CN206625101U - A kind of red mud and red mud stabilization gravel Combined base pavement structure - Google Patents

A kind of red mud and red mud stabilization gravel Combined base pavement structure Download PDF

Info

Publication number
CN206625101U
CN206625101U CN201720119853.6U CN201720119853U CN206625101U CN 206625101 U CN206625101 U CN 206625101U CN 201720119853 U CN201720119853 U CN 201720119853U CN 206625101 U CN206625101 U CN 206625101U
Authority
CN
China
Prior art keywords
red mud
asphalt
changed
underlayment
pavement structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720119853.6U
Other languages
Chinese (zh)
Inventor
韦金城
程钰
王林
孙兆云
余四新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Transportation Institute
Original Assignee
Shandong Transportation Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Transportation Institute filed Critical Shandong Transportation Institute
Priority to CN201720119853.6U priority Critical patent/CN206625101U/en
Application granted granted Critical
Publication of CN206625101U publication Critical patent/CN206625101U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model discloses a kind of red mud and red mud stabilization gravel Combined base pavement structure, belong to field of road.The pavement structure includes asphalt structure sheaf, changed red mud stabilized macadam base, changed red mud underlayment, and asphalt structure sheaf, changed red mud stabilized macadam base and changed red mud underlayment are laid on soil matrix from top to bottom.The utility model makes full use of red mud to be modified underlayment and red mud stabilized macadam base rigidity complementary advantage, combined by Rational structure, form a kind of novel road surface structure, realize application of the industrial residue red mud in pavement structure basic unit and underlayment, the Combined base structure of use improves the rigidity uniformity of sub-surface, reduce the diseases such as traditional semi-rigid asphalt pavement cracking, purt slurry, while industrial waste red mud recycling is realized, the service life of the structure of bituminous paving is improved.

