The forming panel of dry concrete wall Download PDF

Info

Publication number
CN206646806U
CN206646806U CN201720369869.2U CN201720369869U CN206646806U CN 206646806 U CN206646806 U CN 206646806U CN 201720369869 U CN201720369869 U CN 201720369869U CN 206646806 U CN206646806 U CN 206646806U
Authority
CN
China
Prior art keywords
plank sheathing
plates
acrylic board
plank
concrete wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720369869.2U
Other languages
Chinese (zh)
Inventor
肖煌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201720369869.2U priority Critical patent/CN206646806U/en
Application granted granted Critical
Publication of CN206646806U publication Critical patent/CN206646806U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses a kind of forming panel of dry concrete wall, including multiple first plank sheathings and multiple second plank sheathings, concreting cavity is formed between the first plank sheathing and the second plank sheathing, bar frame is provided with concreting cavity;UV plates/acrylic board is bonded with the first plank sheathing in concreting cavity, UV plates/acrylic board shifts to install with the first plank sheathing;More screw rods are provided between first plank sheathing and the second plank sheathing, screw thread is provided with nut on the screw rod on the outside of the first plank sheathing and the second plank sheathing.The slickness of dry concrete wall and planarization are improved by UV plates/high surface of acrylic board smoothness;And adjacent two UV plates/acrylic board docking conformability is good, thickness of thin, reduces the gap between adjacent two UV plates/acrylic board, simultaneously, it is aided with the mode of arranged in dislocation, efficiently solves the problem of spillage, and then has been favorably improved the slickness and planarization of dry concrete wall.

