CN206638534U - One kind is used to survey soil and the lower Particle Breakage degree device of structure interface interaction - Google Patents
One kind is used to survey soil and the lower Particle Breakage degree device of structure interface interaction Download PDFInfo
- Publication number
- CN206638534U CN206638534U CN201720182098.6U CN201720182098U CN206638534U CN 206638534 U CN206638534 U CN 206638534U CN 201720182098 U CN201720182098 U CN 201720182098U CN 206638534 U CN206638534 U CN 206638534U
- Authority
- CN
- China
- Prior art keywords
- sleeve
- particle breakage
- structure interface
- box
- interface interaction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Sampling And Sample Adjustment (AREA)
Abstract
Being used to survey Particle Breakage degree device under soil interacts with structure interface the utility model discloses one kind includes, filling structure material(Concrete, geomembrane etc.)Down cut box, on the upside of the down cut box activity be connected upper shear box device;The upper shear box device includes the first sleeve, the first sleeve upside mating connection 3rd sleeve, at least one second sleeve is additionally provided between the first sleeve and 3rd sleeve.There is the equipment feature to be:The equipment not only has a function used in common shear box in direct shear test, and can structure interface shear band particle carry out Stratified Sampling, be easy to the accurate Particle Breakage for calculating the different layerings of shear band.
Description
Technical field
Ground indoor direct shear test technical field is the utility model is related to, one kind is more particularly to and is connect for surveying soil with structure
The lower Particle Breakage degree device of contacting surface interaction.
Background technology
The contact interface of different materials is commonly encountered in building, hydraulic engineering.Because contact interface two layers of material mechanics is special
Property difference, larger shear stress is commonly present in interface both sides and generates displacement non-continuous event, stress and is deformed more multiple
It is miscellaneous.Such as the CFRD in hydraulic engineering, the safety and panel stress of dam body are closely related, and panel exists
Stress in plane depends primarily on the shearing stress distribution state of contact surface between panel and bed course.There is the heart in core wall rockfill dam
Wall earth material and filter material, polytype contact interface such as dam shell material and basement rock.These usual contacts site are that dam body is easily sent out again
Make trouble thus weak link, wherein contact surface shear band(Can be along with one stress of material internal in rock-soil material destructive process
The region more concentrated, it is that can be formed through banded regions that the straining concentration zone domain of this high gradient enters critical condition in material
Domain, this phenomenon are referred to as strain localization band or shear band in the mechanics of materials, rock-soil mechanics field.)By shearing to particle
Destruction is the most serious, causes bulky grain to reduce, and little particle increases, and particle size distribution plays an important role to engineering stability, because
This research tool for carrying out shear band Particle Breakage is of great significance.
Due to being limited by instrument and equipment, ground on soil with the Particle Breakage situation of the contact surface shear band of works
Study carefully and be present in surface macroscopic observation more, and the microcosmic quantitative research on the Particle Breakage of contact surface shear band is less.Existing text
Offer and be recited as abundant ancestor pool in 1994 and be directly used in sight with digital photo technologies with miniature " periscope " device and Hu Liming in 2000
Examine structural plane soil and the relative displacement of structural member nearby inquire into soil and the broken of the particle in structure interface shearing test and
Motion change.
Although two kinds of equipment described in document can record the particle motion of contact surface shear band in shearing test, crush
Journey, but Precise collection can not be carried out to particle at contact surface shear band, it is difficult to carry out quantum chemical method.
Utility model content
The purpose of this utility model is solve the problems, such as background technology, there is provided one kind is mutual with structure interface for surveying soil
The lower Particle Breakage degree device of effect.
To achieve the above object, the technical solution adopted in the utility model is that one kind is used to survey soil and structure interface phase
Particle Breakage degree device includes filling structure material under interaction(Concrete, geomembrane etc.)Down cut box, the down cut
The upper shear box device of activity mating connection on the upside of box;The upper shear box device includes the first sleeve, coordinates on the upside of the first sleeve
3rd sleeve is connected, at least one second sleeve is additionally provided between the first sleeve and 3rd sleeve.
The utility model uses following prioritization scheme:
(1)The down cut box and upper shear box device are columnar structured that down cut box diameter is more than upper shear box
Assembly dia.
(2)The first sleeve side is provided with first boss.
(3)Second boss, opposite side are provided with the second sleeve side and is provided with the first groove, the first groove with it is described
There is first boss to correspond to grafting cooperation.
(4)The second groove is provided with the 3rd sleeve side, the grafting corresponding with the second boss of the second groove is matched somebody with somebody
Close.
The utility model has invented one kind for the deficiency of common shear box and existing contact surface shearing test scope
For surveying soil and the lower Particle Breakage degree device of structure interface interaction, there is the equipment feature to be:The equipment not only has directly
Function in scissor test used in common shear box, and Stratified Sampling can be carried out to structure interface shear band particle, it is easy to essence
Really calculate the Particle Breakage situation of the different layerings of shear band.
The utility model has the advantage that:The apparatus structure is simple, easy to process, and easily operation, can sheared
Layering collection is carried out to the particle of contact surface shear band after experiment, is the quantum chemical method provider of contact surface shear band Particle Breakage
Just.
Brief description of the drawings
Fig. 1 is a kind of structure for being used to survey soil and the lower Particle Breakage degree device of structure interface interaction of the utility model
Schematic perspective view;
Fig. 2 is that the utility model is a kind of for surveying the basic of the lower Particle Breakage degree device of native and structure interface interaction
Structural representation;
Fig. 3, which is that the utility model is a kind of, to be used to survey soil and the first of the lower Particle Breakage degree device of structure interface interaction
Sleeve diagrammatic cross-section;
Fig. 4, which is that the utility model is a kind of, to be used to survey soil and lower second set of the Particle Breakage degree device of structure interface interaction
Cylinder diagrammatic cross-section;
Fig. 5, which is that the utility model is a kind of, to be used to survey soil and lower the 3rd set of the Particle Breakage degree device of structure interface interaction
Cylinder schematic perspective view;
In figure:1- down cut boxes;The upper shear box devices of 2-;The sleeves of 3- first;3a- first boss;4- second sleeves;4a-
Second boss;The grooves of 4b- first;5- 3rd sleeves;The grooves of 5a- second;6- filling materials.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out
Clearly and completely describe, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole realities
Apply example.
Fig. 1-5 are referred to, one kind is used to survey soil and the lower Particle Breakage degree device of structure interface interaction:Including provided with
The down cut box 1 of filling structure material 6, the upper shear box device 2 of the upside of down cut box 1 activity mating connection, the upper shear box
Device 2 includes the first sleeve 3, upside mating connection 3rd sleeve 5, is additionally provided with least between the first sleeve 3 and 3rd sleeve 5
One second sleeve 4.
Further, first boss 3a is set in the side of the first sleeve 3, the side of second sleeve 4 sets the first groove 4b, the
Shape is equal in magnitude outside one groove 4b and first boss 3a is plugged in together with facilitating.
Further, second boss 4a is set in the side of second sleeve 4, the side of 3rd sleeve 5 sets the second groove 5a, and two
Person's size shape is identical to be conveniently plugged in together.
Further, the upper shear box device 2 being assembled as above, upper shear box device 2 is loaded into the experiment soil body
Particle, then the upper shear box device 2 equipped with soil body particle is placed in the upside of down cut box 1 of filling structure material 6.
Further, above-mentioned one kind is used to survey soil and the lower Particle Breakage degree device of structure interface interaction is placed in
Shear and shearing test is carried out on instrument, after shearing test, remove described one kind and be used to survey soil and structure interface interaction
Lower Particle Breakage degree device.
Further, remove 3rd sleeve 5 and collect the particle in 3rd sleeve 5, particle will be collected and individually preserved.
Further, the particle in the sleeve 3 of second sleeve 4 and first is entered using the endoparticle collection mode of 3rd sleeve 5
Row Collection and conservation.
Further, the particle of collection is sieved, and draws granular-grade distribution, calculates every layer of Particle Breakage.
Claims (5)
1. one kind is used to survey soil and the lower Particle Breakage degree device of structure interface interaction, it is characterised in that:Including provided with filling out
Assembling structure material(6)Down cut box(1), down cut box(1)The upper shear box device of upside activity mating connection(2), it is described on
Shear box device(2)Including the first sleeve(3), the first sleeve(3)Upside mating connection 3rd sleeve(5), in the first sleeve(3)
With 3rd sleeve(5)Between be additionally provided with least one second sleeve(4).
2. it is according to claim 1 a kind of for surveying soil and the lower Particle Breakage degree device of structure interface interaction, its
It is characterised by:The down cut box(1)With upper shear box device(2)It is columnar structured, down cut box(1)Diameter is more than upper
Shear box device(2)Diameter.
3. it is according to claim 1 a kind of for surveying soil and the lower Particle Breakage degree device of structure interface interaction, its
It is characterised by:In first sleeve(3)Side is provided with first boss(3a).
4. it is according to claim 1 a kind of for surveying soil and the lower Particle Breakage degree device of structure interface interaction, its
It is characterised by:In the second sleeve(4)Side is provided with second boss(4a), opposite side be provided with the first groove(4b), first is recessed
Groove(4b)There is first boss with described(3a)Corresponding grafting coordinates.
5. it is according to claim 4 a kind of for surveying soil and the lower Particle Breakage degree device of structure interface interaction, its
It is characterised by:In the 3rd sleeve(5)Side is provided with the second groove(5a), the second groove(5a)With the second boss(4a)
Corresponding grafting coordinates.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720182098.6U CN206638534U (en) | 2017-02-28 | 2017-02-28 | One kind is used to survey soil and the lower Particle Breakage degree device of structure interface interaction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720182098.6U CN206638534U (en) | 2017-02-28 | 2017-02-28 | One kind is used to survey soil and the lower Particle Breakage degree device of structure interface interaction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206638534U true CN206638534U (en) | 2017-11-14 |
Family
ID=60252067
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720182098.6U Expired - Fee Related CN206638534U (en) | 2017-02-28 | 2017-02-28 | One kind is used to survey soil and the lower Particle Breakage degree device of structure interface interaction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206638534U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108398338A (en) * | 2018-01-30 | 2018-08-14 | 河海大学 | It is a kind of can temperature control geomembrane and soil contact face shearing test device and test method |
-
2017
- 2017-02-28 CN CN201720182098.6U patent/CN206638534U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108398338A (en) * | 2018-01-30 | 2018-08-14 | 河海大学 | It is a kind of can temperature control geomembrane and soil contact face shearing test device and test method |
CN108398338B (en) * | 2018-01-30 | 2019-04-19 | 河海大学 | It is a kind of can temperature control geomembrane and soil contact face shearing test device and test method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206638534U (en) | One kind is used to survey soil and the lower Particle Breakage degree device of structure interface interaction | |
CN112487545A (en) | Slope safety real-time monitoring and early warning system based on big data axial force monitoring | |
Gemperline et al. | Centrifugal model tests for ultimate bearing capacity of footings on steep slopes in cohesionless soils | |
Lyndon et al. | Pressure distribution on a rigid retaining wall in cohesionless material | |
Sargand et al. | STRUCTURAL EVALUATION AND PERFORMANCE OF PLASTIC PIPE. VOLUME I AND II | |
Anderson et al. | Estimating in situ shear moduli at competent sites | |
CN111474053B (en) | On-site shear test method | |
CN106918514A (en) | One kind measurement soil and structure interface Particle Breakage degree direct shear test device | |
CN205404156U (en) | Weak intermediate layer sampling device | |
Sun et al. | Arching effect of soil ahead of working face in shield tunnel in sand with various depths | |
CN207148082U (en) | A kind of experimental rig of influence of the analysis bored tunnel construction to building | |
CN203668934U (en) | Device for evenly distributing clamping blocks on precast pile end plate in circumferential direction | |
CN218272289U (en) | Real-time monitoring device for soil profile environment in simulated crop growth process | |
Rajabi et al. | A Numerical Study of the Effect of Fluid Pressure on Smeared Cracking Behavior in the Caprock of Underground Gas Storage Reservoirs | |
Ha | FIELD STUDY OF PILE GROUP ACTION. APPENDIX A | |
Berry et al. | Near surface laboratory testing protocol development | |
Lohnes et al. | Regional approach to landslide interpretation and repair | |
Sakurai | Monitoring and performance in tunneling | |
Delapierre et al. | Analyses of horizontal loading tests on Franki piles | |
Gupta et al. | Developments in geotechnical engineering 11: dams and earthquakes | |
Dobry | STRESS-STRAIN BEHAVIOUR OF SOILS DURING CYCLIC-DYNAMIC LOADING | |
Gardner et al. | Preliminary analysis of the behavior of reinforced concrete box culverts | |
Davis et al. | Site investigation for seismically designed structures | |
Nahrgang | LATERAL DISPLACEMENTS AND EARTH PRESSURES IN SOFT COHESIVE SOILS SUBJECTED TO HIGH SURFACE LOADS | |
Edgars | A MODEL INVESTIGATION OF FRICTION PILE CAPACITIES IN SILTS |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171114 Termination date: 20190228 |