CN206646415U - A kind of supporting bracket of bridge construction - Google Patents

A kind of supporting bracket of bridge construction Download PDF

Info

Publication number
CN206646415U
CN206646415U CN201720362269.3U CN201720362269U CN206646415U CN 206646415 U CN206646415 U CN 206646415U CN 201720362269 U CN201720362269 U CN 201720362269U CN 206646415 U CN206646415 U CN 206646415U
Authority
CN
China
Prior art keywords
support column
fixed seat
fixedly installed
bridge construction
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720362269.3U
Other languages
Chinese (zh)
Inventor
边文同
马义兴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201720362269.3U priority Critical patent/CN206646415U/en
Application granted granted Critical
Publication of CN206646415U publication Critical patent/CN206646415U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a kind of supporting bracket of bridge construction, including base, fixed seat is fixedly installed at the top of the base, the inside of fixed seat is fixedly installed hydraulically extensible bar, the internal activity of the fixed seat is provided with the first support column, the inside of the fixed seat is socketed with the second support column, and the inside of the second support column is socketed with the 3rd support column, and the inside of the 3rd support column is socketed with the 4th support column.The utility model is by setting the first support column to be located at the inside of fixed seat, second support column, the 3rd support column and the 4th support column, reach and facilitated the second support column, the 3rd support column and the 4th support column to be risen, and then the bridge that can adapt to different height is supported, and supporting bracket of bridge construction be adjusted it is easy to operate, simultaneously, improve stability of strutting system, avoid combined type installation and between fixed aspect it is cumbersome and the amount of labour is big, and then the advantages of add staff's operating efficiency and reduce the engineering time.

Description

A kind of supporting bracket of bridge construction
Technical field
Bridge construction appliance technology is the utility model is related to, specially a kind of supporting bracket of bridge construction.
Background technology
The support column of supporting bracket of bridge construction at this stage is combined type or integral type, and knockdown bridge construction supports Post very cumbersome and amount of labour in terms of being installed and being fixed is big, so as to reduce the operating efficiency of staff and increase Engineering time, and stability of strutting system deficiency, the bridge construction support column of integral type can not tackle the bridge of different height, and then Reduce the adaptability of supporting bracket of bridge construction.
Utility model content
The purpose of this utility model is to provide a kind of supporting bracket of bridge construction possess and conveniently bridge construction is propped up Support, and facilitates supporting bracket of bridge construction to be adjusted, and improves stability of strutting system, avoid combined type installation and between it is fixed Aspect is cumbersome and the amount of labour is big, so as to add staff's operating efficiency and reduce the engineering time, meanwhile, it is capable to tackle not Level bridge, the advantages of improving supporting bracket of bridge construction adaptability, solves bridge construction supporting bracket at this stage The support column of frame is combined type or integral type, and knockdown bridge construction support column is very numerous in terms of being installed and being fixed The trivial and amount of labour is big, so as to reduce the operating efficiency of staff and add the engineering time, and stability of strutting system deficiency, one The bridge construction support column of body formula can not tackle the bridge of different height, and then reduce supporting bracket of bridge construction adaptability Problem.
To achieve the above object, the utility model provides following technical scheme:A kind of supporting bracket of bridge construction, including bottom , fixed seat is fixedly installed at the top of the base, the inside of fixed seat is fixedly installed hydraulically extensible bar, the fixed seat Internal activity is provided with the first support column, and the inside of the fixed seat is socketed with the second support column, and the inside of the second support column The 3rd support column is socketed with, the inside of the 3rd support column is socketed with the 4th support column, the first support column, the second support column and the 3rd The inner surface of support column offers internal thread, and the top of the 4th support column is fixedly connected by connecting seat with supporting plate, described Fixed projection is fixedly installed in the middle part of first support column, is fixedly installed column at the top of the fixation projection, described second The surface of dagger, the 3rd support column and the 4th support column bottom is fixedly installed rotation tabs, the rotation tabs and first Dagger, the second support column and the 3rd support column inner surface are engaged by screw thread and connected.
Preferably, cavity, and the first support are left between the bottom of first support column and the bottom of fixed seat inner chamber The both ends of column bottom are fixedly installed pulley, and the bottom of the fixed seat inner chamber is inlaid with the first ball, and the first ball is positioned at cunning The side of wheel.
Preferably, the side wall of the fixed seat offers mounting groove, and the inside of the mounting groove is inlaid with the second ball, and second The top of ball is connected with the surface of the first support column.
Preferably, the surface of first support column and the second support top end is fixedly installed fixed block, and this is fixed The inside of block offers clamping chamber, and the side of fixed block is fixedly installed fixed transverse tube, and the top of fixed block is fixedly installed Fixed riser.
Preferably, the top of the hydraulically extensible bar is through the first support column, the second support column, the 3rd support column and the 4th Support column, and extend and be connected with the top of the 4th support column inner chamber, the side of the hydraulically extensible bar bottom is provided with connecting line, even The bottom of fixed seat side is run through in one end of wiring, and extends to the outside of fixed seat, the junction of the fixed seat and connecting line Offer the through hole being adapted.
Compared with prior art, the beneficial effects of the utility model are as follows:
The utility model is by setting the first support column to be located at the inside of fixed seat, and the second support column is positioned at the first support The inside of post, the 3rd support column are located at the inside of the second support column, and the 4th support column is located at the inside of the 3rd support column, and second Rotation tabs, rotation tabs and the first support column, is fixedly installed in the bottom of support column, the 3rd support column and the 4th support column Two support columns and the 3rd support column inner surface are engaged by screw thread to be connected, and there is fixed projection on the second support column surface, fixed convex The top of block sets column, is used in conjunction with each other, and has reached and has facilitated the second support column, the 3rd support column and the 4th support column to carry out Rise, and then the bridge that can adapt to different height is supported, and supporting bracket of bridge construction be adjusted it is easy to operate, together When, improve stability of strutting system, avoid combined type installation and between fixed aspect it is cumbersome and the amount of labour is big, and then add work The advantages of making person works' efficiency and reducing the engineering time, by setting the first support column, the second support column, the 3rd support column With the hydraulically extensible bar inside the 4th support column, the excellent of further raising supporting bracket of bridge construction stability of strutting system is reached Point.
Brief description of the drawings
Fig. 1 is the utility model structure diagram.