Description

The forming panel of dry concrete wall
Technical field
It the utility model is related to technical field of buildings, more particularly to a kind of forming panel of dry concrete wall.
Background technology
At this stage, the conventional template for being used to being molded dry concrete wall has two kinds, specific as follows:
1st, steel template:It is expensive, and can not reuse, cause cost height;Meanwhile adjacent two steels template is taken Connect easy spillage when being in casting concrete, and template is thicker, so it is concrete curing after can influence the smooth of dry concrete wall Property and planarization, especially to polymorphic structure (such as:Curved surface, multi-region face) dry concrete wall it is particularly evident;
2nd, the wooden template commonly used in construction, relative low price, still, the lap-joint of adjacent two template still deposits The spillage the problem of, the molding effect (slickness and planarization) of dry concrete wall can be equally influenceed.
Utility model content
For in the prior art the defects of, the utility model provides a kind of forming panel of dry concrete wall, with up to To the purpose for reducing cost, the slickness of raising dry concrete wall and planarization.
Technical scheme provided by the utility model is:The forming panel of dry concrete wall, multiple first plank sheathings and Multiple second plank sheathings, concreting cavity is formed between first plank sheathing and second plank sheathing, positioned at described Bar frame is provided with concreting cavity;
UV plates/acrylic board, the UV are bonded with first plank sheathing in the concreting cavity Plate/acrylic board shifts to install with first plank sheathing;It is provided between first plank sheathing and second plank sheathing more Root screw rod, screw thread is provided with nut on the screw rod on the outside of first plank sheathing and second plank sheathing.
As an improvement it is provided with nailing between the UV plates/acrylic board and first plank sheathing.
As a further improvement, the UV plates/acrylic board and first plank sheathing are consistent rectangular of size It is logical to be equipped with that 8 confession screw rods pass through for shape structure, every UV plates/acrylic board and every first plank sheathing Hole;
Corresponding four first plank sheathings of every UV plate/acrylic board, and the institute on UV plates/acrylic board Through hole is stated to be correspondingly arranged with the through hole on first plank sheathing.
By adopting the above-described technical solution, the forming panel of dry concrete wall provided by the utility model is beneficial Effect is as follows:
Because arranged in dislocation has UV plates/acrylic board on the first plank sheathing, so as to high by UV plates/acrylic board smoothness Surface improve the slickness of dry concrete wall and planarization;Moreover, adjacent two UV plates/acrylic board docking conformability Good, thickness of thin substantially reduces the gap between adjacent two UV plates/acrylic board, meanwhile, it is aided with the mode of arranged in dislocation, has Effect solves the problem of spillage, and then has been favorably improved the slickness and planarization of dry concrete wall;In addition, forming panel Convenient material drawing, shaping is simple, cost is cheap, use reliability is high, and the dry concrete wall of also plastic polymorphic structure is (such as:It is bent Face, the dry concrete wall of multi-face structure);Meanwhile as needed, the type of UV/ acrylic boards is changed, can be molded a variety of The effect of dry concrete wall is (such as:Mirror-surfaced as-cast concrete, dumb light clear-water concrete etc.).
Due to UV plates/nailing is provided between acrylic board and the first plank sheathing, so as to by nailing substantially increase UV plates/ Fixed effect of the acrylic board on the first plank sheathing.
Due to UV plates/acrylic board and the first plank sheathing rectangle structure that to be size consistent, and every UV plates/Ya Ke Corresponding four the first plank sheathings of power plate, so that by the structure, the standardization processing and manufacturing of two kinds of sheet material is realized, moreover, being Linking good between the forming panel and adjacent two sheet material of guarantee is quickly assembled to lay a good foundation.
Brief description of the drawings
, below will be right in order to illustrate more clearly of the utility model embodiment or technical scheme of the prior art The required accompanying drawing used is briefly described in embodiment or description of the prior art.In all of the figs, it is similar Element or part are typically identified by similar reference.In accompanying drawing, each element or part might not be according to the ratios of reality Draw.
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the structural representation that the first plank sheathing coordinates with UV plates/acrylic board in Fig. 1;
In accompanying drawing, the plank sheathings of 1- first;The plank sheathings of 2- second;3-UV plates/acrylic board;4- through holes;5- nailings;6- reinforcing bars Rack;7- screw rods;8- concrete;9- concreting cavitys.
Embodiment
The embodiment of technical solutions of the utility model is described in detail below in conjunction with accompanying drawing.Following examples are only For clearly illustrating the technical solution of the utility model, therefore example is only used as, and this practicality can not be limited with this New protection domain.
As Fig. 1 and Fig. 2 are jointly shown, the forming panel of dry concrete wall, including multiple first plank sheathings 1 and multiple the Two plank sheathings 2, the concreting cavity 9 for casting concrete 8 is formed between the plank sheathing 2 of the first plank sheathing 1 and second, Bar frame 6 is provided with concreting cavity 9;It is bonded with the first plank sheathing 1 in concreting cavity 9 UV plates/acrylic board 3, the UV plates/acrylic board 3 shift to install with the first plank sheathing 1;The wooden model of first plank sheathing 1 and second More screw rods 7 are provided between plate 2, screw thread is provided with nut on the screw rod 7 in the first plank sheathing 1 and the outside of the second plank sheathing 2.
In order to ensure the reliability connected between the plank sheathing 1 of UV plates/acrylic board 3 and first, the UV plates/acrylic board 3 Nailing 5 is provided between the first plank sheathing 1.
Preferably, the UV plates/acrylic board 3 and the first plank sheathing 1 rectangle structure that to be size consistent, every UV Plate/acrylic board 3 and every first plank sheathing 1 are equipped with 8 through holes 4 passed through for screw rod 7;Every UV plates/acrylic board 3 is right Four the first plank sheathings 1 are answered, and the through hole 4 on UV plates/acrylic board 3 is correspondingly arranged with the through hole 4 on the first plank sheathing 1.
In order to make it easy to understand, the manufacture craft of following forming panels for giving the dry concrete wall, including following step Suddenly;
(1) stock up:Multiple first plank sheathings 1, multiple second plank sheathings 2 and multiple UV plates/acrylic boards 3 are got out, together When, as needed, a few the first plank sheathings 1 are subjected to sawing, certainly, as needed, also can be by UV plates/He of acrylic board 3 Second plank sheathing 2 carries out sawing (region of the sawing part not covered with UV plates/acrylic board 3 as shown in Figure 2);
(2) drill:The equal multiple through holes 4 of drilling on the first plank sheathing 1, the second plank sheathing 2 and UV plates/acrylic board 3;
(3) the first plank sheathing 1 is installed, upper support column (not shown) is leaned in the side of the first plank sheathing 1, to ensure The stationarity of first plank sheathing 1, the use of the support column are not added herein by commonly using in existing concrete construction Repeat;
(4) gluing:All-purpose adhesive is smeared in side of first plank sheathing 1 away from support column;
(5) arranged in dislocation:Scribble side arranged in dislocation UV plates/acrylic board 3 of all-purpose adhesive on the first plank sheathing 1, one Corresponding four the first plank sheathings 1 of UV plates/acrylic board 3 (and then realize the seam formed between adjacent two UV plates/acrylic board 3 The gap stagger setting formed between gap and adjacent two first plank sheathing 1), and the through hole 4 and first on UV plates/acrylic board 3 Through hole 4 on plank sheathing 1 is correspondingly arranged;The first plank sheathing 1 after sawing is distributed in the surrounding after arranged in dislocation;
If from UV plates, the step of removing UV plate upper protective films is provided with after above-mentioned arranged in dislocation;
In order to ensure the reliability connected between the plank sheathing 1 of UV plates/acrylic board 3 and first, in UV plates/acrylic board 3 And first carry out nailing 5 between plank sheathing 1;
(6) assembling reinforcement:Assembling reinforcement is carried out in the side of UV plates/acrylic board 3 and forms bar frame 6;
(7) the second plank sheathing 2 is installed:Second plank sheathing is installed in side of the bar frame 6 away from UV plates/acrylic board 3 2, the through hole 4 on second plank sheathing 2 is correspondingly arranged with the through hole 4 on the first plank sheathing 1;
(8) screw rod 7 is installed:Through hole 4 on the second plank sheathing 2, the through hole 4 on the first plank sheathing 1 and UV plates/acrylic Upper screw rod 7 is inserted on through hole 4 on plate 3, positioned at the first plank sheathing 1 and the outside of the second plank sheathing 2 (the first plank sheathing 1 and second The side that plank sheathing 2 is located remotely from each other) screw rod 1 on screw thread installation top nut (not shown).
After the completion of above-mentioned technique, the casting concrete 8 between the second plank sheathing 2 and UV plates/acrylic board 3 is to be poured After concrete curing, screw rod 7, the first plank sheathing 1, the second plank sheathing 2 and UV plates/acrylic board 3 are removed, and then just formd Dry concrete wall with the whole property of bloom slip peace.
Various embodiments above is only to illustrate the technical solution of the utility model, rather than its limitations;Although with reference to foregoing The utility model is described in detail each embodiment, it will be understood by those within the art that:It still can be with Technical scheme described in foregoing embodiments is modified, either which part or all technical characteristic are equal Replace;And these modifications or replacement, the essence of appropriate technical solution is departed from various embodiments of the utility model technical side The scope of case, it all should cover among claim of the present utility model and the scope of specification.