Description

A kind of red mud and red mud stabilization gravel Combined base pavement structure
Technical field
Field of road is the utility model is related to, specifically a kind of red mud and red mud stabilization gravel Combined base Pavement structure.
Background technology
The contaminative waste residue that red mud is discharged when being aluminium industry extraction aluminum oxide, average often produces 1 ton of aluminum oxide, attached Band produces 1.0~2.0 tons of red muds.The whole world about 70,000,000 tons of caused red mud every year, caused red mud is 3000 every year in China More than ten thousand tons.Substantial amounts of red mud sufficiently effective can not be utilized at present, and the stockyard of large area can only be relied on to stack, and be occupied a large amount of Soil, serious pollution is also caused to environment.China currently carries out highway construction, it is necessary to material of largely building the road on a large scale Material.But as river course and environmental improvement are increasingly paid attention in various regions in recent years, large area forbids excavating Tu Chang, gravel and mountain area The road-making material such as building stones, many area soil, sand, stone is extremely short, and cost of building the road is significantly increased.Using red mud as each structure of road The main material of layer, while solving some areas road-making material shortage problem, minimizing and recycling to red mud Also will be important breakthrough.
Although had in lot of documents using red mud as the technology that road basement material is applied it is disclosed, due to Or red mud is filling roadbed can not to meet engineering objective requirement, or can not meet environmental protection index requirement, its Pavement Design does not have yet There are corresponding design parameter, index to refer to and follow, real popularization and application is difficult in real road process of deployment. Moreover, in the prior art yet without red mud and red mud stabilization gravel as asphalt pavement structure basic unit and the complete paving of underlayment Assembling structure, constrain minimizing and the recycling of red mud.
The content of the invention
Technical assignment of the present utility model is to be directed to above-mentioned the deficiencies in the prior art, there is provided a kind of red mud and red mud are stablized broken Stone combined basic unit's pavement structure, the pavement structure make full use of red mud modification underlayment and red mud stabilized macadam base rigidity mutual Benefit advantage, is combined by Rational structure, realizes application of the industrial residue red mud in road surface structure basic unit and underlayment, The Combined base structure of use improves the rigidity uniformity of sub-surface, reduces traditional semi-rigid asphalt pavement and opens Split, purt slurry etc. disease, while industrial waste red mud recycling is realized, improve asphalt pavement structure use the longevity Life.
Red mud described in the utility model refers to the contaminative waste residue discharged during aluminium industry extraction aluminum oxide, it is generally the case that For the water content of stockyard red mud more than 30%, simple considers that red mud is mainly made up of fines, 10 μm from Geotechnical Engineering angle ~100 μm of grain group contents have more than 60% and are similar to viscous soil characteristics, and high dispersive colloidal is presented in red mud under nature State, its high-moisture and low-density make its void ratio be up to 1.85~2.40, and this is also extremely rare, but red for mud The composition and the origin cause of formation of mud are entirely different with mud, and property also differs greatly.It is therefore contemplated that red mud is a kind of low severe, height Void ratio, high-consistency, high ph-values, in strong basicity category high liquid limit clay.
Technical assignment of the present utility model is realized in the following manner:A kind of red mud and red mud stabilization gravel combined type base Layer pavement structure, is characterized in including asphalt structure sheaf, changed red mud stabilized macadam base, changed red mud underlayment, Asphalt structure sheaf, changed red mud stabilized macadam base and changed red mud underlayment are laid on soil matrix from top to bottom.
In order to ensure that changed red mud underlayment has good pavement performance, can be filled in the red mud of changed red mud underlayment Modifying agent.Preferably, the modifying agent is formed by ardealite, slag micropowder and cement mixing, ardealite, slag micropowder, water Mud, the mass ratio of red mud are 1-2:20-25:70-80:500.
The thickness of changed red mud underlayment is preferably 15cm~20cm.
In order to ensure that changed red mud stabilized macadam base has good environmental-protecting performance, its strong basicity is reduced, can changed Modifying agent is filled in the red mud of property red mud stabilized macadam base.Preferably, the modifying agent is by ardealite, slag micropowder and water Mud mixes, and ardealite, slag micropowder, cement, red mud, the mass ratio of rubble are 0.3-0.5:5-7:50-70:110-130: 940。
Further, the macadam gradating scope of changed red mud stabilized macadam base, standard size is passed through with each particle diameter mineral aggregate Sieve aperture percentage, it is preferably:
26.5mm, 95%~100%;19mm, 47%~67%;9.5mm, 23%~33%;4.75mm, 12%~ 22%;2.36mm, 7%~17%;0.6mm, 0%~7%;0.075mm, 0%~6%.
The thickness of changed red mud stabilized macadam base is preferably 30~40cm, preferably divides two layers of construction, thickness in monolayer model Enclose 15cm~20cm.
In changed red mud stabilized macadam base and changed red mud underlayment, the ardealite is used for the alkalescence for reducing red mud; The slag micropowder is used for the strength character for exciting red mud compound;Cement is used to form strength stability steady in a long-term.Cause This, above-mentioned modifying agent is added in red mud, can effectively meet the stability of roadbase, improves the length of Pavement Base Structure Phase performance.
The asphalt structure sheaf can be selected any one asphalt structure sheaf in the prior art, but in order to Changed red mud stabilized macadam base preferably coordinates, and the utility model asphalt structure sheaf is preferably by asphalt uplayer, drip Blue or green cutting optimal, macrovoid drainage asphalt metalling, heated bitumen crushed stone sealing form, asphalt structure sheaf by pitch above Layer, pitch cutting optimal, macrovoid drainage asphalt metalling, heated bitumen crushed stone sealing be laid on from top to bottom changed red mud stablize it is broken On ground mass layer.
Asphalt uplayer is preferably SMA-13 or AC-13, uses pitch PG grades as PG76-22, thickness 3-5cm;
Pitch cutting optimal is preferably AC-20, uses pitch PG grades as PG64-22 or PG76-22, thickness 5-7cm.
Heated bitumen crushed stone sealing is preferably PG64-22 or PG76-22 using pitch PG grades
Preferably, macrovoid drainage asphalt metalling uses pitch PG grades as PG64-22 or PG76-22, hole is designed Gap rate is 12%~16%, thickness 10-20cm, when macrovoid drainage asphalt rubble uses pitch PG grades as PG64-22, heat Mixing asphalt outer need to mix 0.5~1.5% lignin fibre.
The outer volume of lignin fibre is preferably 1%.
The macadam gradating scope of macrovoid drainage asphalt metalling, standard size sieve aperture percentage is passed through with each particle diameter mineral aggregate Meter, it is preferably:
31.5mm, 93%~100%;19mm, 60%~75%;9.5mm, 25%~38%;1.18mm, 0~10%; 0.075mm, 0~3%.
Compared with prior art, red mud and red mud stabilization gravel Combined base pavement structure of the present utility model have with Under highlightedly beneficial effect:
(1) particular modification agent is added, the long-time stability of road can be effectively improved, reduce the contaminative of roadbed.Add After above-mentioned Special modifier, the detection Leaching of Heavy Metals concentration total mercury index of changed red mud indoor sample<0.001mg/L, six Valency chromium index<0.05mg/L, meet the class of underground water III control standard so that the pavement structure ensure red mud as roadbase with Underlayment can meet engineering objective requirement, and and can meets environmental requirement, realize minimizing, the recycling profit of industrial residue red mud With;
(2) red mud and red mud stabilization gravel Combined base structure improves sub-surface and the rigidity of underlayment is uniform Property, the diseases such as cracking, purt slurry are prevented, improve the structure service life of semi-rigid type base.
(3) pavement structure is combined using drainage crack resistance bituminous texture layer, prevents Pavement Structure Damage by Water, is extended Pavement structure overall structure service life.
Brief description of the drawings
Accompanying drawing 1 is red mud and red mud stabilization gravel Combined base pavement structure.
Embodiment
With reference to Figure of description with specific embodiment to red mud of the present utility model and red mud stabilization gravel Combined base Pavement structure is described in detail below.
【Embodiment】
As shown in Figure 1, the red mud of the present embodiment and red mud stabilization gravel Combined base pavement structure:4cmSMA-13 Asphalt 1+6cmAC-20 asphalt 2+12cm macrovoid drainage asphalt rubble 3+ heated bitumen crushed stone sealings 4+18cm Basic unit 5+18cm changed red mud stabilization gravels are gone to a grassroots level 6+20cm changed red mud underlayment 7+ soil matrixs on changed red mud stabilization gravel 8。
1st, changed red mud underlayment 7
Using red mud as main pavement material, using the mixture of ardealite, slag micropowder and cement as modifying agent.
It is 1.5 by mass ratio:22:75:After 500 ardealite, slag micropowder, cement, red mud are well mixed, in soil matrix 8 The upper laying (one layer of construction) for carrying out changed red mud underlayment 7.
2nd, changed red mud stabilized macadam base (go to a grassroots level basic unit on 6, changed red mud stabilization gravel by changed red mud stabilization gravel 5)
Standard size sieve aperture percentage, macadam gradating scope are passed through with each particle diameter mineral aggregate:
26.5mm 97%;19mm, 58%;9.5mm, 30%;4.75mm 17%;2.36mm 13%;0.6mm, 4%; 0.075mm, 3%.
Cementitious matter:Using red mud as major ingredient, mixed using the mixture of ardealite, slag micropowder and cement as modifying agent, Ardealite, slag micropowder, cement, red mud, the mass ratio of rubble are 0.4:6:60:120:940.
Changed red mud stabilized macadam base gross thickness is 36cm, point two layers of construction.
3rd, heated bitumen crushed stone sealing 4
Heated bitumen crushed stone sealing uses pitch PG grades as PG64-22.
4th, macrovoid drainage asphalt rubble 3
Pitch PG grade PG76-22, it is 1% lignin fibre that hot-mix asphalt mixture mixes mass percent outside;
It is 15% to design porosity;
It is by standard size sieve aperture percentage, the grading of rubble with each particle diameter mineral aggregate:
31.5mm 95%;19mm, 70%;9.5mm, 30%;1.18mm 5%;0.075mm, 2%.
5th, pitch cutting optimal 2
Using AC-20 compounds, pitch PG grades are PG64-22.
6th, asphalt uplayer 1
Using SMA-13 compounds, pitch PG grades are PG76-22.
【Experimental example】
Using roadbed red mud and the above-mentioned changed red mud underlayment added with modifying agent as experimental subjects, major project and environment Index contrasts:

Claims (6)

1. a kind of red mud and red mud stabilization gravel Combined base pavement structure, it is characterised in that:Including asphalt structure Layer, changed red mud stabilized macadam base, changed red mud underlayment, asphalt structure sheaf, changed red mud stabilized macadam base It is laid on from top to bottom on soil matrix with changed red mud underlayment.
2. red mud according to claim 1 and red mud stabilization gravel Combined base pavement structure, it is characterised in that:It is modified Thickness range 15cm~20cm of red mud underlayment.
3. red mud according to claim 1 and red mud stabilization gravel Combined base pavement structure, it is characterised in that:It is modified The thickness range of red mud stabilized macadam base is 30~40cm, point two layers of construction, thickness in monolayer scope 15cm~20cm.
4. red mud according to claim 1 and red mud stabilization gravel Combined base pavement structure, it is characterised in that:Pitch Mixture structure layer is made up of asphalt uplayer, pitch cutting optimal, macrovoid drainage asphalt metalling, heated bitumen crushed stone sealing, Asphalt structure sheaf by asphalt uplayer, pitch cutting optimal, macrovoid drainage asphalt metalling, heated bitumen crushed stone sealing from It is laid under above on changed red mud stabilized macadam base.
5. red mud according to claim 4 and red mud stabilization gravel Combined base pavement structure, it is characterised in that:Pitch Upper layer is SMA-13 or AC-13, uses pitch PG grades as PG76-22, thickness 3-5cm;
Pitch cutting optimal is AC-20, uses pitch PG grades as PG64-22 or PG76-22, thickness 5-7cm.
6. red mud according to claim 4 and red mud stabilization gravel Combined base pavement structure, it is characterised in that:Macropore Gap drainage asphalt metalling uses pitch PG grades as PG64-22 or PG76-22, and design porosity is 12%~16%, thickness For 10-20cm.
CN201720119853.6U 2017-02-09 2017-02-09 A kind of red mud and red mud stabilization gravel Combined base pavement structure Active CN206625101U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720119853.6U CN206625101U (en) 2017-02-09 2017-02-09 A kind of red mud and red mud stabilization gravel Combined base pavement structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720119853.6U CN206625101U (en) 2017-02-09 2017-02-09 A kind of red mud and red mud stabilization gravel Combined base pavement structure

Publications (1)

Publication Number Publication Date
CN206625101U true CN206625101U (en) 2017-11-10

Family

ID=60212830

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720119853.6U Active CN206625101U (en) 2017-02-09 2017-02-09 A kind of red mud and red mud stabilization gravel Combined base pavement structure

Country Status (1)

Country Link
CN (1) CN206625101U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106676999A (en) * 2017-02-09 2017-05-17 山东省交通科学研究院 Red mud and red mud stabilized macadam combined type base pavement structure
CN111153664A (en) * 2020-01-13 2020-05-15 北京工业大学 Road base material produced by stabilizing waste concrete building waste aggregate with lime red mud
CN114016342A (en) * 2021-09-24 2022-02-08 山东高速集团有限公司 Roadbed and pavement balance design method and structure

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106676999A (en) * 2017-02-09 2017-05-17 山东省交通科学研究院 Red mud and red mud stabilized macadam combined type base pavement structure
CN106676999B (en) * 2017-02-09 2022-06-14 山东省交通科学研究院 Red mud and broken stone combination formula basic unit road surface structure is stabilized to red mud
CN111153664A (en) * 2020-01-13 2020-05-15 北京工业大学 Road base material produced by stabilizing waste concrete building waste aggregate with lime red mud
CN111153664B (en) * 2020-01-13 2022-01-28 北京工业大学 Road base material produced by stabilizing waste concrete building waste aggregate with lime red mud
CN114016342A (en) * 2021-09-24 2022-02-08 山东高速集团有限公司 Roadbed and pavement balance design method and structure

Similar Documents

Publication Publication Date Title
CN106676999A (en) Red mud and red mud stabilized macadam combined type base pavement structure
Choudhary et al. Application of waste materials as fillers in bituminous mixes
CN206625101U (en) A kind of red mud and red mud stabilization gravel Combined base pavement structure
CN105645850A (en) Pavement quick-repair asphalt mixture, and preparation method and application method thereof
CN106587744B (en) A kind of CPC-AC composite pavement Fiber Asphalt Mixture and preparation method thereof
CN104652212B (en) A kind of Promotion Transformation method of Old cement concrete
CN106116395A (en) A kind of inorganic colloid methoder as road subbase course filler and compound method thereof
CN106676998B (en) Red mud basic unit cement concrete pavement composite pavement structure
Fatima et al. Use of ceramic waste as filler in semi-dense bituminous concrete
CN106630767A (en) MS-IV-type iron tailings micro-surfacing mixture and preparation method thereof
CN104692712A (en) Method for designing performance balance of high-viscosity and high-elasticity stress dissipation material
CN206858983U (en) A kind of low noise colour half-flexible pavement structure applied to dedicated bus lanes
CN208009180U (en) A kind of solidified slip soil and construction refuse regenerated grading are gathered materials the pavement structure of composition
CN203923902U (en) The double-deck SMA deck installation structure of a kind of flip-over type
CN113279302A (en) High-temperature-resistant track flexible base asphalt pavement structure suitable for low-traffic-volume road
CN108660889A (en) A kind of energy-saving environment protection asphalt pavement structure
CN206359847U (en) A kind of asphalt pavement structure of clinker silty filler
RU121515U1 (en) ROAD CLOTHING
CN205975254U (en) A durability road surface structure for road maintenance supertronic is handled
CN106676995B (en) A kind of deep formula asphalt pavement structure design method of Bayer process red mud roadbed
CN116655305A (en) Recycled aggregate composite stabilized soil and proportioning design method and manufacturing method thereof
CN204000529U (en) Engineering asphalt pavement structure
CN206625102U (en) A kind of deep formula asphalt pavement structure of Bayer process red mud roadbed
CN104310859B (en) The defining method of high glutinous high-elastic stress dissipation material medium pitch optimum amount
CN109338843A (en) A kind of gold tailings base underloading pavement of road paving structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant