CN206635758U - A kind of construction steel pipe pile machine - Google Patents

A kind of construction steel pipe pile machine Download PDF

Info

Publication number
CN206635758U
CN206635758U CN201720288649.7U CN201720288649U CN206635758U CN 206635758 U CN206635758 U CN 206635758U CN 201720288649 U CN201720288649 U CN 201720288649U CN 206635758 U CN206635758 U CN 206635758U
Authority
CN
China
Prior art keywords
pipe pile
steel
pile
pressure gas
high pressure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720288649.7U
Other languages
Chinese (zh)
Inventor
孙康
高慎伟
高佳
许传遒
刘丹
姚文清
李洋
王莹
刘赛
刘永涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenyang Emperor Platinum Building Engineering Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201720288649.7U priority Critical patent/CN206635758U/en
Application granted granted Critical
Publication of CN206635758U publication Critical patent/CN206635758U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The utility model relates generally to a kind of construction steel pipe pile machine, its rotary motive power head for mainly including setting on high tower stake machine, isolation damper, hangs the composition such as pile cover, long drill pipe, split type positioning disk, down-hole hammer, drill bit.Steel-pipe pile, which is arranged on, hangs pile cover bottom, is enclosed on outside long drill pipe, and pass through split type positioning disk.The utility model can fast and safely complete long steel-pipe pile in area constructions such as rock, cobble stone, boulder, backfill mountain skin stones.

Description

A kind of construction steel pipe pile machine
Technical field
The utility model belongs to geotechnical engineering construction field, and its role is to solve the long steel pipe pile driving construction in Rock Region to ask Topic.
Background technology
In regional construction steel pile tubes such as rock, cobble stone, boulder, backfill mountain skin stones, generally use down-hole hammer draws hole, with Sleeve drill Enter, steel-pipe pile is once constructed as sleeve pipe and completes drilling and steel-pipe pile placement.
Long drill pipe down-hole hammer drawing hole construction is hung to improve efficiency of construction generally use high tower stake machine, brill is enclosed on outside steel-pipe pile Outside bar, shoe is set, shoe welds together with steel-pipe pile outside impactor.
This technique be present at present:
Steel-pipe pile Fast Installation problem.Construction machinery will must be enclosed on outside drilling rod outside steel-pipe pile at present, outside bottom and drill bit Shoe weld together, so construction need every steel pipe with shoe weld, efficiency of construction is slow, be not suitable for extensive steel pipe Pile driving construction.Additionally need every steel-pipe pile and be equipped with a shoe, cost is too high.
High tower stake driver drilling rod is longer, and drilling rod and sleeve pipe are only fixed by top power head suspension, and perpendicularity should not be controlled during construction , easily there is deviation in system.
Rig relies on compressed air-driven DTH drilling pore-forming, and air pressure is larger.High pressure gas pipeline is needed from pneumatics Machine is connected to rotary motive power head lower air inlet, and follows unit head to move up and down, and easily occurs during use damaged.It is once defeated There is breakage in tracheae pipe shaft or joint, and pressure-air sprays moment from breakage, and drives appendix to dance in the air all over the sky, is easy to Damage worker or machinery, cause huge life and property loss.
The content of the invention
Goal of the invention:The purpose of this utility model is to invent a kind of construction steel pile tube that can be efficient, safe and environment-friendly Stake machine.
Technical scheme:
A kind of construction steel pipe pile machine, it is characterised in that:Rotary motive power head is provided with high tower stake machine;The rotary motive power Drilling rod is connected with head;The drilling rod lower end is provided with drill bit;
Steel-pipe pile is cased with outside the drilling rod;The steel-pipe pile passes through the split type positioning disk for being arranged on high tower stake machine bottom;
High pressure gas transmission system is connected on the rotary motive power head.
Described construction steel pipe pile machine, it is characterised in that:There is isolation damper between drilling rod and the rotary motive power head With extension pile cover;The steel-pipe pile is hung below pile cover.
Described construction steel pipe pile machine, it is characterised in that:The extension pile cover top seal, bottom-open;
Hang helmet diameter and be more than steel-pipe pile diameter, limiter is set between hanging at the top of pile cover and at the top of steel-pipe pile;
Hang and multiple extension stake suckers are provided with the middle part of pile cover, including fixing sucking disk and movable suction, wherein:
Fixing sucking disk is fixed on sucker case side wall by tightening latch, non-movable;
Movable suction is fixed in the bar hole in sucker case side wall by tightening latch, can be moved forward and backward;
Sucker lower box part sets guide plate;
The fixing sucking disk and movable suction are permanent magnetic chuck;
Vibrator is provided with the top of the extension pile cover.
Described construction steel pipe pile machine, it is characterised in that:The split type positioning disk includes:
It is divided to the guiding disc carrier of two valves to be separately fixed on high tower stake machine;
Two valve is oriented to disc carrier and connected by being opened and closed tightening latch;
The swing link being only flipped up is set respectively on the guiding disc carrier;
The swing link interior edge, which is set, strengthens edge.
Described construction steel pipe pile machine, it is characterised in that:The high pressure gas transmission system is arranged at rotary motive power head and height Between pressurized air source, including:
High pressure gas pipeline is shorter than high pressure gas pipeline with being set together with cable wire, with cable wire;
Adjacent two high pressure gas pipeline joints both ends set joint connecting strand;In high pressure gas pipeline joint and high pressure gas pipeline Middle position sets stationary rope to be connected with cable wire.
Described construction steel pipe pile machine, it is characterised in that:The high tower stake machine is provided with crawler type or walking Device.
Brief description of the drawings:
Fig. 1 is the utility model construction steel pipe pile machine elevation;
Fig. 2 is that the utility model hangs pile cover elevation;
Fig. 3 is that the utility model hangs pile cover profile;
Fig. 4 is the split type positioning disk plan of the utility model(During closure);
Fig. 5 is the split type positioning disk plan of the utility model(During unlatching);
Fig. 6 is the split type positioning disk profile of the utility model;
Fig. 7 is the utility model high pressure gas transmission system plan.
Description of reference numerals:
1 high tower rig;2 rotary motive power heads;3 shock insulation buffers;
4 hang pile cover;4-1 hangs stake cylinder;4-2 fixing sucking disks;4-3 movable suctions;4-4 tightening latches;4-5 sucker casees;4-6 bar shapeds Hole;4-7 guide plates;4-8 vibrators;4-9 limiters;
5 drilling rods;
6 steel-pipe piles;
7 split type positioning disks;The split type guiding disc carriers of 7-1;7-2 swing links;7-3 strengthens edge;7-4 is opened and closed tightening latch;
8 drill bits;
9 high pressure gas transmission systems;9-1 high pressure gas pipelines;9-2 high pressure gas pipeline joints;9-3 is with cable wire;9-4 joints connect Rope;9-5 static lines.
Advantage and effect:
1. by using high tower stake machine, hanging pile cover, mounting the components such as sucker and can disposably complete long steel pipe pile driving construction, carry High workload efficiency.
2. the perpendicularity of steel pipe pile driving construction can be ensured by plug-in steel-pipe pile and split type positioning disk, construction matter ensure that Amount.
3. being set beside high pressure gas pipeline with cable wire, it is possible to prevente effectively from appendix is hurted sb.'s feelings, construction safety ensure that.
Embodiment:
The utility model is a kind of construction steel pipe pile machine of invention, and this machine includes moveable high tower stake machine, back rotation Power head, fixed dust cover, elastic vibration isolation buffer, extension pile cover, extension stake sucker, drilling rod, down-hole hammer, the first-class composition of reamer.
High tower stake machine carries running gear, can be the forms such as crawler type or walking.High tower stake machine can use long spiral shell The pile machine equipments such as rotary drill machine, vibroflotation hidden pipe pile machine, impact pile driving machine, cement-soil mixing pile machine are transformed.
Rotary motive power head is hung in high tower stake machine tower bar, unit head can be electronic or hydraulic power, and unit head turns round Drilling rod and down-hole hammer drilling drilling are driven, unit head there must be deadweight enough or be equipped with hydraulic loading system.
Connected between rotary motive power head and drilling rod by isolation damper, shock insulation buffer can the revolution torsion of passing power head Square applies pressure to drilling rod and can to drilling rod, while can cut down the vibration to rotary motive power head in down-hole hammer impact shock, prolongs The service life of long rotary motive power head.By using high tower stake machine, pile cover is hung, mount the components such as sucker and can disposably complete to grow Steel pipe pile driving construction, improve operating efficiency.
Extension pile cover is installed below in isolation damper, and it is fixed steel-pipe pile to hang pile cover main function.Steel should be ensured by hanging pile cover Pile tube follows shock insulation buffer synchronization lift rotary, also to accomplish that quick peace is torn open.The utility model uses movable suction and fixation Sucker realizes this purpose.Vertically arranged four sucker casees in the middle part of stake cylinder are hung, cross is placed, and sucker is arranged on sucker case It is interior.It is motionless that two neighboring fixing sucking disk by tightening latch is fixed on sucker case side wall;Two other movable suction will be solid by tightening latch It is scheduled in the horizontal bar hole on sucker box wall, can be moved forward and backward in sucker case.Each sucker case lower end is angularly disposed Guide plate.Fixing sucking disk and movable suction can use permanent magnetic chuck.Hang stake cylinder inside top and limiter is set, limitation steel-pipe pile is inserted Enter position.Hang stake cylinder top outer and vibrator is set, avoid rock debris from being sticky in and hang in stake cylinder.
High tower stake machine bottom sets split type positioning disk, as construct ultralong steel tube stake when if can use multiple split type guiding Disk, one is arranged on tower bottom, and remaining is arranged on pylon centre position, using rope suspensions in rotary motive power head bottom, with With lifting.The guiding disc carrier of split type positioning disk is divided into two valves and is separately fixed on pylon, can left rotation and right rotation opening and closing.Two It is integral using tightening latch closure is opened and closed to be oriented to disc carrier.It is oriented to above disc carrier and swing link is set respectively, support profile is more than the moon Dental lamina, swing link only upwardly open, and close during horizontal level.Swing link internal diameter is slightly larger than steel-pipe pile external diameter after closure.Crescent moon Plate interior edge sets circular reinforcement edge.Drilling rod and steel-pipe pile pass through split type positioning disk, close two swing links, steel-pipe pile can only Lifted among two swing links in circular hole, constraining the horizontal-shift of steel-pipe pile, effectively control the perpendicularity of steel-pipe pile.It is logical The perpendicularity of steel pipe pile driving construction can be ensured by crossing plug-in steel-pipe pile and split type positioning disk, ensure that construction quality.
Installation is with cable wire beside high pressure gas pipeline.High pressure gas pipeline joint both ends are connected to one using joint connecting rope Rise.High pressure gas pipeline joint and high pressure gas pipeline middle position set stationary rope to be connected with cable wire.Grown with cable wire Degree is slightly shorter than high pressure gas pipeline, sufficiently large with intensity of the steel wire rope, and high pressure gas pipeline, which relies on to fix with cable wire, is suspended on a machine, sky On press or other fixtures.Set with cable wire beside high pressure gas pipeline, it is possible to prevente effectively from appendix is hurted sb.'s feelings, protect Construction safety is demonstrate,proved.
The utility model is described further below in conjunction with the accompanying drawings:
Steel-pipe pile 6 is first enclosed on the outside face of drilling rod 5 before construction steel pile tube ram machine construction.Unclamp and hang all work on pile cover 4 Dynamic sucker 4-3 and fixing sucking disk 4-2 ships and resell on another market, and discharges magnetic, removable magnetic sucker and tightening latch is moved on the outside of horizontal bar hole, steel Pile tube is hung in pile cover along hanging stake cylinder and guide plate and pack into, withstood at the top of steel-pipe pile with limiter 4-9 together with.Then by activity forever Magnetic-disc and tightening latch are shifted onto on the inside of horizontal bar hole, are turned round all suckers and are shipped and resell on another market, and produce magnetic, are completed steel-pipe pile and are fixed.Drilling rod Split type positioning disk 7 is passed through with steel-pipe pile, closes two swing links 7-2, locked opening and closing tightening latch 7-4.Steel-pipe pile can only be at two Lifted among swing link in circular hole, constrain the horizontal-shift of steel-pipe pile, effectively control the perpendicularity of steel-pipe pile.
Steel-pipe pile stake machine and high-pressure air source are opened, is crept into, when rotary motive power first 2 and extension pile cover fall on high tower stake machine bottom During portion, the opening and closing tightening latch of split type positioning disk is opened, split type positioning disk 7 is divided into two valves, left rotation and right rotation, fallen to pile cover is hung Get out of the way space.Steel pipe pile driving construction in place after, contrary operation steel-pipe pile hangs process, removes steel-pipe pile.
All high pressure gas pipeline 9-1, which rely on to fix with cable wire 9-3, is suspended on a machine, high-pressure air source or other fixtures On.

Claims (6)

  1. A kind of 1. construction steel pipe pile machine, it is characterised in that:High tower stake machine(1)On be provided with rotary motive power head(2);The revolution Unit head(2)Under be connected with drilling rod(5);The drilling rod(5)Lower end is provided with drill bit(8);
    The drilling rod(5)It is cased with steel-pipe pile outside(6);The steel-pipe pile(6)Through being arranged on high tower stake machine(1)Bottom it is split type Positioning disk(7);
    The rotary motive power head(2)Upper connection high pressure gas transmission system(9).
  2. 2. construction steel pipe pile machine according to claim 1, it is characterised in that:The drilling rod(5)With rotary motive power head(2) Between have isolation damper(3)With extension pile cover(4);The steel-pipe pile(6)Hang extension pile cover(4)Below.
  3. 3. construction steel pipe pile machine according to claim 2, it is characterised in that:The extension pile cover(4)Top seal, bottom Open wide;
    Hang pile cover(4)Diameter is more than steel-pipe pile(6)Diameter, hang pile cover(4)Top and steel-pipe pile(6)Limiter is set between top (4-9);
    Hang pile cover(4)Middle part is provided with multiple extension stake suckers, including fixing sucking disk(4-2)And movable suction(4-3), wherein:
    Fixing sucking disk(4-2)Pass through tightening latch(4-4)It is fixed on sucker case(4-5)Side wall, it is non-movable;
    Movable suction(4-3)Pass through tightening latch(4-4)It is fixed on sucker case(4-5)Bar hole in side wall(4-6)It is interior, front and rear it can move It is dynamic;
    Sucker case(4-5)Bottom sets guide plate(4-7);
    The fixing sucking disk(4-2)And movable suction(4-3)It is permanent magnetic chuck;
    The extension pile cover(4)Top is provided with vibrator(4-8).
  4. 4. construction steel pipe pile machine according to claim 1, it is characterised in that:The split type positioning disk(7)Including:
    It is divided to the guiding disc carrier of two valves(7-1)It is separately fixed at high tower stake machine(1)On;
    Two valve is oriented to disc carrier(7-1)By being opened and closed tightening latch(7-4)Connection;
    The guiding disc carrier(7-1)It is upper that the swing link being only flipped up is set respectively(7-2);
    The swing link(7-2)Interior edge, which is set, strengthens edge(7-3).
  5. 5. construction steel pipe pile machine according to claim 1, it is characterised in that:The high pressure gas transmission system(9)It is arranged at Rotary motive power head(2)Between high-pressure air source, including:
    High pressure gas pipeline(9-1)With adjoint cable wire(9-3)It is set together, with cable wire(9-3)It is shorter than high pressure gas pipeline(9- 1);
    Adjacent two high pressure gas pipeline joints(9-2)Both ends set joint connecting strand(9-4);In high pressure gas pipeline joint(9-2) And high pressure gas pipeline(9-1)Middle position sets stationary rope(9-5)With adjoint cable wire(9-3)Connection.
  6. 6. construction steel pipe pile machine according to claim 1, it is characterised in that:The high tower stake machine(1)It is provided with crawler belt Formula or walking device.
CN201720288649.7U 2017-03-23 2017-03-23 A kind of construction steel pipe pile machine Active CN206635758U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720288649.7U CN206635758U (en) 2017-03-23 2017-03-23 A kind of construction steel pipe pile machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720288649.7U CN206635758U (en) 2017-03-23 2017-03-23 A kind of construction steel pipe pile machine

Publications (1)

Publication Number Publication Date
CN206635758U true CN206635758U (en) 2017-11-14

Family

ID=60249383

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720288649.7U Active CN206635758U (en) 2017-03-23 2017-03-23 A kind of construction steel pipe pile machine

Country Status (1)

Country Link
CN (1) CN206635758U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108825153A (en) * 2018-06-19 2018-11-16 中交二航局第三工程有限公司 Steel-pipe pile hole cleaning device and borehole cleaning method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108825153A (en) * 2018-06-19 2018-11-16 中交二航局第三工程有限公司 Steel-pipe pile hole cleaning device and borehole cleaning method

Similar Documents

Publication Publication Date Title
CN104074461B (en) Engineering groover is rushed in suspension type convolution shake
CN103089145B (en) Down-the-hole hammer power head of rotary drilling rig and rotary drilling rig
CN104929517B (en) Full-hydraulic drill type pressure relieving equipment with double drill bits and pressure relieving method
CN103114806A (en) Rotary drilling rig
CN206635758U (en) A kind of construction steel pipe pile machine
CN103422862A (en) Ultra-large hole-diameter drilling shaft drilling method
CN106988673A (en) A kind of damping type air inlet revolving gear
CN216922116U (en) Shaft tunneling cutter head and shaft tunneling equipment
CN106869125B (en) A kind of steel pipe pile construction method
CN102587834A (en) Drilling tool and piling machinery
CN109356521B (en) Vertical combined type tunneling system
CN109630042B (en) Vertical combined type tunneling process
CN208605192U (en) A kind of unidirectional integral cutting equipment in subsurface rock channel
CN112502634B (en) Dry drilling tunneling method and equipment based on loess layer
CN109653681A (en) Vertical combined type development machine
CN214616355U (en) Crawler drill for hydropower station engineering
CN115628006A (en) Non-rotating down-the-hole hammer drill and use method thereof
CN109025814A (en) A kind of working in driving face of coal mine prospecting by boring protective device
CN113585958A (en) Telescopic drill rod reverse circulation down-the-hole hammer drill and use method thereof
CN211777234U (en) Coal mining tunnelling rig securing device
CN204081992U (en) Engineering groover is rushed in suspension type convolution shake
JP2014125801A (en) Hammer grab and low empty head type excavating device
CN203347791U (en) Cutting supporting device for open-off cut of fully-mechanized coal mining surface of sharp inclined coal seam
RU39614U1 (en) MACHINE FOR DIPPING PILES OR PILED FOUNDATIONS UNDER CONTACT NETWORK SUPPORT (MS-1) (OPTIONS) AND VIBRO LOADER FOR IT
CN204782740U (en) Combined type rig

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20180530

Address after: 110032 six, floor 7, COFCO Plaza, 56 the Yellow River North Street, Huanggu District, Shenyang, Liaoning.

Patentee after: Yan Keqi

Address before: 110032 Liaodi group, Feng Hui square, 56 the Yellow River South Street, Huanggu District, Shenyang, Liaoning

Patentee before: Sun Kang

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20180807

Address after: 110032 No. 56-39 the Yellow River North Street, Huanggu District, Shenyang, Liaoning 604

Patentee after: Shenyang emperor platinum Building Engineering Co., Ltd.

Address before: 110032 six, floor 7, COFCO Plaza, 56 the Yellow River North Street, Huanggu District, Shenyang, Liaoning.

Patentee before: Yan Keqi