Claims (3)

1. a kind of forming panel of dry concrete wall, it is characterised in that including multiple first plank sheathings and multiple second wooden models Plate, concreting cavity is formed between first plank sheathing and second plank sheathing, it is empty positioned at the concreting Intracavitary is provided with bar frame;
UV plates/acrylic board, the UV plates/Asia are bonded with first plank sheathing in the concreting cavity Gram force plate shifts to install with first plank sheathing;More spiral shells are provided between first plank sheathing and second plank sheathing Bar, screw thread is provided with nut on the screw rod on the outside of first plank sheathing and second plank sheathing.
2. the forming panel of dry concrete wall according to claim 1, it is characterised in that the UV plates/acrylic board Nailing is provided between first plank sheathing.
3. the forming panel of dry concrete wall according to claim 2, it is characterised in that the UV plates/acrylic board With first plank sheathing rectangle structure that to be size consistent, every UV plates/acrylic board and every described first Plank sheathing is equipped with the through hole that 8 confession screw rods pass through;
Corresponding four first plank sheathings of every UV plate/acrylic board, and it is described logical on UV plates/acrylic board Hole is correspondingly arranged with the through hole on first plank sheathing.
CN201720369869.2U 2017-04-10 2017-04-10 The forming panel of dry concrete wall Expired - Fee Related CN206646806U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720369869.2U CN206646806U (en) 2017-04-10 2017-04-10 The forming panel of dry concrete wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720369869.2U CN206646806U (en) 2017-04-10 2017-04-10 The forming panel of dry concrete wall

Publications (1)

Publication Number Publication Date
CN206646806U true CN206646806U (en) 2017-11-17

Family

ID=60274982

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720369869.2U Expired - Fee Related CN206646806U (en) 2017-04-10 2017-04-10 The forming panel of dry concrete wall

Country Status (1)

Country Link
CN (1) CN206646806U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108972847A (en) * 2018-09-14 2018-12-11 江苏汤臣新材料科技有限公司 Movable acrylic stairway die

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108972847A (en) * 2018-09-14 2018-12-11 江苏汤臣新材料科技有限公司 Movable acrylic stairway die

Similar Documents

Publication Publication Date Title
CN205875734U (en) Concrete placement splices template
CN106436998A (en) Crush-resisting anti-floating combined mandrel for hollow floor and construction method of crush-resisting anti-floating combined mandrel
CN106869501A (en) The construction technology of dry concrete wall and realize the forming panel of the construction technology
CN206646806U (en) The forming panel of dry concrete wall
CN206053299U (en) A kind of easy-to-mount concrete-pouring template
CN108331339A (en) Curved corner building system
CN210713788U (en) Template for building construction
CN203347220U (en) Double-screw aluminum alloy formwork
CN203716484U (en) Plastic-steel composite building engineering template
KR20130106061A (en) A form for slab and construction method using the same
CN104912327A (en) Internal corner formwork
CN204326519U (en) Mark time tooth raft formula from fissure of displacement flat formwork
ITMO20080305A1 (en) BUILDING STRUCTURE PROVIDED WITH VERTICAL WALLS INCLUDING A THERMOPLASTIC POLYMER.
KR200442878Y1 (en) Recyclable Formwork
CN204715756U (en) Inner corner trim angle mould
CN210850729U (en) One-way superimposed sheet bending resistance mould and side forms thereof
CN208733861U (en) Assembling-type precast wooden frame wall, assembling-type precast wood wall and log cabin structure
CN105971269A (en) Wallboard structure with template screw hole positions standardized
CN203669175U (en) Reinforced concrete hollow floorslab
CN204418964U (en) Ventilation installation and there is its special equipment
CN102409846B (en) Hollow floor slab template for building and assembling method thereof
KR100782537B1 (en) Pannel unit of concrete structure's mold
CN206071037U (en) A kind of floor template for building
CN205894678U (en) Steel wood convolution stair reinforcement template of marking time
CN206299119U (en) B types section bar and building girder construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee