CN206625832U - The experimental provision that a kind of simulated formation water yield influences on gas horizontal well drilling annular space - Google Patents

The experimental provision that a kind of simulated formation water yield influences on gas horizontal well drilling annular space Download PDF

Info

Publication number
CN206625832U
CN206625832U CN201720356218.XU CN201720356218U CN206625832U CN 206625832 U CN206625832 U CN 206625832U CN 201720356218 U CN201720356218 U CN 201720356218U CN 206625832 U CN206625832 U CN 206625832U
Authority
CN
China
Prior art keywords
gas
ball valve
landwaste
annular space
horizontal well
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720356218.XU
Other languages
Chinese (zh)
Inventor
林振凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southwest Petroleum University
Original Assignee
Southwest Petroleum University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southwest Petroleum University filed Critical Southwest Petroleum University
Priority to CN201720356218.XU priority Critical patent/CN206625832U/en
Application granted granted Critical
Publication of CN206625832U publication Critical patent/CN206625832U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

The experimental provision that a kind of simulated formation water yield in air drilling field influences on gas horizontal well drilling annular space is the utility model is related to, it is mainly made up of high-speed camera, computer monitoring system, pressure sensor, pipe joint, gas-particle two-phase import, landwaste funnel, cutting grain, ball valve A, gas flowmeter, air compressor machine, landwaste collecting box, wire netting, mixture outlet, inclination iron plate, inner tube, outer tube, fluidized bed dryer, landwaste collecting vessel, suspension ring, drill bit, water inlet, ball valve B, fluid flowmeter, water pump and hopper.Air compressor machine is connected with gas flowmeter, ball valve A, landwaste funnel and gas-particle two-phase import successively, and hopper is connected with water pump, fluid flowmeter, ball valve B and water inlet successively, and landwaste collecting box right part is provided with the wire netting of rectangle, and bottom is provided with two pieces of inclination iron plates.Influence process of the good simulated formation water outlet of the utility model energy to gas drilling ring empty.

Description

The experimental provision that a kind of simulated formation water yield influences on gas horizontal well drilling annular space
Technical field
A kind of simulated formation water yield in air drilling field be the utility model is related to gas horizontal well drilling annular space The experimental provision of influence.
Background technology
Gas drilling is applied as the drilling mode of a kind of efficient rock-breaking, cleaning, environmental protection by many oil fields, its power auger Speed is improved a lot than conventional drilling, and reservoir is protected in drilling process.But when gas horizontal well drilling drilling strata During water, its borehole wall stability can be greatly affected, and strong retraction mud shale stratum is met if boring, in fact it could happen that hole collapse, Phenomena such as thing that collapses instantaneously is accumulated, the mud shale to be formed that collapses can quickly form mud drum in shaft bottom, have a strong impact on downhole safety. When just having bored chance water layer, its water yield is seldom, and a small amount of water outlet now is on influence aspect caused by gas horizontal well drilling annular space That studies at present is fewer, with the increase of water yield, to annular pressure change should rule it is also to be studied;If it can invent It is real to annular space situation of change that the experimental provision that a kind of simulated formation water yield influences on gas horizontal well drilling annular space carries out water yield Research is tested, this will be significant to live actual exploitation.
The content of the invention
The purpose of the utility model is:Provide the experiment that a kind of simulated formation water yield influences on gas horizontal well drilling annular space Device.
Technical scheme is used by the utility model:
The experimental provision that a kind of simulated formation water yield of the utility model influences on gas horizontal well drilling annular space, mainly by height Fast video camera, computer monitoring system, pressure sensor, pipe joint, gas-particle two-phase import, landwaste funnel, cutting grain, ball Valve A, gas flowmeter, air compressor machine, landwaste collecting box, wire netting, mixture outlet, inclination iron plate, inner tube, outer tube, fluid bed Drier, landwaste collecting vessel, suspension ring, drill bit, water inlet, ball valve B, fluid flowmeter, water pump and hopper composition.Air compressor machine according to It is secondary to be connected with gas flowmeter, ball valve A, landwaste funnel and gas-particle two-phase import, hopper successively with water pump, fluid flowmeter, Ball valve B is connected with water inlet, and landwaste collecting box right part is provided with the wire netting of rectangle, and bottom is provided with two pieces of inclination iron plates.Ball valve A and Ball valve B is the ball valve of two same sizes, and pipe joint uses detachable design, can be changed according to live actual condition different The pipeline of diameter is tested;The a diameter of 2mm of cutting grain used in experimentation, inner and outer tubes are using transparent High pressure resistant PC materials are made, bearing capacity 2MPa.The gas simulation actual condition bet that air compressor machine provides in whole experiment process Enter the gas of underground, cutting grain simulation drill bit drilling process, the Fluid Dynamics formation water output operating mode that hopper provides, inner tube simulation Drilling rod under actual condition, outer tube simulate the sleeve pipe under actual condition.
The advantages of the utility model:Simulation effect is good, and the good simulated formation water outlet of energy influences on gas drilling ring empty Process, experimentation to cutting grain recycle again and economized on resources.
Brief description of the drawings
Fig. 1 is the knot for the experimental provision that a kind of simulated formation water yield of the utility model influences on gas horizontal well drilling annular space Structure schematic diagram.In figure:1. high-speed camera, 2. computer monitoring systems, 3. pressure sensors, 4. pipe joints, 5. gas-solids two Phase import, 6. landwaste funnels, 7. cutting grains, 8. ball valve A, 9. gas flowmeters, 10. air compressor machines, 11. landwaste collecting boxs, 12. wire netting, 13. mixture outlets, 14. tilt iron plate, 15. inner tubes, 16. outer tubes, 17. fluidized bed dryers, 18. landwaste Collecting vessel, 19. suspension ring, 20. drill bits, 21. water inlets, 22. ball valve B, 23. fluid flowmeters, 24. water pumps, 25. hoppers.
Embodiment
The utility model is described further below in conjunction with the accompanying drawings.
As shown in figure 1, the experiment dress that a kind of simulated formation water yield of the utility model influences on gas horizontal well drilling annular space Put, mainly by high-speed camera 1, computer monitoring system 2, pressure sensor 3, pipe joint 4, gas-particle two-phase import 5, landwaste Funnel 6, cutting grain 7, ball valve A8, gas flowmeter 9, air compressor machine 10, landwaste collecting box 11, wire netting 12, mixture outlet 13rd, iron plate 14, inner tube 15, outer tube 16, fluidized bed dryer 17, landwaste collecting vessel 18, suspension ring 19, drill bit 20, water inlet are tilted 21st, ball valve B22, fluid flowmeter 23, water pump 24 and hopper 25 form.Air compressor machine 10 successively with gas flowmeter 9, ball valve A8, landwaste funnel 6 are connected with gas-particle two-phase import 5, and hopper 25 is successively with water pump 24, fluid flowmeter 23, ball valve B22 and entering The mouth of a river 21 is connected, and the right part of landwaste collecting box 11 is provided with the wire netting 12 of rectangle, and bottom is provided with two pieces of inclination iron plates 14.
As shown in figure 1, physical simulation process is:Be first turned on air compressor machine 10, make gas from air compressor machine 10 come out after successively After gas flowmeter 9, ball valve A8, together with the cutting grain 7 of the outflow of landwaste funnel 6 out of gas-particle two-phase import 5 entrance Inside pipe 15, gas and cutting grain 7 flow from top to bottom in inner tube 15, are finally flowed out from drill bit 20;Work as computer monitoring In system 2 after the pressure level-off of display, water pump 24 is opened, the water in hopper 25 is pressurizeed successively by water pump 24, liquid After flowmeter body 23 and ball valve B22, enter outer tube 16 from water inlet 21.When experiment just starts, regulation ball valve B22 apertures, make The flow very little of display in fluid flowmeter 23, ball valve B22 aperture is then slowly opened, is seen in computer monitoring system 2 Examine increase of the pressure with inflow, pressure changing;Gas-liquid-solid three-phase up flows in annular space, now by taking the photograph at a high speed Camera 1 have recorded whole experimental phenomena, and gas-liquid-solid three-phase finally flows out from mixture outlet 13, is carried out into landwaste collecting box 11 The recovery of cutting grain, gas flow out from by top, and cutting grain 7 flows out into fluidized bed dryer 17 by bottom and done Dry, final cutting grain 7 enters landwaste collecting vessel 18 and recycled again, i.e., whole experimental simulation process terminates.Whole Control inflow maximum no more than 0.3m in individual experimentation3/ h, because this experimental study is the less bar of formation water production To the influence of gas horizontal well drilling annular space under part.

Claims (4)

1. the experimental provision that a kind of simulated formation water yield influences on gas horizontal well drilling annular space, mainly by high-speed camera (1), Computer monitoring system (2), pressure sensor (3), pipe joint (4), gas-particle two-phase import (5), landwaste funnel (6), landwaste Particle (7), ball valve A (8), gas flowmeter (9), air compressor machine (10), landwaste collecting box (11), wire netting (12), mixture go out Mouth (13), tilt iron plate (14), inner tube (15), outer tube (16), fluidized bed dryer (17), landwaste collecting vessel (18), suspension ring (19), drill bit (20), water inlet (21), ball valve B (22), fluid flowmeter (23), water pump (24) and hopper (25) composition, its It is characterised by:Air compressor machine (10) successively with gas flowmeter (9), ball valve A (8), landwaste funnel (6) and gas-particle two-phase import (5) It is connected, hopper (25) is connected with water pump (24), fluid flowmeter (23), ball valve B (22) and water inlet (21) successively, and landwaste is received Header (11) right part is provided with the wire netting (12) of rectangle, and bottom is provided with two pieces and tilts iron plate (14).
2. the experimental provision that a kind of simulated formation water yield according to claim 1 influences on gas horizontal well drilling annular space, It is characterized in that:Ball valve A (8) and ball valve B (22) is the ball valve of two same sizes, and pipe joint (4) is set using detachable Meter, the pipeline that different-diameter can be changed according to live actual condition are tested.
3. the experimental provision that a kind of simulated formation water yield according to claim 1 influences on gas horizontal well drilling annular space, It is characterized in that:The a diameter of 2mm of cutting grain used in experimentation, inner tube (15) and outer tube (16) are using transparent High pressure resistant PC materials are made, bearing capacity 2MPa.
4. the experimental provision that a kind of simulated formation water yield according to claim 1 influences on gas horizontal well drilling annular space, It is characterized in that:The gas of underground, rock are injected under the gas simulation actual condition that air compressor machine (10) provides in whole experiment process Consider particle (7) simulation drill bit drilling process, the Fluid Dynamics formation water output operating mode that hopper (25) provides, inner tube (15) simulation reality to be worth doing Drilling rod under operating mode, outer tube (16) simulate the sleeve pipe under actual condition.
CN201720356218.XU 2017-04-07 2017-04-07 The experimental provision that a kind of simulated formation water yield influences on gas horizontal well drilling annular space Expired - Fee Related CN206625832U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720356218.XU CN206625832U (en) 2017-04-07 2017-04-07 The experimental provision that a kind of simulated formation water yield influences on gas horizontal well drilling annular space

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720356218.XU CN206625832U (en) 2017-04-07 2017-04-07 The experimental provision that a kind of simulated formation water yield influences on gas horizontal well drilling annular space

Publications (1)

Publication Number Publication Date
CN206625832U true CN206625832U (en) 2017-11-10

Family

ID=60207821

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720356218.XU Expired - Fee Related CN206625832U (en) 2017-04-07 2017-04-07 The experimental provision that a kind of simulated formation water yield influences on gas horizontal well drilling annular space

Country Status (1)

Country Link
CN (1) CN206625832U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111141481A (en) * 2020-01-07 2020-05-12 中国地质大学(武汉) Horizontal directional drilling and reaming reverse circulation hydraulic rock debris migration test device and test method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111141481A (en) * 2020-01-07 2020-05-12 中国地质大学(武汉) Horizontal directional drilling and reaming reverse circulation hydraulic rock debris migration test device and test method
CN111141481B (en) * 2020-01-07 2024-05-17 中国地质大学(武汉) Horizontal directional drilling reaming reverse circulation hydraulic rock debris migration test device and test method

Similar Documents

Publication Publication Date Title
CN105464606B (en) A kind of simulation drilling Double-working-condition sand-carrying production Multiphase Flow experimental provision and method
CN107218034B (en) Experimental device for simulating flowing state change of multiple expanding sections of natural gas hydrate drilling well
CN206668257U (en) A kind of experimental provision simulated production water and shaked out on the influence of individual well Wellbore of Gas Wells
CN206737912U (en) A kind of device simulated the after-applied wellhead back pressure of controlled pressure drilling gas cut and influenceed on annular space
CN105672876B (en) A kind of combustible ice drilling and the integrated quarrying apparatus of gasification separation and method
CN106869871A (en) Using the device and method of water outlet of being shaked out in bottom aerogenesis removing hydrate well
CN206818589U (en) Experimental provision of the corrosion inhibiter to drilling rod antiseptic effect in a kind of simulation gas drilling
CN107575206A (en) A kind of modularization sea bed gas hydrate underground separator
CN208520832U (en) A kind of experimental provision for simulating gas hydrates counterflush drilling flow field change
CN105551362B (en) Horizontal directional drill Annular Cuttings migration integrated simulation experiment method and experimental provision
CN203603806U (en) Rock debris transportation simulating device
CN205936555U (en) Horizontal well intelligence segmentation water injection technology tubular column of taking in and send out
CN206627513U (en) A kind of experimental provision simulated natural gas hydrate stratum and shaked out on annular space influence
CN109187309A (en) A kind of experimental rig and test method of the weak cementing fragmented rock body of study of fault
CN109059692A (en) Easy collapse hole soft stratum superdeep holes loading method based on charge sleeve lower in drilling rod
CN206397496U (en) It is a kind of to simulate the experimental provision that under balance pressure drilling stratum outlet influences on annular pressure
CN206625832U (en) The experimental provision that a kind of simulated formation water yield influences on gas horizontal well drilling annular space
CN105390060A (en) Annular multi-field coupling simulation drilling experiment method and apparatus through horizontal directional drilling
CN108716361B (en) A kind of ocean gas hydrate original position Dynamic Separation backfilling apparatus
CN103867148B (en) Concentric-tube pulverized coal discharging system and method for coal-bed gas well
CN206753554U (en) One kind can sand control become a mandarin Balance route surely oily device
CN206233886U (en) One kind simulation gas hydrates horizontal well drilling horizontal segment Cutting movement device
CN207315341U (en) A kind of modularization sea bed gas hydrate underground separator
CN206818382U (en) One kind simulation exploitation gas condensate reservoir separates out oil pipe flowing changing rule experimental provision after condensate
CN105909235A (en) Borehole cleaning tool testing device and method for evaluating performance of borehole cleaning tool by using same

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171110

Termination date: 20180407