In figure:1 base, 2 fixed seats, 3 first support columns, 4 pulleys, 5 first balls, 6 mounting grooves, 7 second balls, 8 liquid Press expansion link, 9 connecting lines, 10 through holes, 11 fix projections, 12 columns, 13 second support columns, 14 the 3rd support columns, 15 the 4th Dagger, 16 connecting seats, 17 supporting plates, 18 rotation tabs, 19 cavitys, 20 fixed blocks, 21 clamping chambers, 22 fixation transverse tubes, 23, which are fixed, stands Pipe.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment obtained, belong to the scope of the utility model protection.
Referring to Fig. 1, a kind of supporting bracket of bridge construction, including base 1, the top of base 1 are fixedly installed fixed seat 2, the inside of fixed seat 2 is fixedly installed hydraulically extensible bar 8, and the internal activity of the fixed seat 2 is provided with the first support column 3, the Cavity 19 is left between the bottom of one support column 3 and the bottom of the inner chamber of fixed seat 2, and the both ends of the bottom of the first support column 3 are solid Surely pulley 4 is provided with, the bottom of the inner chamber of fixed seat 2 is inlaid with the first ball 5, and the first ball 5 is located at the side of pulley 4, Gu The side wall of reservation 2 offers mounting groove 6, and the inside of the mounting groove 6 is inlaid with the second ball 7, pulley 4, the first ball 5 and second Ball 7, it is used in conjunction with each other, has reached and facilitated the first support column 3 to be rotated, meanwhile, the advantages of improving smoothness, The top of two balls 7 is connected with the surface of the first support column 3, and the inside of fixed seat 2 is socketed with the second support column 13, and second The inside of dagger 13 is socketed with the 3rd support column 14, and the inside of the 3rd support column 14 is socketed with the 4th support column 15, the first support The inner surface of post 3, the second support column 13 and the 3rd support column 14 offers internal thread, and the top of the 4th support column 15 passes through Connecting seat 16 is fixedly connected with supporting plate 17, and the middle part of the first support column 3 is fixedly installed fixed projection 11, the fixation projection 11 Top is fixedly installed column 12, and the second support column 13, the 3rd support column 14 and the surface of the bottom of the 4th support column 15 are fixed Rotation tabs 18 are provided with, the rotation tabs 18 lead to the first support column 3, the second support column 13 and the inner surface of the 3rd support column 14 Cross screw thread engagement to connect, the surface on the first support column 3 and the top of the second support column 13 is fixedly installed fixed block 20, and this is fixed The inside of block 20 offers clamping chamber 21, and the side of fixed block 20 is fixedly installed fixed transverse tube 22, the top of fixed block 20 Fixed riser 23 is fixedly installed, facilitates the installation that bar is attached between supporting bracket of bridge construction, the top of hydraulically extensible bar 8 The first support column 3, the second support column 13, the 3rd support column 14 and the 4th support column 15 are run through in end, and extend and the 4th support column The top connection of 15 inner chambers, the side of the bottom of hydraulically extensible bar 8 are provided with connecting line 9, and fixed seat is run through in one end of connecting line 9 The bottom of 2 sides, and extend to the outside of fixed seat 2, the fixed seat 2 offered with the junction of connecting line 9 be adapted it is logical Hole 10, by setting the first support column 3 to be located at the inside of fixed seat 2, and the second support column 13 is located at the interior of the first support column 3 Portion, the 3rd support column 14 are located at the inside of the second support column 13, and the 4th support column 15 is located at the inside of the 3rd support column 14, and The bottom of two support columns 13, the 3rd support column 14 and the 4th support column 15 is fixedly installed rotation tabs 18, rotation tabs 18 with First support column 3, the second support column 13 and the inner surface of the 3rd support column 14 are engaged by screw thread and connected, and the table of the second support column 13 There is fixed projection 11 in face, and the top of fixed projection 11 sets column 12, is used in conjunction with each other, reached and facilitated the second support column 13rd, the 3rd support column 14 and the 4th support column 15 are risen, and then the bridge that can adapt to different height is supported, and bridge Beam Construction Support bracket be adjusted it is easy to operate, meanwhile, improve stability of strutting system, avoid combined type installation and between it is solid The advantages of it is cumbersome big with the amount of labour to determine aspect, and then adds staff's operating efficiency and reduces the engineering time, by setting The hydraulically extensible bar 8 inside the first support column 3, the second support column 13, the 3rd support column 14 and the 4th support column 15 is put, is reached The advantages of further improving supporting bracket of bridge construction stability of strutting system.
In use, connecting line 9 is attached with hydraulic fluid tank, holds column 12 and firmly drive fixed projection 11 and first to support Post 3 is rotated, and so as to which the first support column 3 is rotated in fixed seat 2, rotation tabs 18 pass through the support of screw thread difference first Moved in post 3, the second support column 13 and the 3rd support column 14, and then drive the second support column 13, the 3rd support column 14 and the 4th Support column 15 is risen, and supporting plate 17, which reaches construction surface, to be stopped, and operation hydraulic fluid tank drives hydraulically extensible bar 8 to be risen, with the The inner chamber of four support column 15 top connection, when need carry out supporting bracket of bridge construction lateral connection when, by connecting tube grafting with The inside of fixed transverse tube 22.
While there has been shown and described that embodiment of the present utility model, for the ordinary skill in the art, It is appreciated that these embodiments can be carried out with a variety of changes in the case where not departing from principle of the present utility model and spirit, repaiied Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.

Claims (5)

1. a kind of supporting bracket of bridge construction, including base (1), it is characterised in that:It is fixedly installed at the top of the base (1) Fixed seat (2), the inside of fixed seat (2) are fixedly installed hydraulically extensible bar (8), and the internal activity of the fixed seat (2) is provided with First support column (3), the inside of the fixed seat (2) are socketed with the second support column (13), and the inside of the second support column (13) It is socketed with the 3rd support column (14), the inside of the 3rd support column (14) is socketed with the 4th support column (15), the first support column (3), The inner surface of second support column (13) and the 3rd support column (14) offers internal thread, and the top of the 4th support column (15) leads to Cross connecting seat (16) to be fixedly connected with supporting plate (17), fixed projection (11) be fixedly installed in the middle part of first support column (3), Column (12), second support column (13), the 3rd support column (14) and are fixedly installed at the top of the fixation projection (11) The surface of four support columns (15) bottom is fixedly installed rotation tabs (18), the rotation tabs (18) and the first support column (3), Second support column (13) and the 3rd support column (14) inner surface are engaged by screw thread to be connected.
A kind of 2. supporting bracket of bridge construction according to claim 1, it is characterised in that:First support column (3) Cavity (19) is left between the bottom of bottom and fixed seat (2) inner chamber, and the both ends of the first support column (3) bottom are fixedly installed There is pulley (4), the bottom of fixed seat (2) inner chamber is inlaid with the first ball (5), and the first ball (5) is located at the one of pulley (4) Side.
A kind of 3. supporting bracket of bridge construction according to claim 1, it is characterised in that:The side wall of the fixed seat (2) Offer mounting groove (6), the inside of the mounting groove (6) is inlaid with the second ball (7), the top of the second ball (7) with first The surface connection of dagger (3).
A kind of 4. supporting bracket of bridge construction according to claim 1, it is characterised in that:First support column (3) and The surface on the second support column (13) top is fixedly installed fixed block (20), and the inside of the fixed block (20) offers clamping chamber (21), and the side of fixed block (20) is fixedly installed fixed transverse tube (22), and the top of fixed block (20) is fixedly installed fixation Standpipe (23).
A kind of 5. supporting bracket of bridge construction according to claim 1, it is characterised in that:The hydraulically extensible bar (8) The first support column (3), the second support column (13), the 3rd support column (14) and the 4th support column (15) are run through in top, and extend with The top connection of the 4th support column (15) inner chamber, the side of hydraulically extensible bar (8) bottom is provided with connecting line (9), connecting line (9) bottom of fixed seat (2) side is run through in one end, and extends to the outside of fixed seat (2), the fixed seat (2) and connecting line (9) junction offers the through hole (10) being adapted.
CN201720362269.3U 2017-04-09 2017-04-09 A kind of supporting bracket of bridge construction Expired - Fee Related CN206646415U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720362269.3U CN206646415U (en) 2017-04-09 2017-04-09 A kind of supporting bracket of bridge construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720362269.3U CN206646415U (en) 2017-04-09 2017-04-09 A kind of supporting bracket of bridge construction

Publications (1)

Publication Number Publication Date
CN206646415U true CN206646415U (en) 2017-11-17

Family

ID=60274337

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720362269.3U Expired - Fee Related CN206646415U (en) 2017-04-09 2017-04-09 A kind of supporting bracket of bridge construction

Country Status (1)

Country Link
CN (1) CN206646415U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108483313A (en) * 2018-02-27 2018-09-04 周玉翔 A kind of lifting apparatus for heavy-duty machinery

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108483313A (en) * 2018-02-27 2018-09-04 周玉翔 A kind of lifting apparatus for heavy-duty machinery

Similar Documents

Publication Publication Date Title
CN205894733U (en) Novel building engineering supports device
CN206646415U (en) A kind of supporting bracket of bridge construction
CN206839863U (en) A kind of glass polishing machine
CN106948271A (en) A kind of front leg strut elevating mechanism of highway bridging machine
CN210086491U (en) Supporting device is strengthened in building jacking control
CN205605223U (en) Prefabricated tube coupling fluid pressure type combination steel form
CN201958212U (en) Liftable wall-mounted cupboard
CN210115848U (en) Device for ensuring horizontal assembly concentricity of multistage centrifugal pump
CN114923034A (en) Pipeline installing support for hydraulic engineering convenient to installation and regulation
CN207794238U (en) A kind of toilet urinal integrative installation technology steelframe
CN206530081U (en) A kind of novel building engineering support meanss
CN213773613U (en) Frequency conversion water supply equipment
CN219018409U (en) Bridge support with anti-seismic function for bridge
CN206408751U (en) A kind of steel-structured circular pin adjusts bearing
CN219281283U (en) Assembled support frame for building engineering
CN216463920U (en) Novel five-axis numerically controlled grinder base
CN210919127U (en) Hydraulic support used with ordinary water
CN216715411U (en) Water conservancy is pipe-line erection locating support for water and electricity
CN220738046U (en) Concrete sprays curing means
CN219242818U (en) Water conservancy pipeline fixing device
CN218236418U (en) Stable connecting structure for water supply and drainage pipeline
CN213088386U (en) Special testboard of hydraulic pressure station
CN220621912U (en) Supporting device for tunnel reinforcement
CN214998510U (en) Energy-saving pneumatic hydraulic supercharging device
CN212257105U (en) Quick installation base of transformer for construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171117

Termination date: 20210409