusting bridge crane steel wire rope counter-jib |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206654661U (en) |
-
2017
- 2017-04-13 CN CN201720386758.2U patent/CN206654661U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203209852U (en) | Stirring friction welding tool for longitudinal joint of cylinder section | |
CN104060607B (en) | Prestress steel pipe pile and production method of prestress steel pipe pile | |
CN106758882A (en) | For the hood type automatic leveling anchor and its method for suspender replacement of CFST Arch Bridge suspender replacement | |
CN206591449U (en) | Hood type automatic leveling anchor for CFST Arch Bridge suspender replacement | |
CN105173379B (en) | The band special Auxiliary support bar assembly of door opening prefabricated panel | |
CN206654661U (en) | A kind of device for adjusting bridge crane steel wire rope counter-jib | |
CN208613612U (en) | A kind of device for straightening pile crown reinforcing bar | |
CN102182150A (en) | Installation method of externally hung steel template for anti-collision guardrail construction outside viaduct | |
CN102267046B (en) | Device for separated assembling of dry-quenching hoister frame | |
CN102275829B (en) | Frame high-altitude piece mounting method of dry quenching lifter device | |
CN106012834B (en) | A kind of spatial warping curve abnormal shape antisymmetry steel king-tower inner support and tensioning system | |
CN208516837U (en) | One kind is for borehole filling pile cage of reinforcement overlapped hanging apparatus | |
CN206172803U (en) | Clamp type ear plate | |
CN203821865U (en) | Adjusting device for installing gap of H-shaped steel beam | |
CN108943379A (en) | Long-line pedestal compressor wire and steel strand wires exchange integral tension and put a device | |
CN104495644B (en) | A kind of crane and crane gooseneck boom thereof | |
CN103835516A (en) | H-type steel beam installation gap adjusting device and use method thereof | |
CN201155150Y (en) | Steel cable connection device for construction steel structure | |
CN104310241A (en) | Standard knot of tower crane | |
CN108222503A (en) | A kind of combined large pier stud steel form | |
CN209721363U (en) | A kind of lifting pipeline auxiliary device | |
CN209686924U (en) | A kind of large volume arc concrete steel lattice supporting framework | |
CN201405004Y (en) | Tension station for steel wire rope conveyer belt production line | |
CN202271145U (en) | Wheel fixing device for installing frame of coke dry quenching hoister in fragmentation mode | |
CN205772901U (en) | A kind of conduction rack |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171121 |
|
CF01 | Termination of patent right due to non-payment of annual fee |