CN206632541U - A kind of high-strength connecting frame automatically welding workstation - Google Patents
A kind of high-strength connecting frame automatically welding workstation Download PDFInfo
- Publication number
- CN206632541U CN206632541U CN201720176343.2U CN201720176343U CN206632541U CN 206632541 U CN206632541 U CN 206632541U CN 201720176343 U CN201720176343 U CN 201720176343U CN 206632541 U CN206632541 U CN 206632541U
- Authority
- CN
- China
- Prior art keywords
- fixture
- heat
- chock
- conducting block
- welding
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model discloses a kind of high-strength connecting frame automatically welding workstation, belongs to technical field of welding equipment.It includes two symmetrically arranged couple yoke fixtures;Each couple yoke fixture includes fixture installing plate and the first heat-conducting block and the second heat-conducting block that are assemblied on fixture installing plate same side, and flexible pipe is also equipped with the fixture installing plate;The first chock being adapted with outer groove is installed on first heat-conducting block and offers the first cooling through hole in the first heat-conducting block.The utility model is by setting the first chock and the second chock and filling in the first chock and the second chock in outer groove, using welding robot, using single face welding and double face shaping technology, to four internal grooves, art is welded simultaneously at internal groove, back chipping is not needed in welding process, welding efficiency and welding quality are improved, reduces labor strength.
Description
Technical field
Technical field of welding equipment is the utility model is related to, especially a kind of high-strength connecting frame automatically welding workstation.
Background technology
With domestic and international market demand and technological innovation sustainable development, machinery industry shows the impetus of fast development, respectively
The advanced processing welding technique in individual field is applied in machinery production manufacture, and the development in an all-round way for machinery brings new machine
Meet;Welding job is heavy in the production process of product, and manual welding occupies leading position, and manual welding is endangered to the health of worker
Evil is big, can not meet the demand of the development of modern mechanical manufacturing technology;In Europe and the construction machinery industry of Japan, structure
Part robotic welding technology development is more early, and as technology is gradually ripe, application is gradually increased;In recent years, domestic market pair
The requirement of manufacturing technology is constantly lifted, the trend pickup of product structure part welding technique, some domestic Large-Scale Equipments
Gradually start to grope applied robot's welding technique on structural member, and then form robot welding and human weld is combined
Efficient welding production model, for locomotive connection the high-strength connecting frame of high-strength material product welding procedure automation weight
The property wanted is protruded and displayed;It is the revolutionary advancement of Automation of Welding using robot welding, it is firm that it breaches traditional welding
Property automation mode, opened up a kind of flexible automation new paragon, rigid automatic welding equipment be typically all it is special, generally
Used in, the automated production of high-volume welding product, thus in, in be pilot welding production, SMAW and
Artificial gas shield welding is still main welding manner, and welding robot application produce the automatic welding of be pilot turn into can
Energy;
High-strength connecting frame is the high-strength material product for locomotive connection, and high-strength connecting frame is by workpiece framework and connecting plate
Composition, produced using the method for welding, as shown in figure 4, high-strength connecting frame 12 includes upper frame body 12a, lower frame body 12b and setting
Between upper frame body 12a and lower frame body 12b left connection board 12c and right connection board 12d, upper frame body 12a and left connection board 12c it
Between, outer the groove 12e and internal groove 12f of position correspondence are provided between lower frame body 12b and left connection board 12c.Upper frame body 12a with
Also outer the groove 12e and internal groove of position correspondence are provided between right connection board 12d, between lower frame body 12b and right connection board 12d
12f.First by the mode of artificial spot welding splicing in welding process, multi-pass welding then is carried out to the position that needs weld again
Connect.High-strength connecting frame is welded at present in the presence of being soldered behind side, it is necessary to which back chipping, welding efficiency is low, and poor welding quality, worker's work is by force
Degree is big, and cooling effect is poor in welding process, the problem of being also easy to produce failure welding product.
Utility model content
The purpose of this utility model is to overcome above-mentioned the deficiencies in the prior art, there is provided a kind of high-strength connecting frame automatic welding
Work station.The utility model is soldered behind side, it is necessary to back chipping, welding efficiency to solve to weld high-strength connecting frame presence at present
Low, poor welding quality, labor strength is big, and cooling effect is poor in welding process, the problem of being also easy to produce failure welding product.
The utility model uses following technical proposals:A kind of high-strength connecting frame automatically welding workstation, it is right including two
Claim the couple yoke fixture set;
Each couple yoke fixture includes fixture installing plate and be assemblied on fixture installing plate same side first
Heat-conducting block and the second heat-conducting block, flexible pipe is also equipped with the fixture installing plate;It is provided with first heat-conducting block and outer slope
The first cooling through hole, one end connection of the first cooling through hole are offered in the first adaptable chock of mouth and the first heat-conducting block
There is the first pipe joint, the other end of the first cooling through hole and one end of flexible pipe connect;Be provided with second heat-conducting block with outside
The second cooling through hole is offered in the second adaptable chock of groove and the second heat-conducting block, one end of the second cooling through hole connects
The second pipe joint is connected to, the other end of the second cooling through hole and the other end of flexible pipe connect;First chock and the second chock
The distance between it is identical with distance between two adjacent outer grooves for being opened in high-strength connecting frame the same side;
The fixture installing plate centre position is provided with fixture axle sleeve, and the fixture axle sleeve is built-in to be provided with externally threaded folder
Have rotary shaft, be combined with the external screw thread of the fixture rotary shaft on adjusting nut and the adjusting nut and be fixedly connected with fixture
Gib head, the gib head end of the fixture gib head and the first chock and the second chock are in the same side of fixture installing plate.
Preferably, the material of first heat-conducting block and the second heat-conducting block is red copper.
Preferably, the tail end of the fixture rotary shaft radially offers is provided with rotary shaft hole and the rotary shaft hole
Fixture rotary shaft.
Preferably, the flexible pipe is PVC material, and flexible pipe is fixed on fixture installing plate by hose clamp.
The utility model is by setting the first chock and the second chock and the first chock and the second chock being filled in into outer groove
Interior, using welding robot, using single face welding and double face shaping technology, to four internal grooves, art is welded simultaneously at internal groove,
Back chipping is not needed in welding process, welding efficiency and welding quality is improved, reduces labor strength, by setting first
Heat-conducting block, the second heat-conducting block, flexible pipe, and it is cold by the progress of outside cold water circulating system by the first pipe joint, the second pipe joint
Cooling water circulation, good cooling results in welding process, improve product qualification rate.
Brief description of the drawings
Fig. 1 is the utility model overall structure diagram;
Fig. 2 is Fig. 1 right side structural representation;
Fig. 3 is Fig. 2 overlooking the structure diagram;
Fig. 4 is the structural representation of high-strength connector in Fig. 1;
Wherein fixture installing plate 1, the first heat-conducting block 2, the first chock 2a, the first cooling through hole 2b, the second heat-conducting block 3, the
Two chock 3a, the second cooling through hole 3b, flexible pipe 4, the first pipe joint 5, the second pipe joint 6, fixture axle sleeve 7, fixture rotary shaft 8,
Adjusting nut 9, fixture gib head 10, fixture rotary shaft 11, high-strength connecting frame 12, upper frame body 12a, lower frame body 12b, left connection board
12c, right connection board 12d, outer groove 12e, internal groove 12f.
Embodiment
Need exist for explanation, the noun of locality is left and right, it is upper and lower be to be defined on the basis of the view shown in Fig. 1
, it will be appreciated that the use of the noun of locality should not limit the protection domain that the application is asked.
The utility model is further illustrated with reference to the accompanying drawings and examples.
As shown in Figures 1 to 4, a kind of high-strength connecting frame automatically welding workstation, it includes two symmetrically arranged hook tails
Frame fixture;
Each couple yoke fixture includes fixture installing plate 1 and be assemblied on the same side of fixture installing plate 1 the
One heat-conducting block 2 and the second heat-conducting block 3, flexible pipe 4 is also equipped with the fixture installing plate 1;It is provided with first heat-conducting block 2
With outer groove 12e the first cooling through hole 2b, first cooling are offered in the first adaptable chock 2a and the first heat-conducting block 2
Through hole 2b one end is connected with the first pipe joint 5, and the first cooling through hole 2b other end is connected with one end of flexible pipe 4;Described
It is provided with two heat-conducting blocks 3 and outer groove 12e the second chock 3a being adapted and offers the second cooling in the second heat-conducting block 3 and lead to
Hole 3b, the second cooling through hole 3b one end are connected with the second pipe joint 6, the second cooling through hole 3b other end and flexible pipe 4
The other end connection;The distance between the first chock 2a and the second chock 3a are with being opened in high-strength the same side of connecting frame 12
Distance is identical between two adjacent outer groove 12e;
The centre position of fixture installing plate 1 is provided with fixture axle sleeve 7, and the fixture axle sleeve 7 is built-in to be provided with external screw thread
Fixture rotary shaft 8, fixed company on adjusting nut 9 and the adjusting nut 9 is combined with the external screw thread of the fixture rotary shaft 8
Fixture gib head 10 is connected to, the gib head end of the fixture gib head 10 is with the first chock 2a and the second chock 3a in fixture installing plate 1
The same side.
During work, high-strength connecting frame 12 is fixed on the table, by the first chock 2a of one of couple yoke fixture
It is aligned and fills in two outer groove 12e in high-strength connecting frame 12 on left connection board 12c with the second chock 3a, can be manually rotated folder
Has rotary shaft 8, fixture rotary shaft 8 drives fixture gib head 10 to clamp left connection board 12c, outside cold water is followed by adjusting nut 9
The water inlet and delivery port of loop system are connected on the first pipe joint 5 and the second pipe joint 6;Similarly, by another hook tail
Frame clamp is on right connection board 12d and connects another set of outside cold water circulating system, starts outside cold water circulating system, stream
Dynamic cold water, to weld part potential drop temperature, single welding pair is utilized using welding robot by the first heat-conducting block 2 and the second heat-conducting block 3
Face forming technique welds simultaneously to four internal groove 12f, after the completion of welding, by rolling clamp rotary shaft 8 respectively by two
The fixture gib head 10 of individual couple yoke fixture unclamps.
On the basis of above-mentioned technical proposal, the material of the heat-conducting block 3 of the first heat-conducting block 2 and second is red copper.So
Set, the first heat-conducting block 2 and the heat conductivility of the second heat-conducting block 3 are high, are cooled down in welding process rapid.
On the basis of above-mentioned technical proposal, the tail end of the fixture rotary shaft 8 radially offers rotary shaft hole and described
Fixture rotary shaft 11 is installed in rotary shaft hole.It is arranged such, by fixture rotary shaft 11 fixture rotary shaft 8 can be driven to revolve
Turn, rotation is more laborsaving.
On the basis of above-mentioned technical proposal, the flexible pipe 4 is PVC material, and flexible pipe 4 is fixed on fixture by hose clamp
On installing plate 1.It is arranged such, flexible pipe 4 is in light weight and conveniently dismounting can clear up, and meets actual use needs.
Limitation to scope of protection of the utility model, one of ordinary skill in the art should be understood that in skill of the present utility model
On the basis of art scheme, those skilled in the art need not pay the various modifications that creative work can make or deformation still exists
Within the scope of protection of the utility model.
Claims (4)
- A kind of 1. high-strength connecting frame automatically welding workstation, it is characterised in that:It includes two symmetrically arranged couple yoke fixtures;Each couple yoke fixture includes fixture installing plate (1) and be assemblied on fixture installing plate (1) same side the One heat-conducting block (2) and the second heat-conducting block (3), flexible pipe (4) is also equipped with the fixture installing plate (1);First heat-conducting block (2) it is provided with and offers the first cooling in the first chock (2a) adaptable with outer groove (12e) and the first heat-conducting block (2) and lead to Hole (2b), one end of the first cooling through hole (2b) are connected with the first pipe joint (5), the other end of the first cooling through hole (2b) It is connected with one end of flexible pipe (4);Second chock adaptable with outer groove (12e) is installed on second heat-conducting block (3) The second cooling through hole (3b) is offered in (3a) and the second heat-conducting block (3), one end of the second cooling through hole (3b) is connected with Second pipe joint (6), the other end of the second cooling through hole (3b) are connected with the other end of flexible pipe (4);First chock (2a) And second the distance between chock (3a) with being opened between two of high-strength connecting frame (12) the same side adjacent outer grooves (12e) Apart from identical;Fixture installing plate (1) centre position is provided with fixture axle sleeve (7), and the fixture axle sleeve (7) is built-in to be provided with outer spiral shell The fixture rotary shaft (8) of line, adjusting nut (9) and the adjusting nut are combined with the external screw thread of the fixture rotary shaft (8) (9) fixture gib head (10), gib head end and the first chock (2a) and the second chock of the fixture gib head (10) are fixedly connected with (3a) is in the same side of fixture installing plate (1).
- A kind of 2. high-strength connecting frame automatically welding workstation according to claim 1, it is characterised in that:First heat conduction The material of block (2) and the second heat-conducting block (3) is red copper.
- A kind of 3. high-strength connecting frame automatically welding workstation according to claim 1 or 2, it is characterised in that:The fixture The tail end of rotary shaft (8), which radially offers, is provided with fixture rotary shaft (11) in rotary shaft hole and the rotary shaft hole.
- A kind of 4. high-strength connecting frame automatically welding workstation according to claim 3, it is characterised in that:The flexible pipe (4) For PVC material, and flexible pipe (4) is fixed on fixture installing plate (1) by hose clamp.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720176343.2U CN206632541U (en) | 2017-02-27 | 2017-02-27 | A kind of high-strength connecting frame automatically welding workstation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720176343.2U CN206632541U (en) | 2017-02-27 | 2017-02-27 | A kind of high-strength connecting frame automatically welding workstation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206632541U true CN206632541U (en) | 2017-11-14 |
Family
ID=60252716
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720176343.2U Expired - Fee Related CN206632541U (en) | 2017-02-27 | 2017-02-27 | A kind of high-strength connecting frame automatically welding workstation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206632541U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114227115A (en) * | 2022-01-13 | 2022-03-25 | 安徽江淮汽车集团股份有限公司 | Arc welding deformation prevention mechanism |
-
2017
- 2017-02-27 CN CN201720176343.2U patent/CN206632541U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114227115A (en) * | 2022-01-13 | 2022-03-25 | 安徽江淮汽车集团股份有限公司 | Arc welding deformation prevention mechanism |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203887461U (en) | Workpiece welding jig | |
CN108799346B (en) | Split formula axial connecting device | |
CN103862146A (en) | Method for manufacturing inner barrel of combustor of gas turbine and fixture | |
CN213764724U (en) | Novel welding device for welding work of flange adapter | |
CN212239744U (en) | Multi-angle rotating welding machine for electrical engineering machining | |
CN206632541U (en) | A kind of high-strength connecting frame automatically welding workstation | |
CN206047420U (en) | Angle of chamfer pipe numerical control welding equipment | |
CN203621466U (en) | Fully automatic accumulator plate cast weld machine | |
CN104842108A (en) | Water-cooling welding tool | |
CN106002074B (en) | Movable pipeline fixing device used for welding in a kind of construction | |
CN209288581U (en) | Box type steel structure welding system | |
CN207154458U (en) | A kind of copper bar flattening device | |
CN110253205A (en) | Tree structure tube welding anti-deformation device and localization method | |
CN102848571A (en) | Device and method for sweating soldering plastic thin-walled tube cone mouth | |
CN206169550U (en) | Thin wall conical body welding special fixture | |
CN207206029U (en) | A kind of 90 degree of end face of elbow bevel apparatus of fire fighting supply | |
CN211332031U (en) | Tool based on return bend is fixed | |
CN108067775A (en) | A kind of multiple tube Seal welding protective device | |
CN211052529U (en) | Double chuck device of double-line cold pilger mill | |
CN204035910U (en) | Portal crane supporting cylinder weld jig | |
CN103990906A (en) | Aluminum alloy friction stir welding electric spindle | |
CN205254435U (en) | Pipe fitting circumferential weld autogiration welding frock | |
CN206780181U (en) | A kind of clamper for polishing machine for welding rod production | |
CN207615928U (en) | A kind of joint close equipment suitable for large diameter steel pipe | |
CN209158061U (en) | A kind of mechanical equipment of the steel pipe's production with stability pedestal |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171114 Termination date: 20200227 |
|
CF01 | Termination of patent right due to non-payment of annual fee |