CN206626270U - A kind of no-dig technique void channels aid in trustship device - Google Patents

A kind of no-dig technique void channels aid in trustship device Download PDF

Info

Publication number
CN206626270U
CN206626270U CN201720149121.1U CN201720149121U CN206626270U CN 206626270 U CN206626270 U CN 206626270U CN 201720149121 U CN201720149121 U CN 201720149121U CN 206626270 U CN206626270 U CN 206626270U
Authority
CN
China
Prior art keywords
trustship
dig technique
void channels
gate type
type support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720149121.1U
Other languages
Chinese (zh)
Inventor
黄兆芳
徐孝普
闫学猛
王春为
孟博
田丽娜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Xin Hui Municipal Engineering Ltd By Share Ltd
Original Assignee
Shandong Xin Hui Municipal Engineering Ltd By Share Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Xin Hui Municipal Engineering Ltd By Share Ltd filed Critical Shandong Xin Hui Municipal Engineering Ltd By Share Ltd
Priority to CN201720149121.1U priority Critical patent/CN206626270U/en
Application granted granted Critical
Publication of CN206626270U publication Critical patent/CN206626270U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Pharmaceuticals Containing Other Organic And Inorganic Compounds (AREA)
  • Fencing (AREA)

Abstract

The utility model belongs to no-dig technique servicing unit field, it is related to a kind of no-dig technique void channels auxiliary trustship device, including two gate type support framves, deposit mechanism is provided between described two gate type support framves, the deposit mechanism includes 4 fixed mounts that is arranged on gate type support frame and can move up and down, demountable trustship component is provided between the fixed mount, the trustship component includes two connecting plates and the porous annulus being arranged between two connecting plates, and the porous annulus includes outer toroid and at least two small circle rings being arranged on inside outer toroid.The utility model is provided with gate type support frame and deposit mechanism, its porous pipeline can pass through according to specified position out of porous annulus, so as to substantially reduce active force of the pipeline to drill bit, overcome two power pipes welding position phenomenon of rupture caused by staggeredly, reduce the labour of workmen so that workmen can more easily perform returning for power pipe and drag constructing operation.

Description

A kind of no-dig technique void channels aid in trustship device
Technical field
The utility model belongs to no-dig technique servicing unit field, more particularly to a kind of no-dig technique void channels auxiliary trustship dress Put.
Background technology
No-dig technique refers to utilize various drilling and tunneling equipments and technological means, by modes such as guiding, directional drillings on ground Table small part (refers generally to entrance and exit small area excavation) in the case of excavating, and lays, changes and repair various buried pipes It the construction technique of line, will not block the traffic, will not destroy greenery patches, vegetation does not interfere with shop, hospital, school and resident's Normal life and order of work, solve interference of traditional excavation construction to resident living, to traffic, environment, surrounding building The destruction and harmful effect on basis, therefore there is higher social economic effect.
Two kinds are typically had for the mode of trenchless pipelaying, one kind is to be rammed pipeline to formulation position using tamping tube hammer, It is another then be to utilize drilling rod;This mode of drilling rod is usually to set drilling rod up front, so as to enter with pipeline, this Although sample is convenient, can there is many problems, such as, if pipeline is long, because landform is different, pipe laying it is twisted Seven or eight, when work, due to the unbalance stress of pipeline, then anterior drill bit can be caused more or less to offset, if it happens Skew, is very troublesome in modification.When dragging construction now with some relatively more special porous power pipes time, drill bit and steel wire rope Angle it is inconsistent, easily cause power pipe juxtaposition and mutual wrapping phenomena, so after the completion of hauling pipe pipe both ends misplace Than more serious, very big difficulty is brought to school tube head, and due to not setting by pulley bracket, the tube head angle of penetration and drill bit of power pipe And drilling rod is made great difference, so also easily cause power pipe welding position and be easily broken off.
Utility model content
The utility model is directed to the problem of above-mentioned, there is provided a kind of no-dig technique void channels aid in trustship device.
In order to achieve the above object, the technical solution adopted in the utility model is that the utility model provides a kind of no-dig technique Void channels aid in trustship device, including two gate type support framves, and deposit mechanism is provided between described two gate type support framves, The deposit mechanism includes 4 fixed mounts that is arranged on gate type support frame and can move up and down, and is set between the fixed mount It is equipped with demountable trustship component, the trustship component includes two connecting plates and is arranged on more between two connecting plates Hole annulus, the porous annulus include outer toroid and at least two small circle rings being arranged on inside outer toroid.
Preferably, the number of the trustship component is 2-4.
Preferably, the connecting plate is connected setting with fixed mount by fixing bolt.
Preferably, the gate type support frame is oppositely arranged 7 word fixed mounts including two, described two 7 word fixed mounts it Between be provided with connecting rod.
Preferably, the connecting rod is connected setting by bolt with 7 word fixed mounts, bolt is provided with the connecting rod Hole, the fitted bolt hole group corresponding with bolt hole is provided with the 7 word fixed mount.
Preferably, the bottom of the 7 word fixed mount is provided with firm banking plate, peace is provided with the firm banking plate Hole is filled, long fixing bolt is provided with the mounting hole.
Preferably, the bar that is connected that the fixed mount includes connection cross bar and is arranged on connection cross bar.
Preferably, the connection cross bar is provided at both ends with the fixed cover being arranged on 7 word fixed mounts, the fixed cover On be provided with bolt hole, fixing bolt is provided with the bolt hole, is provided with the 7 word fixed mount and is engaged with bolt hole Fitted bolt hole group.
Compared with prior art, it is the advantages of the utility model with good effect,
The utility model is provided with gate type support frame and deposit mechanism, its porous pipeline can according to specified position from Passed through in porous annulus, so as to substantially reduce active force of the pipeline to drill bit, overcome two power pipes due to staggeredly leading The welding position phenomenon of rupture of cause, reduce further the labour of workmen so that workmen can more easily hold Constructing operation is dragged in returning for row power pipe;And can according to the size of pipeline, to adjust the size of whole retail sales support frame, so as to The size of annulus is conveniently replaceable, it is the flexible pipe for all size to be easy to.
Brief description of the drawings
It is required in being described below to embodiment in order to illustrate more clearly of the technical scheme of the utility model embodiment The accompanying drawing used is briefly described, it should be apparent that, drawings in the following description are some embodiments of the utility model, For those of ordinary skill in the art, without having to pay creative labor, can also be obtained according to these accompanying drawings Obtain other accompanying drawings.
Fig. 1 is the dimensional structure diagram that a kind of no-dig technique void channels that embodiment 1 provides aid in trustship device;
Fig. 2 is the dimensional structure diagram for the trustship component that embodiment 1 provides;
More than in each figure, 1, gate type support frame;11st, 7 word fixed mount;111/112nd, fitted bolt hole group;12nd, connecting rod; 13rd, firm banking plate;14th, long fixing bolt;15th, bolt;2nd, fixed mount;21st, cross bar is connected;22nd, be connected bar;3rd, trustship Component;31st, outer toroid;32nd, connecting plate;321st, fixing hole;33rd, small circle ring.
Embodiment
It is below in conjunction with the accompanying drawings and real in order to be more clearly understood that above-mentioned purpose of the present utility model, feature and advantage Example is applied to be described further the utility model.It should be noted that in the case where not conflicting, embodiments herein and reality Applying the feature in example can be mutually combined.
Many details are elaborated in the following description in order to fully understand the utility model, still, this practicality New to implement using different from other modes described here, therefore, the utility model is not limited to be described below The limitation of the specific embodiment of specification.
Embodiment 1, as depicted in figs. 1 and 2, the utility model provide a kind of no-dig technique void channels auxiliary trustship dress Put, mainly solve the effect of pipeline delivery support for the trustship device, it is main include two gate type support framves and The deposit mechanism being arranged between gate type support frame, the gate type support frame 1 are used for deposit mechanism, but for The design of gate type support frame is also what is required, i.e., to have preferable stationarity and retractility, to adapt to different landform, except this Outside, also there is higher intensity.Its deposit mechanism is then the principal organ for making pipeline through auxiliary, and deposit mechanism includes setting On gate type support frame and 4 fixed mounts can moving up and down, demountable trustship component is provided between its fixed mount, This four fixed mounts are oppositely arranged with two for one group, and its purpose is then in order to carry trustship component, it is also assumed that solid Determine the part that frame is also gate type support frame, be intended merely to preferably describe, thus gate type support frame and fixed mount is described separately; Demountable trustship component, why not Integral design, it is different to be mainly in view of the diameter of pipeline, that is, trustship group Part 3 also can some changes;Its trustship component includes two connecting plates and the porous annulus being arranged between two connecting plates, more Hole annulus includes outer toroid and at least two small circle rings being arranged on inside outer toroid, and upper and lower two connecting plates mainly will circle Ring is fixed on fixed mount 2, and porous annulus is then the main fixed critical piece to pipeline restriction site, here small circle ring position The setting put depends primarily on the design of void channels, if it is desired to improving pipeline speed and suffered friction in small circle ring Power, it can be provided with the place that pipeline and small circle ring contact beneficial to the part rotated, such as, bearing, annulus set etc.;Having When body is installed, then need pipeline to first pass through annulus, be connected with drill bit, can be by twisted 78 pipeline by annulus To righting, so that drill bit by pipeline others torsion, will not also improve the accuracy of the drilling of drill bit accordingly.
For the number of trustship component, inventor draws by substantial amounts of experiment, is ratio when its number is 2-4 It is more rational.
From figure 1 it appears that (do not drawn in the fixing bolt figure by fixing bolt between connecting plate and fixed mount Go out, but have no effect on) both are fixed, when changing trustship component if desired, therefore fixing bolt is pulled down into replacing i.e. Can.
Say above in order that gate type support frame has more preferable retractility, so, gate type support frame includes two 7 word fixed mounts are oppositely arranged, connecting rod is provided between two 7 word fixed mounts, connecting rod is connected by bolt and 7 word fixed mounts Setting is connect, bolt hole is provided with connecting rod, the fitted bolt hole group corresponding with bolt hole is provided with 7 word fixed mounts, is adopted With above-mentioned design, it can require according to specific circumstances, to adjust the width of gate type support frame, to coordinate different size of circle Ring uses.
From figure 1 it appears that the bottom of 7 word fixed mounts is provided with firm banking plate, it is provided with its firm banking plate Mounting hole, and long fixing bolt is provided with mounting hole, here why it is however emphasized that being long fixing bolt, inventor is main The stability of gate type support frame is allowed for, from long fixing bolt, then whole device preferably can be fixed on ground On, make its more difficult rollover.
The bar that is connected that fixed mount includes connection cross bar and is arranged on connection cross bar, it connects the both ends of cross bar and set The fixed cover being arranged on 7 word fixed mounts has been put, bolt hole is provided with fixed cover, fixed spiral shell is provided with the bolt hole Bolt, it is provided with 7 word fixed mounts and fitted bolt hole group is engaged with bolt hole;Mentality of designing at this is set up with gate type support Meter thinking is much the same, is designed also for different size of pipeline is tackled.
It is described above, only it is preferred embodiment of the present utility model, is not that other forms are made to the utility model Limitation, any person skilled in the art is changed or is modified as possibly also with the technology contents of the disclosure above equivalent The equivalent embodiment of change is applied to other fields, but every without departing from the content of the technical scheme of the utility model, according to this reality Any simple modification, equivalent variations and the remodeling made with new technical spirit to above example, it is new to still fall within this practicality The protection domain of type technical scheme.

Claims (8)

1. a kind of no-dig technique void channels aid in trustship device, including two gate type support framves, it is characterised in that:Described two doors Deposit mechanism is provided between formula support frame, the deposit mechanism includes what is be arranged on gate type support frame and can move up and down 4 fixed mounts, are provided with demountable trustship component between the fixed mount, the trustship component include two connecting plates with And the porous annulus between two connecting plates is arranged on, the porous annulus includes outer toroid and is arranged on inside outer toroid At least two small circle rings.
A kind of 2. no-dig technique void channels auxiliary trustship device according to claim 1, it is characterised in that:The trustship group The number of part is 2-4.
A kind of 3. no-dig technique void channels auxiliary trustship device according to claim 2, it is characterised in that:The connecting plate Setting is connected with fixed mount by fixing bolt.
A kind of 4. no-dig technique void channels auxiliary trustship device according to claim 1, it is characterised in that:The gate-type branch Support is oppositely arranged 7 word fixed mounts including two, and connecting rod is provided between described two 7 word fixed mounts.
A kind of 5. no-dig technique void channels auxiliary trustship device according to claim 4, it is characterised in that:The connecting rod Setting is connected with 7 word fixed mounts by bolt, bolt hole is provided with the connecting rod, be provided with the 7 word fixed mount with The corresponding fitted bolt hole group of bolt hole.
A kind of 6. no-dig technique void channels auxiliary trustship device according to claim 5, it is characterised in that:7 word is consolidated The bottom for determining frame is provided with firm banking plate, and mounting hole is provided with the firm banking plate, length is provided with the mounting hole Fixing bolt.
A kind of 7. no-dig technique void channels auxiliary trustship device according to claim 6, it is characterised in that:The fixed mount Including connection cross bar and the bar that is connected being arranged on connection cross bar.
A kind of 8. no-dig technique void channels auxiliary trustship device according to claim 7, it is characterised in that:The connection is horizontal Bar is provided at both ends with the fixed cover being arranged on 7 word fixed mounts, is provided with bolt hole on the fixed cover, in the bolt hole Fixing bolt is provided with, is provided with the 7 word fixed mount and fitted bolt hole group is engaged with bolt hole.
CN201720149121.1U 2017-02-20 2017-02-20 A kind of no-dig technique void channels aid in trustship device Expired - Fee Related CN206626270U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720149121.1U CN206626270U (en) 2017-02-20 2017-02-20 A kind of no-dig technique void channels aid in trustship device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720149121.1U CN206626270U (en) 2017-02-20 2017-02-20 A kind of no-dig technique void channels aid in trustship device

Publications (1)

Publication Number Publication Date
CN206626270U true CN206626270U (en) 2017-11-10

Family

ID=60211413

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720149121.1U Expired - Fee Related CN206626270U (en) 2017-02-20 2017-02-20 A kind of no-dig technique void channels aid in trustship device

Country Status (1)

Country Link
CN (1) CN206626270U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110260052A (en) * 2019-06-17 2019-09-20 中国一冶集团有限公司 One kind laying group's pipe device and its application method at the piping lane egress hatch of both sides of the road
CN111022765A (en) * 2019-12-13 2020-04-17 深圳海油工程水下技术有限公司 Installation frame for sea pipe maintenance equipment
CN111577974A (en) * 2020-04-11 2020-08-25 河南鼎盛园林工程有限公司 Shockproof pipe groove structure for water pipe laying and construction method
CN112413237A (en) * 2020-11-10 2021-02-26 艾肯(江苏)工业技术有限公司 Pipe fitting connecting flange

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110260052A (en) * 2019-06-17 2019-09-20 中国一冶集团有限公司 One kind laying group's pipe device and its application method at the piping lane egress hatch of both sides of the road
CN111022765A (en) * 2019-12-13 2020-04-17 深圳海油工程水下技术有限公司 Installation frame for sea pipe maintenance equipment
CN111022765B (en) * 2019-12-13 2021-05-28 深圳海油工程水下技术有限公司 Installation frame for sea pipe maintenance equipment
CN111577974A (en) * 2020-04-11 2020-08-25 河南鼎盛园林工程有限公司 Shockproof pipe groove structure for water pipe laying and construction method
CN111577974B (en) * 2020-04-11 2022-04-19 河南鼎盛园林工程有限公司 Shockproof pipe groove structure for water pipe laying and construction method
CN112413237A (en) * 2020-11-10 2021-02-26 艾肯(江苏)工业技术有限公司 Pipe fitting connecting flange
CN112413237B (en) * 2020-11-10 2022-03-22 艾肯(江苏)工业技术有限公司 Pipe fitting connecting flange

Similar Documents

Publication Publication Date Title
CN206626270U (en) A kind of no-dig technique void channels aid in trustship device
Li et al. Stability analysis of large slurry shield-driven tunnel in soft clay
CN104612698B (en) A kind of shallow-depth-excavation tunnel top bar interval wall construction method
CN103469817B (en) Existing subway station main structure broadening construction method
CN109723443B (en) Tunnel construction method
Li et al. Numerical study on the response of ground movements to construction activities of a metro station using the pile-beam-arch method
CN107023300A (en) A kind of use canopy, which is defended the doctrine, builds the construction method of subway station
CN106436718A (en) Subway foundation pit large-span support system and construction method thereof
CN110362932B (en) Shallow subsurface tunnel pipe curtain structure calculation model that buries under complicated environmental condition
CN101737059A (en) Advancing construction method of long tube shed
CN106758759B (en) A kind of trestle pile foundation and its anchoring process for deep water drift net riverbed
Gao et al. Influence of Benoto bored pile construction on nearby existing tunnel: A case study
CN207999260U (en) A kind of anti-sticking single shield TBM of NEW TYPE OF COMPOSITE
CN108692104A (en) A kind of chemical pipeline casing protection device passing through complicated geological riverbed
CN109339800A (en) A kind of Rapid Construction of Tunnels method in the connected section of bridge tunnel
CN208106342U (en) A kind of multi-functional double sleeve slewing drilling machine drilling rods
CN208816132U (en) Collapsible loess combination land pebble stratum tunneling air duct connects the ventilating shaft of shield tunnel
CN208310757U (en) A kind of rich water weak soil, the artificial bore detecting device of thin silt ultra-deep pipeline
CN108755693B (en) Grouting device and in-hole sectional grouting method for multiple karst caves
CN201560769U (en) Improved three-arm drilling jumbo
CN107269283B (en) A kind of big cross section tunneling subway station and running tunnel penetrate through construction method
CN108487869A (en) The multi-functional double sleeve slewing drilling machine drilling rods of one kind and its construction method
CN206625798U (en) A kind of no-dig technique single tube aids in trustship device
CN206477240U (en) A kind of trestle pile foundation for deep water drift net riverbed
CN110004945A (en) The outside weld steel reinforcement cage miniature steel pipe pile supporting construction and its construction method of harnessing landslide

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171110

Termination date: 20190220