CN206625187U - A kind of dam armored concrete panel crack repairs structure - Google Patents

A kind of dam armored concrete panel crack repairs structure Download PDF

Info

Publication number
CN206625187U
CN206625187U CN201720268846.2U CN201720268846U CN206625187U CN 206625187 U CN206625187 U CN 206625187U CN 201720268846 U CN201720268846 U CN 201720268846U CN 206625187 U CN206625187 U CN 206625187U
Authority
CN
China
Prior art keywords
armored concrete
concrete panel
panel
dam
crack
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720268846.2U
Other languages
Chinese (zh)
Inventor
黄承斌
周正
周正一
罗子湛
李楠
李金锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Huadian Engineering Group Co Ltd
Original Assignee
China Huadian Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Huadian Engineering Group Co Ltd filed Critical China Huadian Engineering Group Co Ltd
Priority to CN201720268846.2U priority Critical patent/CN206625187U/en
Application granted granted Critical
Publication of CN206625187U publication Critical patent/CN206625187U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

The utility model discloses a kind of dam armored concrete panel crack to repair structure, for repairing dam panel crack, offers the groove of rectangle on dam panel at crack;There is the first armored concrete panel, the second armored concrete panel and the 3rd armored concrete panel in rectangular recess, the reinforcement welding of the reinforcing bar of first armored concrete panel and the second armored concrete panel, the reinforcing bar of second armored concrete panel and the reinforcement welding of the 3rd armored concrete panel, the reinforcing bar of the first armored concrete panel, the second armored concrete panel and the 3rd armored concrete panel is equal and the reserved steel bar of dam former panel welds;It is equipped with the first geomembrane in dam former panel, the second geomembrane on the first armored concrete panel, the second armored concrete panel and the 3rd armored concrete panel connects with the first geomembrane sealing.The utility model can be intact by the crack reparation on dam, using the dam after this structure repair.

Description

A kind of dam armored concrete panel crack repairs structure
Technical field
It the utility model is related to a kind of dam armored concrete panel crack and repair structure, belong to armored concrete dam and split Stitch recovery technique field.
Background technology
Dam is block rivers ditch water flow with raising of water level or the water retaining structure of regulation flow.Reservoir can be formed, is lifted High water level, regulated flow, head is concentrated, for flood control, water supply, irrigation, hydroelectric generation, improve shipping etc..Dam uses the longevity Life is very long, and because prolonged water and soil balance and riverbed water level are higher, dam is chronically at overload operation, and part dam goes out , there is serious potential safety hazard in existing crack.
Utility model content
The purpose of this utility model is, there is provided a kind of dam armored concrete panel crack repairs structure, for repairing Crack on armored concrete dam, there is good repairing effect.
In order to solve the above technical problems, the utility model adopts the following technical scheme that:
A kind of dam armored concrete panel crack repairs structure, for repairing dam panel crack, is split on dam panel The groove of rectangle is offered at seam;There is in rectangular recess the first armored concrete panel, the second armored concrete panel and the The reinforcement welding of three armored concrete panels, the reinforcing bar of the first armored concrete panel and the second armored concrete panel, second The reinforcement welding of the reinforcing bar of armored concrete panel and the 3rd armored concrete panel, the first armored concrete panel, the second steel The reinforcing bar of reinforced concrete panel and the 3rd armored concrete panel is equal and the reserved steel bar of dam former panel welds;Dam former panel On be equipped with the first geomembrane, the first armored concrete panel, the second armored concrete panel and the 3rd armored concrete panel On the second geomembrane connected with the first geomembrane sealing.The sealing connection refers to the first geomembrane and the second geomembrane Edge is closely coupled, can prevent rainwater from being penetrated into from gap between the two.
A kind of foregoing dam armored concrete panel crack is repaired in structure, the first armored concrete panel, the second steel Reinforced concrete panel and the 3rd armored concrete panel and the junction of dam former panel are equipped with the 3rd geomembrane.
A kind of foregoing dam armored concrete panel crack is repaired in structure, the first armored concrete panel, the second steel Double-decker reinforcing bar is respectively provided with reinforced concrete panel and the 3rd armored concrete panel.
A kind of foregoing dam armored concrete panel crack is repaired in structure, and the recessed circumferential offers four row's diameters For 30 millimeters of shock relieve vent, the pitch of holes of two adjacent shock relieve vents is equal to 150 millimeters in same row.In view of dam former panel Material, by the diameter design of shock relieve vent be 30 millimeters of damping effects it is more preferable, can prevent from going out in work progress reclaimed water dam facing plate Existing crack.
A kind of foregoing dam armored concrete panel crack is repaired in structure, the first armored concrete panel, the second steel Crack gauge is provided between reinforced concrete panel and the 3rd armored concrete panel and dam former panel.
It is to be based on a kind of dam armored concrete panel that a kind of foregoing dam armored concrete panel crack, which repairs structure, What structural crack treatment construction technology was arisen at the historic moment, the technique comprises the following steps:
S100:Determine that situation determines to cut region according to the distribution in crack, it is rectangle to cut region, and region is cut described Shock relieve vent is arranged on periphery, specifically, the surrounding for cutting region of rectangle arranges four row's shock relieve vents, the shock relieve vent of same row is adjacent Two shock relieve vents between pitch of holes be equal to 150 millimeters;Ensure the crack for cutting more than 0.5 millimeter of region overlay of rectangle, A diameter of 30 millimeters of shock relieve vent;Grout nipple is buried by raggle, raked joint, epoxy resin mortar joint filling, the junction of the edges of two sheets of paper and overfall mouth, chemistry fill Slurry, the process of quality examination handle 0.2 to 0.5 millimeter of crack;Closing is carried out to the crack brushing epoxy less than 0.2 millimeter to split Seam processing;
S200:The region division three that cuts is cut into band, three cut band and are arranged in order in the horizontal direction, first by position Band is cut in two of both sides to cut, then cut middle part cuts band, often cuts one and cuts band, produces by channel steel support Deep trouth, one end of channel-section steel contradicts the top of deep trouth, and the other end contradicts the bottom of deep trouth, and finally cut middle part again cuts band, The channel-section steel refers to 25b I-shaped bracing members;
S300:It will cut after band is cut and double-decker reinforcing bar is arranged in caused deep trouth, and by the double-decker steel Muscle is connected with former panel reinforcement welding;
S400:The band that cuts positioned at middle part is cut, will cut after band is cut and arrange double-decker in caused deep trouth Reinforcing bar, and the double-decker reinforcing bar is connected with former panel reinforcement welding;
S500:The casting concrete in the deep trouth, the concrete grade poured is identical with former panel, and in concrete Add swelling agent;
S600:The monitoring installed between band and former panel for monitor and repairing region is cut between and cuts at two Instrument;
S700:Geomembrane is laid on new panel, by the close phase of geomembrane on the geomembrane and former panel on new panel Even, geomembrane is set up in the junction of new panel and former panel.
Compared with prior art, the utility model can repair the crack on dam intact, using after this structure repair Dam, the monitoring instrument that the later stage is set by face observes, and does not find caused crack between the old and new's panel concrete, panel itself Monitoring instrument observation data are normal, have no that there is abnormal deformation in the region.Reservoir is not also found in examination water storage to the region The obvious increase of infiltration, it is successful to illustrate repair process.
Brief description of the drawings
Fig. 1 is a kind of structural representation of embodiment of the present utility model.
Reference:1- the first armored concrete panels, 2- the second armored concrete panels, the armored concrete faces of 3- the 3rd Plate, the geomembranes of 4- the 3rd, the geomembranes of 5- second, 6- shock relieve vents.
The utility model is further described with reference to the accompanying drawings and detailed description.
Embodiment
Embodiment 1 of the present utility model:A kind of dam armored concrete panel crack repairs structure, for repairing dam face Plank split, the groove of rectangle is offered on dam panel at crack;There is in rectangular recess the first armored concrete panel 1, the Two armored concrete panels 2 and the 3rd armored concrete panel 3, the reinforcing bar and the second reinforcing bar of the first armored concrete panel 1 mix The reinforcement welding of native panel 2, the reinforcing bar of the second armored concrete panel 2 and the reinforcement welding of the 3rd armored concrete panel 3 are coagulated, The reinforcing bar of first armored concrete panel 1, the second armored concrete panel 2 and the 3rd armored concrete panel 3 is equal and dam is former The reserved steel bar welding of panel;The first geomembrane, the first armored concrete panel 1, the second reinforcing bar are equipped with dam former panel Concrete slab 2 connects with the second geomembrane 5 on the 3rd armored concrete panel 3 with the first geomembrane sealing.
First armored concrete panel 1, the second armored concrete panel 2 and the 3rd armored concrete panel 3 and dam are former The junction of panel is equipped with the 3rd geomembrane 4.First armored concrete panel 1, the second armored concrete panel 2 and the 3rd steel Double-decker reinforcing bar is respectively provided with reinforced concrete panel 3.The recessed circumferential offers the shock relieve vent of a diameter of 30 millimeters of four rows 6, the pitch of holes of two adjacent shock relieve vents 6 is equal to 150 millimeters in same row.First armored concrete panel 1, the second reinforcing bar mix It is solidifying to be provided with crack gauge between the native armored concrete panel 3 of panel 2 and the 3rd and dam former panel.
Embodiment 2:A kind of dam armored concrete panel crack repairs structure, for repairing dam panel crack, dam The groove of rectangle is offered on panel at crack;There is the first armored concrete panel 1, the second armored concrete in rectangular recess The steel of the armored concrete panel 3 of panel 2 and the 3rd, the reinforcing bar of the first armored concrete panel 1 and the second armored concrete panel 2 Muscle welds, the reinforcing bar of the second armored concrete panel 2 and the reinforcement welding of the 3rd armored concrete panel 3, the first reinforced concrete The reinforcing bar of native panel 1, the second armored concrete panel 2 and the 3rd armored concrete panel 3 and dam former panel reserved steel Muscle welds;The first geomembrane, the first armored concrete panel 1, the and of the second armored concrete panel 2 are equipped with dam former panel The second geomembrane 5 on 3rd armored concrete panel 3 connects with the first geomembrane sealing.
It is respectively provided with first armored concrete panel 1, the second armored concrete panel 2 and the 3rd armored concrete panel 3 Double-decker reinforcing bar.The recessed circumferential offers the shock relieve vent 6 of a diameter of 30 millimeters of four rows, and adjacent two subtract in same row The pitch of holes for shaking hole 6 is equal to 150 millimeters.First armored concrete panel 1, the second armored concrete panel 2 and the 3rd reinforcing bar mix It is solidifying that crack gauge is provided between native panel 3 and dam former panel.
The form of construction work of embodiment 2 of the present utility model:A kind of dam armored concrete panel construction crack treatment is applied Work technique, comprises the following steps:
S100:Determine that situation determines to cut region according to the distribution in crack, it is rectangle to cut region, and region is cut described Shock relieve vent is arranged on periphery, specifically, the surrounding for cutting region of rectangle arranges four row's shock relieve vents, the shock relieve vent of same row is adjacent Two shock relieve vents between pitch of holes be equal to 150 millimeters;Ensure the crack for cutting more than 0.5 millimeter of region overlay of rectangle, A diameter of 30 millimeters of shock relieve vent;Grout nipple is buried by raggle, raked joint, epoxy resin mortar joint filling, the junction of the edges of two sheets of paper and overfall mouth, chemistry fill Slurry, the process of quality examination handle 0.2 to 0.5 millimeter of crack;Closing is carried out to the crack brushing epoxy less than 0.2 millimeter to split Seam processing;
S200:The region division three that cuts is cut into band, three cut band and are arranged in order in the horizontal direction, first by position Band is cut in two of both sides to cut, then cut middle part cuts band, often cuts one and cuts band, produces by channel steel support Deep trouth, one end of channel-section steel contradicts the top of deep trouth, and the other end contradicts the bottom of deep trouth, and finally cut middle part again cuts band, The channel-section steel refers to 25b I-shaped bracing members;
S300:It will cut after band is cut and double-decker reinforcing bar is arranged in caused deep trouth, and by the double-decker steel Muscle is connected with former panel reinforcement welding;
S400:The band that cuts positioned at middle part is cut, will cut after band is cut and arrange double-decker in caused deep trouth Reinforcing bar, and the double-decker reinforcing bar is connected with former panel reinforcement welding;
S500:The casting concrete in the deep trouth, the concrete grade poured is identical with former panel, and in concrete Add swelling agent;
S600:The monitoring installed between band and former panel for monitor and repairing region is cut between and cuts at two Instrument;
S700:Geomembrane is laid on new panel, by the close phase of geomembrane on the geomembrane and former panel on new panel Even, geomembrane is set up in the junction of new panel and former panel.

Claims (5)

1. a kind of dam armored concrete panel crack repairs structure, for repairing dam panel crack, it is characterised in that dam The groove of rectangle is offered on panel at crack;There is the first armored concrete panel (1), the second reinforced concrete in rectangular recess Native panel (2) and the 3rd armored concrete panel (3), the reinforcing bar and the second armored concrete of the first armored concrete panel (1) The reinforcement welding of panel (2), the reinforcing bar of the second armored concrete panel (2) and the steel bar welding of the 3rd armored concrete panel (3) Connect, the reinforcing bar of the first armored concrete panel (1), the second armored concrete panel (2) and the 3rd armored concrete panel (3) is equal Welded with the reserved steel bar of dam former panel;The first geomembrane, the first armored concrete panel are equipped with dam former panel (1), the second geomembrane (5) on the second armored concrete panel (2) and the 3rd armored concrete panel (3) is and first is geotechnological Film sealing connects.
2. a kind of dam armored concrete panel crack according to claim 1 repairs structure, it is characterised in that the first steel Reinforced concrete panel (1), the second armored concrete panel (2) and the 3rd armored concrete panel (3) and the company of dam former panel The place of connecing is equipped with the 3rd geomembrane (4).
3. a kind of dam armored concrete panel crack according to claim 1 or 2 repairs structure, it is characterised in that the Bilayer is respectively provided with one armored concrete panel (1), the second armored concrete panel (2) and the 3rd armored concrete panel (3) Structure reinforcing bars.
4. a kind of dam armored concrete panel crack according to claim 3 repairs structure, it is characterised in that described recessed Groove periphery offers the shock relieve vent (6) of a diameter of 30 millimeters of four rows, adjacent pitch of holes of two shock relieve vents (6) etc. in same row In 150 millimeters.
5. a kind of dam armored concrete panel crack according to claim 4 repairs structure, it is characterised in that the first steel Between reinforced concrete panel (1), the second armored concrete panel (2) and the 3rd armored concrete panel (3) and dam former panel Provided with crack gauge.
CN201720268846.2U 2017-03-20 2017-03-20 A kind of dam armored concrete panel crack repairs structure Expired - Fee Related CN206625187U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720268846.2U CN206625187U (en) 2017-03-20 2017-03-20 A kind of dam armored concrete panel crack repairs structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720268846.2U CN206625187U (en) 2017-03-20 2017-03-20 A kind of dam armored concrete panel crack repairs structure

Publications (1)

Publication Number Publication Date
CN206625187U true CN206625187U (en) 2017-11-10

Family

ID=60209503

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720268846.2U Expired - Fee Related CN206625187U (en) 2017-03-20 2017-03-20 A kind of dam armored concrete panel crack repairs structure

Country Status (1)

Country Link
CN (1) CN206625187U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109056658A (en) * 2018-08-29 2018-12-21 中国电建集团华东勘测设计研究院有限公司 Concrete slab defect repair construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109056658A (en) * 2018-08-29 2018-12-21 中国电建集团华东勘测设计研究院有限公司 Concrete slab defect repair construction method

Similar Documents

Publication Publication Date Title
CN107268636A (en) The diaphragm wall foundation ditch that the steel cylinder or steel sheet pile of a kind of seal groove and occlusion structure are constituted is with going along with sb. to guard him and construction method
CN107044129A (en) A kind of bottomless single wall steel boxed cofferdam of piecemeal pin-connected panel and its construction method
CN105648984B (en) The repairing structure and construction method that a kind of concrete slab bulging is destroyed
CN103061357B (en) Connection joint between basement base plate and underground diaphragm wall
CN201943086U (en) Underground building wall body
CN104652495B (en) Internal support of foundation pit column and base plate node waterproof construction technology
CN206625187U (en) A kind of dam armored concrete panel crack repairs structure
CN206554099U (en) A kind of bottomless single wall steel boxed cofferdam of piecemeal pin-connected panel
CN106812131A (en) A kind of permanent sheet pile underground structure and its construction method
CN106906794B (en) A kind of dam armored concrete panel construction crack treatment construction technology
CN109972627A (en) A kind of fashioned iron assembled foundation pit enclosure structure and its construction method
CN103437779A (en) Construction method for renovating tunnel lining water seeping damage
CN209836999U (en) Underground continuous wall with seepage-proof joint
CN207537987U (en) The narrow toe board arrangement of the high CFRD in Narrow Valleys area
CN110004959A (en) Concrete cofferdam rapid constructing method and template under circumstance of flowing water
US11598065B2 (en) Method for stabilizing and lifting channel boards by underwater grouting
CN107940102A (en) Underground raw water pipe protection construction method
CN103485792B (en) The construction method of underground continuous wall of movable seal up a door mechanism and reserved opening within the walls
CN113846663A (en) Concrete continuous tooth wall structure without structural joint and construction method
CN110184952B (en) Modification structure of existing bridge abutment and construction method thereof
CN105780938A (en) Vertical construction seam construction method of core tube bottom board for super high-rise
CN210315502U (en) Deep-width and shallow-width connecting structure of underground continuous wall
CN212896160U (en) Structure is restoreed to breakwater bank protection slope
CN110206036B (en) Underground diaphragm wall construction technology with depth first and depth later
CN217870461U (en) Construction structure of karst district bored concrete pile

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171110