CN206635842U - A kind of depositing dust bull-dozer - Google Patents

A kind of depositing dust bull-dozer Download PDF

Info

Publication number
CN206635842U
CN206635842U CN201720395854.3U CN201720395854U CN206635842U CN 206635842 U CN206635842 U CN 206635842U CN 201720395854 U CN201720395854 U CN 201720395854U CN 206635842 U CN206635842 U CN 206635842U
Authority
CN
China
Prior art keywords
water
shoveling
bull
pipe
fixedly connected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720395854.3U
Other languages
Chinese (zh)
Inventor
冯建丰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Forever Environmental Ltd By Share Ltd
Original Assignee
Zhejiang Forever Environmental Ltd By Share Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Forever Environmental Ltd By Share Ltd filed Critical Zhejiang Forever Environmental Ltd By Share Ltd
Priority to CN201720395854.3U priority Critical patent/CN206635842U/en
Application granted granted Critical
Publication of CN206635842U publication Critical patent/CN206635842U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of depositing dust bull-dozer, dust is larger when solving existing bull-dozer construction, the problem of larger to operator's infringement, its drip irrigation device is a kind of depositing dust bull-dozer, including mainframe, the mainframe is provided with driver's cabin, the side of the mainframe is provided with the shoveling for bulldozing, water tank is fixedly connected with the mainframe, the side of the water tank is fixedly connected with suction pump, sparge pipe is fixedly connected with the shoveling, offered on the sparge pipe several be used for spray water water jet, the sparge pipe is connected with suction pump by water-supply-pipe, the valve for adjusting current size is also communicated with the water-supply-pipe.With dust in air content is reduced, reduce the advantages of operator damages.

Description

A kind of depositing dust bull-dozer
Technical field
A kind of municipal equipment is the utility model is related to, more specifically, it relates to a kind of depositing dust bull-dozer.
Background technology
Bull-dozer is a kind of typical earth and rock works machinery, and it is widely used in highway, railway, building, harbour etc. and built If engineering.
Bull-dozer generally comprises mainframe and the large-scale bulldozing shovel blade being arranged in front of mainframe, the bulldozing shovel blade are general Made using metal, when bull-dozer works, operating personnel control bulldozing shovel blade to put down, and bulldozing shovel blade is with the forward shovel of vehicle Cut and push mud, the material such as sand and stone, the position of bulldozing shovel blade and angle are typically all what can be adjusted, so as to complete Into the different operating such as digging, transport and unload.
At present, Publication No. CN202482906U Chinese patent discloses a kind of high-power bull-dozer, including mainframe And the bulldozing shovel blade of the leading section of the mainframe is arranged at, in addition to for being kept for matching somebody with somebody for the bull-dozer job stability Refitting is put, and the counter weight device is arranged in the rearward end of the mainframe.
But above-mentioned bull-dozer, when being constructed on the larger building site of sandy soil content, when shoveling is bulldozed, dust is hiked up by impact, Substantial amounts of airborne dust is easily produced, destroys construction environment, the long-term operation of operator is easily by larger infringement.
Utility model content
In view of the deficienciess of the prior art, the utility model is to provide a kind of depositing dust bull-dozer, having reduces air Middle dust content, reduce the advantages of operator damages.
To achieve the above object, the utility model provides following technical scheme:A kind of depositing dust bull-dozer, including main frame Frame, the mainframe are provided with driver's cabin, and the side of the mainframe is provided with the shoveling for bulldozing, fixed on the mainframe Water tank is connected with, the side of the water tank is fixedly connected with suction pump, sparge pipe, the water spray are fixedly connected with the shoveling Offered on pipe several be used for spray water water jet, the sparge pipe connected with suction pump by water-supply-pipe, the water-supply-pipe On be also communicated with valve for adjusting current size.
By using above-mentioned technical proposal, during bulldozer operation, suction pump and valve are opened, current can enter water spray Pipe, and sprayed from water jet, the current of ejection can bond with dust, and dust can follow current to fall, and reduce in air Dust content, protect construction environment, reduce the possibility that operator suffers damage.
The utility model is further arranged to:Waterfog head is mounted on several described water jets.
By using above-mentioned technical proposal, current can be sprayed water in the form of water smoke, the swept area of the current of expansion, The possibility that current contact with dust is added, reduces the content of dust in air.
The utility model is further arranged to:Fixed support is fixedly connected with the shoveling, the sparge pipe is embedded On the fixed support.
By using above-mentioned technical proposal, it is embedded the sparge pipe on fixed support and still is able to stably be fixedly connected on shoveling On, and because sparge pipe is embedded on fixed support, it is easy to the replacing of sparge pipe.
The utility model is further arranged to:The sparge pipe is located in the one end of fixed support away from shoveling, the spray Gap is provided between water pipe and shoveling.
By using above-mentioned technical proposal, during bull-dozer is bulldozed, soil is easy to accumulate, and the setting in gap, reduces Soil touches the possibility of shoveling;Soil can drop from the opposite side of shoveling simultaneously, reduce the possibility being blocked on sparge pipe.
The utility model is further arranged to:Threeway is fixedly connected with the water-supply-pipe, two sparge pipes are fixed Remaining both ends of threeway are connected to, the sparge pipe is fixedly connected on water-supply-pipe by the threeway, two sparge pipes It is threaded in threeway, two sparge pipes are rotatably connected on fixed support along its axis direction.
Shoveling needs that different angles is presented under different operating modes, but because sparge pipe is fixedly connected on water-supply-pipe, Sparge pipe can only be so that, in fixed angle injection water, when the angle that shoveling lifts is larger, shoveling can only spray downwards with shoveling Penetrate, the possibility that current contact with dust is smaller, and by using above-mentioned technical proposal, after rotating sparge pipe, current have larger spray Firing angle degree so that after shoveling rotates, current remain able to eject with larger angle, increase what current contacted with dust It is possible, reduce the content of dust in air.
The utility model is further arranged to:Fixed dam, the fixation are fixedly connected with left and right sides of the shoveling Baffle plate is tilted and is fixed in shoveling, and the fixed dam tilts laterally.
By using above-mentioned technical proposal, outward-dipping baffle plate can increase the capacity of shoveling, add the work of equipment Make efficiency.
The utility model is further arranged to:The length of the sparge pipe is more than the length of shoveling.
By using above-mentioned technical proposal, the current that sparge pipe sprays can cover the soil for producing dust, reduce Dust is retained in the possibility in air.
The utility model is further arranged to:The one end of the shoveling away from mainframe is fixedly connected with wear-resisting perching knife.
During dozer operation, shoveling constantly and ground friction, by using above-mentioned technical proposal, reduces shoveling damage Bad possibility.
In summary, the utility model has the advantages that:The water smoke that sparge pipe sprays can be with the powder in air Dirt bonds so that dust can follow directly after water smoke and fall, and reduce the content of dust in air, realize the effect of depositing dust.
Brief description of the drawings
Fig. 1 is the stereogram of the present embodiment;
Fig. 2 is enlarged drawing at Fig. 1 A.
Reference:1st, mainframe;2nd, driver's cabin;3rd, shoveling;4th, drive rod;5th, water tank;6th, water-supply-pipe;7th, suction pump; 8th, valve;9th, threeway;10th, sparge pipe;11st, fixed support;12nd, through groove;13rd, gap;14th, water jet;15th, waterfog head; 16th, push pedal;17th, bottom plate;18th, fixed dam;19th, wear-resisting perching knife.
Embodiment
The utility model is described further referring to figs. 1 to Fig. 2.
As depicted in figs. 1 and 2, a kind of depositing dust bull-dozer, the mainframe 1 of rear side is included, mainframe 1 is provided with driver's cabin 2, The front side of mainframe 1 is provided with the shoveling 3 for bulldozing, and the length on the left and right directions of shoveling 3 is more than on the left and right directions of mainframe 1 Length, the drive rod 4 for driving shoveling 3 to rotate is additionally provided with mainframe 1;The lower section of driver's cabin 2 is fixedly connected with water tank 5, The right side of water tank 5 is fixedly connected with water-supply-pipe 6, and water-supply-pipe 6 is provided with the suction pump 7 for being used for extracting water in water tank 5, water-supply-pipe 6 On be additionally provided with valve 8 for regulating water flow size.
The front end of water-supply-pipe 6 is fixedly connected with threeway 9, and the left and right ends of threeway 9 are threaded with sparge pipe 10, sparge pipe 10 can be rotatably connected in threeway 9 along its axis direction, and the maximum spacing of two left and right ends of sparge pipe 10 is more than the left side of shoveling 3 The maximum length at right both ends.
Fixed support 11 has been fixedly connected with left and right sides of the upper end of shoveling 3, has been offered on fixed support 11 for spraying water What pipe 10 passed through passes through groove 12, and sparge pipe 10 can pass through to be rotatably connected on fixed support 11 through groove 12, and sparge pipe 10 is worn The upper end of fixed support 11 is located at, and certain gap 13 is provided between sparge pipe 10 and shoveling 3;Uniformly opened up on sparge pipe 10 There are several water jets 14 for being used for water outlet, a waterfog head 15 is mounted on each water jet 14.
Shoveling 3 includes the most push pedal 16 of rear side and the bottom plate 17 close to ground side, and shoveling 3 also includes the left and right sides and tilted The fixed dam 18 of setting, the front end of fixed dam 18 tilt laterally, and two fixed dams 18 are in eight shape;Before bottom plate 17 End is also fixedly connected with wear-resisting perching knife 19.
Operation principle:When needing to bulldoze, suction pump 7 and valve 8 are opened, water-supply-pipe 6 can be continuous by the water in water tank 5 It is transferred in sparge pipe 10, current can be sprayed after waterfog head 15 in the form of water smoke;When operator drives shoveling 3 When different angles are presented, there is certain angle between shoveling 3 and ground, rotate sparge pipe 10, waterfog head 15 can be presented Different angles, waterfog head 15 can spray water smoke at different angles, increase the use range of equipment;Water smoke sprays Afterwards, water smoke can be bonded together with the dust in air, and dust drops together with water smoke, the effect for the dedusting played.
Described above is only preferred embodiment of the present utility model, and the scope of protection of the utility model is not limited merely to Above-described embodiment, all technical schemes belonged under the utility model thinking belong to the scope of protection of the utility model.It should refer to Go out, for those skilled in the art, some improvement under the premise of the utility model principle is not departed from and Retouching, these improvements and modifications also should be regarded as the scope of protection of the utility model.

Claims (8)

1. a kind of depositing dust bull-dozer, including mainframe (1), the mainframe (1) is provided with driver's cabin (2), the mainframe (1) Side be provided with for bulldoze shoveling (3), it is characterised in that:Water tank (5) is fixedly connected with the mainframe (1), it is described The side of water tank (5) is fixedly connected with suction pump (7), and sparge pipe (10), the sparge pipe are fixedly connected with the shoveling (3) (10) offered on several be used for spray water water jet (14), the sparge pipe (10) and suction pump (7) pass through water-supply-pipe (6) Connect, the valve (8) for adjusting current size is also communicated with the water-supply-pipe (6).
A kind of 2. depositing dust bull-dozer according to claim 1, it is characterised in that:Pacify on several described water jets (14) Equipped with waterfog head (15).
A kind of 3. depositing dust bull-dozer according to claim 1, it is characterised in that:It is fixedly connected with the shoveling (3) Fixed rack (11), the sparge pipe (10) are embedded on the fixed support (11).
A kind of 4. depositing dust bull-dozer according to claim 3, it is characterised in that:The sparge pipe (10) is located in fixed branch The one end of frame (11) away from shoveling (3), gap (13) are provided between the sparge pipe (10) and shoveling (3).
A kind of 5. depositing dust bull-dozer according to claim 4, it is characterised in that:It is fixedly connected with the water-supply-pipe (6) Threeway (9), two sparge pipes (10) are fixedly connected on remaining both ends of threeway (9), and the sparge pipe (10) is by described Threeway (9) is fixedly connected on water-supply-pipe (6), and two sparge pipes (10) are threaded in threeway (9), two sprays Water pipe (10) is rotatably connected on fixed support (11) along its axis direction.
A kind of 6. depositing dust bull-dozer according to claim 1, it is characterised in that:The left and right sides of the shoveling (3) is fixed Fixed dam (18) is connected with, the fixed dam (18) tilts and is fixed in shoveling (3), and the fixed dam (18) is outside Roll oblique.
A kind of 7. depositing dust bull-dozer according to claim 1, it is characterised in that:The length of the sparge pipe (10), which is more than, to be pushed away Shovel the length of (3).
A kind of 8. depositing dust bull-dozer according to claim 1, it is characterised in that:The remote mainframe (1) of the shoveling (3) One end is fixedly connected with wear-resisting perching knife (19).
CN201720395854.3U 2017-04-15 2017-04-15 A kind of depositing dust bull-dozer Expired - Fee Related CN206635842U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720395854.3U CN206635842U (en) 2017-04-15 2017-04-15 A kind of depositing dust bull-dozer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720395854.3U CN206635842U (en) 2017-04-15 2017-04-15 A kind of depositing dust bull-dozer

Publications (1)

Publication Number Publication Date
CN206635842U true CN206635842U (en) 2017-11-14

Family

ID=60245804

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720395854.3U Expired - Fee Related CN206635842U (en) 2017-04-15 2017-04-15 A kind of depositing dust bull-dozer

Country Status (1)

Country Link
CN (1) CN206635842U (en)

Similar Documents

Publication Publication Date Title
US7191553B2 (en) Ditch digging bucket
US6733086B1 (en) Vacuum system for milling machine
JP2018504541A (en) Towable work machine for ground and road leveling
JP5216324B2 (en) Drag head for trailing suction hopper and method for dredging with this drag head
US5178484A (en) Apparatus to prepare a road surface
CN110700849A (en) Tunnel hard rock heading machine and heading machine cutter head thereof
KR100808243B1 (en) Dredging apparatus
US7832128B2 (en) Ditch digging bucket
EP1972724B1 (en) Device for the profiling of canals
CN208870597U (en) A kind of balance shield machine cutterhead
CN102605749A (en) Construction method of shuttle-shaped dam for intercepting debris flow
CN206635842U (en) A kind of depositing dust bull-dozer
CN209430197U (en) A kind of digging laneway dust goes out except equipment
CN211174123U (en) Tunnel hard rock heading machine and heading machine cutter head thereof
CN106049334B (en) A kind of environmental protection cleaning cart
CN110080795A (en) A kind of tunneling subway rapid construction mucking machine
CN207484364U (en) A kind of civil engineering works clean dust-extraction unit
CN206034522U (en) A spray nozzle system that is used for owner of rake head mechanism rake head
JPH11336037A (en) Water permeable function recovering method and device for pavement having void
CN209669955U (en) A kind of bull-dozer for building easy to use
CN207295807U (en) A kind of power shovel of civil engineering
CN217974554U (en) Anti-sticking bucket for high-unloading loader
US6918448B2 (en) Grader
CN207660023U (en) A kind of earth mover ridge buster
CN219240401U (en) Asphalt mixture scattering dust-proof device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171114

Termination date: 20200415