CN206636026U CN201720183166.0U CN201720183166U CN206636026U CN 206636026 U CN206636026 U CN 206636026U CN 201720183166 U CN201720183166 U CN 201720183166U CN 206636026 U CN206636026 U CN 206636026U
Authority
CN
China
Prior art keywords
hanging
keelson
bridging arrangement
connecting plate
fixed support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720183166.0U
Other languages
Chinese (zh)
Inventor
赵云平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing New Building Material Group Co Ltd
Original Assignee
Beijing New Building Material Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing New Building Material Group Co Ltd filed Critical Beijing New Building Material Group Co Ltd
Priority to CN201720183166.0U priority Critical patent/CN206636026U/en
Application granted granted Critical
Publication of CN206636026U publication Critical patent/CN206636026U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Tents Or Canopies (AREA)

Abstract

The utility model discloses a kind of Novel ceiling attachment structure, including new receipts keelson and Novel spider plant suspension member;Wherein, new receipts keelson, which is provided with, hangs binding structure, bridging arrangement and connecting plate;The top that binding structure is arranged on connecting plate is hung, binding structure is hung and is arranged to connect Novel spider plant suspension member;Bridging arrangement is arranged on the bottom of connecting plate, and bridging arrangement is arranged to support integrated belt;Connecting plate is provided with first side and second side, and first side is arranged to the decorative cover with smooth flat, and second side is arranged to hang the joint face of binding structure, bridging arrangement;Novel spider plant suspension member is provided with hanging structure and screwing structure;The application relates to, but are not limited to building material field, can realize that the cooperation between integrated belt is installed using the application, and compatibility is preferably;The labor intensity of installation exercise can be effectively reduced, the mounting structure for not being close to wall can be realized, using the teaching of the invention it is possible to provide the independently installed space of integrated belt.

Description

A kind of Novel ceiling attachment structure
Technical field
It the utility model is related to but be not limited to building material field, especially a kind of Novel ceiling attachment structure.
Background technology
Keel be for support moulding, fixed structure a kind of construction material;It is widely used in hotel, terminal, visitor Transport the places such as station, station, arenas, market, factory, office building, old building remodeling, interior decoration setting, ceiling.Keel are as dress The skeleton and base material repaiied, use are very universal.
Wherein, the place such as increasing office building, hospital start from foreign countries introduce integrated belt, with improve indoor pipeline, The isostructural integrated level of cold-heating system, air exchange system.However, the integrated belt of external production often with the other structures at the top of house It is the integrated design, design and manufacture is uniformly responsible for by equipment supplier.Based on cost and transportation reasons, domestic often only import Its core component-integrated belt, to reduce cost to greatest extent;This results in integrated belt can not during later stage actual installation Integrative installation technology is realized, installation is required to make corresponding auxiliary accessories every time for it, its poor compatibility with integrated belt, and installs Program is cumbersome, workload is big.
Utility model content
The technical problem that the utility model solves is to provide a kind of Novel ceiling attachment structure, can effectively overcome existing skill Shortcoming present in art, the cooperation installation between integrated belt can be realized, and compatibility is preferably;Installation can be effectively reduced to make The labor intensity of industry, the mounting structure for not being close to wall can be realized, using the teaching of the invention it is possible to provide the independently installed space of integrated belt.
In order to solve the above technical problems, the utility model provides a kind of Novel ceiling attachment structure, including new receipts side Keel and Novel spider plant suspension member;Wherein,
The new receipts keelson, which is provided with, hangs binding structure, bridging arrangement and connecting plate;The binding structure that hangs is arranged on The top of the connecting plate, the binding structure that hangs are arranged to connect the Novel spider plant suspension member;The bridging arrangement is arranged on described The bottom of connecting plate, the bridging arrangement are arranged to support integrated belt;The connecting plate is provided with first side and second side, The first side is arranged to the decorative cover with smooth flat, and the second side is arranged to described and hangs binding structure, overlap joint knot The joint face of structure;
The Novel spider plant suspension member is provided with hanging structure and screwing structure;The hanging structure is provided with hanging hole, described Hanging hole is arranged to insert connecting rod to realize the connection with headroom;The screwing structure is provided with fixed support plate and work Dynamic supporting plate, the screwing structure are arranged to connect the new receipts keelson;The fixed support plate and the hanging framework It is fixedly connected, the movable supporting plate, which is provided with, tightens bolt, and the bolt of tightening is arranged to connect and tightens the activity branch Fagging and the fixed support plate, the space between the fixed support plate and the movable supporting plate is arranged to clamping and waits to hang Receive the coupling part of keelson.
Above-mentioned Novel ceiling attachment structure, can also have following features,
The second side of the connecting plate is provided with inserting groove, and the inserting groove is arranged to grafting lath to realize adjacent receipts Being connected between keelson.
Above-mentioned Novel ceiling attachment structure, can also have following features, and the binding structure that hangs is provided with c-type structure, the C The opening direction of type structure is away from the bridging arrangement;Wherein,
The c-type structure setting has the flanging being oppositely arranged, and the flanging being oppositely arranged is arranged to clamping suspender member Coupling part;The c-type structure setting has c-type cavity, and the c-type cavity is arranged to accommodate the coupling part of suspender member.
Above-mentioned Novel ceiling attachment structure, can also have following features, the bridging arrangement is provided with lapping plate, described to take Fishplate bar is arranged to support the edge of integrated belt.
Above-mentioned Novel ceiling attachment structure, can also have following features, and the inserting groove is provided with the first edge and second Edge;Wherein,
First edge is arranged on the bottom surface for hanging binding structure, the sky between first edge and the connecting plate Between be arranged to accommodate and grafting lath described in clamping a side;Second edge is arranged on the top of the bridging arrangement Face, the space between second edge and the connecting plate is arranged to accommodate and the relative side of grafting lath described in clamping.
Above-mentioned Novel ceiling attachment structure, can also have following features,
Angle is arranged to 45 ° between the first side end face and trailing flank of the new receipts keelson, and the second side end face is with after Angle is also configured as 45 ° between side;Wherein,
The trailing flank is arranged to, and is overlapped with side of the connecting plate away from the bridging arrangement;First side Face is arranged to, and is overlapped with the first end face of the bridging arrangement;Second side end face is arranged to, and with the bridging arrangement Biend overlaps.
Above-mentioned Novel ceiling attachment structure, can also have following features,
The fixed support plate is connected to the bottom of the hanging structure, and the upper surface of the fixed support plate is provided with pair Claim two grooves set, the groove is arranged to accommodate the flanging for connecting and treating that keelson is received in hanging.
Above-mentioned Novel ceiling attachment structure, can also have following features,
The movable supporting plate is arranged on the top of the fixed support plate, and the lower surface of the movable supporting plate is embedded with Anti-skid rubber cushion, the anti-skid rubber cushion are arranged to increase the movable supporting plate and treat that the connecting portion of hanging receipts keelson divides it Between frictional force.
Above-mentioned Novel ceiling attachment structure, can also have following features,
The fixed support plate is arranged to the Integral design of sheet material bending with the hanging structure.
Above-mentioned Novel ceiling attachment structure, can also have following features,
It is arranged to be welded to connect between the fixed support plate and the hanging structure;
The hanging structure is arranged to hanging board.
The utility model above-mentioned technical proposal has the advantages that:
The said structure that the utility model passes through optimal design-aside, using the teaching of the invention it is possible to provide multiple independent installation regions, can be preferable The above-mentioned functional independence of adaptation each suspended ceiling module splicing installation;The decoration of the interior space, Neng Gouyou can directly be carried out The indoor space environment of effect beautification, it can effectively provide the texture in indoor suspended ceiling space;Adjacent receipts keelson can be effectively improved Between connective stability, can effectively avoid keel from arranging the operation of connecting hole in advance, Installation Flexibility is good;Can effectively it protect The overlap joint for demonstrate,proving integrated belt overlaps for Maximum Contact face, can effectively ensure that the stability of overlap joint;Receipts keelson can be effectively improved The intensity of itself, can effectively keep away receive keelson because bear a heavy burden it is big and caused by slight bending phenomenon, overall knot can be effectively improved The mounting stability of structure.
Other features and advantages of the utility model will illustrate in the following description, also, partly from specification In become apparent, or understood by implementing the utility model.The purpose of this utility model and other advantages can pass through Specifically noted structure is realized and obtained in specification, claims and accompanying drawing.
Brief description of the drawings
Accompanying drawing is used for providing further understanding technical solutions of the utility model, and a part for constitution instruction, With being used to explain the technical solution of the utility model together with embodiments herein, do not form to technical solutions of the utility model Limitation.
Fig. 1 is the mounting structure schematic diagram of embodiment in the utility model;
Fig. 2 is new receipts keelson structural representation one of the present utility model;
Fig. 3 is the grafting lath for connecting adjacent new receipts keelson;
Fig. 4 is the connection diagram of adjacent new receipts keelson;
Fig. 5 is Novel spider plant suspension member structural representation of the present utility model;
Fig. 6 is new receipts keelson structural representation two of the present utility model;
Fig. 7 is new receipts keelson combination diagram one of the present utility model;
Fig. 8 is new receipts keelson combination diagram two of the present utility model.
Embodiment
For the purpose of this utility model, technical scheme and advantage is more clearly understood, below in conjunction with accompanying drawing to this The embodiment of utility model is described in detail.It should be noted that in the case where not conflicting, embodiment in the application and Feature in embodiment can be mutually combined.
As shown in figure 1,
The utility model provides a kind of Novel ceiling attachment structure, can include new receipts keelson 200 and Novel spider plant Suspension member 100.In concrete operations, new receipts keelson 200 can be connected by above-mentioned Novel spider plant suspension member 100, to realize new receipts side The fixation of keel 200;And then can be by the supporting role of above-mentioned new receipts keelson 200, to realize the fixation of integrated belt 300.
Now above-mentioned new receipts keelson is each described in detail with Novel spider plant suspension member:
As shown in Figure 2, Figure 3, Figure 4,
Above-mentioned new receipts keelson in the utility model can include hanging binding structure 1, bridging arrangement 3 and connecting plate 2; Wherein, the top that binding structure 1 is arranged on connecting plate 2 is hung, binding structure 1 is hung and is arranged to connect suspender member;The company of being arranged on of bridging arrangement 3 The bottom of fishplate bar 2, bridging arrangement 3 are arranged to support integrated belt;Connecting plate 2 is provided with first side 6 and second side 7, and first Side 6 is arranged to the decorative cover with smooth flat, and second side 7 is arranged to hang binding structure 1, the joint face of bridging arrangement 3.
In concrete operations, the realization of binding structure 1 and the connection of suspender member can be hung by above-mentioned, and then realize that Novel ceiling connects The overall fixation of structure;And then can realize that the support with integrated belt is fixed by bridging arrangement 3, and then realize integrated belt entirety Overlap joint fix.Keel of the prior art are both needed to that, by keelson and connection between the walls, the installation of keel could be realized It is fixed;Fixed however, the above-mentioned receipts keelson that the technical program provides need not be close to the overall installation of the i.e. achievable keel of wall, The fixation of keel only can be achieved by the suspender member set between roof.Above-mentioned attachment structure can form respective independence Integrated belt installation region, it is unaffected between adjacent integrated belt.The integrated belt introduced in the market is suspended ceiling module Splice and combine and form, and respective functional independence;Therefore, the receipts keelson that the technical program provides can provide multiple independent peaces Region is filled, the splicing installation of each suspended ceiling module of above-mentioned functional independence can be well adapted to.In addition, above-mentioned receipts keelson is straight Connect and be presented in installing space, the first side 6 of wherein connecting plate 2 is arranged to the decorative cover with smooth flat, can be direct The decoration of the interior space is carried out, can effectively beautify the space environment of interior, the texture in indoor suspended ceiling space can be effectively provided.
Preferably, in order to effectively improve it is adjacent receipts keelson between connective stability;The utility model is specifically grasped In work, the second side 7 of connecting plate 2 is provided with inserting groove 5, and inserting groove 5 is arranged to grafting lath to realize adjacent receipts keelson Between be connected.
In concrete operations, the bottom surface of integrated belt is mostly rectangle or square structure, is needed four bottoms in installation process Side is supported fixation.For example, two bases of integrated belt mutually are mutually perpendicular to, the receipts keelson on the two bases is supported It is mutually perpendicular to;By inserting L-type lath in inserting groove 5, as shown in Figure 3, Figure 4, i.e., a receipts side is inserted in one end of L-type lath The inserting groove 5 of keel, the other end insert another and receive the inserting groove 5 that keelson is received on side, you can realize two neighboring receipts keelson Between connective stability.Or a base of integrated belt is long, receiving keelson needs two or three splicings real The now support on the base;By inserting linear pattern lath, i.e. the inserting groove of a receipts keelson is inserted in one end of linear pattern lath 5, the other end inserts another and receives the inserting groove 5 that keelson is received on side, you can realizes that the connection between two neighboring receipts keelson is steady It is qualitative.
Preferably, hanging binding structure 1 and can be provided with c-type structure in the technical program, the opening direction of c-type structure is remote Bridging arrangement 3;Wherein, c-type structure setting has the flanging 9,10 being oppositely arranged, and the flanging 9,10 being oppositely arranged is arranged to clamping and hung The coupling part of suspension member;C-type structure setting has c-type cavity 8, and c-type cavity 8 is arranged to accommodate the coupling part of suspender member.
In concrete operations, c-type structure can directly be slipped into the coupling part of suspender member, and then tighten bolt, you can realize Being connected between suspender member and receipts keelson.Above-mentioned c-type structure can effectively ensure that the installation effectiveness of keel.Prior art In, it is mostly punching connection between keel and suspension member, the spacing that suspender member connecting hole is arranged on keel need to be shifted to an earlier date, it is flexible for installation Property is poor;However, the above-mentioned attachment structure in the technical program can effectively avoid the above-mentioned operation for arranging connecting hole in advance, can be Directly slip into c-type structure during actual installation to tighten, Installation Flexibility is good.
Preferably, the bridging arrangement 3 in the technical program can be provided with lapping plate 4, and it is integrated that lapping plate 4 is arranged to support The edge of band.
In concrete operations, the edge of integrated belt is directly snapped into integrated belt can be achieved on above-mentioned lapping plate 4 Installation.Meanwhile the integrated belt installation region that above-mentioned receipts keelson provides is independent of one another, does not influence each other.The utility model is specific In operation, the angle between lapping plate 4 and connecting plate 2 can be preferably right angle, when above-mentioned angle is right angle, can effectively ensure that The overlap joint of integrated belt overlaps for Maximum Contact face, can effectively ensure that the stability of overlap joint.
Preferably, the inserting groove 5 in the technical program can be provided with the first edge 11 and the second edge 12;Wherein, One edge 11 is arranged on the bottom surface for hanging binding structure 1, and the space between the first edge 11 and connecting plate 2 is arranged to accommodate and clamping is inserted One side of fishplate bar bar;Second edge 12 is arranged on the top surface of bridging arrangement 3, the sky between the second edge 12 and connecting plate 2 Between be arranged to accommodate and clamping grafting lath relative side.
In concrete operations, the region structure between the second side 7 of above-mentioned first edge 11, the second edge 12 and connecting plate 2 Into the grafting region of lath;And then it the lath for treating grafting inserted into above-mentioned grafting region can realize between adjacent receipts keelson It is connected.The inserting groove 5 that said structure provides, can effectively improve installation effectiveness, without aiding in specific purpose tool to can be achieved It is connected.Meanwhile the lath of insertion can also effectively improve the intensity for receiving keelson itself in inserting groove 5, can effectively keep away receipts Keelson because bear a heavy burden it is big and caused by slight bending phenomenon, i.e., can effectively improve integrally-built mounting stability.
The said structure that the technical program passes through optimal design-aside, using the teaching of the invention it is possible to provide multiple independent installation regions, can be preferable The above-mentioned functional independence of adaptation each suspended ceiling module splicing installation;The decoration of the interior space, Neng Gouyou can directly be carried out The indoor space environment of effect beautification, it can effectively provide the texture in indoor suspended ceiling space;Adjacent receipts keelson can be effectively improved Between connective stability, can effectively avoid keel from arranging the operation of connecting hole in advance, Installation Flexibility is good;Can effectively it protect The overlap joint for demonstrate,proving integrated belt overlaps for Maximum Contact face, can effectively ensure that the stability of overlap joint;Receipts keelson can be effectively improved The intensity of itself, can effectively keep away receive keelson because bear a heavy burden it is big and caused by slight bending phenomenon, overall knot can be effectively improved The mounting stability of structure.
As shown in figure 5,
Above-mentioned Novel spider plant suspension member in the utility model can include hanging structure 13 and screwing structure;Wherein, hanging knot Structure 13 is provided with hanging hole 14, and hanging hole 14 is arranged to insert connecting rod to realize the connection with headroom;Screwing structure is set Fixed support plate 17 and movable supporting plate 16 are equipped with, fixed support plate 17 is fixedly connected with hanging framework, and movable supporting plate 16 is set It is equipped with and tightens bolt 15, tightens bolt 15 and be arranged to connect and tighten movable supporting plate 16 and fixed support plate 17, fixed support Space between plate 17 and movable supporting plate 16 is arranged to clamping and treats that the coupling part of keelson is received in hanging.
In concrete operations, can also may be used by the installation bolt of hanging hole 14 or other connecting rods of above-mentioned hanging structure 13 Realization is fixedly connected with roof;Those skilled in the art can select corresponding connecting rod according to actual conditions.In addition, also Can realize and treat by above-mentioned screwing structure mounting receive keelson between tighten connection;Above-mentioned the tightening of the technical program offer Structure has fixed part and movable part, and part fixed part, which slips into, first treats that mounting is received in the c-type cavity of keelson, c-type The flanging limitation fixation portions point of cavity skids off cavity;And then movable part can be realized with fixing by tightening bolt 15 Connection between part, while by the flanging clamping of c-type cavity.
Preferably, in order to effectively improve suspender member and treat mounting receive keelson between connective stability;This technology Fixed support plate 17 in scheme is attached to the bottom of hanging structure 13, wherein, the upper surface of fixed support plate 17 is provided with Symmetrically arranged two grooves, groove are arranged to accommodate the flanging for connecting and treating that keelson is received in hanging.
In concrete operations, above-mentioned fixed support plate 17 is slipped into the c-type cavity for treating that keelson is received in hanging, and by above-mentioned fixation The symmetrical grooves and the flanging of c-type cavity that the upper surface of supporting plate 17 is set mutually are fitting to connection.It is above-mentioned be mutually fitting to connection consolidate Determine supporting plate 17 and c-type cavity flanging, suspender member can be effectively improved and receive the connective stability between keelson.
Further, in order to effectively improve suspender member and treat mounting receive keelson between connective stability;This skill Movable supporting plate 16 in art scheme can be arranged on the top of fixed support plate 17, wherein, the lower surface of movable supporting plate 16 Anti-skid rubber cushion is embedded with, anti-skid rubber cushion is arranged to increase movable supporting plate 16 and treats that the connecting portion of hanging receipts keelson divides it Between frictional force.
In concrete operations, after supporting plate 17 to be fixed slips into c-type cavity, and after groove is chimeric with flanging, then by above-mentioned work Move supporting plate 16 and tighten bolt 15 and be connected with fixed support plate 17;Meanwhile the lower surface of movable supporting plate 16 be embedded it is anti-skidding Rubber blanket is directly close to on the outside of the flanging of c-type cavity, and then tightens bolt 15 and movable supporting plate 16 and fixed branch can be achieved Connection between fagging 17.The above-mentioned anti-skid rubber cushion being embedded can be avoided effectively, when because of Bolt Tightening Force deficiency or installing Between bolt too long loosen naturally, the position of caused movable supporting plate 16 is slided.
Preferably, the fixed support plate 17 in the technical program could be arranged to the one of sheet material bending with hanging structure 13 Design;Accordingly, may be alternatively provided as being welded to connect between fixed support plate 17 and hanging structure 13;In addition, hanging structure 13 can To be arranged to hanging board.It should be noted which kind of connected mode specifically selected, those skilled in the art can be according to actual feelings Condition is accordingly selected, and to realize fixed support plate 17, directly firm connection is defined with hanging structure 13.
With reference to Fig. 6, Fig. 7, Fig. 8;
Preferably, in order to effectively improving the connective stability between new receipts keelson;The above-mentioned new receipts of the application In keelson, angle is arranged to 45 ° between the first side end face and trailing flank, and angle is also provided between the second side end face and trailing flank For 45 °;Wherein, trailing flank is arranged to, and is overlapped with side of the connecting plate away from the bridging arrangement;First side end face It is arranged to, is overlapped with the first end face of the bridging arrangement;Second side end face is arranged to, and second with the bridging arrangement End face overlaps.As illustrated, the first side end face, as shown in label 31 in figure, the second side end face is as shown in label 32 in figure, rear side Face is as shown in label 33 in figure.
In concrete operations, as shown in fig. 6, above-mentioned side end face is arranged to 45 ° of angles;As shown in fig. 7, above-mentioned optimal design-aside, It is intended to splice with the side end face of adjacent receipts keelson and connects;As shown in figure 8, connected by the side end face of 4 above-mentioned receipts keelsons Connect, the loop configuration of completion can be formed, i.e., the annular overlapping regions of closing can be provided, the branch of equipment belt can be effectively improved Support stability.
The above-mentioned Novel spider plant suspension member that the technical program provides can be realized to be connected with the optimization of Novel ceiling attachment structure, energy Enough effectively improve suspender member and receive the connective stability between keelson, can effectively avoid because of Bolt Tightening Force deficiency or peace Slide the position that the bolt of ETL estimated time of loading too long loosens caused movable supporting plate naturally;Wherein, mutually chimeric attachment structure Suspender member can be effectively improved and receive the connective stability between keelson.
Although those skilled in the art should be understood that embodiment disclosed by the utility model as above, described Content is only the embodiment for readily appreciating the utility model and using, and is not limited to the utility model.Any practicality Technical staff in new art, on the premise of the spirit and scope disclosed by the utility model are not departed from, Ke Yi Any modification and change, but scope of patent protection of the present utility model are carried out in the form and details of implementation, still must be with appended The scope that is defined of claims be defined.

Claims (10)

1. a kind of Novel ceiling attachment structure, it is characterised in that including new receipts keelson and Novel spider plant suspension member;Wherein,
The new receipts keelson, which is provided with, hangs binding structure, bridging arrangement and connecting plate;Hang binding structure and be arranged on connecting plate Top, hang binding structure and be arranged to connect Novel spider plant suspension member;Bridging arrangement is arranged on the bottom of connecting plate, and bridging arrangement is arranged to prop up Support integrated belt;Connecting plate is provided with first side and second side, and first side is arranged to the decorative cover with smooth flat, the Two side faces are arranged to hang the joint face of binding structure, bridging arrangement;
The Novel spider plant suspension member is provided with hanging structure and screwing structure;Hanging structure is provided with hanging hole, and hanging hole is arranged to Connecting rod is inserted to realize the connection with headroom;Screwing structure is provided with fixed support plate and movable supporting plate, tightens knot Structure is arranged to connect new receipts keelson;Fixed support plate is fixedly connected with hanging framework, and movable supporting plate, which is provided with, tightens spiral shell Bolt, tighten bolt and be arranged to connect and tighten movable supporting plate and fixed support plate, between fixed support plate and movable supporting plate Space be arranged to clamping treat hanging receive keelson coupling part.
2. Novel ceiling attachment structure according to claim 1, it is characterised in that
The second side of the connecting plate is provided with inserting groove, inserting groove be arranged to grafting lath with realize adjacent receipts keelson it Between be connected.
3. Novel ceiling attachment structure according to claim 1 or 2, it is characterised in that hang binding structure and be provided with c-type knot Structure, the opening direction of c-type structure is away from bridging arrangement;Wherein,
The c-type structure setting has the flanging being oppositely arranged, and the flanging being oppositely arranged is arranged to the coupling part of clamping suspender member; C-type structure setting has c-type cavity, and c-type cavity is arranged to accommodate the coupling part of suspender member.
4. Novel ceiling attachment structure according to claim 1 or 2, it is characterised in that bridging arrangement is provided with lapping plate, Lapping plate is arranged to support the edge of integrated belt.
5. Novel ceiling attachment structure according to claim 2, it is characterised in that inserting groove is provided with the first edge and Two edges;Wherein,
First edge is arranged on the bottom surface for hanging binding structure, and the space between the first edge and connecting plate is arranged to accommodate and blocked One side of tight grafting lath;Second edge is arranged on the top surface of bridging arrangement, the space between the second edge and connecting plate It is arranged to accommodate the relative side of simultaneously clamping grafting lath.
6. Novel ceiling attachment structure according to claim 1, it is characterised in that
Angle is arranged to 45 ° between the first side end face and trailing flank of the new receipts keelson, the second side end face and trailing flank Between angle be also configured as 45 °;Wherein,
The trailing flank is arranged to, and is overlapped with side of the connecting plate away from bridging arrangement;First side end face is arranged to, and is tied with overlap joint The first end face of structure overlaps;Second side end face is arranged to, and is overlapped with the second end face of bridging arrangement.
7. Novel ceiling attachment structure according to claim 1, it is characterised in that
The fixed support plate is connected to the bottom of hanging structure, and the upper surface of fixed support plate is provided with symmetrically arranged two Groove, groove are arranged to accommodate the flanging for connecting and treating that keelson is received in hanging.
8. the Novel ceiling attachment structure according to claim 1 or 7, it is characterised in that
The movable supporting plate is arranged on the top of fixed support plate, and the lower surface of movable supporting plate is embedded with anti-skid rubber cushion, Anti-skid rubber cushion is arranged to increase movable supporting plate and treats that the frictional force between the coupling part of keelson is received in hanging.
9. the Novel ceiling attachment structure according to claim 1 or 7, it is characterised in that
The fixed support plate is arranged to the Integral design of sheet material bending with hanging structure.
10. the Novel ceiling attachment structure according to claim 1 or 7, it is characterised in that
It is arranged to be welded to connect between the fixed support plate and hanging structure;
The hanging structure is arranged to hanging board.
CN201720183166.0U 2017-02-27 2017-02-27 A kind of Novel ceiling attachment structure Active CN206636026U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720183166.0U CN206636026U (en) 2017-02-27 2017-02-27 A kind of Novel ceiling attachment structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720183166.0U CN206636026U (en) 2017-02-27 2017-02-27 A kind of Novel ceiling attachment structure

Publications (1)

Publication Number Publication Date
CN206636026U true CN206636026U (en) 2017-11-14

Family

ID=60251652

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720183166.0U Active CN206636026U (en) 2017-02-27 2017-02-27 A kind of Novel ceiling attachment structure

Country Status (1)

Country Link
CN (1) CN206636026U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108049554A (en) * 2017-12-30 2018-05-18 浙江亚厦装饰股份有限公司 Double-deck drop level furred ceiling and installation method
CN108505665A (en) * 2017-02-27 2018-09-07 北新集团建材股份有限公司 A kind of Novel ceiling connection structure

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108505665A (en) * 2017-02-27 2018-09-07 北新集团建材股份有限公司 A kind of Novel ceiling connection structure
CN108505665B (en) * 2017-02-27 2023-10-20 北新集团建材股份有限公司 Suspended ceiling connection structure
CN108049554A (en) * 2017-12-30 2018-05-18 浙江亚厦装饰股份有限公司 Double-deck drop level furred ceiling and installation method

Similar Documents

Publication Publication Date Title
CN106401027A (en) Modularization wall body with self-bring decoration and installation method thereof
WO2017031627A1 (en) Assembled building structure, wallboard installation hanger, and assembled building construction method
CN206636026U (en) A kind of Novel ceiling attachment structure
CN108505665A (en) A kind of Novel ceiling connection structure
JP2011153446A (en) Method for assembling arch reinforcement and arch reinforcement structure
CN206752800U (en) A kind of Novel ceiling system
CN202324501U (en) Full clamping piece connecting member for mounting low carbon board on building outer brim
CN206636025U (en) A kind of new receipts keelson
CN206636024U (en) A kind of Novel spider plant suspension member
JP5861903B1 (en) Indirect lighting structure unit parts
CN206752801U (en) A kind of keelson structure, keelson attachment structure and ceiling system
CN102146703B (en) Installation and fixing method for wallboards
CN107747410A (en) A kind of modularization assembling bathroom and its installation method
CN108505670A (en) A kind of Novel ceiling system
CN206752802U (en) A kind of hanging piece structure
CN204781543U (en) Double layer plaster tablet furred ceiling structure
CN108505666A (en) A kind of novel receipts keelson
CN108505668A (en) A kind of keelson structure, keelson connection structure and ceiling system
CN105113684B (en) A kind of unit assembled building external protecting system and its construction method equipped with window
CN103866893A (en) Composite metal ceiling
CN207673052U (en) A kind of modularization assembling bathroom
CN211341372U (en) Plane ceiling
CN205917951U (en) Light trough furred ceiling falls a grade device
CN216305278U (en) Take lamp fast-assembling closing up strip
CN220058497U (en) Hook-up type suspended ceiling structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant