CN206633175U - A kind of concrete cast iron die trial - Google Patents
A kind of concrete cast iron die trial Download PDFInfo
- Publication number
- CN206633175U CN206633175U CN201720253230.8U CN201720253230U CN206633175U CN 206633175 U CN206633175 U CN 206633175U CN 201720253230 U CN201720253230 U CN 201720253230U CN 206633175 U CN206633175 U CN 206633175U
- Authority
- CN
- China
- Prior art keywords
- cheek
- cheek board
- bottom plate
- die trial
- ring
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Sampling And Sample Adjustment (AREA)
Abstract
The utility model discloses a kind of concrete cast iron die trial, it is characterized in:Including retainer ring and square bottom plate, cheek board is respectively articulated with four sides of bottom plate, four cheek boards are rotated up forming die cavity, and Fixing shrink ring is located at the upper end of four cheek boards;The upper end of cheek board is provided with shrinkage pool, and the ring ear of protrusion is provided with the outside of retainer ring.It is of the present utility model simple in construction, using bottom plate and four rotatable cheek board structures, the combination of die trial is completed located at four cheek board upper ends with Fixing shrink ring, therefore it combines very convenient quick, likewise, its fractionation is convenient to quickly, as long as removing retainer ring;Shrinkage pool is inserted with specific purpose tool during the demoulding, increases the torque for rotating cheek board with this, therefore is easy to rotate cheek board, and then removes test specimen.
Description
Technical field
The utility model belongs to technical field of building construction, more particularly, to a kind of concrete cast iron die trial.
Background technology
In building construction, in order to test or examine the compressive property of concrete, it is necessary to make the concrete of square build
Test specimen.Making test specimen then needs square die trial, and in the market still without the concrete test die of unified standard, some use plastics
Manufactured die trial, it is a uniform shapes, therefore the demoulding is highly difficult, and some castiron die trials, its cheek board can be torn open
Open, it is so conveniently stripped, but relation is typically spirally connected to fix by screw bolt and nut between cheek board, so that die trial
Combination and split that speed is slower, and bolt is easily adhered cement in use for die trial, cause it to combine and split more
It is not easy, it is therefore necessary to improved.
The content of the invention
The purpose of this utility model is to be directed to above-mentioned the shortcomings of the prior art, there is provided a kind of concrete cast iron die trial,
It, which has, is convenient in demoulding, and the characteristics of quick is combined and split in die trial.
To achieve these goals, technical scheme is used by the utility model:A kind of concrete cast iron die trial, including
The bottom plate of retainer ring and square, cheek board has been respectively articulated with four sides of the bottom plate, four cheek boards are rotated up shape
Into die cavity, the Fixing shrink ring is located at the upper end of four cheek boards;The upper end of the cheek board is provided with shrinkage pool, the fixation
The ring ear of protrusion is provided with the outside of ring.
The bottom of the bottom plate is provided with boss.
After said structure, the utility model is compared to the prior art advantageously:Knot of the present utility model
Structure is simple, and using bottom plate and four rotatable cheek board structures, examination is completed located at four cheek board upper ends with Fixing shrink ring
The combination of mould, therefore its combination is very convenient quick, likewise, its fractionation is convenient to quickly, as long as removing retainer ring i.e.
Can;Shrinkage pool is inserted with specific purpose tool during the demoulding, increases the torque for rotating cheek board with this, therefore is easy to rotate cheek board, is entered
And remove test specimen.
Brief description of the drawings
Fig. 1 is top view of the present utility model.
Fig. 2 is front view of the present utility model.
Embodiment
As described below is only preferred embodiment of the present utility model, does not therefore limit protection model of the present utility model
Enclose, the utility model is further illustrated with reference to the accompanying drawings and examples.
Embodiment, as shown in Fig. 1 to Fig. 2:A kind of concrete cast iron die trial, including the bottom plate 2 of retainer ring 1 and square,
Cheek board 3 is hinged with by hinge 8 respectively on four sides of the bottom plate 2, four cheek boards 3 are rotated up forming die cavity 4, institute
State the upper end that retainer ring 1 is set in four cheek boards 3;The upper end of the cheek board 3 is provided with shrinkage pool 5, the retainer ring 1
Outside is provided with the ring ear 6 of protrusion.
Preferably, the bottom of the bottom plate 2 is provided with the boss 7 for being higher by hinge 8, can prevent when die trial from using because of collision and
Hinge 8 is damaged, and then avoids result in when four cheek boards 3 combine and can not mutually be fitted close.
The upper end that retainer ring 1 is sheathed on four cheek boards 3 by the utility model can complete the combination of die trial, therefore its group
Close very convenient quick, likewise, its fractionation is convenient to quick, as long as removing retainer ring 1, ring ear 6 is solid to removing
It is helpful to determine ring 1;Shrinkage pool 5 is inserted with specific purpose tool during the demoulding, torque when rotating cheek board 3 is increased with this, therefore is easy to
Cheek board is rotated, and then removes test specimen.
Claims (2)
- A kind of 1. concrete cast iron die trial, it is characterised in that:Bottom plate (2) including retainer ring (1) and square, the bottom plate (2) cheek board (3) has been respectively articulated with four sides, four cheek boards (3) are rotated up forming die cavity (4), the retainer ring (1) it is set in the upper end of four cheek boards (3);The upper end of the cheek board (3) is provided with shrinkage pool (5), the retainer ring (1) Outside be provided with the ring ear (6) of protrusion.
- A kind of 2. concrete cast iron die trial according to claim 1, it is characterised in that:The bottom of the bottom plate (2) is set There is boss (7).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720253230.8U CN206633175U (en) | 2017-03-15 | 2017-03-15 | A kind of concrete cast iron die trial |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720253230.8U CN206633175U (en) | 2017-03-15 | 2017-03-15 | A kind of concrete cast iron die trial |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206633175U true CN206633175U (en) | 2017-11-14 |
Family
ID=60249501
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720253230.8U Expired - Fee Related CN206633175U (en) | 2017-03-15 | 2017-03-15 | A kind of concrete cast iron die trial |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206633175U (en) |
-
2017
- 2017-03-15 CN CN201720253230.8U patent/CN206633175U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2006057672A3 (en) | Method and apparatus for casting structures | |
CN105525750B (en) | Beam forms is crossed by a kind of construction method of door lintel and aluminium alloy door | |
CN203022340U (en) | Concrete flanging tool type template for rooms with waterproof requirement | |
CN206633175U (en) | A kind of concrete cast iron die trial | |
CN205593816U (en) | Detachable concrete test | |
CN209854874U (en) | Inspection shaft well body pouring template | |
CN205487741U (en) | Dry -type transformer high -pressure coil casting mold | |
CN204225493U (en) | Construction formwork molding structure | |
CN207260580U (en) | A kind of abnormity Mould for door and window | |
CN203096941U (en) | Detachable locking pin screw | |
CN207268085U (en) | Novel architecture through-wall bolt | |
CN207032868U (en) | The form clamp of reversed beam is poured after a kind of | |
CN204012542U (en) | Wall bushing | |
CN207296382U (en) | A kind of building template | |
CN202187553U (en) | Floor prepared hole die with steel bed die | |
CN205483759U (en) | Concrete cube compressive strength that permeates water smashes shaping examination mould from shaking | |
CN205531287U (en) | Scaffold that encorbelments puts up fixing device | |
CN210917751U (en) | U-shaped ring protective sleeve | |
CN202910972U (en) | Prefabricated die for wall crown corner building block | |
CN207778360U (en) | A kind of streetlamp foundation built-in fitting | |
CN208072967U (en) | A kind of beam for building side fixing piece | |
CN207245172U (en) | A kind of constructional column prefab-form structure | |
CN203603484U (en) | Opposite-pull screw | |
CN203257101U (en) | Structure for connecting bare concrete formwork and square timber | |
CN205840328U (en) | Pour the interior template of cartridge type component |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20180330 Address after: Taizhou City, Zhejiang province Huangyan District Dongcheng Street 318020 Lane 12 Patentee after: Guan Xianming Address before: Jiaojiang District Hongjiadu streets Gangtou Xu village in Taizhou City, Zhejiang province 318015 1-10 Patentee before: Xu Yunfei |
|
TR01 | Transfer of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171114 Termination date: 20180315 |
|
CF01 | Termination of patent right due to non-payment of annual fee |